Christmas land project is good business opportunity for investment, because most of the people in the
cities are interested to visit these type of recreational areas with their families during their vacations.
Christmas land type business are running on very short period of time with very high profits and the
bankers and other investors are interested to finance these businesses. People from across the country
are planning their vacations to visit such recreational places, hence the project is able to gain high number
of customers.
It is a difficult to acquire all stakeholders’ expectations in a project, especially when we have multiple
number of stakeholders as each stakeholder’s objective is different. In order to tackle this problem and
carry the project to success by achieving each stakeholder’s expectation we have to narrow down
objectives of the project by harmonizing stakeholders’ objectives.
To achieve customer satisfaction we need to use different quality control approaches to ensure
conformance of performance to our pre-defined standards which is defined with consideration to
customer’s needs and expectations. Time to time every individual task of the project should be
controlled to start and end based on the project schedule.
Considering our high quality of service and good marketing approach we can target 100,000 number of
visitors/customers for our project.
Our main entity for the Christmas Land project, as for any other project, is the Stakeholders. Selecting,
assigning and management of stakeholders are very critical and hard work of the project. When planning
and designing the project we have to define tasks for every stakeholder. Sometimes activities and tasks
of stakeholders may overlap each other which does not only create conflict but also slows down the
project. It is project manager’s job while designing the project to manage and control activities of
stakeholders not to overlap each other.
One of the main factors on which Success and failure of the project depends is Project Team. The actual
implementer of the project are the project team who are involved in the project from the beginning till
end. Thus staffing the project – selecting members for project team – and positioning them is an important
task that should be carefully considered while planning and designing the project. To mitigate any risk of
delivering low quality outcome from the project, it is important to select a team of highly qualified
professionals with professional background of delivering successful projects, especially in projects similar
to Christmas Land.
Infrastructure and assets or materials used in the project are another important factor on which success
and failure of the project depend. Step by step quality check should be done for materials in order to have
best outcome.
Selecting best suppliers for our material and professional contractors for the design of environment have
also significant impact on project outcome. In order to attract more customers and gain their satisfaction
the environment should have a unique and attracting design which needs experienced contractors and
designer with successful past experience
2015
Christmas Land Project
BUSINESS CASE
UNIVERSITY OF SALFORD
Ahmad Reza Khawar STID @00450058
Contents
1. Literature View......................................................................................................................................7
2. Introduction ..........................................................................................................................................7
3. Project Initiation: ..................................................................................................................................8
3.1. Objectives......................................................................................................................................8
3.2. Stakeholder Analysis:....................................................................................................................9
3.3. Success and failure of the project.................................................................................................9
3.4. Initial Planning.............................................................................................................................10
4. Project Planning:.................................................................................................................................11
4.1. Project Scheduling and Work breakdown structure (WBS)........................................................11
4.2. Quality Management..................................................................................................................13
4.2.1. Planning Quality:.................................................................................................................13
4.2.2. Quality Assurance: ..............................................................................................................13
4.2.3. Quality Control:...................................................................................................................14
4.3. Risk and Opportunity Management............................................................................................14
4.4. Problem-Solving and Decision-making .......................................................................................14
5. Project Closure (Development):..........................................................................................................14
5.1. Project Completion and Review..................................................................................................14
5.2. Performance Improvement ........................................................................................................15
6. Conclusion...........................................................................................................................................15
7. Bibliography ........................................................................................................................................15
1. Literature View
This document is a business case report that is intended for the conceptualization, plan and design of a
Tourism Attraction Area for Christmas in Salford City. The report is developed based on the researches on
similar projects that are previously conducted in UK; lessons learned from projects are taken to
recommend successful approaches for the implementation of the project. The ‘Blunderland’ project of
Harrogate is studied in detail in the report, examples are provided that caused failure of the project and
solutions are pointed to proactively prevent such problems.
The recommendations in the document for each approaches in project management are given based on
the research from some highly read books in the subject. Project initiation and planning approaches
described by Dr. Maylor in his book Project Manage are suggested in the document.
2. Introduction
Having fun has always been people’s dream, and businesses on creating fun for people is top of the all
running and successful businesses in the world. Most of the recreational events are planned and
established on special religious holidays, as people respect and organize their vacations on such events.
Christmas land is one of these investment business opportunities that can be a good point of attraction
for businessmen’s interest.
