                       10,000 kiloliter (㎘)/year
             BDF production plant preliminary cost estimate
Plant Specifications

1. BDF Production capacity:         10,000 ㎘/year
                                    30 ㎘/day(360 days operation, 24 hours continuous)
2. Feedstock:                       Jatropha oil
3. Plant components:                Feedstock tank, BDF production tank/storage,
                                    methanol tank (electricity and water is provided on site)

4. BDF production Flow:             Please refer to the diagram below


BDF plant preliminary cost estimate
   BDF production facility

   Process                Equipment/Specifications             Quantity   Estimate cost (in
                                                                           Japanese yen)
                Feedstock tank
                 Feedstock receiving tank 30 ㎘                        2          20,000,000
1. Reaction     Methanol tank 20 ㎘                                    1          10,000,000
   process      No.1 decompressor                                     2          20,000,000
                Reaction tank: with agitator                          2          20,000,000
                 Tank capacity 3.0 m3
                Catalyst mixing tank: with agitator                   1          10,000,000
                 Tank capacity 0.75m3

                Separator container
2. Refining      Tank capacity: 2.9m3                                15          75,000,000
   process      Glycerine tank
                 Tank capacity: 15 ㎘                                  1          10,000,000
                Refining column (with exchange equipment
                as accessory)                                         4           8,000,000
                 Column capacity 0.2m3                                2          80,000,000
                Centrifuge (automatic blow)                           1          10,000,000
                No.2 decompressor                                     2          40,000,000
                 Product buffer tank mixing line as
                 accessory)

3. Storage      Product tank:
   process       Tank capacity: 100 ㎘                              2基            30,000,000



4. Others       Mount                                                            20,000,000
                Utility                                                          40,000,000
                Administration cost                                             100,000,000
                 (design, engineering, paperwork)

                Total                                                           493,000,000
CDM Consulting Co., Ltd.




BDF production facility
Total: 493,000,000 yen

CDM Consulting Co., Ltd. BDF Production Flow
 *The quantity and dimension of equipment may change according to BDF production
capacity

More Related Content

Similar to 10,000 kiloliter capacity_bdf_plant-1

Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingPRAN-RFL Group
 
Water Distribution Planning
Water Distribution PlanningWater Distribution Planning
Water Distribution PlanningDan Barr
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)PRAN-RFL Group
 
Throughput accounting assignment
Throughput accounting assignmentThroughput accounting assignment
Throughput accounting assignmentnadric
 
Textile printing project dr.azhar 2004
Textile printing project dr.azhar 2004Textile printing project dr.azhar 2004
Textile printing project dr.azhar 2004softbiz1
 
Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)
Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)
Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)Farming Futures
 
Bajaj Auto Limited(Aurangabad division) Waluj
Bajaj Auto Limited(Aurangabad division) WalujBajaj Auto Limited(Aurangabad division) Waluj
Bajaj Auto Limited(Aurangabad division) WalujIndia Water Portal
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125ennioeni
 
CALB Presentation
CALB PresentationCALB Presentation
CALB Presentationgerrardjiao
 
Calb Presentation
Calb PresentationCalb Presentation
Calb Presentationgerrardjiao
 
Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.
Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.
Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.Scale-up Systems
 
17 Nov08 Campos Rodrigues
17 Nov08  Campos Rodrigues17 Nov08  Campos Rodrigues
17 Nov08 Campos Rodriguesh2portugal
 
96130014 cost-accounting-series-3-2010-code3017
96130014 cost-accounting-series-3-2010-code301796130014 cost-accounting-series-3-2010-code3017
96130014 cost-accounting-series-3-2010-code3017priya5594
 
AutoStore Almacen Automatico Sin Pasillos
AutoStore Almacen Automatico Sin PasillosAutoStore Almacen Automatico Sin Pasillos
AutoStore Almacen Automatico Sin Pasillosetsystems
 
Fluid bed dryer
Fluid bed dryerFluid bed dryer
Fluid bed dryerVM Sethi
 
Fluid bed dryer
Fluid bed dryerFluid bed dryer
Fluid bed dryerVM Sethi
 

Similar to 10,000 kiloliter capacity_bdf_plant-1 (20)

Goal One
Goal OneGoal One
Goal One
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Water Distribution Planning
Water Distribution PlanningWater Distribution Planning
Water Distribution Planning
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)
 
Throughput accounting assignment
Throughput accounting assignmentThroughput accounting assignment
Throughput accounting assignment
 
Textile printing project dr.azhar 2004
Textile printing project dr.azhar 2004Textile printing project dr.azhar 2004
Textile printing project dr.azhar 2004
 
Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)
Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)
Rainwater Harvesting: Installation & Pitfalls - Simon Jones (Even Products Ltd)
 
Bajaj Auto Limited(Aurangabad division) Waluj
Bajaj Auto Limited(Aurangabad division) WalujBajaj Auto Limited(Aurangabad division) Waluj
Bajaj Auto Limited(Aurangabad division) Waluj
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125
 
CALB Presentation
CALB PresentationCALB Presentation
CALB Presentation
 
Calb Presentation
Calb PresentationCalb Presentation
Calb Presentation
 
AGI MILLTEC RICE MILLING .pdf
AGI MILLTEC RICE MILLING .pdfAGI MILLTEC RICE MILLING .pdf
AGI MILLTEC RICE MILLING .pdf
 
Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.
Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.
Applications in Kilo Lab Flow Chemistry and Scale-up. Edel Hughes.
 
