Katie Devitt
katie@gfsdesign.com.au
0419 730 934
43 Panorama StreetAshgrove Q 4060
twitter:#katiedevitt
Lucy O’Driscoll
Principal
Hassell
3914 4000
Rosemary Kennedy
Director of Subtropical Design QUT
0434 369 343
Rebecca Caldwell
Architect and mentor
0410 554 288
Val King
(Former General Manager)
RFDS Qld Section
0421 597 653
References
In 2016, I completed the Masters of Architecture at Queensland University of Technology and in 2013 I
completed a Bachelor of Design at QUT with First Class Honours majoring in Architecture and minoring in
Project Management and Collaborative Digital Design.
I have achieved an overall GPA of 6.14 (on a 7 point scale) in my bachelor degree.
Architecture is an exciting change of career for me.
My professional background is in Project Management at the RFDS and at Accenture.
I bring to any job a strong work ethic and desire to succeed, a willingness to cooperate with others, and a
need to produce quality work. As a result of the knowledge and skills gained through my studies at QUT and
my industry-based experiences, I can offer a wide breadth of skills and experience and a deep enthusiasm
for creating diverse architecture.
Profile
Experience
STAC app for iPhone
DWP|Suters
Gold Coast Private Hospital
Graduate Architect
HASSELL
Role: Concept Design for holistic refurbishment of UNSW EEB Building and Rex Vowels.
Working with Architects: Mark Roehrs, Lucy O’Driscoll, Mathew Larme, Daniel Loo and other team members to complete concept design for the
major university renewal project, UNSW EEB CRM.
• Drawing Revit concept design plans from sketches. Updating Revit details after client meetings including; structural details, facade details, wall
details, floor plans, cabinetry details, furniture layouts, wall and floor
treatments, and data sheets details as required.
• Drawing and maintaining within Revit area zone plans, options, and schedules. Downloading /uploading to excel and analysing room data
schedules as changes were made to check m2 per discipline group. Ensuring each group at the University had the required allocated area in
the new design was a critical project measurement.
• Creation of Hassell template for Project Risk to meet audit standards. This was developed for the project and as a result was adopted firm
wide.
• Completion of Risk assessments for the multiple stages of UNSW EEB Project.
• Liaising with clients on phone and email to discuss project requirements and changes as required.
• Working with lead architects and sub-contractors to obtain the reports from 15+ sub-contractors and then
completing coordination of Concept Design.
• Coordination and collation of the successfully adopted UNSW EEB CRM Concept Design Report.
• Created Interior Design and joinery detail designs for construction including Reception Desk with
accessibility details, Nurses Stations and bathroom cabinetry for Port Macquarie Hospital.
• Created Interior Design and joinery proposals for multiple University Project proposals.
• Developed Microsoft Office Project Schedules for 2 Health Project Proposals.
	 2014 - 2015
Student Architect
DWP|Suters
Role: Documentation for Gold Coast Private Hospital Project.
Working with Architects: Paul Anthony, David Brian, Fay Wang, and an external team of 10 + architects and architect assistants to
complete documentation for Trade Tender and Construction.
• Maintenance of door schedule in Revit for 1400+ doors on the project.
• Drawing within Revit; typical door elevations, door details and door sections for issue with Door Trade package.
• Preparing for Issues Revisions from Revit as required by changes made by the team and through external consultants.
• Liaising and meeting with external consultants (engineering and door hardware) to discuss project requirements and changes as required to
the schedule.
• Auditing doors on the fire line to ensure that hardware specified would comply with requirements. Providing markups to Architects for discus-
sion with engineers.
• Creating Crash rails and Corner Guards in Revit across 2 floors of hospital as part of Joinery package.
• Maintaining, updating and checking Joinery Schedule against current drawings in Revit before release of Tender package.
	2014
Experience
RFDS Mount Isa Base
Research Assistant to Director of the Centre for Subtropical Design
QUT
Role: Scholarship position as Research Assistant at QUT as part of the Vacation Research Experience Scheme.
• Scoping and Design with a multi-disciplinary team with students to create Architectural App proposal
• Creation of prototype iPhone Architectural App - STAC Design
• Presentation of prototype to peers and stakeholders. Preparation of posters for exhibition.
• Creation of website of STAC Design iPhone prototype - http://www.tumblr.com/blog/stacliving
2013 - 2014
Project Manager for Royal Flying Doctor Service Queensland Section (RFDS)
Role: Scoping Stage to Project Construction Completion
APA Design awarded North Queensland Regional Architectural Awards “Regional Commendation’ and “Walter and Oliver Tunbridge Award for
building of the Year”.