Assuredly, not all the recreational projects are successful sometimes these type of project fail if they are
not carefully planned and designed. The ‘Blunderland’ project of Harrogate’s is a good example which
eventually failed. According to Calleam Consulting Ltd “updated 16 Dec 2014: The Magical Journey did in
fact reopen after a three day closure. Unfortunately, with just 9 days to go before Christmas, a key financial
backer has withdrawn from the project and the event has now closed its doors permanently”. The report
states the causes of the failure of this project as “poor management and lack of quality”. If we ponder on
the project, one of the main reasons behind first closure of the project from project management’s
perspective was not considering the uncertainties of the project. The organizer of the project did not
consider unexpected weather change of the environment which resulted in the failure of the project.
Planning Christmas land project in Salford City council is an opportunity for promoting the city and attract
tourists to the community and improve the local businesses and also introduce the city to the new
commerce. Setting up the Christmas land project in the Salford City with 100s of attraction and exciting
games for the visitors will change the Salford city view. Shareholders are not the only people that gain
benefits and revenue from this project, however the other stakeholders will also gain benefits from
Christmas land project. Along this the community will have long-term benefits.
Defining and designing of Christmas land project is a very complex task, it requires a detailed scrutiny of
the availability of the resources in the markets, environmental challenges such as unexpected climate
change, targeted customers with their budgets and city existing law. Considering these factors beforehand
will mitigate the project risk and also facilitate other associated tasks within Christmas land project. In
Christmas Land project of Salford City Council we need to clearly define any uncertainties associated with
the project and project environment.
The Christmas Land project should be intended to deliver high level quality services to the customers with
conformance to many different stakeholder’s expectation from the project. Moreover planning this
project in budget within timeframe is the most difficult task, Christmas land project cost estimation should
be done based on the market price with 10% margin to secure the project from any uncertainty in the
market prices. One of the major failure factor of the ‘Blunderland’ project was poor cost and benefits
analysis. Regarding MailOnline reported “there were claims that the crisis-hit attraction crumbled under
pressure to pay its staff wages of more than £100,000 per month - just nine days before Christmas”. It
shows a vast cost difference in their plan when designing the project.
To assure the Christmas land project is designed based on the stakeholder’s expectation, it’s required to
apply different project management approaches, in that the Total Quality Management TQM is one of the
successful approaches to keep maintain the project and provide high level services to the customers
within time in the right place.
3. Project Initiation:
3.1. Objectives
Planning the project main objective, which is to accomplish the project within timeframe and budget, is a
complex work in planning and designing stage. Having multiple objectives for a project is also considered
as a factor that may result to the failure of the project. Minimizing number of objectives for the project
will facilitate concentration on the project and project objectives while multiple objectives will result on
losing focus from the project. Keeping everyone happy is a difficult task, and having multiple number of
stakeholders will result in maximization of project objective since each stakeholder will have its own
expectation and objective from the project. To narrow down multiple objectives into few objectives that
encompasses the expectation of all stakeholders is one of the major task in Design stage of the project.
Most projects fail because of having multiple objectives. Likewise projects with ambiguous and unclear
objective are considered to be failed projects. The ‘Blunderland’ project, for instance, is a project in which
objectives were not accurately considered during budget estimation, nor during execution of the project.
In a small change in the budget and plan of the project, focus from the project objective was completely
distracted. The quality and performance were completely ignored and instead all focus was routed to
minimization of project cost. To make the Christmas land project successful we limit the main objectives
of the project. Following are considered as main objectives of Christmas Land project:
Customer satisfaction with high level services, high level customer care
To finish the Project within budget and schedule.
Target at least 100,000 visitors in the first year
To achieve the aforementioned objectives it is required to have an experienced professional team in
management, financing and designing. Also good financing for the Christmas land project is another factor
that can enhance the project objectives accomplishment.
3.2. Stakeholder Analysis:
Christmas land project success is dependent on stakeholder satisfaction, stakeholder can be a team or an
individual. Defining stakeholders for the project is tough work, because they have direct impact to the
project success and failure. How the stakeholders are managed and assigned to the specific portion of the
project is another complex work. The Christmas land requires different number of stakeholders who are
involved in different part of the project based the project requirements. According to Dr. Maylor’s book
Project Management key questions to be asked about stakeholders are “Who are the stakeholders?
What do they want? What influence is this going to have on the project process or outcome?” In general,
according to Dr. Maylor, stakeholders are divided into two main groups External stakeholders and
internal stakeholders. External stakeholder those who are externally involve with the project and
received the project services (e.g. customers, sponsors). Internal stakeholders are those who are
associated with the project process (e.g. member of project team or government structure).
