SlideShare a Scribd company logo
ARCHITECTURE URBAN DESIGN PLANNING INTERIORS



             The Palm Beach County
             Sandra C. Slomin
      School & Foundation for Autism
       3005 S Congress Ave. Boynton Beach, Fl.

        Master Plan & Facility Design
Autism is a brain development disorder
               characterized by impaired social interaction
               and communication, and by restricted and
               repetitive behavior.

July 2, 2009                  OCAMPO & ASSOCIATES             2
MASTER SITE PLAN
                  SCHEME B


July 2, 2009    OCAMPO & ASSOCIATES   3
Existing Boynton Beach Site



July 2, 2009        OCAMPO & ASSOCIATES      4
PROGRAM REQUIREMENTS:
               • SCHOOL FACILITY (MAX 200 STUDENTS)        25,000 SF
               • SLOMIN FOUNDATION HEADQUARTERS FACILITY   25,000 SF
               • GYMNASIUM BUILDING                         8,500 SF
               • NATATORIUM BUILDING                        6,000 SF
               • OUTDOOR FIELDS                               TBD
               • TOTAL                                     54,500 SF

               FACILITIES PROVIDED:
               • SCHOOL FACILITY (MAX 200 STUDENTS)        35,198 SF
               • SLOMIN FOUNDATION HEADQUARTERS FACILITY   26,258 SF
               • GYMNASIUM BUILDING                         8,500 SF
               • NATATORIUM BUILDING                        6,000 SF
               • OUTDOOR FIELDS                              TBD
               • TOTAL                                     61,456 SF




July 2, 2009                       OCAMPO & ASSOCIATES                 5
The CONCEPT Analysis
               Before 159 Parking Spaces Requirement




July 2, 2009          OCAMPO & ASSOCIATES              6
The CONCEPT Analysis
                Plus 159 Parking Spaces +/-




July 2, 2009      OCAMPO & ASSOCIATES         7
The Master Plan
                  CONCEPT
                   Alternative A
July 2, 2009   OCAMPO & ASSOCIATES   8
The Master Plan
                  CONCEPT
                   Alternative B

July 2, 2009   OCAMPO & ASSOCIATES   9
The Master Plan
                  CONCEPT
                  (Alternative C)

July 2, 2009   OCAMPO & ASSOCIATES   10
The Campus Design Concept Must:
          •    Address the Uniqueness of the Autism School Program.
          •    Address the Uniqueness of the Autism Campus Concept (One Stop
               Shop) & the Connectivity of its functions.
          •    Address the Need to Introduce Natural Light as a “special” benefit to
               the Occupants.
          •    Address the special spatial and orientation needs created by ASD.
          •    Address Constraint of a “tight” site which must accommodate the very
               high parking count required due to the unique teacher / student ratio.
          •    Address the desire to develop a Concept that is environmentally
               sensitive, sustainable (based on cost / benefit) and be “GREEN”.
          •    Be capable of raising the community awareness (if not “national”
               awareness) of ASD.




                                       The Master Plan
                                         CONCEPT B

July 2, 2009                            OCAMPO & ASSOCIATES                             11
PARENT DROP OFF


                                                SLOMIN
                                              FOUNDATION

                                                                        GYM
               PLAY
               FIELDS
                        SCHOOL HOUSE
                                                           NATATORIUM


                                             FOUNDATION
                                                PLAZA




                         MASTER SITE PLAN
                            SCHEME B

July 2, 2009                OCAMPO & ASSOCIATES                               12
PARENT DROP OFF


                                               SLOMIN
                                             FOUNDATION

                                                               SLOMIN
               PLAY
                                    SCHOOL                   FOUNDATION
               FIELDS
                                     HOUSE                      OVER
                                                                GYM
                                                FOUNDATION
                                                   PLAZA




                        MASTER SITE PLAN
                           SCHEME C

July 2, 2009             OCAMPO & ASSOCIATES                              13
PHASE 1 PLANS




July 2, 2009   OCAMPO & ASSOCIATES   14
FUNCTIONAL DIAGRAM




July 2, 2009      OCAMPO & ASSOCIATES   15
July 2, 2009   OCAMPO & ASSOCIATES   16
July 2, 2009   OCAMPO & ASSOCIATES   17
July 2, 2009   OCAMPO & ASSOCIATES   18
PHASE 1
                ELEVATIONS