• Successful planning, budgeting and reporting for the AUD $7.5 million Mount Isa Base Redevelopment Project.
• Reporting on all schedule changes, risks and solutions, issues and potential variations to the RFDS Project Board.
• Successful professional communication and good working relationships with multiple stakeholders to the projects; RFDS employees,
management and external contractors including architects, engineers, and manufacturers.
• Maintained responsibility and accountability for project decision making throughout the project.
2009 - 2012
Accenture Resourcing Assistant:
Queensland Treasury
Resourcing assistant for Accenture’s IT project at Queensland Treasury.
• External Agency Point of Contact.
• Sourced and Proposed Candidates.
• Sought Feedback and liaised with interviewing panel for feedback on resources.
• Visa Support and managing existing resources.
Major Projects as Accenture Manager
/ Consultant / Analyst
• Accenture is a global management consulting, technology services and outsourcing company. Employed as a Graduate-analyst in 1996 after
completing the Bachelor of Commerce and Bachelor of Economics with Japanese. Promotion received to Consultant in 1998 and to Manager
in 2001.
• Multiple projects completed with clients in Queensland and interstate, specialising in finance and projects components of large scale
implementations of modular software.
• Clients included: Crane Distribution, Griffith University, CS Energy, Qld Department of Public Works, Housing Queensland, Telstra and
Queensland Rail.
2006 - 2007
1996 - 2002
Skills &
Education
MASTER OF ARCHITECTURE - QUT
2014-2016
BACHELOR OF DESIGN - QUT
2004-2013 GPA: 6.14
BACHELOR OF COMMERCE - UQ
1994-1995 GPA: 5.4
BACHELOR OF ECONOMICS - UQ
1991 - 1993 GPA: 4.5
PROFICIENT IN
REVIT, CAD, AND ADOBE DESIGN
PREMIUM SUITE.
PROFICIENT IN SOCIAL MEDIA
INCLUDING TWITTER, LINKED-IN, FACEBOOK
AND BLOGGING.
OVER 20 YEARS EXPERIENCE
WITH MICROSOFT OFFICE
SUITE, MS PROJECT, SAP, AND
OTHER FINANCIAL PACKAGES
OVER 10 YEARS OF
PROJECT MANAGEMENT
AND
STAKEHOLDER MANAGEMENT
EXPERIENCE
Work
Examples
Brief
Guerilla Project : Catalyst building for Petrie University of the
Sunshine Coast.
Revit
Adobe InDesign
Adobe Photoshop
Adobe Illustrator
Sketchup for massing models
CNC machine for physical model
Physical model construction
Systems Used
Internal Courtyard + Art Gallery
Petrie Information Exchange
1:20000
1
2
2
2
2
2b
3
3
3
3
3 3
3
3
3
3
4
4
4
4
4
4
5a
5b
5c
Gympie
Gympie
Petrie
Petrie
PETRIE
TrainLine
TrainLine
Anzac
5a. Main Amphitheatre
5b. Small Amphitheatre
5c. Fitness Centre + Pool
1. PETRIE INFORMATION EXCHANGE
2. Campus Buildings
2b Mangrove Education Centre
3. Permaculture Planting
4. Eco-Luxury Housing
Proposed Masterplan
Entrance + Meeting Area
Internal Courtyard + Cafe
Children’s Library
1:200
Elevation South
1:500
Section
Section
1:500
Information Hub Street Scape
Local Farmer Markets Playgrounds
Sketch Vignettes
Brief
A structure that can accommodate the House of Representatives outside of
Canberra. The Elaine Elizabeth Darling Forum is the structure in Brisbane in King
George Square.
The new structure is a gift to the city/town as a permanent facility that adds to their
public buildings.
The new structure is adaptable for multiple cultural events for the city/town.
Elaine Elizabeth Darling Forum
Capithetical competition: international
competition to design a hypothetical Australian capital city.
