Clearly defined requirementsare the key to project
success.
68% of projects with effective communication, and precise
requirements, are likely to deliver project scope and meet
quality standards successfully.
At the same time, 32% of IT projects failed due to sparse
estimation during the planning phase and unclear
requirements.
Besides, unclear requirements
increase the project timeline and budget up to 60%.
Also, unclear requirements consume over
41% of the IT development budget for software, staff, and
external professional services.
4.
1. describe howa system should act, appear or perform.
2. condition or capability possessed by the software or system
component
3. differ from one user to another and differs from one business
process to another.
4. description of features and functionalities of the target system.
5. convey the expectations of users from the software product
6. can be obvious or hidden, known or unknown, expected or
unexpected
What is Software Requirement?
5.
IEEE defines requirementas
(1) A condition or capability needed by a user to solve a problem
or achieve an objective.
(2) A condition or capability that must be met or possessed by a
system or system component to satisfy a contract, standard,
specification, or other formally imposed documents.
(3) A documented representation of a condition or capability as in
(1) or (2).
6.
Characteristics of Requirements
•Solutionindependent. This means that requirements should not specify a
solution to the problem; they should specify what needs to be done, but not
how it will be done.
•Complete. Requirements must cover all areas of concern, including all phases
of the product life cycle.
•Clear. Requirements should not leave anyone guessing what is required.
•Concise. Unnecessary requirements should be omitted, and the wording of
requirements should be concise.
•Testable. Testable requirements can be measured in order to determine if the
design goal is met.
•Traceable. It should be possible to trace a requirement back to the rationale
from which it was derived and forward to its implementation in the design
Functional Requirements
1. relatedto functional aspect of software
2. requirements that the end user specifically demands as basic facilities of the
system
3. The functionalities that need to be necessarily incorporated into the system
as a part of the contract.
4. These are represented or stated in the form of input to be given to the
system, the operation performed and the output expected.
5. which one can see directly in the final product.
10.
For example, ina hospital management system, a doctor
should be able to retrieve the information of his patients.
The functional requirements should be complete and
consistent.
Completeness implies that all the user requirements are
defined.
Consistency implies that all requirements are specified
clearly without any contradictory definition.
Functional Requirements Contd…
11.
Non Functional Requirement
Theseare not related to functional aspect of software.
They are implicit or expected characteristics of software.
The non-functional requirements (also known as quality requirements) are
related to system attributes such as reliability and response time.
Non-functional requirements arise due to user requirements, budget
constraints, organizational policies, and so on.
These requirements are not related directly to any particular function provided
by the system.
12.
ExamplesofNon-functionalrequirements
1. Users mustchange the initially assigned login password
immediately after the first successful login. Moreover, the
initial should never be reused.
2. Employees never allowed to update their salary information.
Such attempt should be reported to the security administrator.
3. Every unsuccessful attempt by a user to access an item of data
shall be recorded on an audit trail.
4. A website should be capable enough to handle 20 million users
without affecting its performance
5. The software should be portable. So moving from one OS to
other OS does not create any problem.
13.
The process ofspecifying non-functional requirements
requires
1. the knowledge of the functionality of the system
2. as well as the knowledge of the context within
which the system will operate.
Product requirements: Theserequirements specify how software product performs.
1. Efficiency requirements: software makes optimal use of resources, the speed with which the
system executes, and the memory it consumes for its operation.
For example, the system should be able to operate at least three times faster than the existing
system.
2. Reliability requirements: Describe the acceptable failure rate of the software.
For example, the software should be able to operate even if a hazard occurs.
3. Portability requirements: Describe the ease with which the software can be transferred from
one platform to another.
For example, it should be easy to port the software to a different operating system without the
need to redesign the entire software.
4. Usability requirements: Describe the ease with which users are able to operate the software.
For example, the software should be able to provide access to functionality with fewer
keystrokes and mouse clicks.
Non-functional requirements
16.
Organizational requirements: Theserequirements are derived from the
policies and procedures of an organization.
1. Delivery requirements: Specify when the software and its documentation
are to be delivered to the user.
2. Implementation requirements: Describe requirements such as
programming language and design method.
3. Standards requirements: Describe the process standards to be used
during software development.
For example, the software should be developed using standards specified by
the ISO and IEEE standards.
17.
External requirements: Theserequirements include all the requirements
that affect the software or its development process externally.
1. Interoperability requirements: Define the way in which different computer
based systems will interact with each other in one or more organizations.
2. Ethical requirements: Specify the rules and regulations of the software so
that they are acceptable to users.
