CGSPremier.com

                 Mobile Marketing build-outs
                             digital printing
                          specialty Vehicles    big ideas. on time. on budget.
CapaCity
                  23,000 sq. ft. Facility (Expanding to 40,000 sq. ft. in ‘09)
                  6 Full Service Production Bays That Accommodate 53’ Trailers (Expanding to 10 in ‘09)

                  MOBiLE MaRKEtiNG BUiLD-OUtS
                  Trailers: 53’, Expandable, Cargo, Gooseneck, Flatbed & Stage Trailers
                  Box Trucks, Vans, Autos, SUV’s Motor Coaches, Buses & RV’s
                  Vehicle Customization
The CGS Premier   Mobile Exhibits


    Advantage
                  Interactive Kiosks and Displays
                  Event Elements
                  Mall Tours

                  DiGitaL pRiNtiNG
                  High Definition Digital Printing
                  Nationwide Graphic Application
                  3M Scotchprint Certified
                  2 Shift Production
                  Computer-Cut Vinyl
                  Latest Color Management Software
                  Show Quality Vehicle Wraps

                  SpECiaLty VEHiCLES
                  Business-to-Business Road Shows
                  Mobile Repair Centers
                  Catastrophe Response
                  Mobile Showrooms
                  Mobile Training Centers
                  Mobile Kitchens

                  pRODUCtiON
                  Complete Wood/Metal Fabrication
                  Electrical/Plumbing
                  Audio/Video Systems
                  Trailer/Equipment Service & Maintenance
                  SolidWorks 3D CAD Design Software
ExpERiENCE
                  Established in 1993, our team of 30 employees includes account managers (with national account
                  service experience) and highly skilled fabricators all qualified to handle a diverse range of projects–
                  large or small. Our production and engineering experts average 23+ years of industry experience.

                  QUaLity
                  We take great pride in the quality of projects that we produce. With our added production capacity we
The CGS Premier   are now able to take even further steps to ensure each project we produce is of the highest quality.


    Advantage     SERViCE
                  Service beyond what is expected is part of our daily objective. Our Account Executives personally
                  send digital pictures of progress made each day during the build process, and give updates via
                  emailed project spreadsheets or phone conversations.

                  pRODUCtiON
                  We have recently increased our production through-put by purchasing additional equipment in our
                  Fabrication and Printing departments. We have also added experienced employees in both areas.
                  We have two shifts in our printing department to handle large jobs with fast turnarounds.

                  pROjECt pLaNNiNG
                  We take proper steps in planning to ensure each project is a success before we even begin the
                  production process.

                  pROOfiNG
                  We make sure to allow for extra days in the production schedule to ensure we have enough time
                  to print proofs on the actual material, and send out for approval.

                  ON tiME. ON BUDGEt.
                  Our Account Executives personally guide each project through the shop to ensure that it’s completed
                  on time and on budget. If any changes or alterations take place during the production process, we
                  will make sure we have a signed Change Order before proceeding.

                  StRENGtH Of CGS pREMiER
                  Even during slow economic times we are continuing to grow. We have been fiscally responsible and we
                  will be here to service you long after your project leaves our shop. We will be adding 14,000 square feet
                  to our facility in 2009, bringing our total square footage to just under 40,000 square feet.
mobile wellness tours




» Wellness health screening tour - 10 coaches,         » Interior / Exterior A/V systems, custom awning,
  multi-year program                                     table covers, plumbing, electrical, flooring
» Custom interior build with waiting area, health      » HD Digital 3M Scotchprint graphic wrap
  screening pods, event site elements, tents




                                                                                                                      CGSPremier.com
            big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
mobile mArKetinG ProGrAms




» 53’ semi trailer used for fashion shows              » Custom elements include roof marquee,
                                                         TV stands, and awning
» Fold-down stage and portable staging used
  for runway                                           » HD Digital 3M Scotchprint graphic wrap




                                                                                                                       CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
suV builD-outs




» 13 Hummers, 26 FJ Cruisers, 8 Avalanches.           » All electronics powered by self contained battery
  Multi-year program.                                   system with inverter. No generator needed.
» Complete A/V systems and custom                     » HD Digital 3M Scotchprint graphic wraps
  phone displays