July 2, 2009   OCAMPO & ASSOCIATES   19
July 2, 2009   OCAMPO & ASSOCIATES   20
July 2, 2009   OCAMPO & ASSOCIATES   21
July 2, 2009   OCAMPO & ASSOCIATES   22
July 2, 2009   OCAMPO & ASSOCIATES   23
PHASE 1
                RENDERINGS




July 2, 2009   OCAMPO & ASSOCIATES   24
School House Building
                    SCHEME B

July 2, 2009     OCAMPO & ASSOCIATES   25
Cross Section
                 SCHEME B

July 2, 2009   OCAMPO & ASSOCIATES   26
Transverse Section
                   SCHEME B

July 2, 2009    OCAMPO & ASSOCIATES   27
Cross Section
                 SCHEME B

July 2, 2009   OCAMPO & ASSOCIATES   28
Detail at Atrium Space
                     SCHEME B

July 2, 2009      OCAMPO & ASSOCIATES   29
PHASE 2
                ELEVATIONS




July 2, 2009   OCAMPO & ASSOCIATES   30
July 2, 2009   OCAMPO & ASSOCIATES   31
PHASE 2
               MASTER PLAN




July 2, 2009   OCAMPO & ASSOCIATES   32
MASTER SITE PLAN SCHEME B


July 2, 2009        OCAMPO & ASSOCIATES    33
MASTER SITE PLAN
                  SCHEME B

July 2, 2009    OCAMPO & ASSOCIATES   34
PHASE 2
                RENDERINGS




July 2, 2009   OCAMPO & ASSOCIATES   35
School House Entrance
                    SCHEME B

July 2, 2009      OCAMPO & ASSOCIATES   36
Campus Entrance SCHEME B


July 2, 2009        OCAMPO & ASSOCIATES   37
View of Entry Plaza SCHEME B


July 2, 2009         OCAMPO & ASSOCIATES      38
Cross Section of Foundation Building
                            SCHEME B

July 2, 2009             OCAMPO & ASSOCIATES          39
View of Natatorium Building
                       SCHEME B

July 2, 2009        OCAMPO & ASSOCIATES      40
Cross Section of Natatorium Building
                            SCHEME B

July 2, 2009             OCAMPO & ASSOCIATES          41
Cross Section of Natatorium & Gym Building
                                SCHEME B

July 2, 2009                OCAMPO & ASSOCIATES             42
View of Natatorium Building
                       SCHEME B

July 2, 2009        OCAMPO & ASSOCIATES      43
View of Natatorium Building
                       SCHEME B

July 2, 2009        OCAMPO & ASSOCIATES      44
Cross Section of Gymnasium Building
                            SCHEME B

July 2, 2009            OCAMPO & ASSOCIATES          45
Rear View of Foundation Building
                         SCHEME B

July 2, 2009           OCAMPO & ASSOCIATES        46
MASTER SITE PLAN
                  SCHEME B

July 2, 2009    OCAMPO & ASSOCIATES   47
ALTERNATE
               MASTER PLAN




July 2, 2009   OCAMPO & ASSOCIATES   48
PARENT DROP OFF


                                               SLOMIN
                                             FOUNDATION

                                                               SLOMIN
               PLAY
                                    SCHOOL                   FOUNDATION
               FIELDS
                                     HOUSE                      OVER
                                                                GYM
                                                FOUNDATION
                                                   PLAZA




                        MASTER SITE PLAN
                           SCHEME C

July 2, 2009             OCAMPO & ASSOCIATES                              49
MASTER SITE PLAN
                  SCHEME C

July 2, 2009    OCAMPO & ASSOCIATES   50
View of Entry Plaza
                   SCHEME C

July 2, 2009    OCAMPO & ASSOCIATES   51
View of Natatorium & Gym
                       SCHEME C

