ASCE – Tri‐County Workshop
L‐8 Flow Equalization Basin 
and C‐51 Reservoir
May 10, 2013
Tommy Strowd, PE
SFWMD Assistant Executive Director
Restoration Strategies Key Projects
2
 Existing
 Northwestern Palm Beach 
County
 Former 950‐acre rock mine
 46,000 ac/ft of storage
 Capture and store excess surface 
water from L‐8 basin
 Benefit South Florida’s ecosystem 
and sustain regional water 
supplies
L‐ 8 Reservoir
L‐ 8 Canal
J WCorbett Wildlife 
Management Area
Water 
Catchment 
Area
Loxahatchee 
Slough
Arthur R. Marshall
Loxahatchee 
National Wildlife 
Refuge
WellingtonWellington
Fox TrailFox Trail Royal Palm 
Beach
Royal Palm 
Beach
Palm Beach 
International 
Airport
Palm Beach 
International 
Airport
Lake WorthLake Worth
GreenacresGreenacres
Rivera 
Beach
Rivera 
Beach
North Palm 
Beach
North Palm 
Beach
West Palm 
Beach
West Palm 
Beach
Palm Beach 
Gardens
Palm Beach 
Gardens
Southern BlvdSouthern Blvd
TurnpikeTurnpike
95
95
95
TurnpikeTurnpike
 Existing
 Northwestern Palm 
Beach County
 Former 950‐acre rock 
mine
 46,000 ac/ft of storage
 Benefit South Florida’s 
ecosystem
 Essential Feature in the 
District’s Restoration 
Strategies for WQ in 
the Everglades
 Assist in sustaining 
regional water supplies
L‐8 ReservoirL‐8 Reservoir
L‐8 Reservoir
Arthur R. Marshall
Loxahatchee 
National Wildlife 
Refuge
 Existing
 Northwestern Palm Beach 
County
 Former 950‐acre rock mine
 46,000 ac/ft of storage
 Capture and store excess surface 
water from L‐8 basin
 Benefit South Florida’s ecosystem 
and sustain regional water 
supplies
L‐ 8 Reservoir
L‐ 8 Canal
J WCorbett Wildlife 
Management Area
Water 
Catchment 
Area
Loxahatchee 
Slough
Arthur R. Marshall
Loxahatchee 
National Wildlife 
Refuge
WellingtonWellington
Fox TrailFox Trail Royal Palm 
Beach
Royal Palm 
Beach
Palm Beach 
International 
Airport
Palm Beach 
International 
Airport
Lake WorthLake Worth
GreenacresGreenacres
Rivera 
Beach
Rivera 
Beach
North Palm 
Beach
North Palm 
Beach
West Palm 
Beach
West Palm 
Beach
Palm Beach 
Gardens
Palm Beach 
Gardens
Southern BlvdSouthern Blvd
TurnpikeTurnpike
95
95
95
TurnpikeTurnpike
Existing L-8
Reservoir
Existing L-8
Reservoir
Proposed C‐51 
Reservoir
Proposed C‐51 
Reservoir
 Proposed 
 Located in western 
Palm Beach County
 75,000 ac/ft of 
storage
 Capture and store 
excess surface water 
from C‐51 basin
 Increased water 
storage and delivery 
to help benefit South 
Florida’s regional 
water supplies
 Reduce harmful 
discharges to the 
Lake Worth LagoonLake Worth
Lagoon
Lake Worth
Lagoon
C‐51 Reservoir
L‐8/Northern 
ITID Basin
Lake
Okeechobee
C‐51 West 
Basin
Source of Water
L‐8 Flow 
Equalization 
Basin (FEB)
6
L‐8 Flow Equalization Basin (FEB)
• Component of the Eastern Flow Path
– Storage initially acquired in 2003 
• 950 acres, Excavated to ‐42 feet NAVD, 
45,000 acre feet capacity
– Divided into 6 cells
– Adjacent to and west of the L‐8 Canal
7
L‐8 Flow Equalization Basin (FEB)
• Component Purpose
– Part of Eastern Flow Path 
• Attenuates peak flows from S‐5A and C‐51W 
basins
• Reduces impact of storm event inflows and 
optimizes STA inflow rates
• Works in conjunction with other Eastern Flow 
Path Projects
– L‐8 Divide Structure, STA 1W Expansion, S‐375 
Structure, S‐5A South Divide Structure 
8
L‐8 Flow Equalization Basin (FEB)
Unique Geology
9
L‐8 Flow Equalization Basin (FEB)
Project Description
• Design and Construct Infrastructure to 
Utilize Existing Storage
– 450 cfs outflow pump station
– 3,000 cfs inflow structure
– Embankment revetment – Soil Cement
– Reservoir Improvements – Cell‐to‐cell cuts
11
• Executed Design/Build Contract in 
September 2012
– Archer Western/Jacobs Engineering
– $64 M
– Construction complete
• 18‐April‐2015
– Testing and Commissioning Complete
• 15‐Oct‐2015
12
L‐8 Flow Equalization Basin (FEB)
Project Overview
L‐8 Flow Equalization Basin (FEB)
Project Overview
13
L‐8 FEB
Pump Station
L‐8 FEB
Pump Station
L‐8 Flow Equalization Basin (FEB)
Soil Cement Revetment
TOB  23’ NAVD
Ties into
existing 
rock shelf
~ 3‐5’ NAVD
15
L‐8 Flow Equalization Basin (FEB)
Dewatering Operations
16
C‐51 Reservoir 
Proposed Project
17
C‐51 Reservoir
Future Water Supplies
• Lower East Coast Water 
Supply Plan under way
– Targeted for 
completion 2013
• Water sources capped
– Regional Water 
Availability Rule 
approved 2007
• Feasibility Study focus
– Modeling of storage 
capability
– Quantity of water lost 
to tide
– Ability to move water 
through canal system 
to create head
C‐51 Reservoir 
Sub‐Regional Geology
C‐51 Reservoir
C‐51 Discharges to Lake Worth Lagoon
C‐51 Reservoir
Saltwater Intrusion 
C‐51 Reservoir
C‐51 Canal Conveyance Capacity
• Challenges for western PBC 
communities
C‐51 Reservoir 
Conveyance 
Reports have shown that it 
is feasible to use a 
combination of District &  
Lake Worth Drainage 
District facilities
C‐51 Reservoir
Summary of Benefits
• Regionally significant project with 
multiple public purposes
• Beneficial use of water lost to tide
• Decrease in harmful fresh water 
releases to Lake Worth Lagoon
• Long‐term & cost‐effective Alternative 
Water Supply
• Potential flood relief for western Palm 
Beach County
• Sea level rise & saltwater intrusion 
benefits
• Location and geology
• Cross roads
• Extensive canal infrastructure & 
conveyance capabilities
• Stakeholder interest and support
C‐51 Reservoir 
SFWMD Considerations
 Construction: cost, schedule, 
performance, technology, 
completion and delivery
 Operations and Maintenance: cost 
and performance (fee)
 Renewal, replacement and life cycle 
costs
 Supply of water
 Contracts for water storage/market 
alternatives
 Financing/Credit Rating
 Regulatory 
C‐51 Reservoir
District Infrastructure Connections Could 
Substantially Reduce Project Costs for Utilities
Phase 1 costs  with independent
Infrastructure   $186.5  million
Phase 1 costs  with connection
to L‐8 Reservoir   $150.5  million
Questions