Design Ideas
2
3
4
5
1
Revit
Adobe InDesign
Adobe Photoshop
Adobe Illustrator
Sketchup for massing models
CNC machine for physical model
Physical model construction
Systems Used
Roof
Office
Storage
Viewing seated and standing areas
Circulation around and through the
building
Toilets
All lower level bases,chairs,
tables etc storage
on stage rigging system
Catering Kitchen
Single Offices
Large Meeting Room
Adjustable Meeting Room
Hot Desks
Lounge
Photovoltaic Blades
Circulation
Hexagonal Parliament
Circulation
Toilets
1
2
3
4
5 Core
Exhibition Grounds: Bowen Hills
Transport of the mails,
Transport of the human voice,
Transport of flickering pictures- in this century as in others our highest accomplishments
still have the single aim of bringing men together. 				Antoine de Saint-Exupery
Brief
Create 60+ high density dwellings on the Bowen Hills /
RNA exhibition site with a focus on sustainability.
Design ideas
This development is situated in the hub of transport
connections for Brisbane, next to a proposed new O’Connell
Terrace Station.
The key commitment for this community is to use these
connections, and abandon car ownership.
Adobe InDesign
Adobe Photoshop
Adobe Illustrator
Sketchup
Physical model construction
Systems Used
Train Station
access direct to city and
suburbs. No need for car
ownership in this building.
Water Tanks
collecting rainwater on roof
for rooftop garden irrigation of
market gardens.
Rooftop Gardens
Rooftops are used for growing vegetables,
fruit, and herbs for the community.
Summer Sun
Summer sun shading by
projecting covered balconies.
Winter Sun
Northern winter sun warms
the balconies and into the living spaces of
the apartments.
Community Spaces
The arcade provides the access point for
both towers, gardens, creche, library, cafe
and share market.
This is the neighbourhood street.
Energy
Photovoltaic cells are installed on the sun
shading for the roof top gardens.
Cross Ventilation
single loaded corridors allow cross ventilation
throughout
every apartment.
Water Recycling
treated grey water
reticulation supply system
recycles water for
landscape irrigation and
toilet flushingConnection to the Earth
Bringing back the Verandah
Sharing the leisure space
Sharing the opportunity to grow to eat
Sharing of lives and stories
Sharing of smiles
Animation Design: Howard Smith
Brief
Utilising the animation software: Blender, and traditional
architectural methods of site analysis, readings, pro-
gramming and diagramming design; determine and
design a public use for the Howard Smith Wharves site
under the Storey Bridge, Brisbane.
Design Ideas
Howard Smith Wharves is transposed from a inner city wasteland into a park, ferry terminal
and amphitheater to meet the needs of the
growing population of inner city Brisbane, Fortitude Valley and New Farm.
The undulating forms of the folie playground provide rest and shade and respite from the
city and were developed through the study of children playing on site.
The Multi-use community space amphitheatre and ferry terminal provide a transport focus
and meeting / performance space for the local community and allow for continued pedes-
trian traffic to enliven and stimulate this corner of the Brisbane city riverside.
A designer must first document the existing conditions of a problem,
define its context, and collect relevant data to be assimilated and analyzed.
							 Francis Ching
Blender , Sketchup and Revit
Adobe InDesign, Illustrator and Photoshop
3D physical printer
Powerpoint presentation
Systems Used
Collaborative Design: Lone Pine Koala Sanctuary Child Care Centre
Rainwater
Harvesting
Photovoltaic
solar cells
Solar cells collect the sun and can be
utilised in indoor lighting and any unused
can be sold back to the grid.
Rainwater is used in toilets
and in the laundry.
Rainwater used in garden
irrigation
Brief
Provide a childcare facility adjacent to the Lone Pine
Koala sanctuary, Fig Tree Pocket Brisbane, that will
provide facilities for the families of workers at the Sanc-
tuary and for the local community. The Facility must
work in harmony with the Sanctuary and be based on
principles of sustainability.
Design Ideas
Lone Pine Cielo Koala Sanctuary. Cielo is Italian for Canopy.
The Reggio Emilia inspired kindergarten at Lone Pine Koala Sanctuary is proposed as a
canopy of care for children and for the environment.
Sustainable construction and sustainable maintenance are key principles of the Cielo
proposal. Recycled wood, cork and
carpets to be utilised in the construction. Rainwater harvesting, solar panels and CBUS
aided natural ventilation to reduce
energy consumption in use.
Revit
Sketchup for massing models
Hand drawing and sketching
Adobe InDesign, Illustrator and Photoshop
Systems Used
Built Works: Bathroom and Bedroom Renovation
891
2371
24127852187
1870
2070
2701
421
1050
1041
785865
5384100100
MASTER
BEDROOM
STUDY
ENSUITE
DEMOLITION
PLAYROOM
Verandah
Verandah
Wall to be removed
and rebuilt in line with
front wall.
