ECWAY TECHNOLOGIES
IEEE PROJECTS & SOFTWARE DEVELOPMENTS
OUR OFFICES @ CHENNAI / TRICHY / KARUR / ERODE / MADURAI / SALEM / COIMBATORE
BANGALORE / HYDRABAD
CELL: +91 98949 17187, +91 875487 1111 / 2111 / 3111 / 4111 / 5111 / 6111 / 8111
Visit: www.ecwayprojects.com Mail to: ecwaytechnologies@gmail.com

2013 IEEE PROJECT .NET TITLES
DOMAIN: WIRELESS NETWORK PROJECTS
A Data Fusion Technique for Wireless Ranging Performance Improvement
Harvesting-Aware Energy Management for Time-Critical Wireless Sensor Networks With Joint Voltage and
Modulation Scaling
Importance of Coherence Protocols with Network Applications on Multicore Processors
Jamming Games in the MIMO Wiretap Channel With an Active Eavesdropper
Channel Allocation and Routing in Hybrid Multichannel Multiradio Wireless Mesh Networks
Modeling and Optimizing the Performance- Security Tradeoff on D-NCS Using the Coevolutionary Paradigm
Localization-Based Radio Model Calibration for Fault-Tolerant Wireless Mesh Networks

DOMAIN: MOBILE COMPUTING
Capacity of Hybrid Wireless Mesh Networks with Random APs
Power Allocation for Statistical QoS Provisioning in Opportunistic Multi-Relay DF Cognitive Networks
Delay-Optimal Broadcast for Multihop Wireless Networks Using Self-Interference Cancellation
Pulse Switching Toward a Packet-Less Protocol Paradigm for Event Sensing
Quality-Differentiated Video Multicast in Multirate Wireless Networks
Evaluating Temporal Robustness of Mobile Networks
SinkTrail A Proactive Data Reporting Protocol for Wireless Sensor Networks
Target Tracking and Mobile Sensor Navigation in Wireless Sensor Networks
A Resource Allocation Scheme for Scalable Video Multicast in WiMAX Relay Networks
Toward Privacy Preserving and Collusion Resistance in a Location Proof Updating System
SSD: A Robust RF Location Fingerprint Addressing Mobile Devices’ Heterogeneity
An Investigation on LTE Mobility Management
On Exploiting Transient Social Contact Patterns for Data Forwarding in Delay-Tolerant Networks
On the Real-Time Hardware Implementation Feasibility of Joint Radio Resource Management Policies for
Heterogeneous Wireless Networks
Simple Hybrid and Incremental Postpruning Techniques for Rule Induction
Supporting Search-As-You-Type Using SQL in Databases
Reinforced Similarity Integration in Image-Rich Information Networks
Autonomous Sensing Order Selection Strategies Exploiting Channel Access Information
Mobile Relay Configuration in Data-Intensive Wireless Sensor Networks
Toward a Statistical Framework for Source Anonymity in Sensor Networks
On Centralized and Localized Approximation Algorithms for Interference-Aware Broadcast Scheduling
Model-Based Analysis of Wireless System Architectures for Real-Time Applications
Successive Interference Cancellation: Carving Out MAC Layer Opportunities
Vampire Attacks: Draining Life from Wireless Ad Hoc Sensor Networks
Group-Based Medium Access Control for IEEE 802.11n Wireless LANs
Discovery and Verification of Neighbor Positions in Mobile Ad Hoc Networks
A Secure Payment Scheme with Low Communication and Processing Overhead for Multihop Wireless
Networks
A Scalable Server Architecture for Mobile Presence Services in Social Network Applications
Secure Communication Based on Ambient Audio
Successive Interference Cancellation: Carving Out MAC Layer Opportunities
Cross-Layer Design of Congestion Control and Power Control in Fast-Fading Wireless Networks
Coloring-Based Inter-WBAN Scheduling for Mobile Wireless Body Area Networks
Cluster-Based Certificate Revocation with Vindication Capability for Mobile Ad Hoc Networks
Analysis of Distance-Based Location Management in Wireless Communication Networks
Gaussian versus Uniform Distribution for Intrusion Detection in Wireless Sensor Networks
Fast Channel Zapping with Destination-Oriented Multicast for IP Video Delivery
Exploiting Ubiquitous Data Collection for Mobile Users in Wireless Sensor Networks
Dynamic Coverage of Mobile Sensor Networks
In-Network Estimation with Delay Constraints in Wireless Sensor Networks
Microarchitecture of a Coarse-Grain Out-of-Order Superscalar Processor
Jamming Games in the MIMO Wiretap Channel With an Active Eavesdropper
IDM: An Indirect Dissemination Mechanism for Spatial Voice Interaction in Networked Virtual Environments
EMAP Expedite Message Authentication Protocol for Vehicular Ad Hoc Networks
Channel Assignment for Throughput Optimization in Multichannel Multiradio Wireless Mesh Networks Using
Network Coding
Receiver-Driven Adaptive Enhancement Layer Switching Algorithm for Scalable Video Transmission Over
Link-adaptive Networks