More Related Content

Viewers also liked

BRAVO_ROBAYO_GIOVANNY_AA1_BOCETAR
BRAVO_ROBAYO_GIOVANNY_AA1_BOCETARBRAVO_ROBAYO_GIOVANNY_AA1_BOCETAR
BRAVO_ROBAYO_GIOVANNY_AA1_BOCETARGEBRAVO
 
Minutes 3rd May NBN Digital Learning Project workshop hvha v3
Minutes 3rd May NBN Digital Learning Project workshop hvha v3Minutes 3rd May NBN Digital Learning Project workshop hvha v3
Minutes 3rd May NBN Digital Learning Project workshop hvha v3nicholebarnes
 
Direccion hidraulica
Direccion hidraulicaDireccion hidraulica
Direccion hidraulicaDiego Procel
 
Victor medios de comunicacion
Victor medios de comunicacionVictor medios de comunicacion
Victor medios de comunicacionvictorcrespin
 
Tarea de relevamiento
Tarea de relevamientoTarea de relevamiento
Tarea de relevamientobrunitto686
 
Let's geek! (1)
Let's geek! (1) Let's geek! (1)
Let's geek! (1) nerdsday
 
Can I Solar: How it Works
Can I Solar: How it WorksCan I Solar: How it Works
Can I Solar: How it WorksGabriel Michael
 
Soalan pkbs3
Soalan pkbs3Soalan pkbs3
Soalan pkbs3shah mohd
 
Alabama's Scenic Byways
Alabama's Scenic BywaysAlabama's Scenic Byways
Alabama's Scenic BywaysScenicAlabama
 
Impressão 3D para Campus Party
Impressão 3D para Campus PartyImpressão 3D para Campus Party
Impressão 3D para Campus PartyRafael Pasqua
 
Health practitioner vaccination (Melb) May13
Health practitioner vaccination (Melb) May13Health practitioner vaccination (Melb) May13
Health practitioner vaccination (Melb) May13Marie Bismark
 