ICE PLANT
ICE PLANTICE PLANT
ICE PLANT
 
Achema industrial heat pumps v6
Achema industrial heat pumps v6Achema industrial heat pumps v6
Achema industrial heat pumps v6
 
17 Nov08 Campos Rodrigues
17 Nov08  Campos Rodrigues17 Nov08  Campos Rodrigues
17 Nov08 Campos Rodrigues
 
96130014 cost-accounting-series-3-2010-code3017
96130014 cost-accounting-series-3-2010-code301796130014 cost-accounting-series-3-2010-code3017
96130014 cost-accounting-series-3-2010-code3017
 
AutoStore Almacen Automatico Sin Pasillos
AutoStore Almacen Automatico Sin PasillosAutoStore Almacen Automatico Sin Pasillos
AutoStore Almacen Automatico Sin Pasillos
 
Fluid bed dryer
Fluid bed dryerFluid bed dryer
Fluid bed dryer
 
Fluid bed dryer
Fluid bed dryerFluid bed dryer
Fluid bed dryer
 

More from ehiosa

Cdm bhcs technology_pamphlet
Cdm bhcs technology_pamphletCdm bhcs technology_pamphlet
Cdm bhcs technology_pamphletehiosa
 
Glovapp Presentation140709
Glovapp Presentation140709Glovapp Presentation140709
Glovapp Presentation140709ehiosa
 
Hotel Isreals
Hotel IsrealsHotel Isreals
Hotel Isrealsehiosa
 
OZONAIR deodorizes and sterilizer
OZONAIR deodorizes and sterilizerOZONAIR deodorizes and sterilizer
OZONAIR deodorizes and sterilizerehiosa
 
Business History Of Sd[1]
Business History Of Sd[1]Business History Of Sd[1]
Business History Of Sd[1]ehiosa
 
Nccij 1
Nccij 1Nccij 1
Nccij 1ehiosa
 

More from ehiosa (6)

Cdm bhcs technology_pamphlet
Cdm bhcs technology_pamphletCdm bhcs technology_pamphlet
Cdm bhcs technology_pamphlet
 
Glovapp Presentation140709
Glovapp Presentation140709Glovapp Presentation140709
Glovapp Presentation140709
 
Hotel Isreals
Hotel IsrealsHotel Isreals
Hotel Isreals
 
OZONAIR deodorizes and sterilizer
OZONAIR deodorizes and sterilizerOZONAIR deodorizes and sterilizer
OZONAIR deodorizes and sterilizer
 
Business History Of Sd[1]
Business History Of Sd[1]Business History Of Sd[1]
Business History Of Sd[1]
 
Nccij 1
Nccij 1Nccij 1
Nccij 1
 

10,000 kiloliter capacity_bdf_plant-1

  • 1. CDM Consulting Co., Ltd. 10,000 kiloliter (㎘)/year BDF production plant preliminary cost estimate Plant Specifications 1. BDF Production capacity: 10,000 ㎘/year 30 ㎘/day(360 days operation, 24 hours continuous) 2. Feedstock: Jatropha oil 3. Plant components: Feedstock tank, BDF production tank/storage, methanol tank (electricity and water is provided on site) 4. BDF production Flow: Please refer to the diagram below BDF plant preliminary cost estimate BDF production facility Process Equipment/Specifications Quantity Estimate cost (in Japanese yen) Feedstock tank Feedstock receiving tank 30 ㎘ 2 20,000,000 1. Reaction Methanol tank 20 ㎘ 1 10,000,000 process No.1 decompressor 2 20,000,000 Reaction tank: with agitator 2 20,000,000 Tank capacity 3.0 m3 Catalyst mixing tank: with agitator 1 10,000,000 Tank capacity 0.75m3 Separator container 2. Refining Tank capacity: 2.9m3 15 75,000,000 process Glycerine tank Tank capacity: 15 ㎘ 1 10,000,000 Refining column (with exchange equipment as accessory) 4 8,000,000 Column capacity 0.2m3 2 80,000,000 Centrifuge (automatic blow) 1 10,000,000 No.2 decompressor 2 40,000,000 Product buffer tank mixing line as accessory) 3. Storage Product tank: process Tank capacity: 100 ㎘ 2基 30,000,000 4. Others Mount 20,000,000 Utility 40,000,000 Administration cost 100,000,000 (design, engineering, paperwork) Total 493,000,000
  • 2. CDM Consulting Co., Ltd. BDF production facility Total: 493,000,000 yen CDM Consulting Co., Ltd. BDF Production Flow *The quantity and dimension of equipment may change according to BDF production capacity