Wall to be removed
and rebuilt to form
Meg's bedroom.
Aluminium sliding
windows on this
wall that form Meg's
bedroom to be removed
and replaced with
antique windows.
Railing to be removed
in part to form the wall
of Meg's bedroom.
1004355
10010401239100145410044810321001359100
2500100
2300 100
2305 1001003645100
1003650100
PRODUCEDBYANAUTODESKSTUDENTPRODUCT
Before
Provide Design and Project Management for a
renovation of a master bedroom, ensuite and
walk-in-robe.
The 1905 house in Ashgrove, had an existing 1970/80’s
ensuite to the master bedroom that was badly in need of update
and no built in wardrobes.
Design Ideas & Construction
The design included a small extension onto the front verandah and a resuming
of some of the playroom space to the rear, to provide opportunity for the walk
in robe and ensuite.
Design attention was paid to maximising the heritage features of the room,
including the owner’s chest of drawers that had sentimental importance,
maximising space in the walk-in-robe and providing a luxurious spa-like atmos-
phere in the ensuite to create a sanctuary for the parents.
Revit
MS Project and Excel for Project Management
Systems used
Brief
After
7852237
1870
2070
1153100 100100 50
100
100
100
1775 100100890 3386 100100
1045 100 1500 100 1553 600
600
2405
Veitch stainless steel
shower channel, 1200 mm long
'Aqua' grate.
Showers supplied - this end hand
held bar shower - rain shower other
end
ENSUITE
WALK -IN ROBE
MASTER
BEDROOM
Fixed glass
shower screen
700600
Bedside
table
not fixed
client
supplied
Chest of
drawers
not fixed
wall to fit
this furniture
Heated Towel
rail supplied
Full length mirror
1051
Window seat
Install antique
windows - client
supplied
Remove french doors and
fan light reinstall within new
wall on verandah.
fall of the tiles
MEG'S
BEDROOM
Mirror cabinets above
vanity, with press seals.
Marble top custom
made vanity.
2170
2700
7336
864785467
34891001945
TO BE
8384
100189510034891002170
506007105851001308100807621239
100
2170
1003745100
1855110164015001145100
100
820
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRODUCEDBYANAUTODESKSTUDENTPRODUCT
PRODUCEDBYANAUTODESKSTUDENTPRODUCT
Katie Devitt
katie@gfsdesign.com.au
0419 730 934
43 Panorama StreetAshgrove Q 4060
twitter: #katiedevitt

161121 Katie Devitt Portfolio_email_wo cv

  • 1.
    Katie Devitt katie@gfsdesign.com.au 0419 730934 43 Panorama StreetAshgrove Q 4060 twitter:#katiedevitt
  • 2.
    Lucy O’Driscoll Principal Hassell 3914 4000 RosemaryKennedy Director of Subtropical Design QUT 0434 369 343 Rebecca Caldwell Architect and mentor 0410 554 288 Val King (Former General Manager) RFDS Qld Section 0421 597 653 References
  • 3.
    In 2016, Icompleted the Masters of Architecture at Queensland University of Technology and in 2013 I completed a Bachelor of Design at QUT with First Class Honours majoring in Architecture and minoring in Project Management and Collaborative Digital Design. I have achieved an overall GPA of 6.14 (on a 7 point scale) in my bachelor degree. Architecture is an exciting change of career for me. My professional background is in Project Management at the RFDS and at Accenture. I bring to any job a strong work ethic and desire to succeed, a willingness to cooperate with others, and a need to produce quality work. As a result of the knowledge and skills gained through my studies at QUT and my industry-based experiences, I can offer a wide breadth of skills and experience and a deep enthusiasm for creating diverse architecture. Profile
  • 4.
    Experience STAC app foriPhone DWP|Suters Gold Coast Private Hospital
  • 5.