July 2, 2009       OCAMPO & ASSOCIATES    52
Cross Section of Natatorium & Gym
                           SCHEME C

July 2, 2009           OCAMPO & ASSOCIATES         53
View of Rear of Campus
                     SCHEME C

July 2, 2009      OCAMPO & ASSOCIATES   54
MASTER PLAN
               RECOMMENDATION




July 2, 2009    OCAMPO & ASSOCIATES   55
MASTER SITE PLAN
                  SCHEME B

July 2, 2009    OCAMPO & ASSOCIATES   56
ARCHITECTURE URBAN DESIGN PLANNING INTERIORS
  This Presentation and its Content are the property of OCAMPO
  & ASSOCIATES, INC. and are protected by common copyright
   law. No portion of this presentation may be reproduced in
      part or in its entirety without the written permission of
                    OCAMPO & ASSOCIATES, INC.

More Related Content

What's hot

NCPA , MUMBAI
  NCPA , MUMBAI   NCPA , MUMBAI
NCPA , MUMBAI
pritesh malviya
 
Open air theater
Open air theaterOpen air theater
Open air theater
Nikita Loknathan
 
ARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDSARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDSstuti31
 
Master plan of NID Shrikant
Master plan of NID ShrikantMaster plan of NID Shrikant
Master plan of NID Shrikant
ShriKant49
 
Open air theatre Case Study
Open air theatre Case StudyOpen air theatre Case Study
Open air theatre Case Study
Amal Sridar
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
Amir Azhar
 
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Akshit Charan
 
Architectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolArchitectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus School
Rashmi Gautam
 
Tagore Theater case study
Tagore Theater case studyTagore Theater case study
Tagore Theater case study
Rohan Choudhary
 
Sabarmati Ashram
Sabarmati AshramSabarmati Ashram
Sabarmati Ashram
Aniruddh Dubey
 
Dilli haat janakpuri
Dilli haat janakpuriDilli haat janakpuri
Dilli haat janakpuri
BISHAL KHANAL
 
Javahar kala kendra'
Javahar kala kendra'Javahar kala kendra'
Javahar kala kendra'
Pravara College Of Architecture
 
Shri ram center of performing arts,delhi
Shri ram center of performing arts,delhiShri ram center of performing arts,delhi
Shri ram center of performing arts,delhi
chandar prakash suthar
 
Jawahar kala kendra
Jawahar kala kendra Jawahar kala kendra
Jawahar kala kendra
pushpdeepgehlot
 
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAIShanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Dijo Mathews
 
Virasat - E - Khalsa memorial and heritage complex.
Virasat - E - Khalsa memorial and heritage complex.Virasat - E - Khalsa memorial and heritage complex.
Virasat - E - Khalsa memorial and heritage complex.
KARTIK PARIHAR
 
Triveni kala sangam
Triveni kala sangamTriveni kala sangam
Triveni kala sangam
Harpreet Bhatia
 
Design of amphitheatre
Design of amphitheatreDesign of amphitheatre
Design of amphitheatre
Dinesh Kannan
 
NIFT Delhi architecture
NIFT Delhi architectureNIFT Delhi architecture
NIFT Delhi architecture
AmayVikramaChauhan1
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre finalJYOTSNA MISHRA
 

What's hot (20)

NCPA , MUMBAI
  NCPA , MUMBAI   NCPA , MUMBAI
NCPA , MUMBAI
 
Open air theater
Open air theaterOpen air theater
Open air theater
 
ARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDSARCHITECTURAL STANDARDS
ARCHITECTURAL STANDARDS
 
Master plan of NID Shrikant
Master plan of NID ShrikantMaster plan of NID Shrikant
Master plan of NID Shrikant
 
Open air theatre Case Study
Open air theatre Case StudyOpen air theatre Case Study
Open air theatre Case Study
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
Case study (JAWAHAR KALA KENDRA & SFMOMA SAN FRANSISCO)
 
Architectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolArchitectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus School
 
Tagore Theater case study
Tagore Theater case studyTagore Theater case study
Tagore Theater case study
 