DOMAIN: NETWORK SECURITY PROJECTS
Distance Bounding A Practical Security Solution for Real-Time Location Systems
EAACK—A Secure Intrusion-Detection System for MANETs
Security Analysis of a Single Sign-On Mechanism for Distributed Computer Networks

DOMAIN: DATA MINING (Data Engineering)
Ontology Matching: State of the Art and Future Challenges
A Fast Clustering-Based Feature Subset Selection Algorithm for High-Dimensional Data
A System to Filter Unwanted Messages from OSN User Walls
A Survey of XML Tree Patterns
Automatic Semantic Content Extraction in Videos Using a Fuzzy Ontology and Rule-Based Model
Distributed Processing of Probabilistic Top-k Queries in Wireless Sensor Networks
Distributed Web Systems Performance Forecasting Using Turning Bands Method
Evaluating Data Reliability An Evidential Answer with Application to a Web-Enabled Data Warehouse
Maximum Likelihood Estimation from Uncertain Data in the Belief Function Framework
Ranking on Data Manifold with Sink Points
Region-Based Foldings in Process Discovery
Relationships between Diversity of Classification Ensembles and Single-Class Performance Measures
T-Drive Enhancing Driving Directions with Taxi Drivers’ Intelligence
The Generalization Ability of Online Algorithms for Dependent Data
Clustering Sentence-Level Text Using a Novel Fuzzy Relational Clustering Algorithm
A Graph-Based Consensus Maximization Approach for Combining Multiple Supervised and Unsupervised
Models
Large Graph Analysis in the GMine System
Nonadaptive Mastermind Algorithms for String and Vector Databases, with Case Studies
A Rough-Set-Based Incremental Approach for Updating Approximations under Dynamic Maintenance
Environments
A Proxy-Based Approach to Continuous Location-Based Spatial Queries in Mobile Environments
A Generalized Flow-Based Method for Analysis of Implicit Relationships on Wikipedia
AML: Efficient Approximate Membership Localization within a Web-Based Join Framework
Event Tracking for Real-Time Unaware Sensitivity Analysis
Detecting Intrinsic Loops Underlying Data Manifold
Clustering Large Probabilistic Graphs
Anonymization of Centralized and Distributed Social Networks by Sequential Clustering
Minimally Supervised Novel Relation Extraction Using a Latent Relational Mapping
Finding Rare Classes: Active Learning with Generative and Discriminative Models
Fast Activity Detection: Indexing for Temporal Stochastic Automaton-Based Activity Models

DOMAIN: CLOUD COMPUTING
QoS Ranking Prediction for Cloud Services
Scalable and Secure Sharing of Personal Health Records in Cloud Computing Using Attribute-Based
Encryption
Mona: Secure Multi-Owner Data Sharing for Dynamic Groups in the Cloud
On Data Staging Algorithms for Shared Data Accesses in Clouds
Optimal Multiserver Configuration for Profit Maximization in Cloud Computing