                                                                                                                  CGSPremier.com
          big ideas. on time. on budget.   Mobile Marketing build-outs    digital printing   specialty Vehicles
mobile sAmPlinG ProGrAms




» 38' gooseneck used for cooking demonstrations       » Event site elements including tents,
  and sampling                                          kiosks, and games
» Fold-down stage, awning, and roof-top inflatable » HD Digital 3M Scotchprint graphic wrap




                                                                                                                         CGSPremier.com
          big ideas. on time. on budget.   Mobile Marketing build-outs    digital printing     specialty Vehicles
mobile DisPlAY




» Three Sprinter vans built-out to show capabilities » All electronics powered by self contained battery
  of Verizon FiOS high speed service                   system with inverter. No generator needed.
» Two 46" LCD's, BluRay players, Playstation 3,        » Interior of Sprinter built-out for storage of
  PA system with wireless mic installed                  tent and kiosks




                                                                                                                     CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs     digital printing    specialty Vehicles
bumPer Pull trAilers




» GEICO - College Football Tour with truss              » Gillette Fusion - Used as mobile
  display, TV's mounted on trailer sides,                 product sampling vehicle, providing
  event site elements                                     shaving demonstrations
» Jose Cuervo - Used primarily as storage               » Listerine - Used as a product sampling vehicle,
  for premiums as part of a nationwide                    with portable sinks and displays built inside
  nightclub program




                                                                                                                        CGSPremier.com
           big ideas. on time. on budget.    Mobile Marketing build-outs   digital printing     specialty Vehicles
sPeCiAltY VeHiCles




» Transform virtually any vehicle into a               » Integrity Windows - 38' gooseneck with
  mobile showroom, product showcase,                     complete interior build-out used as
  demonstration vehicle                                  product showcase
» WAGO - 18' cut-away van used as                      » Servomex - 16' cut-away van with interior
  mobile showroom, taken to distibutors                  build-out used as a mobile product
  nationwide. 2 Vehicles.                                demonstration vehicle.




                                                                                                                   CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
mobile eVent site




» Aluminum truss event site, welded and               » Features LED lighting, and easy to change
  powder coated                                         graphics and plexi panels
» Easy to set-up and change configurations            » Packs into tow-behind trailer
  without the use of tools




                                                                                                                  CGSPremier.com
          big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
Green




» 180 Green Projects to date                            » Alternative fuels such as biodiesel, E85 and propane
» Battery powered A/V and lighting systems,             » Recycled and recycle-able building materials such
  solar power, hybrid vehicles, electric vehicles         as flooring, aluminum, and biodegradable printing
                                                          substrates




                                                                                                                    CGSPremier.com
     big ideas. on time. on budget.       Mobile Marketing build-outs     digital printing     specialty Vehicles
mobile eVent ProGrAms




» Fully customized 38' motor coach that travels to     » Two video confessional booths and two
  retailers, special events, and Wynonna concerts        wall mounted touch screens
» Complete interior build-out including custom         » Full wrap exterior, interior graphics, and die-cut
  couch, flooring, and wall treatments                   marquee using 3M Scotchprint HD Digital Graphics




                                                                                                                     CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
mobile mArKetinG ProGrAms




» 53' trailer with custom build-out                    » Custom offboard interactive elements
» HD theater inside and outside the trailer, plus      » Consumer Electronics Show displays and graphics
  video game and laptop stations




                                                                                                                       CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
mobile mArKetinG eVent site




» 38' gooseneck trailer and dually fully built-out     » Large windows on both sides of
  for NASCAR events, leased by CGS Premier               trailer for public to view
» Built-in home theater and gaming area                » Mobile gaming stations for positioning at event site




                                                                                                                         CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs    digital printing   specialty Vehicles
worKHorse VAn builD-outs




» Transform a Workhorse Van into a mobile              » Pittsburgh Pirates - A/V system built into
  gaming unit, product showcase, or                      side of vehicle with weather-proof doors
  seasonal event program
                                                       » MasterCard - Mobile gift wrapping stations
» Army - Mobile interactive gaming vehicle               used for Christmas promotion outside retailers
  for multicultural national tour




                                                                                                                        CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs    digital printing   specialty Vehicles
mobile sAmPlinG ProGrAms




