10. As an ESRI Australia BDM, he
naturally sold Data Interop as
the answer for anyone wanting
to do data transformations.
11. In Engineering
and Design
consultancies,
the challenges
included:
Dealing with CAD
data on a daily basis:
Regular design
changes
Survey CAD data
Differing quality of
geometry and
attribution
20. So before
budgets were
set and the
solution locked
in, he went
exploring
Knowing nothing of
FME, he watched every
FME Channel YouTube
video he could (an
excellent use of
company time).
www.youtube.com/user/FMEchannel
21. So before
budgets were
set and the
solution locked
in, he went
exploring
He downloaded a trial of
FME Desktop to have a
play
(with varying success)
Then…
22. He phoned 1Spatial,
who took him further
along his journey.
With their guidance
they were able to
show that…
27. A little about my
role
Joined Lendlease in
2016 to build a GIS
infrastructure
Using the Kingsford
Smith Drive (KSD)
Upgrade project as
the initial purpose
Will take GIS across
the entire
organisation
28. Kingsford Smith Drive Upgrade
KSD is a 3.5km road upgrade from 4 – 6 lanes
Includes construction 15m into the river
Is the first Lendlease Engineering project with
internal GIS implementation
30. KSD Data
Main data types:
CAD
Imagery (Nearmap)
Live data
Primary sources of
data:
Our Designers
(Jacobs)
Our Survey team
Third party services
31. Data challenges on KSD
Daily > Weekly CAD data updates
All data imported to SDE before publishing
Varying quality of data received
High resolution imagery requirements
32. FME on KSD
We started using FME for Nearmap mosaics
Extremely impressed with the speed and
stability compared to an ESRI workflow
Ability to write ECW
Ease of use was immediately apparent
34. Next, we got
some help
Moving into vector
based data was a little
harder.
Adrian helped us with
workspaces for:
Survey import
Live weather data
35. Survey Import
Knowing where sub-surface utilities are is critical.
Our survey import workspace simplifies the CAD to
GIS cleaning and transformation of this data.
Layer attribution quality is a major issue and the
workspace has been rewritten many times.
36. We run this each week -
and sometimes modify it each week…
37. We run this each week -
and sometimes modify it each week…
39. Live weather data
KSD has a live weather station on site
Weather data is updated to a website every 5
minutes
The dashboard display provided by the
instrument manufacturer is not user friendly
We use FME Server to poll an API and submit
weather data into our database for analysis,
display and archiving
47. FME for Western Distributor
Lendlease were involved in a tender design and
submission for Melbourne’s Western Distributor
project, which required many GIS deliverables.
First round of submission late 2016
Heavy GIS involvement to compile land
availability plans and associated data
Completely manual processes resulting in very
late nights and too many kebabs.
48. Round 2 of
submissions
were required
Feb 2017
There had to be a better
way of compiling land
availability plans.
After getting more
comfortable with FME, I
knew it would be the
answer.
49. Working smarter
The challenge:
Ever changing data up
until the last day of
submission
Deliverables that relied
on the analysis of many
different datasets
Terrible data (geometry
errors everywhere)
The solution:
A suite of FME
Workspaces
Updated data could be
plugged in anywhere in
the process and the suite
of workspaces run again.
50. The result?
Sanity!
Confidence in
delivery
Being able to
programmatically fix
terrible data
Responsiveness;
and
Not a single kebab was
consumed.
51. FME for Gateway Upgrade North
Long highway upgrade with many challenges
Underground and overhead services
Environment constraints and sensitivities
52. FME for Gateway Upgrade North
Current work in progress.
Excellent data quality
and consistency
Excellent opportunity
to use the power of
FME Server
Need to solve:
The risk of hitting
services during
construction
A lack of
time/resources to
dedicate to the project
53. The answer
An automated
process for Survey
team to upload the
latest survey
Reliance on FME
Server to process
and update the
project SDE
database
No effort from me.
55. FME Server
We’re putting a lot of focus on FME Server.
We believe it has fantastic potential to change the
way we handle data in the organisation.
56. Automation
Automating anything
and everything
Shifting legwork
away from GIS staff
Self serve data
upload procedures
Smart ‘behind the
scenes’ workflows
57. Integration
Using the ability to
read and manipulate
third party API data
to our advantage
Using FME Server to
solve ETL problems
where direct
integration is not
possible
Increase the non-
spatial data focus
58. Exploration
Turning unknown
files (documents,
photos) on our
network into usable
and accessible
content
Creating registers of
previously siloed
information
60. 1. FME is amazing software
It’s saved me on more than one
occasion
61. 2. Buy enough licenses for your staff
We have more on the way but the
struggle to get a license is real!
62. 3. FME will move up
your windows start
menu
I rely more and more
on it each day. I’m
enjoying finding new
ways to use it and
relish the challenge of
a new workspace.
63. 4. Find out all the things FME can do
beyond conversion – particularly with
FME Server.
There’s functionality of FME I’m really
looking forward to using.
64. 5. The pricing of FME, for the power
and functionality you get, is brilliant
65. 6. Don’t stop at desktop.
FME Server will take your
productivity to another level.
66. 7. Get training to understand the main
concepts
Once you have a basic understanding,
your learning curve will be steep and
quick but your effectiveness will astound
you.
67. 8. Get training to understand the main
concepts
Use the knowledge and experience of
someone else to take you towards FME
enlightenment!