DOMAIN: PARALLEL & DISTRIBUTED COMPUTING
Network Traffic Classification Using Correlation Information
Scalable and Secure Sharing of Personal Health Records in Cloud Computing Using Attribute-Based
Encryption
Adaptive Network Coding for Broadband Wireless Access Networks
Detection and Localization of Multiple Spoofing Attackers in Wireless Networks
Online Real-Time Task Scheduling in Heterogeneous Multicore System-on-a-Chip
MIN-MAX: A Counter-Based Algorithm for Regular Expression Matching
Binary Tree Slotted ALOHA for Passive RFID Tag Anticollision
Covering Points of Interest with Mobile Sensors
Topology Abstraction Service for IP-VPNs
Thermal and Energy Management of High-Performance Multicores: Distributed and Self-Calibrating ModelPredictive Controller
High Performance Resource Allocation Strategies for Computational Economies
Strategies for Energy-Efficient Resource Management of Hybrid Programming Models

DOMAIN: MULTIMEDIA & IMAGE PROCESSING
Mining Semantic Context Information for Intelligent Video Surveillance of Traffic Scenes
An Access Point-Based FEC Mechanism for Video Transmission Over Wireless LANs
Interactive Segmentation for Change Detection in Multispectral Remote-Sensing Images
Reversible Data Hiding With Optimal Value Transfer
Query-Adaptive Image Search With Hash Codes
Reversible Watermarking Based on Invariant Image Classification and Dynamic Histogram Shifting
Noise Reduction Based on Partial-Reference, Dual-Tree Complex Wavelet Transform Shrinkage
LDFT-Based Watermarking Resilient to Local Desynchronization Attacks
Image Size Invariant Visual Cryptography for General Access Structures Subject to Display Quality
Constraints
Secure Watermarking for Multimedia Content Protection: A Review of its Benefits and Open Issues
Robust Face Recognition for Uncontrolled Pose and Illumination Changes