» Custom build-out of Sprinter sampling vehicle        » Custom awning, fencing, and exterior signage
» Vending windows, refrigerator, sink, generator,      » HD Digital 3M Scotchprint graphic wrap
  A/C unit, and blenders installed




                                                                                                                       CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
motor Coach, rV, and bus build-outs




» Transform a Motor Coach, RV, or Double Decker        » Trojan - 40' Motor Coach with custom couch, touch
  Bus into a mobile marketing experience with big        screen displays, and video confessionals
  impact
                                                       » Harry Potter - Double Decker Bus transformed into
» 9 Lives - 38' RV totally built-out as a mobile cat     the Knight Bus for nationwide book launch
  adoption vehicle with complete event site




                                                                                                                          CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
mAll tours




» Verizon Blackberry Storm launch - truss              » Game Show Network - Custom stage, podiums
  TV stands and phone displays                           and signage
» Nokia Ngage launch - gaming stations and             » Wii Music - Gaming systems built into road cases
  event site elements




                                                                                                                  CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
suV builD-outs




» Alltel Mini Cooper - Dimensional phones              » Playstation Escalade - A/V System and Playstation
  fabricated and mounted to roof                         gaming system built into rear
» DirecTV Hummer - A/V System and DirecTV              » Allstate Yukon - A/V System, DirecTV, and gaming
  built into rear                                        system built into rear.




                                                                                                                  CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
eVent site elements




» Custom fabricated kiosks and displays for            » Most event site elements constructed of aluminum,
  event, retail, and trade show use                      with options for powder coating or metal laminates
» Touch screen interactive, data capture, ticket       » Lightweight, easy to set-up, and durable
  printing, video game kiosks, product display




                                                                                                                    CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
DiGitAl PrintinG




» High Definition Digital Printing up to 1440dpi       » Applications include vehicle wraps, wall
                                                         murals, banners, event signage, indoor and
» Materials include 3M Scotchprint adhesive              outdoor options
  backed vinyl, banner vinyl, fabrics, backlit,
  biodegradable banner vinyl, clear film,              » 2 shift production in our printing department
  mesh, paper, and polycarbonate                         makes for faster turnaround times and
                                                         better throughput




                                                                                                                   CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs    digital printing   specialty Vehicles
leAsinG oPtions




» CGS Premier offers leasing options from virtually    » Long or Short Term Leasing availble for single
  any vehicle from a 53' Double Expandable Semi          or multiple vehicles
  Trailer to a Smart Car
                                                       » In most cases, modifications can be made
» Network of both new and used vehicles                  to leased vehicles such as build-outs and
  available for immediate use                            graphic wraps




                                                                                                                  CGSPremier.com
           big ideas. on time. on budget.   Mobile Marketing build-outs   digital printing   specialty Vehicles
big ideas. on time. on budget.

     Mobile Marketing build-outs           digital printing            specialty Vehicles




5786 South Westridge Drive | New Berlin, WI 53151 | Phone (262) 641-7414 | Fax (262) 641-7420
                                     CGSPremier.com

