16.5 production schedule
1. 16.5 Production Plan – single episode
Title: ‘Lotus’ Shoot locations: Cambridge City Centre, Police Station, holy Trinity Church
Cambridge
Dates: 1st
February – 4th
May Legal & Ethical issues:
Feb
Pre-
Production
1
st
- 10
th
11
th
-17
th
18
st
– 23
rd
23
rd
– 29
th
Hire/Scout potential actors.
Have an audition/tryout to help
narrow down possible
candidates.
Choose actors from audition to
play the roles of the key
characters. Anyone else can be
extras.
Collect Costumes for main actors
And extras
Possible Locations
Find a building in Cambridge that
vaguely resembles a police or
secret service on the inside and
out (does not have to be the same
building for interior and exterior
shots.
Possible Locations. Police
station in Cambridge (would
have to as and obtain release
form). Shooting there seems
very unlikely.
Will settle for Shooting inside
college if not able to find
suitable location.
Weather would need to be
cloudy to fit the mood of the
show. If it rains. The better.
Costume designer acquires
materials to make
costumes/acquires appropriate
clothing for characters.
Script re-worked is and polished Actors are hired
Insurance is sorted
Hire make-up artists Script re-worked is and polished Make-up artists are hired
Hire Sound designers Script re-worked is and polished Sound designers are hired
March
Pre-
Production
1
st
– 10
th
11
th
– 17
th
18
th
– 23
rd
24
th
– 31
st
Shooting equipment is
gathered: A DSLR able to shoot
4K or 1080p 60FPS
Multiple Sony NEX-FS700RH
Tripods, and additional lenses.
First Dry Run. Director and Producer review
footage and make necessary
adjustments and changes to script,
costume, lighting and sound
Sound designer goes on strike
Due to lack of appreciation.
Housing accommodations for
actors
First Dry Run. Changes are reviewed Sound designer is fired due to
rudeness
Transport for cast and crew
Bombardier Global 700.
Kings Ferry Luxury Coach Hire
First Dry Run. Changes are reviewed New sound designer is hired.
First Dry Run. Changes are reviewed Changes are made to dry run
and reviewed
April
Production
1s
t
- 10
th
11
th
- 17
th
18
th
- 23
th
24
th
- 30
th
BREAK SHOOTING BREAK SHOOTING
SHOOTING BREAK SHOOTING BREAK
SHOOTING BREAK SHOOTING FINISH SHOOT