2013 ieee project dotnet titles

  • 1.
    ECWAY TECHNOLOGIES IEEE PROJECTS& SOFTWARE DEVELOPMENTS OUR OFFICES @ CHENNAI / TRICHY / KARUR / ERODE / MADURAI / SALEM / COIMBATORE BANGALORE / HYDRABAD CELL: +91 98949 17187, +91 875487 1111 / 2111 / 3111 / 4111 / 5111 / 6111 / 8111 Visit: www.ecwayprojects.com Mail to: ecwaytechnologies@gmail.com 2013 IEEE PROJECT .NET TITLES DOMAIN: WIRELESS NETWORK PROJECTS A Data Fusion Technique for Wireless Ranging Performance Improvement Harvesting-Aware Energy Management for Time-Critical Wireless Sensor Networks With Joint Voltage and Modulation Scaling Importance of Coherence Protocols with Network Applications on Multicore Processors Jamming Games in the MIMO Wiretap Channel With an Active Eavesdropper Channel Allocation and Routing in Hybrid Multichannel Multiradio Wireless Mesh Networks Modeling and Optimizing the Performance- Security Tradeoff on D-NCS Using the Coevolutionary Paradigm Localization-Based Radio Model Calibration for Fault-Tolerant Wireless Mesh Networks DOMAIN: MOBILE COMPUTING Capacity of Hybrid Wireless Mesh Networks with Random APs Power Allocation for Statistical QoS Provisioning in Opportunistic Multi-Relay DF Cognitive Networks Delay-Optimal Broadcast for Multihop Wireless Networks Using Self-Interference Cancellation Pulse Switching Toward a Packet-Less Protocol Paradigm for Event Sensing Quality-Differentiated Video Multicast in Multirate Wireless Networks
  • 2.
    Evaluating Temporal Robustnessof Mobile Networks SinkTrail A Proactive Data Reporting Protocol for Wireless Sensor Networks Target Tracking and Mobile Sensor Navigation in Wireless Sensor Networks A Resource Allocation Scheme for Scalable Video Multicast in WiMAX Relay Networks Toward Privacy Preserving and Collusion Resistance in a Location Proof Updating System SSD: A Robust RF Location Fingerprint Addressing Mobile Devices’ Heterogeneity An Investigation on LTE Mobility Management On Exploiting Transient Social Contact Patterns for Data Forwarding in Delay-Tolerant Networks On the Real-Time Hardware Implementation Feasibility of Joint Radio Resource Management Policies for Heterogeneous Wireless Networks Simple Hybrid and Incremental Postpruning Techniques for Rule Induction Supporting Search-As-You-Type Using SQL in Databases Reinforced Similarity Integration in Image-Rich Information Networks Autonomous Sensing Order Selection Strategies Exploiting Channel Access Information Mobile Relay Configuration in Data-Intensive Wireless Sensor Networks Toward a Statistical Framework for Source Anonymity in Sensor Networks On Centralized and Localized Approximation Algorithms for Interference-Aware Broadcast Scheduling Model-Based Analysis of Wireless System Architectures for Real-Time Applications Successive Interference Cancellation: Carving Out MAC Layer Opportunities Vampire Attacks: Draining Life from Wireless Ad Hoc Sensor Networks Group-Based Medium Access Control for IEEE 802.11n Wireless LANs Discovery and Verification of Neighbor Positions in Mobile Ad Hoc Networks A Secure Payment Scheme with Low Communication and Processing Overhead for Multihop Wireless Networks
  • 3.
    A Scalable ServerArchitecture for Mobile Presence Services in Social Network Applications Secure Communication Based on Ambient Audio Successive Interference Cancellation: Carving Out MAC Layer Opportunities Cross-Layer Design of Congestion Control and Power Control in Fast-Fading Wireless Networks Coloring-Based Inter-WBAN Scheduling for Mobile Wireless Body Area Networks Cluster-Based Certificate Revocation with Vindication Capability for Mobile Ad Hoc Networks Analysis of Distance-Based Location Management in Wireless Communication Networks Gaussian versus Uniform Distribution for Intrusion Detection in Wireless Sensor Networks Fast Channel Zapping with Destination-Oriented Multicast for IP Video Delivery Exploiting Ubiquitous Data Collection for Mobile Users in Wireless Sensor Networks Dynamic Coverage of Mobile Sensor Networks In-Network Estimation with Delay Constraints in Wireless Sensor Networks Microarchitecture of a Coarse-Grain Out-of-Order Superscalar Processor Jamming Games in the MIMO Wiretap Channel With an Active Eavesdropper IDM: An Indirect Dissemination Mechanism for Spatial Voice Interaction in Networked Virtual Environments EMAP Expedite Message Authentication Protocol for Vehicular Ad Hoc Networks Channel Assignment for Throughput Optimization in Multichannel Multiradio Wireless Mesh Networks Using Network Coding Receiver-Driven Adaptive Enhancement Layer Switching Algorithm for Scalable Video Transmission Over Link-adaptive Networks DOMAIN: NETWORK SECURITY PROJECTS Distance Bounding A Practical Security Solution for Real-Time Location Systems EAACK—A Secure Intrusion-Detection System for MANETs