2009 Cgs Premier Deck

  • 1.
    CGSPremier.com Mobile Marketing build-outs digital printing specialty Vehicles big ideas. on time. on budget.
  • 2.
    CapaCity 23,000 sq. ft. Facility (Expanding to 40,000 sq. ft. in ‘09) 6 Full Service Production Bays That Accommodate 53’ Trailers (Expanding to 10 in ‘09) MOBiLE MaRKEtiNG BUiLD-OUtS Trailers: 53’, Expandable, Cargo, Gooseneck, Flatbed & Stage Trailers Box Trucks, Vans, Autos, SUV’s Motor Coaches, Buses & RV’s Vehicle Customization The CGS Premier Mobile Exhibits Advantage Interactive Kiosks and Displays Event Elements Mall Tours DiGitaL pRiNtiNG High Definition Digital Printing Nationwide Graphic Application 3M Scotchprint Certified 2 Shift Production Computer-Cut Vinyl Latest Color Management Software Show Quality Vehicle Wraps SpECiaLty VEHiCLES Business-to-Business Road Shows Mobile Repair Centers Catastrophe Response Mobile Showrooms Mobile Training Centers Mobile Kitchens pRODUCtiON Complete Wood/Metal Fabrication Electrical/Plumbing Audio/Video Systems Trailer/Equipment Service & Maintenance SolidWorks 3D CAD Design Software
  • 3.
    ExpERiENCE Established in 1993, our team of 30 employees includes account managers (with national account service experience) and highly skilled fabricators all qualified to handle a diverse range of projects– large or small. Our production and engineering experts average 23+ years of industry experience. QUaLity We take great pride in the quality of projects that we produce. With our added production capacity we The CGS Premier are now able to take even further steps to ensure each project we produce is of the highest quality. Advantage SERViCE Service beyond what is expected is part of our daily objective. Our Account Executives personally send digital pictures of progress made each day during the build process, and give updates via emailed project spreadsheets or phone conversations. pRODUCtiON We have recently increased our production through-put by purchasing additional equipment in our Fabrication and Printing departments. We have also added experienced employees in both areas. We have two shifts in our printing department to handle large jobs with fast turnarounds. pROjECt pLaNNiNG We take proper steps in planning to ensure each project is a success before we even begin the production process. pROOfiNG We make sure to allow for extra days in the production schedule to ensure we have enough time to print proofs on the actual material, and send out for approval. ON tiME. ON BUDGEt. Our Account Executives personally guide each project through the shop to ensure that it’s completed on time and on budget. If any changes or alterations take place during the production process, we will make sure we have a signed Change Order before proceeding. StRENGtH Of CGS pREMiER Even during slow economic times we are continuing to grow. We have been fiscally responsible and we will be here to service you long after your project leaves our shop. We will be adding 14,000 square feet to our facility in 2009, bringing our total square footage to just under 40,000 square feet.
  • 4.
    mobile wellness tours »Wellness health screening tour - 10 coaches, » Interior / Exterior A/V systems, custom awning, multi-year program table covers, plumbing, electrical, flooring » Custom interior build with waiting area, health » HD Digital 3M Scotchprint graphic wrap screening pods, event site elements, tents CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 5.
    mobile mArKetinG ProGrAms »53’ semi trailer used for fashion shows » Custom elements include roof marquee, TV stands, and awning » Fold-down stage and portable staging used for runway » HD Digital 3M Scotchprint graphic wrap CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 6.
    suV builD-outs » 13Hummers, 26 FJ Cruisers, 8 Avalanches. » All electronics powered by self contained battery Multi-year program. system with inverter. No generator needed. » Complete A/V systems and custom » HD Digital 3M Scotchprint graphic wraps phone displays CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 7.
    mobile sAmPlinG ProGrAms »38' gooseneck used for cooking demonstrations » Event site elements including tents, and sampling kiosks, and games » Fold-down stage, awning, and roof-top inflatable » HD Digital 3M Scotchprint graphic wrap CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 8.
    mobile DisPlAY » ThreeSprinter vans built-out to show capabilities » All electronics powered by self contained battery of Verizon FiOS high speed service system with inverter. No generator needed. » Two 46" LCD's, BluRay players, Playstation 3, » Interior of Sprinter built-out for storage of PA system with wireless mic installed tent and kiosks CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 9.
    bumPer Pull trAilers »GEICO - College Football Tour with truss » Gillette Fusion - Used as mobile display, TV's mounted on trailer sides, product sampling vehicle, providing event site elements shaving demonstrations » Jose Cuervo - Used primarily as storage » Listerine - Used as a product sampling vehicle, for premiums as part of a nationwide with portable sinks and displays built inside nightclub program CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 10.