Ebook: Guia de inteligência competitiva
Ebook: Guia de inteligência competitivaEbook: Guia de inteligência competitiva
Ebook: Guia de inteligência competitivaXtrategie
 

Viewers also liked (17)

BRAVO_ROBAYO_GIOVANNY_AA1_BOCETAR
BRAVO_ROBAYO_GIOVANNY_AA1_BOCETARBRAVO_ROBAYO_GIOVANNY_AA1_BOCETAR
BRAVO_ROBAYO_GIOVANNY_AA1_BOCETAR
 
Minutes 3rd May NBN Digital Learning Project workshop hvha v3
Minutes 3rd May NBN Digital Learning Project workshop hvha v3Minutes 3rd May NBN Digital Learning Project workshop hvha v3
Minutes 3rd May NBN Digital Learning Project workshop hvha v3
 
Direccion hidraulica
Direccion hidraulicaDireccion hidraulica
Direccion hidraulica
 
Victor medios de comunicacion
Victor medios de comunicacionVictor medios de comunicacion
Victor medios de comunicacion
 
Tarea de relevamiento
Tarea de relevamientoTarea de relevamiento
Tarea de relevamiento
 
Let's geek! (1)
Let's geek! (1) Let's geek! (1)
Let's geek! (1)
 
Aperson
ApersonAperson
Aperson
 
Can I Solar: How it Works
Can I Solar: How it WorksCan I Solar: How it Works
Can I Solar: How it Works
 
Soalan pkbs3
Soalan pkbs3Soalan pkbs3
Soalan pkbs3
 
Alabama's Scenic Byways
Alabama's Scenic BywaysAlabama's Scenic Byways
Alabama's Scenic Byways
 
Memorial
MemorialMemorial
Memorial
 
Obredis
ObredisObredis
Obredis
 
Impressão 3D para Campus Party
Impressão 3D para Campus PartyImpressão 3D para Campus Party
Impressão 3D para Campus Party
 
Presentation1
Presentation1Presentation1
Presentation1
 
Health practitioner vaccination (Melb) May13
Health practitioner vaccination (Melb) May13Health practitioner vaccination (Melb) May13
Health practitioner vaccination (Melb) May13
 
EFTA
EFTAEFTA
EFTA
 
Ebook: Guia de inteligência competitiva
Ebook: Guia de inteligência competitivaEbook: Guia de inteligência competitiva
Ebook: Guia de inteligência competitiva
 

Similar to 1.4 l 8 feb and c51 reservoir

Beauty in the backwaters
Beauty in the backwatersBeauty in the backwaters
Beauty in the backwatersPark Pride
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor ProjectSean Merrell
 
Trinity River Corridor Project 2011
Trinity River Corridor Project 2011Trinity River Corridor Project 2011
Trinity River Corridor Project 2011Sean Merrell
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...ascemiami-dade
 
Environmental Permitting of Lake Ralph Hall, Larry Patterson and Ed Motley -...
Environmental Permitting of Lake Ralph Hall,  Larry Patterson and Ed Motley -...Environmental Permitting of Lake Ralph Hall,  Larry Patterson and Ed Motley -...
Environmental Permitting of Lake Ralph Hall, Larry Patterson and Ed Motley -...TWCA
 
Nichi.11-12-13.coastal louisiana.garretgraves
Nichi.11-12-13.coastal louisiana.garretgravesNichi.11-12-13.coastal louisiana.garretgraves
Nichi.11-12-13.coastal louisiana.garretgravesNICHI_USA
 
Colorado water conservation board and great outdoors colorado funding sources...
Colorado water conservation board and great outdoors colorado funding sources...Colorado water conservation board and great outdoors colorado funding sources...
Colorado water conservation board and great outdoors colorado funding sources...rshimoda2014
 
A Case Study of Heyburn State Park
A Case Study of Heyburn State ParkA Case Study of Heyburn State Park
A Case Study of Heyburn State ParkJoshua Arnold
 
View Royal Open House Boards Final
View Royal Open House Boards FinalView Royal Open House Boards Final
View Royal Open House Boards FinalKeltie Chamberlain
 
MST_ProjExpSumm (as of 2014)
MST_ProjExpSumm (as of 2014)MST_ProjExpSumm (as of 2014)
MST_ProjExpSumm (as of 2014)MSTomlinson
 
Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...
Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...
Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...Michael Hewitt, GISP
 
Public Forum on the Future of the Anacostia Waterfront
Public Forum on the Future of the Anacostia WaterfrontPublic Forum on the Future of the Anacostia Waterfront
Public Forum on the Future of the Anacostia WaterfrontAnacostia Waterfront Trust
 