  • 4.
    Security Analysis ofa Single Sign-On Mechanism for Distributed Computer Networks DOMAIN: DATA MINING (Data Engineering) Ontology Matching: State of the Art and Future Challenges A Fast Clustering-Based Feature Subset Selection Algorithm for High-Dimensional Data A System to Filter Unwanted Messages from OSN User Walls A Survey of XML Tree Patterns Automatic Semantic Content Extraction in Videos Using a Fuzzy Ontology and Rule-Based Model Distributed Processing of Probabilistic Top-k Queries in Wireless Sensor Networks Distributed Web Systems Performance Forecasting Using Turning Bands Method Evaluating Data Reliability An Evidential Answer with Application to a Web-Enabled Data Warehouse Maximum Likelihood Estimation from Uncertain Data in the Belief Function Framework Ranking on Data Manifold with Sink Points Region-Based Foldings in Process Discovery Relationships between Diversity of Classification Ensembles and Single-Class Performance Measures T-Drive Enhancing Driving Directions with Taxi Drivers’ Intelligence The Generalization Ability of Online Algorithms for Dependent Data Clustering Sentence-Level Text Using a Novel Fuzzy Relational Clustering Algorithm A Graph-Based Consensus Maximization Approach for Combining Multiple Supervised and Unsupervised Models Large Graph Analysis in the GMine System Nonadaptive Mastermind Algorithms for String and Vector Databases, with Case Studies A Rough-Set-Based Incremental Approach for Updating Approximations under Dynamic Maintenance Environments
  • 5.
    A Proxy-Based Approachto Continuous Location-Based Spatial Queries in Mobile Environments A Generalized Flow-Based Method for Analysis of Implicit Relationships on Wikipedia AML: Efficient Approximate Membership Localization within a Web-Based Join Framework Event Tracking for Real-Time Unaware Sensitivity Analysis Detecting Intrinsic Loops Underlying Data Manifold Clustering Large Probabilistic Graphs Anonymization of Centralized and Distributed Social Networks by Sequential Clustering Minimally Supervised Novel Relation Extraction Using a Latent Relational Mapping Finding Rare Classes: Active Learning with Generative and Discriminative Models Fast Activity Detection: Indexing for Temporal Stochastic Automaton-Based Activity Models DOMAIN: CLOUD COMPUTING QoS Ranking Prediction for Cloud Services Scalable and Secure Sharing of Personal Health Records in Cloud Computing Using Attribute-Based Encryption Mona: Secure Multi-Owner Data Sharing for Dynamic Groups in the Cloud On Data Staging Algorithms for Shared Data Accesses in Clouds Optimal Multiserver Configuration for Profit Maximization in Cloud Computing DOMAIN: PARALLEL & DISTRIBUTED COMPUTING Network Traffic Classification Using Correlation Information Scalable and Secure Sharing of Personal Health Records in Cloud Computing Using Attribute-Based Encryption Adaptive Network Coding for Broadband Wireless Access Networks Detection and Localization of Multiple Spoofing Attackers in Wireless Networks
  • 6.
    Online Real-Time TaskScheduling in Heterogeneous Multicore System-on-a-Chip MIN-MAX: A Counter-Based Algorithm for Regular Expression Matching Binary Tree Slotted ALOHA for Passive RFID Tag Anticollision Covering Points of Interest with Mobile Sensors Topology Abstraction Service for IP-VPNs Thermal and Energy Management of High-Performance Multicores: Distributed and Self-Calibrating ModelPredictive Controller High Performance Resource Allocation Strategies for Computational Economies Strategies for Energy-Efficient Resource Management of Hybrid Programming Models DOMAIN: MULTIMEDIA & IMAGE PROCESSING Mining Semantic Context Information for Intelligent Video Surveillance of Traffic Scenes An Access Point-Based FEC Mechanism for Video Transmission Over Wireless LANs Interactive Segmentation for Change Detection in Multispectral Remote-Sensing Images Reversible Data Hiding With Optimal Value Transfer Query-Adaptive Image Search With Hash Codes Reversible Watermarking Based on Invariant Image Classification and Dynamic Histogram Shifting Noise Reduction Based on Partial-Reference, Dual-Tree Complex Wavelet Transform Shrinkage LDFT-Based Watermarking Resilient to Local Desynchronization Attacks Image Size Invariant Visual Cryptography for General Access Structures Subject to Display Quality Constraints Secure Watermarking for Multimedia Content Protection: A Review of its Benefits and Open Issues Robust Face Recognition for Uncontrolled Pose and Illumination Changes