    Graduate Architect HASSELL Role: ConceptDesign for holistic refurbishment of UNSW EEB Building and Rex Vowels. Working with Architects: Mark Roehrs, Lucy O’Driscoll, Mathew Larme, Daniel Loo and other team members to complete concept design for the major university renewal project, UNSW EEB CRM. • Drawing Revit concept design plans from sketches. Updating Revit details after client meetings including; structural details, facade details, wall details, floor plans, cabinetry details, furniture layouts, wall and floor treatments, and data sheets details as required. • Drawing and maintaining within Revit area zone plans, options, and schedules. Downloading /uploading to excel and analysing room data schedules as changes were made to check m2 per discipline group. Ensuring each group at the University had the required allocated area in the new design was a critical project measurement. • Creation of Hassell template for Project Risk to meet audit standards. This was developed for the project and as a result was adopted firm wide. • Completion of Risk assessments for the multiple stages of UNSW EEB Project. • Liaising with clients on phone and email to discuss project requirements and changes as required. • Working with lead architects and sub-contractors to obtain the reports from 15+ sub-contractors and then completing coordination of Concept Design. • Coordination and collation of the successfully adopted UNSW EEB CRM Concept Design Report. • Created Interior Design and joinery detail designs for construction including Reception Desk with accessibility details, Nurses Stations and bathroom cabinetry for Port Macquarie Hospital. • Created Interior Design and joinery proposals for multiple University Project proposals. • Developed Microsoft Office Project Schedules for 2 Health Project Proposals. 2014 - 2015
  • 6.
    Student Architect DWP|Suters Role: Documentationfor Gold Coast Private Hospital Project. Working with Architects: Paul Anthony, David Brian, Fay Wang, and an external team of 10 + architects and architect assistants to complete documentation for Trade Tender and Construction. • Maintenance of door schedule in Revit for 1400+ doors on the project. • Drawing within Revit; typical door elevations, door details and door sections for issue with Door Trade package. • Preparing for Issues Revisions from Revit as required by changes made by the team and through external consultants. • Liaising and meeting with external consultants (engineering and door hardware) to discuss project requirements and changes as required to the schedule. • Auditing doors on the fire line to ensure that hardware specified would comply with requirements. Providing markups to Architects for discus- sion with engineers. • Creating Crash rails and Corner Guards in Revit across 2 floors of hospital as part of Joinery package. • Maintaining, updating and checking Joinery Schedule against current drawings in Revit before release of Tender package. 2014
  • 7.
  • 8.
    Research Assistant toDirector of the Centre for Subtropical Design QUT Role: Scholarship position as Research Assistant at QUT as part of the Vacation Research Experience Scheme. • Scoping and Design with a multi-disciplinary team with students to create Architectural App proposal • Creation of prototype iPhone Architectural App - STAC Design • Presentation of prototype to peers and stakeholders. Preparation of posters for exhibition. • Creation of website of STAC Design iPhone prototype - http://www.tumblr.com/blog/stacliving 2013 - 2014 Project Manager for Royal Flying Doctor Service Queensland Section (RFDS) Role: Scoping Stage to Project Construction Completion APA Design awarded North Queensland Regional Architectural Awards “Regional Commendation’ and “Walter and Oliver Tunbridge Award for building of the Year”. • Successful planning, budgeting and reporting for the AUD $7.5 million Mount Isa Base Redevelopment Project. • Reporting on all schedule changes, risks and solutions, issues and potential variations to the RFDS Project Board. • Successful professional communication and good working relationships with multiple stakeholders to the projects; RFDS employees, management and external contractors including architects, engineers, and manufacturers. • Maintained responsibility and accountability for project decision making throughout the project. 2009 - 2012
  • 9.
    Accenture Resourcing Assistant: QueenslandTreasury Resourcing assistant for Accenture’s IT project at Queensland Treasury. • External Agency Point of Contact. • Sourced and Proposed Candidates. • Sought Feedback and liaised with interviewing panel for feedback on resources. • Visa Support and managing existing resources. Major Projects as Accenture Manager / Consultant / Analyst • Accenture is a global management consulting, technology services and outsourcing company. Employed as a Graduate-analyst in 1996 after completing the Bachelor of Commerce and Bachelor of Economics with Japanese. Promotion received to Consultant in 1998 and to Manager in 2001. • Multiple projects completed with clients in Queensland and interstate, specialising in finance and projects components of large scale implementations of modular software. • Clients included: Crane Distribution, Griffith University, CS Energy, Qld Department of Public Works, Housing Queensland, Telstra and Queensland Rail. 2006 - 2007 1996 - 2002
  • 10.
  • 11.