3. Legislative requirements: Ensure that the software operates within the
legal jurisdiction. For example, pirated software should not be sold.
18.
Metrics for Non-functionalRequirements
Non-functional requirements are difficult to verify.
Hence, it is essential to write non-functional requirements quantitatively, so that they can be
tested.
19.
Features Measures
Speed •Processed transaction/ second
• User/event response time
• Screen refresh rate
Size • Amount of memory (KB)
• Number of RAM chips.
Ease of use • Training time
• Number of help windows
Reliability • Mean time to failure (MTTF)
• Portability of unavailability
• Rate of failure occurrence
Robustness • Time to restart after failure
• Percentage of events causing failure
• Probability of data corruption on failure
Portability • Percentage of target-dependent statements
• Number of target systems
20.
Parameters Functional RequirementNon-Functional Requirement
What it is Verb Attributes
Requirement It is mandatory It is non-mandatory
Capturing type It is captured in use case.
It is captured as a quality
attribute.
End-result Product feature Product properties
Capturing Easy to capture Hard to capture
21.
Objective
Helps you verifythe functionality
of the software.
Helps you to verify the
performance of the software.
Area of focus Focus on user requirement
Concentrates on the user's
expectation.
Documentation Describe what the product does Describes how the product works
Type of Testing
Functional Testing like System,
Integration, End to End, API
testing, etc.
Non-Functional Testing like
Performance, Stress, Usability,
Security testing, etc.
Test Execution Test Execution is done before
non-functional testing.
After the functional testing
Product Info
Product Features
Product Properties
22.
Domain requirements
which arederived from the application domain of the system instead from the
needs of the users
It is characteristic of a particular category or domain of projects.
The basic functions that a system of a specific domain must necessarily exhibit
come under this category.
For instance, in an academic software that maintains records of a school or
college, the functionality of being able to access the list of faculty and list of
students of each grade is a domain requirement.
These requirements are therefore identified from that domain model and are
not user specific.
23.
If these requirementsare not fulfilled, it may be difficult to make the system
work as desired.
When domain requirements are not expressed clearly, it can result in the
following difficulties.
1. Problem of understandability: When domain requirements are specified in
the language of application domain (such as mathematical expressions), it
becomes difficult for software engineers to understand them.
2. Problem of implicitness: When domain experts understand the domain
requirements but do not express these requirements clearly, it may create
a problem (due to incomplete information) for the development team to
understand and implement the requirements in the system.
User requirements
1. Userrequirements, often referred to as user needs
2. what activities that users must be able to perform.
3. User requirements are generally documented in a User
Requirements Document (URD) using narrative text.
4. User requirements are generally signed off by the user
5. used as the primary input for creating system requirements.
26.
When it isidentified?
1. User requirements are typically written when discussing the use cases for a
project.
2. The requirements definition is done with the customer or product managers
that know how the embedded system will be used by the user.
27.
System requirements
1. allof the requirements at the system level that describe the
functions which the system as a whole
2. to satisfy the stakeholder needs and requirements,
3. it is expressed in an appropriate combination of textual
statements, views, and non-functional requirements.
4. It expresses the levels of safety, security, reliability, etc., that will
be necessary.
28.
Role of systemrequirement
1. Form the basis of system architecture and design activities.
2. Form the basis of system integration and verification activities.
3. Act as reference for validation and stakeholder acceptance.
4. Provide a means of communication between the various technical staff that
interact throughout the project.
29.
Types of SystemRequirement
1. Functional Requirements- Describe qualitatively the system functions or tasks
to be performed in operation.
2. Performance Requirements- Define quantitatively the extent, or how well,
and under what conditions a function or task is to be performed (e.g. rates,
velocities).
3. Usability Requirements- Define the quality of system use (e.g. measurable
effectiveness, efficiency, and satisfaction criteria).
4. Interface Requirements- defines how system elements within the system, like
human elements, interact with each other (internal interface).
5. Operational Requirements- Define the operational conditions or properties
that are required for the system to operate .
30.
5. Modes and/orStates Requirements- Define the various operational modes of
the system in use and events conducting to transitions of modes.
6. Adaptability Requirements-- Define potential extension, growth, or scalability
during the life of the system.
7. Physical Constraints- Define constraints on weight, volume, and dimension
applicable to the system elements that compose the system.
8. Design Constraints- Define the limits on the designer by imposing immovable
boundaries and limits .
Types of System Requirement
Contd…
31.
9. Environmental Conditions-Define the environmental conditions to be
encountered by the system in its different operational modes.