Sabarmati Ashram
Sabarmati AshramSabarmati Ashram
Sabarmati Ashram
 
Dilli haat janakpuri
Dilli haat janakpuriDilli haat janakpuri
Dilli haat janakpuri
 
Javahar kala kendra'
Javahar kala kendra'Javahar kala kendra'
Javahar kala kendra'
 
Shri ram center of performing arts,delhi
Shri ram center of performing arts,delhiShri ram center of performing arts,delhi
Shri ram center of performing arts,delhi
 
Jawahar kala kendra
Jawahar kala kendra Jawahar kala kendra
Jawahar kala kendra
 
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAIShanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
 
Virasat - E - Khalsa memorial and heritage complex.
Virasat - E - Khalsa memorial and heritage complex.Virasat - E - Khalsa memorial and heritage complex.
Virasat - E - Khalsa memorial and heritage complex.
 
Triveni kala sangam
Triveni kala sangamTriveni kala sangam
Triveni kala sangam
 
Design of amphitheatre
Design of amphitheatreDesign of amphitheatre
Design of amphitheatre
 
NIFT Delhi architecture
NIFT Delhi architectureNIFT Delhi architecture
NIFT Delhi architecture
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
 

Viewers also liked

Presfield School Autism and Employment
Presfield School Autism and Employment Presfield School Autism and Employment
Presfield School Autism and Employment
Paul Isaacs
 
Autism Life Community Vision
Autism Life Community VisionAutism Life Community Vision
Autism Life Community Vision
Dror Pockard
 
Autism Life Community Principles
Autism Life Community PrinciplesAutism Life Community Principles
Autism Life Community Principles
Dror Pockard
 
Autism Life Community Initiation
Autism Life Community InitiationAutism Life Community Initiation
Autism Life Community Initiation
Dror Pockard
 
Introduction to Master Thesis Research
Introduction to Master Thesis ResearchIntroduction to Master Thesis Research
Introduction to Master Thesis Research
azarbad
 
Pacie capacitacion pa
Pacie capacitacion paPacie capacitacion pa
Pacie capacitacion pa
richycc7
 
Rebecca School is a therapeutic day school for autism
Rebecca School is a therapeutic day school for autismRebecca School is a therapeutic day school for autism
Rebecca School is a therapeutic day school for autism
Roman Collins
 
School Design: Be the Change...
School Design: Be the Change...School Design: Be the Change...
School Design: Be the Change...
esltechnology
 
Autism pp
Autism ppAutism pp
Autism pp
Brittney Ortega
 
School Case Study
School Case StudySchool Case Study
School Case Study
Mediator_Michael
 
School designs
School designsSchool designs
School designsLaya Hague
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
Abhishek Tiwari
 
School rooms and places
School rooms and placesSchool rooms and places
School rooms and places
beamcgc
 
STUDY ON SCHOOL ARCHITECTURE - ORCHARDS
STUDY ON SCHOOL ARCHITECTURE - ORCHARDSSTUDY ON SCHOOL ARCHITECTURE - ORCHARDS
STUDY ON SCHOOL ARCHITECTURE - ORCHARDS
shifhana aneezmohamed
 
Literature case study - Druk White Lotus School
Literature case study - Druk White Lotus SchoolLiterature case study - Druk White Lotus School
Literature case study - Druk White Lotus School
nainadesh
 
Case study/ Literature of a School
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a School
Sarthak Kaura
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
Seth Familian
 

Viewers also liked (19)

Presfield School Autism and Employment
Presfield School Autism and Employment Presfield School Autism and Employment
Presfield School Autism and Employment
 
Thesis
ThesisThesis
Thesis
 
Autism Life Community Vision
Autism Life Community VisionAutism Life Community Vision
Autism Life Community Vision
 
Autism Life Community Principles
Autism Life Community PrinciplesAutism Life Community Principles
Autism Life Community Principles
 
Autism Life Community Initiation
Autism Life Community InitiationAutism Life Community Initiation
Autism Life Community Initiation
 
Introduction to Master Thesis Research
Introduction to Master Thesis ResearchIntroduction to Master Thesis Research
Introduction to Master Thesis Research
 
Pacie capacitacion pa
Pacie capacitacion paPacie capacitacion pa
Pacie capacitacion pa
 
Rebecca School is a therapeutic day school for autism
Rebecca School is a therapeutic day school for autismRebecca School is a therapeutic day school for autism
Rebecca School is a therapeutic day school for autism
 
Autism case study
Autism case studyAutism case study
Autism case study
 
School Design: Be the Change...
School Design: Be the Change...School Design: Be the Change...
School Design: Be the Change...
 
