SlideShare a Scribd company logo
NORTH ELEVATION
BISTRO
PARKING
EAST ELEVATION
ENGINEERING
ARCHITECTURE &
PLANNING
320-324 W. VALLEY BOULEVARD
SAN GABRIEL, CA, 91776
NORTH ELEVATION
SCALE: 3
32" = 1'-0"
EAST ELEVATION
SCALE: 3
32" = 1'-0"
ELEVATION NOTES
A- Stone veneer
B- Aluminum Storefront
C- Aluminum Entrance Door
D- Canopy
E- Metal Roof
F- Trellis
G- Building Signage
H- Steel Tower
I- Roof Garden
J- Stair to Roof
K- Planter
L- Parapet Coping
M- Cornice
N- Parking Entrance
O- Clear Story Window
P- Wall Paint Finished
ABCD EF C DG G HH I JK KL N OP
6
GROUP0DwgDWG121251312513.dwg, 9/22/2015 3:33:37 PM, DWG To PDF.pc3

More Related Content

What's hot

Konstantinos.S.Brellas.Resume TN
Konstantinos.S.Brellas.Resume TNKonstantinos.S.Brellas.Resume TN
Konstantinos.S.Brellas.Resume TN?????? ????????
 
Building-Performance case study: Toondah Harbour, Cleveland
Building-Performance case study: Toondah Harbour, ClevelandBuilding-Performance case study: Toondah Harbour, Cleveland
Building-Performance case study: Toondah Harbour, Clevelandbuildingperformance
 
CURRICULUM VITAE1
CURRICULUM VITAE1CURRICULUM VITAE1
CURRICULUM VITAE1Yas Eid
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5Campus
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015Hassan gariesh
 

What's hot (7)

cv mohamed mostafa 6
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6
 
Konstantinos.S.Brellas.Resume TN
Konstantinos.S.Brellas.Resume TNKonstantinos.S.Brellas.Resume TN
Konstantinos.S.Brellas.Resume TN
 
Building-Performance case study: Toondah Harbour, Cleveland
Building-Performance case study: Toondah Harbour, ClevelandBuilding-Performance case study: Toondah Harbour, Cleveland
Building-Performance case study: Toondah Harbour, Cleveland
 
CURRICULUM VITAE1
CURRICULUM VITAE1CURRICULUM VITAE1
CURRICULUM VITAE1
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
P15921-1(23) North Elevation Proposed (1)
P15921-1(23) North Elevation Proposed (1)P15921-1(23) North Elevation Proposed (1)
P15921-1(23) North Elevation Proposed (1)
 

Viewers also liked (6)

12513-A1
12513-A112513-A1
12513-A1
 
12513-A5
12513-A512513-A5
12513-A5
 
12513-A3
12513-A312513-A3
12513-A3
 
12513-A4
12513-A412513-A4
12513-A4
 
12513-A7
12513-A712513-A7
12513-A7
 
12513-A2
12513-A212513-A2
12513-A2
 

12513-A6

  • 1. NORTH ELEVATION BISTRO PARKING EAST ELEVATION ENGINEERING ARCHITECTURE & PLANNING 320-324 W. VALLEY BOULEVARD SAN GABRIEL, CA, 91776 NORTH ELEVATION SCALE: 3 32" = 1'-0" EAST ELEVATION SCALE: 3 32" = 1'-0" ELEVATION NOTES A- Stone veneer B- Aluminum Storefront C- Aluminum Entrance Door D- Canopy E- Metal Roof F- Trellis G- Building Signage H- Steel Tower I- Roof Garden J- Stair to Roof K- Planter L- Parapet Coping M- Cornice N- Parking Entrance O- Clear Story Window P- Wall Paint Finished ABCD EF C DG G HH I JK KL N OP 6 GROUP0DwgDWG121251312513.dwg, 9/22/2015 3:33:37 PM, DWG To PDF.pc3