10. Logistical Requirements- Define the logistical conditions needed by the
continuous utilization of the system.
11. Policies and Regulations- Define relevant and applicable organizational
policies or regulatory requirements that could affect the operation or
performance of the system
12. Cost and Schedule Constraints- Define, for example, the cost of a single
exemplar of the system, the expected delivery date of the first exemplar, etc.
Types of System Requirement
Contd…
33.
Requirement Engineering
Requirement Engineeringis the disciplined application of proven principles, methods,
tools, and notations to describe a proposed system’s intended behavior and its
associated constraints.
SRS may act as a contract between developer and customer.
State of practice
Requirements are difficult to uncover
• Requirements change
• Over reliance on CASE (Computer Aided SW Engg.) Tools
• Tight project Schedule
• Communication barriers
• Market driven software development
• Lack of resources
34.
A University wishto develop a software system for the student result
management of its M.Tech. Programme. A problem statement is to be
prepared for the software development company. The problem statement may
give an overview of the existing system and broad expectations from the new
software system.
Requirement Engineering Example
Maintainability
Portability
Testability
For Users
For Developers
Typesof Requirements
Functional requirements describe what the software has to do. They are often called product features.
Requirements, that stipulate how well the software does, what it has to do.
Non Functional requirements are mostly quality
Availability
Reliability
Usability
Flexibility
37.
User and systemrequirements
• User requirements are written for the users and include functional and non functional requirements.
• System requirements are derived from user requirement.
• The user system requirements are the parts of Software Requirement and Specification (SRS)
document.
Types of Requirements
38.
Types of Requirements
InterfaceSpecification
• Important for the customers.
TYPES OF INTERFACES
• Procedural interfaces (Application Programming Interfaces (APIs))
• Data structures
• Representation of data.
39.
Requirement Engineering isthe process of defining, documenting and
maintaining the requirements.
It is a process of gathering and defining service provided by the system.
Requirement Engineering
41.
Requirement Engineering
Requirements describe
What,not How
Produces one large document written in natural language which contains a description
of what the system will do without describing how it will do it.
Crucial process steps
Quality of product Process that creates it
Without well written document
-- Developers do not know what to build
-- Customers do not know what to expect
-- What to validate
42.
Requirements Engineering Processconsists of the following main activities:
Requirements elicitation
Requirements specification
Requirements verification and validation
Requirements management
Requirements Engineering Process
Requirements Elicitation
It isrelated to the various ways used to gain knowledge about the project
domain and requirements.
The various sources of domain knowledge include customers, business
manuals, the existing software of same type, standards and other stakeholders
of the project.
The techniques used for requirements elicitation include interviews,
brainstorming, task analysis, Delphi technique, prototyping, etc
This step widens the knowledge domain of the analyst and thus helps in
providing input to the next stage.
45.
Requirements Elicitation
Perhaps
• Mostdifficult
• Most critical
• Most error prone
• Most communication intensive
Succeed
effective customer developer partnership
Selection of any method
1. It is the only method that we know
2. It is our favorite method for all situations
3. We understand intuitively that the method is effective in the present circumstances.
Normally we rely on first two reasons.
46.
Requirements Specification
This activityis used to produce formal software requirement models.
All the requirements including the functional as well as the non-functional
requirements and the constraints are specified by these models in totality.
During specification, more knowledge about the problem may be required
which can again trigger the elicitation process.
The models used at this stage include ER diagrams, data flow diagrams(DFDs),
function decomposition diagrams(FDDs), data dictionaries, etc.
47.
Requirements Verification andValidation
Verification: It refers to the set of tasks that ensure that software correctly
implements a specific function.
Validation: It refers to a different set of tasks that ensure that the software
that has been built is traceable to customer requirements.
If requirements are not validated, errors in the requirements definitions would
propagate to the successive stages resulting in a lot of modification and rework.
48.
Constraints
The requirements shouldbe consistent with all the other requirements i.e. no
two requirements should conflict with each other.
The requirements should be complete in every sense.
The requirements should be practically achievable.
49.
Requirements Management
Requirement managementis the process of analyzing, documenting,
tracking, prioritizing and agreeing on the requirement and controlling the
communication to relevant stakeholders.
This stage takes care of the changing nature of requirements.
It should be ensured that the SRS is as modifiable as possible so as to
incorporate changes in requirements specified by the end users at later stages
too.
Being able to modify the software as per requirements in a systematic and
controlled manner is an extremely important part of the requirements
engineering process.
Feasibility is definedas the practical extent to which a project can be
completed successfully.