Autism pp
Autism ppAutism pp
Autism pp
 
School Case Study
School Case StudySchool Case Study
School Case Study
 
School designs
School designsSchool designs
School designs
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
School rooms and places
School rooms and placesSchool rooms and places
School rooms and places
 
STUDY ON SCHOOL ARCHITECTURE - ORCHARDS
STUDY ON SCHOOL ARCHITECTURE - ORCHARDSSTUDY ON SCHOOL ARCHITECTURE - ORCHARDS
STUDY ON SCHOOL ARCHITECTURE - ORCHARDS
 
Literature case study - Druk White Lotus School
Literature case study - Druk White Lotus SchoolLiterature case study - Druk White Lotus School
Literature case study - Druk White Lotus School
 
Case study/ Literature of a School
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a School
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
 

Slomin Foundation & School of Autism Campus

  • 1. ARCHITECTURE URBAN DESIGN PLANNING INTERIORS The Palm Beach County Sandra C. Slomin School & Foundation for Autism 3005 S Congress Ave. Boynton Beach, Fl. Master Plan & Facility Design
  • 2. Autism is a brain development disorder characterized by impaired social interaction and communication, and by restricted and repetitive behavior. July 2, 2009 OCAMPO & ASSOCIATES 2
  • 3. MASTER SITE PLAN SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 3
  • 4. Existing Boynton Beach Site July 2, 2009 OCAMPO & ASSOCIATES 4
  • 5. PROGRAM REQUIREMENTS: • SCHOOL FACILITY (MAX 200 STUDENTS) 25,000 SF • SLOMIN FOUNDATION HEADQUARTERS FACILITY 25,000 SF • GYMNASIUM BUILDING 8,500 SF • NATATORIUM BUILDING 6,000 SF • OUTDOOR FIELDS TBD • TOTAL 54,500 SF FACILITIES PROVIDED: • SCHOOL FACILITY (MAX 200 STUDENTS) 35,198 SF • SLOMIN FOUNDATION HEADQUARTERS FACILITY 26,258 SF • GYMNASIUM BUILDING 8,500 SF • NATATORIUM BUILDING 6,000 SF • OUTDOOR FIELDS TBD • TOTAL 61,456 SF July 2, 2009 OCAMPO & ASSOCIATES 5
  • 6. The CONCEPT Analysis Before 159 Parking Spaces Requirement July 2, 2009 OCAMPO & ASSOCIATES 6
  • 7. The CONCEPT Analysis Plus 159 Parking Spaces +/- July 2, 2009 OCAMPO & ASSOCIATES 7
  • 8. The Master Plan CONCEPT Alternative A July 2, 2009 OCAMPO & ASSOCIATES 8
  • 9. The Master Plan CONCEPT Alternative B July 2, 2009 OCAMPO & ASSOCIATES 9
  • 10. The Master Plan CONCEPT (Alternative C) July 2, 2009 OCAMPO & ASSOCIATES 10
  • 11. The Campus Design Concept Must: • Address the Uniqueness of the Autism School Program. • Address the Uniqueness of the Autism Campus Concept (One Stop Shop) & the Connectivity of its functions. • Address the Need to Introduce Natural Light as a “special” benefit to the Occupants. • Address the special spatial and orientation needs created by ASD. • Address Constraint of a “tight” site which must accommodate the very high parking count required due to the unique teacher / student ratio. • Address the desire to develop a Concept that is environmentally sensitive, sustainable (based on cost / benefit) and be “GREEN”. • Be capable of raising the community awareness (if not “national” awareness) of ASD. The Master Plan CONCEPT B July 2, 2009 OCAMPO & ASSOCIATES 11
  • 12. PARENT DROP OFF SLOMIN FOUNDATION GYM PLAY FIELDS SCHOOL HOUSE NATATORIUM FOUNDATION PLAZA MASTER SITE PLAN SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 12
  • 13. PARENT DROP OFF SLOMIN FOUNDATION SLOMIN PLAY SCHOOL FOUNDATION FIELDS HOUSE OVER GYM FOUNDATION PLAZA MASTER SITE PLAN SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 13
  • 14. PHASE 1 PLANS July 2, 2009 OCAMPO & ASSOCIATES 14