    MASTER OF ARCHITECTURE- QUT 2014-2016 BACHELOR OF DESIGN - QUT 2004-2013 GPA: 6.14 BACHELOR OF COMMERCE - UQ 1994-1995 GPA: 5.4 BACHELOR OF ECONOMICS - UQ 1991 - 1993 GPA: 4.5 PROFICIENT IN REVIT, CAD, AND ADOBE DESIGN PREMIUM SUITE. PROFICIENT IN SOCIAL MEDIA INCLUDING TWITTER, LINKED-IN, FACEBOOK AND BLOGGING. OVER 20 YEARS EXPERIENCE WITH MICROSOFT OFFICE SUITE, MS PROJECT, SAP, AND OTHER FINANCIAL PACKAGES OVER 10 YEARS OF PROJECT MANAGEMENT AND STAKEHOLDER MANAGEMENT EXPERIENCE
  • 12.
  • 13.
    Brief Guerilla Project :Catalyst building for Petrie University of the Sunshine Coast. Revit Adobe InDesign Adobe Photoshop Adobe Illustrator Sketchup for massing models CNC machine for physical model Physical model construction Systems Used Internal Courtyard + Art Gallery Petrie Information Exchange
  • 14.
    1:20000 1 2 2 2 2 2b 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 5a 5b 5c Gympie Gympie Petrie Petrie PETRIE TrainLine TrainLine Anzac 5a. MainAmphitheatre 5b. Small Amphitheatre 5c. Fitness Centre + Pool 1. PETRIE INFORMATION EXCHANGE 2. Campus Buildings 2b Mangrove Education Centre 3. Permaculture Planting 4. Eco-Luxury Housing Proposed Masterplan
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
    Information Hub StreetScape Local Farmer Markets Playgrounds Sketch Vignettes
  • 20.
    Brief A structure thatcan accommodate the House of Representatives outside of Canberra. The Elaine Elizabeth Darling Forum is the structure in Brisbane in King George Square. The new structure is a gift to the city/town as a permanent facility that adds to their public buildings. The new structure is adaptable for multiple cultural events for the city/town. Elaine Elizabeth Darling Forum Capithetical competition: international competition to design a hypothetical Australian capital city. Design Ideas
  • 21.
    2 3 4 5 1 Revit Adobe InDesign Adobe Photoshop AdobeIllustrator Sketchup for massing models CNC machine for physical model Physical model construction Systems Used
  • 22.
    Roof Office Storage Viewing seated andstanding areas Circulation around and through the building Toilets All lower level bases,chairs, tables etc storage on stage rigging system Catering Kitchen Single Offices Large Meeting Room Adjustable Meeting Room Hot Desks Lounge Photovoltaic Blades Circulation Hexagonal Parliament Circulation Toilets 1 2 3 4 5 Core
  • 23.
    Exhibition Grounds: BowenHills Transport of the mails, Transport of the human voice, Transport of flickering pictures- in this century as in others our highest accomplishments still have the single aim of bringing men together. Antoine de Saint-Exupery Brief Create 60+ high density dwellings on the Bowen Hills / RNA exhibition site with a focus on sustainability. Design ideas This development is situated in the hub of transport connections for Brisbane, next to a proposed new O’Connell Terrace Station. The key commitment for this community is to use these connections, and abandon car ownership. Adobe InDesign Adobe Photoshop Adobe Illustrator Sketchup Physical model construction Systems Used
  • 24.
    Train Station access directto city and suburbs. No need for car ownership in this building. Water Tanks collecting rainwater on roof for rooftop garden irrigation of market gardens. Rooftop Gardens Rooftops are used for growing vegetables, fruit, and herbs for the community. Summer Sun Summer sun shading by projecting covered balconies. Winter Sun Northern winter sun warms the balconies and into the living spaces of the apartments. Community Spaces The arcade provides the access point for both towers, gardens, creche, library, cafe and share market. This is the neighbourhood street. Energy Photovoltaic cells are installed on the sun shading for the roof top gardens. Cross Ventilation single loaded corridors allow cross ventilation throughout every apartment. Water Recycling treated grey water reticulation supply system recycles water for landscape irrigation and toilet flushingConnection to the Earth Bringing back the Verandah Sharing the leisure space Sharing the opportunity to grow to eat Sharing of lives and stories Sharing of smiles
  • 25.
    Animation Design: HowardSmith Brief Utilising the animation software: Blender, and traditional architectural methods of site analysis, readings, pro- gramming and diagramming design; determine and design a public use for the Howard Smith Wharves site under the Storey Bridge, Brisbane. Design Ideas Howard Smith Wharves is transposed from a inner city wasteland into a park, ferry terminal and amphitheater to meet the needs of the growing population of inner city Brisbane, Fortitude Valley and New Farm. The undulating forms of the folie playground provide rest and shade and respite from the city and were developed through the study of children playing on site. The Multi-use community space amphitheatre and ferry terminal provide a transport focus and meeting / performance space for the local community and allow for continued pedes- trian traffic to enliven and stimulate this corner of the Brisbane city riverside.