To evaluate feasibility, a feasibility study is performed
It determines whether the solution considered to accomplish the requirements is practical
and workable in the software.
Information such as resource availability, cost estimation for software development, benefits
of the software to the organization after it is developed and cost to be incurred on its
maintenance are considered during the feasibility study.
The objective of the feasibility study is to establish the reasons for developing the software
that is acceptable to users, adaptable to change and conformable to established standards.
Feasibility study
54.
Is cancellation ofa project a bad news?
As per IBM report, “31% projects get cancelled before they are completed, 53% over-
run their cost estimates by an average of 189% & for every 100 projects, there are 94
restarts.
How do we cancel a project with the least work?
CONDUCT A FEASIBILTY STUDY
Feasibility study
55.
Purpose of feasibilitystudy
Evaluation or analysis of the potential impact of a proposed project or program.
Focus of feasibility studies
• Is the product concept viable?
• Will it be possible to develop a product that matches the project’s vision
statement?
• What are the current estimated costs and schedules for the project?
Feasibility study
56.
Focus of feasibilitystudies
• How big is the gap between the original cost & schedule targets & current estimates?
• Is the business model for software justified when the current costs & schedule
estimates are considered?
• Have the major risks to the project been identified & can they be surmounted?
• Is the specification complete & stable enough to support remaining
development work?
• Have users and developers been able to agree on a detailed user interface
prototype? If not, are the requirements really stable?
• Is the software development plan complete & adequate to support further
development work?
57.
Objectives of FS
1.To analyze whether the software will meet organizational
requirements.
2. To determine whether the software can be implemented using
the current technology and within the specified budget and
schedule.
3. To determine whether the software can be integrated with other
existing software.
Technical feasibility
• Isit technically feasible to provide direct communication connectivity through space
from one location of globe to another location?
• Is it technically feasible to design a programming language using "Kashmiri”?
Feasibility depends upon non-technical Issues like:
• Are the project’s cost and schedule assumption realistic?
• Is the business model realistic?
• Is there any market for the product?
61.
Technical feasibility
The technicalfeasibility study compares the level of technology available in the software
development firm and the level of technology required for the development of the product.
Here the level of technology consists of the programming language, the hardware resources,
Other software tools etc.
Technical feasibility assesses the current resources (such as hardware and software) and
technology
The software development team ascertains whether the current resources and technology
need to be upgraded to accomplish specified user requirements
62.
Task of technicalfeasibility
Technical feasibility also performs the following tasks.
• Analyzes the technical skills and capabilities of the software development
team members.
• Determines whether the relevant technology is stable and established.
• Ascertains that the technology chosen for software development has a large
number of users so that they can be consulted when problems arise or
improvements are required.
63.
Operational feasibility
Operational feasibilitystudy tests the operational scope of the software to be
developed.
The proposed software must have high operational feasibility
High operational feasibility has high usability.
This feasibility is dependent on human resources (software development
team)
involves visualizing whether the software will operate after it is developed and
be operative once it is installed.
64.
Operational feasibility alsoperforms the following tasks
• Determines whether the solution suggested by the software development
team is acceptable.
• Analyzes whether users will adapt to a new software.
65.
Economic feasibility
The economicfeasibility study evaluate the cost of the software development against the
ultimate income or benefits gets from the developed system.
There must be scopes for profit after the successful Completion of the project.
Economic feasibility determines whether the required software is capable of generating
financial gains for an organization.
It involves the cost incurred on the software development team, estimated cost of hardware
and software, cost of performing feasibility study, and so on.
For this, it is essential to consider expenses made on purchases (such as hardware purchase)
and activities required to carry out software development.
In addition, it is necessary to consider the benefits that can be achieved by developing the
software.
66.
Economic feasibility
Software issaid to be economically feasible if it focuses on the issues listed
below.
• Cost incurred on software development to produce long-term gains for an
organization.
• Cost required to conduct full software investigation (such as requirements
elicitation and requirements analysis).
• Cost of hardware, software, development team, and training.
Information Assessment
Identifiesinformation about whether the system helps in achieving the
objectives of the organization.
It also verifies that the system can be implemented using new technology and
within the budget
and whether the system can be integrated with the existing system.
69.
Information Collection
Specifies thesources from where information about software can be obtained.
Generally, these sources include users (who will operate the software),
organization (where the software will be used), and the software development
team (which understands user requirements and knows how to fulfill them in
software).
70.
Report writing
Uses afeasibility report, which is the conclusion of the feasibility study by the
software development team.
It includes the recommendations whether the software development should
continue.