    sPeCiAltY VeHiCles » Transformvirtually any vehicle into a » Integrity Windows - 38' gooseneck with mobile showroom, product showcase, complete interior build-out used as demonstration vehicle product showcase » WAGO - 18' cut-away van used as » Servomex - 16' cut-away van with interior mobile showroom, taken to distibutors build-out used as a mobile product nationwide. 2 Vehicles. demonstration vehicle. CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 11.
    mobile eVent site »Aluminum truss event site, welded and » Features LED lighting, and easy to change powder coated graphics and plexi panels » Easy to set-up and change configurations » Packs into tow-behind trailer without the use of tools CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 12.
    Green » 180 GreenProjects to date » Alternative fuels such as biodiesel, E85 and propane » Battery powered A/V and lighting systems, » Recycled and recycle-able building materials such solar power, hybrid vehicles, electric vehicles as flooring, aluminum, and biodegradable printing substrates CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 13.
    mobile eVent ProGrAms »Fully customized 38' motor coach that travels to » Two video confessional booths and two retailers, special events, and Wynonna concerts wall mounted touch screens » Complete interior build-out including custom » Full wrap exterior, interior graphics, and die-cut couch, flooring, and wall treatments marquee using 3M Scotchprint HD Digital Graphics CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 14.
    mobile mArKetinG ProGrAms »53' trailer with custom build-out » Custom offboard interactive elements » HD theater inside and outside the trailer, plus » Consumer Electronics Show displays and graphics video game and laptop stations CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 15.
    mobile mArKetinG eVentsite » 38' gooseneck trailer and dually fully built-out » Large windows on both sides of for NASCAR events, leased by CGS Premier trailer for public to view » Built-in home theater and gaming area » Mobile gaming stations for positioning at event site CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 16.
    worKHorse VAn builD-outs »Transform a Workhorse Van into a mobile » Pittsburgh Pirates - A/V system built into gaming unit, product showcase, or side of vehicle with weather-proof doors seasonal event program » MasterCard - Mobile gift wrapping stations » Army - Mobile interactive gaming vehicle used for Christmas promotion outside retailers for multicultural national tour CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 17.
    mobile sAmPlinG ProGrAms »Custom build-out of Sprinter sampling vehicle » Custom awning, fencing, and exterior signage » Vending windows, refrigerator, sink, generator, » HD Digital 3M Scotchprint graphic wrap A/C unit, and blenders installed CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 18.
    motor Coach, rV,and bus build-outs » Transform a Motor Coach, RV, or Double Decker » Trojan - 40' Motor Coach with custom couch, touch Bus into a mobile marketing experience with big screen displays, and video confessionals impact » Harry Potter - Double Decker Bus transformed into » 9 Lives - 38' RV totally built-out as a mobile cat the Knight Bus for nationwide book launch adoption vehicle with complete event site CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 19.
    mAll tours » VerizonBlackberry Storm launch - truss » Game Show Network - Custom stage, podiums TV stands and phone displays and signage » Nokia Ngage launch - gaming stations and » Wii Music - Gaming systems built into road cases event site elements CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 20.
    suV builD-outs » AlltelMini Cooper - Dimensional phones » Playstation Escalade - A/V System and Playstation fabricated and mounted to roof gaming system built into rear » DirecTV Hummer - A/V System and DirecTV » Allstate Yukon - A/V System, DirecTV, and gaming built into rear system built into rear. CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 21.
    eVent site elements »Custom fabricated kiosks and displays for » Most event site elements constructed of aluminum, event, retail, and trade show use with options for powder coating or metal laminates » Touch screen interactive, data capture, ticket » Lightweight, easy to set-up, and durable printing, video game kiosks, product display CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 22.
    DiGitAl PrintinG » HighDefinition Digital Printing up to 1440dpi » Applications include vehicle wraps, wall murals, banners, event signage, indoor and » Materials include 3M Scotchprint adhesive outdoor options backed vinyl, banner vinyl, fabrics, backlit, biodegradable banner vinyl, clear film, » 2 shift production in our printing department mesh, paper, and polycarbonate makes for faster turnaround times and better throughput CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 23.
    leAsinG oPtions » CGSPremier offers leasing options from virtually » Long or Short Term Leasing availble for single any vehicle from a 53' Double Expandable Semi or multiple vehicles Trailer to a Smart Car » In most cases, modifications can be made » Network of both new and used vehicles to leased vehicles such as build-outs and available for immediate use graphic wraps CGSPremier.com big ideas. on time. on budget. Mobile Marketing build-outs digital printing specialty Vehicles
  • 24.
    big ideas. ontime. on budget. Mobile Marketing build-outs digital printing specialty Vehicles 5786 South Westridge Drive | New Berlin, WI 53151 | Phone (262) 641-7414 | Fax (262) 641-7420 CGSPremier.com