  • 26.
    A designer mustfirst document the existing conditions of a problem, define its context, and collect relevant data to be assimilated and analyzed. Francis Ching Blender , Sketchup and Revit Adobe InDesign, Illustrator and Photoshop 3D physical printer Powerpoint presentation Systems Used
  • 28.
    Collaborative Design: LonePine Koala Sanctuary Child Care Centre Rainwater Harvesting Photovoltaic solar cells Solar cells collect the sun and can be utilised in indoor lighting and any unused can be sold back to the grid. Rainwater is used in toilets and in the laundry. Rainwater used in garden irrigation Brief Provide a childcare facility adjacent to the Lone Pine Koala sanctuary, Fig Tree Pocket Brisbane, that will provide facilities for the families of workers at the Sanc- tuary and for the local community. The Facility must work in harmony with the Sanctuary and be based on principles of sustainability. Design Ideas Lone Pine Cielo Koala Sanctuary. Cielo is Italian for Canopy. The Reggio Emilia inspired kindergarten at Lone Pine Koala Sanctuary is proposed as a canopy of care for children and for the environment. Sustainable construction and sustainable maintenance are key principles of the Cielo proposal. Recycled wood, cork and carpets to be utilised in the construction. Rainwater harvesting, solar panels and CBUS aided natural ventilation to reduce energy consumption in use. Revit Sketchup for massing models Hand drawing and sketching Adobe InDesign, Illustrator and Photoshop Systems Used
  • 29.
    Built Works: Bathroomand Bedroom Renovation 891 2371 24127852187 1870 2070 2701 421 1050 1041 785865 5384100100 MASTER BEDROOM STUDY ENSUITE DEMOLITION PLAYROOM Verandah Verandah Wall to be removed and rebuilt in line with front wall. Wall to be removed and rebuilt to form Meg's bedroom. Aluminium sliding windows on this wall that form Meg's bedroom to be removed and replaced with antique windows. Railing to be removed in part to form the wall of Meg's bedroom. 1004355 10010401239100145410044810321001359100 2500100 2300 100 2305 1001003645100 1003650100 PRODUCEDBYANAUTODESKSTUDENTPRODUCT Before Provide Design and Project Management for a renovation of a master bedroom, ensuite and walk-in-robe. The 1905 house in Ashgrove, had an existing 1970/80’s ensuite to the master bedroom that was badly in need of update and no built in wardrobes. Design Ideas & Construction The design included a small extension onto the front verandah and a resuming of some of the playroom space to the rear, to provide opportunity for the walk in robe and ensuite. Design attention was paid to maximising the heritage features of the room, including the owner’s chest of drawers that had sentimental importance, maximising space in the walk-in-robe and providing a luxurious spa-like atmos- phere in the ensuite to create a sanctuary for the parents. Revit MS Project and Excel for Project Management Systems used Brief
  • 31.
    After 7852237 1870 2070 1153100 100100 50 100 100 100 1775100100890 3386 100100 1045 100 1500 100 1553 600 600 2405 Veitch stainless steel shower channel, 1200 mm long 'Aqua' grate. Showers supplied - this end hand held bar shower - rain shower other end ENSUITE WALK -IN ROBE MASTER BEDROOM Fixed glass shower screen 700600 Bedside table not fixed client supplied Chest of drawers not fixed wall to fit this furniture Heated Towel rail supplied Full length mirror 1051 Window seat Install antique windows - client supplied Remove french doors and fan light reinstall within new wall on verandah. fall of the tiles MEG'S BEDROOM Mirror cabinets above vanity, with press seals. Marble top custom made vanity. 2170 2700 7336 864785467 34891001945 TO BE 8384 100189510034891002170 506007105851001308100807621239 100 2170 1003745100 1855110164015001145100 100 820 PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCEDBYANAUTODESKSTUDENTPRODUCT PRODUCEDBYANAUTODESKSTUDENTPRODUCT
  • 34.
    Katie Devitt katie@gfsdesign.com.au 0419 730934 43 Panorama StreetAshgrove Q 4060 twitter: #katiedevitt