This report may also include information about changes in the software scope,
budget, and schedule and suggestions of any requirements in the system.
71.
General Information
Describes thepurpose and scope of feasibility study. It also describes system overview, project
references, acronyms and abbreviations, and points of contact to be used.
System overview provides description about the name of the organization responsible for the
software development, system name or title, system category, operational status, and so on.
Project references provide a list of the references used to prepare this document.
Acronyms and abbreviations provide a list of the terms that are used in this document along
with their meanings.
Points of contact provide a list of points of organizational contact with users for information
and coordination.
72.
The developer needsto have clear and thorough understanding of the products,
achieved through detailed and continuous communications with the project
team and customer.
Software Requirement Specification (SRS)
73.
A Software RequirementsSpecification (SRS) is
a description of a software system to be developed.
a document that captures complete description about how the system is expected to perform.
usually signed off at the end of requirements engineering phase.
modeled after business requirements specification, also known as a stakeholder
requirements specification (StRS).
The SRS includes functional and non-functional requirements.
It may include a set of use cases that describe user interactions that the software must provide
to the user.
74.
• This isthe way of representing requirements in a consistent format
• SRS serves many purposes depending upon who is writing it.
written by customer
written by developer
Serves as contract between customer & developer.
Requirements Documentation
Requirements
Documentation
Correct
AnSRS is correctif and only if every requirement stated therein
is one that the software shall meet.
Unambiguous
AnSRS is unambiguous if and only if, every requirement stated therein has only
one interpretation.
Complete
AnSRS is complete if and only if, it includes the following elements:
(I) All significant requirements, whether related to functionality, performance, design constraints,
attributes or external interfaces.
(ii) Responses to both valid & invalid inputs.
(iii) Full Label and references to all figures, tables and diagrams in the SRS and definition of all
terms and units of measure.
77.
Requirements Documentation
Consistent
An SRSis consistent if and only if, no subset of individual requirements
described in it conflict.
Ranked for importance and/or Stability
If an identifier is attached to every requirement to indicate either the
importance or stability of that particular requirement.
78.
Requirements Documentation
Verifiable
An SRSis verifiable, if and only if, every requirement stated therein is verifiable.
Modifiable
An SRS is modifiable, if and only if, its structure and style are such that any changes to the
requirements can be made easily, completely, and consistently while retaining structure and style.
Traceable
An SRS is traceable, if the origin of each of the requirements is clear and if it facilitates the
referencing of each requirement in future development or enhancement documentation.
79.
Importance of SRS
SRSestablishes the basis for an agreement between customers and contractors
or suppliers.
It is a rigorous assessment of requirements before the more specific system
design stages
Its goal is to reduce later redesign.
It is a realistic basis for estimating product costs, risks, and schedules.
If used appropriately, software requirements specifications can help prevent
software project failure.
80.
1. It minimizesthe amount of time and effort
2. It reduces development cost.
3. It also helps clear any communication problems between the client and
the developer.
4. Furthermore, an SRS serves to form a foundation of mutual
agreement between the client and the developer (supplier).
5. It also serves as the document to verify the testing processes.
Importance of SRS Cont…
82.
Nature of SRS
BasicIssues
• Functionality
• External Interfaces
• Performance
• Attributes
• Design constraints imposed on an Implementation
Requirements Documentation
83.
Organization of theSRS
IEEE has published guidelines and standards to organize an SRS.
First two sections are same. The specific tailoring occurs in section-3.
1. Introduction
1.1
1.2
1.3
1.4
1.5
Purpose
Scope
Definition, Acronyms and
abbreviations References
Overview
Requirements Documentation
84.
Requirements
Documentation
2. The OverallDescription
2.1 Product
Perspective
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
System
Interfaces
Interfaces
Hardware
Interfaces
Software Interfaces
Communication
Interfaces Memory
Constraints Operations
Site Adaptation
Requirements
85.
Requirements Documentation
2. ProductFunctions
3. User Characteristics
4. Constraints
5. Assumptions for dependencies
6. Apportioning of requirements
3. Specific Requirements
1. External Interfaces
2. Functions
3. Performance requirements
4. Logical database requirements
5. Design Constraints
6. Software System attributes
7. Organization of specific
requirements
8. Additional Comments.
Requirements
Validation
Problem actions
• Requirementsclarification
• Missing information
• find this information from stakeholders
• Requirements conflicts
• Stakeholders must negotiate to resolve this conflict
• Unrealistic requirements
• Stakeholders must be consulted
• Security issues
• Review the system in accordance to security standards