  • 15. FUNCTIONAL DIAGRAM July 2, 2009 OCAMPO & ASSOCIATES 15
  • 16. July 2, 2009 OCAMPO & ASSOCIATES 16
  • 17. July 2, 2009 OCAMPO & ASSOCIATES 17
  • 18. July 2, 2009 OCAMPO & ASSOCIATES 18
  • 19. PHASE 1 ELEVATIONS July 2, 2009 OCAMPO & ASSOCIATES 19
  • 20. July 2, 2009 OCAMPO & ASSOCIATES 20
  • 21. July 2, 2009 OCAMPO & ASSOCIATES 21
  • 22. July 2, 2009 OCAMPO & ASSOCIATES 22
  • 23. July 2, 2009 OCAMPO & ASSOCIATES 23
  • 24. PHASE 1 RENDERINGS July 2, 2009 OCAMPO & ASSOCIATES 24
  • 25. School House Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 25
  • 26. Cross Section SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 26
  • 27. Transverse Section SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 27
  • 28. Cross Section SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 28
  • 29. Detail at Atrium Space SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 29
  • 30. PHASE 2 ELEVATIONS July 2, 2009 OCAMPO & ASSOCIATES 30
  • 31. July 2, 2009 OCAMPO & ASSOCIATES 31
  • 32. PHASE 2 MASTER PLAN July 2, 2009 OCAMPO & ASSOCIATES 32
  • 33. MASTER SITE PLAN SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 33
  • 34. MASTER SITE PLAN SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 34
  • 35. PHASE 2 RENDERINGS July 2, 2009 OCAMPO & ASSOCIATES 35
  • 36. School House Entrance SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 36
  • 37. Campus Entrance SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 37
  • 38. View of Entry Plaza SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 38
  • 39. Cross Section of Foundation Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 39
  • 40. View of Natatorium Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 40
  • 41. Cross Section of Natatorium Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 41
  • 42. Cross Section of Natatorium & Gym Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 42
  • 43. View of Natatorium Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 43
  • 44. View of Natatorium Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 44
  • 45. Cross Section of Gymnasium Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 45
  • 46. Rear View of Foundation Building SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 46
  • 47. MASTER SITE PLAN SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 47
  • 48. ALTERNATE MASTER PLAN July 2, 2009 OCAMPO & ASSOCIATES 48
  • 49. PARENT DROP OFF SLOMIN FOUNDATION SLOMIN PLAY SCHOOL FOUNDATION FIELDS HOUSE OVER GYM FOUNDATION PLAZA MASTER SITE PLAN SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 49
  • 50. MASTER SITE PLAN SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 50
  • 51. View of Entry Plaza SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 51
  • 52. View of Natatorium & Gym SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 52
  • 53. Cross Section of Natatorium & Gym SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 53
  • 54. View of Rear of Campus SCHEME C July 2, 2009 OCAMPO & ASSOCIATES 54
  • 55. MASTER PLAN RECOMMENDATION July 2, 2009 OCAMPO & ASSOCIATES 55
  • 56. MASTER SITE PLAN SCHEME B July 2, 2009 OCAMPO & ASSOCIATES 56
  • 57. ARCHITECTURE URBAN DESIGN PLANNING INTERIORS This Presentation and its Content are the property of OCAMPO & ASSOCIATES, INC. and are protected by common copyright law. No portion of this presentation may be reproduced in part or in its entirety without the written permission of OCAMPO & ASSOCIATES, INC.