Lake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake TahoeLake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake TahoeCrowdbrite
 

Similar to 1.4 l 8 feb and c51 reservoir (20)

Storm water treatment areas
Storm water treatment areasStorm water treatment areas
Storm water treatment areas
 
Beauty in the backwaters
Beauty in the backwatersBeauty in the backwaters
Beauty in the backwaters
 
Trinity River Corridor Project
Trinity  River Corridor ProjectTrinity  River Corridor Project
Trinity River Corridor Project
 
Finnegan Sess12 102409
Finnegan Sess12 102409Finnegan Sess12 102409
Finnegan Sess12 102409
 
Muskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success StoryMuskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success Story
 
Trinity River Corridor Project 2011
Trinity River Corridor Project 2011Trinity River Corridor Project 2011
Trinity River Corridor Project 2011
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...
 
Magness Sess12 102609
Magness Sess12 102609Magness Sess12 102609
Magness Sess12 102609
 
Environmental Permitting of Lake Ralph Hall, Larry Patterson and Ed Motley -...
Environmental Permitting of Lake Ralph Hall,  Larry Patterson and Ed Motley -...Environmental Permitting of Lake Ralph Hall,  Larry Patterson and Ed Motley -...
Environmental Permitting of Lake Ralph Hall, Larry Patterson and Ed Motley -...
 
Nichi.11-12-13.coastal louisiana.garretgraves
Nichi.11-12-13.coastal louisiana.garretgravesNichi.11-12-13.coastal louisiana.garretgraves
Nichi.11-12-13.coastal louisiana.garretgraves
 
Lake shady plans
Lake shady plansLake shady plans
Lake shady plans
 
Colorado water conservation board and great outdoors colorado funding sources...
Colorado water conservation board and great outdoors colorado funding sources...Colorado water conservation board and great outdoors colorado funding sources...
Colorado water conservation board and great outdoors colorado funding sources...
 
A Case Study of Heyburn State Park
A Case Study of Heyburn State ParkA Case Study of Heyburn State Park
A Case Study of Heyburn State Park
 
2016 top 100 family fishing & boating spots
2016 top 100 family fishing & boating spots2016 top 100 family fishing & boating spots
2016 top 100 family fishing & boating spots
 
View Royal Open House Boards Final
View Royal Open House Boards FinalView Royal Open House Boards Final
View Royal Open House Boards Final
 
MST_ProjExpSumm (as of 2014)
MST_ProjExpSumm (as of 2014)MST_ProjExpSumm (as of 2014)
MST_ProjExpSumm (as of 2014)
 
Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...
Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...
Amy Wolfe, Trout Unlimited, "A Decade of Progress for the West Branch Susqueh...
 
Public Forum on the Future of the Anacostia Waterfront
Public Forum on the Future of the Anacostia WaterfrontPublic Forum on the Future of the Anacostia Waterfront
Public Forum on the Future of the Anacostia Waterfront
 
Claire Robinson
Claire RobinsonClaire Robinson
Claire Robinson
 
Lake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake TahoeLake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake Tahoe
 

More from ascemiami-dade

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...ascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvementsascemiami-dade
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectascemiami-dade
 
2.4 fll airport improvements
2.4 fll airport improvements2.4 fll airport improvements
2.4 fll airport improvementsascemiami-dade
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvementsascemiami-dade
 
3.2 wpb transit village
3.2 wpb transit village3.2 wpb transit village
3.2 wpb transit villageascemiami-dade
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plansascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.1 port of miami tunnel cei
2.1 port of miami tunnel cei2.1 port of miami tunnel cei
2.1 port of miami tunnel ceiascemiami-dade
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoirascemiami-dade
 

More from ascemiami-dade (20)

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvements
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
2.4 fll airport improvements
2.4 fll airport improvements2.4 fll airport improvements
2.4 fll airport improvements
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progression
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvements
 
4 public policy panel
4   public policy panel4   public policy panel
4 public policy panel
 
4 cards
4   cards4   cards
4 cards
 
3.2 wpb transit village
3.2 wpb transit village3.2 wpb transit village
3.2 wpb transit village
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plans
 
3 climate change
3   climate change3   climate change
3 climate change
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.1 port of miami tunnel cei
2.1 port of miami tunnel cei2.1 port of miami tunnel cei
2.1 port of miami tunnel cei
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir
 
1.3 pbcwud update
1.3 pbcwud update1.3 pbcwud update
1.3 pbcwud update
 
1.2 bcwws update
1.2 bcwws update1.2 bcwws update
1.2 bcwws update
 
1.1 mdwasd update
1.1 mdwasd update1.1 mdwasd update
1.1 mdwasd update
 

1.4 l 8 feb and c51 reservoir