All stakeholders focus on their own significant benefits and have influence on the project, or sometimes
the stakeholders overlap each other activities. To manage this issue within different stakeholders it is
required to map related tasks to each stakeholders and give them a proper guidance.
The management board will be the actual organizer to the Christmas land and they will take more benefits
from this project. Considering that the Christmas land project is a recreational project, many companies
will be interested to sponsor it. Establishing such recreational place in main city requires a lot of legal
work, and it is required to have the legal team to arrange such work and push for the appropriate laws to
be passed through legislative body if not already in place. Residents of the adjacent area are critical
stakeholders for the project. They can directly earn benefits from this project (e.g. the Christmas land
visitors will use their hotels and shops). Also residents will use the Christmas land to do their marketing
and advertisements. Suppliers (contractors) are the companies or individuals that are preparing the
Christmas Land environment. Companies that supply raw materials for the project are also considered as
stakeholders for the project. Suppliers can be from the local or international companies.
3.3. Success and failure of the project
The Christmas Land project success factors and benefits are depending on complexities associated with
the “objectives” of the project and the stakeholders’ requirements/expectations. Thus selection of
stakeholders and bringing the contradictions and conflicts of requirements from each stakeholder group
into harmony and thenceforth defining relevant objectives for the project is of the most important tasks
of the Project.
Once the project stakeholders are identified and objective(s) set for the project the second most
important tasks which defines success and failure of the project is the allocation of resources for the
project. In resource allocation first point of focus should be given to the human resources as they are
those who are using other resources and running the project. Delivering a project within time, budget and
defined quality while achieving stakeholder’s expectations is a difficult task which requires a team of
professionals for board of management as well as skilled team for the execution and implementation of
the project.
Capital resources, which includes materials, infrastructure and other assets that are required to run the
project, is the second point of focus in resource allocation. Success of Christmas Land project depends on
the selection of high quality materials and capital resources for the project. The reason that ‘Blunderland’
project was closed permanently after re-opening was selection of low quality materials to minimize cost
as the report states “Trees laid low with snow – reality: a few hastily erected plastic Christmas trees in a
muddy field”. In Christmas Land project it is required to select best suppliers with past experience in
delivering quality products for such events on time.
Last but not least of the key success factors for the project is the interior/environmental design of the
Christmas Land area. Arranging and setting-up a world class entertainment environment for the visitors
in such a unique event requires selection of best contractors and designers for the project. A Challenge
for the project is to select contracts and designers in consideration of the project budget. Methods can be
used to convince such contractors with low cost, such us providing other benefits in the project for
contracts. For instance, advertisement opportunity for contractors is a good point to attract their interest
in the project. This way, contractors are considered as the stakeholders of the project and thus tries their
best to provide quality service.
These are the main factors that help the Christmas land project drive into the success stage, while poor
management of these factors will fail the project.
3.4. Initial Planning
To run the project within scope and time frame, it’s required to do project initial planning based on the
market available resources and costing. Dr. Kerzner in his book Project Management A Systems Approach
to Planning Scheduling and Controlling lists “Poor Initial Planning and Market Prognosis” among the nine
reasons that are stopping projects. Initial planning is considered the foremost important step after
outlining “the requirements, measures and benefits” in that the outcome of the project is clearly defined
and the activities involved to deliver this outcome is defined. Based on the data from the requirements,
measure and benefits of the project, the project scope and out of scope is clearly defined and
documented.
The Winton Park of Salford City is recommended for the project as it has wide area where all the required
environmental settings for the project can be configured. In order to mitigate any risks and scope creeps
in the project, the project scope is defined as follow:
Design and Construction of Christmas Tourists Attraction Area in Winton Park with 100 Stalls
Provision of 10 beautifully designed wagons with their reindeers
Provision of 100 Santa with real-looking costumes
Staffing of the area with welcoming young teens
Provision of Christmas gifts for children
Advertisement of the project to TV channels and other media
In order to achieve the project objectives within the defined scope and within the timeframe, it is required
to define a work breakdown structure for the project and assign resources for each activity of the project.
Activities in WBS should be logically sequenced in that the predecessor activities should be considered
before scheduling any successor activity. Preparing a Gantt chart is one of the best approaches that
facilitates the provision of WBS with consideration to predecessor and successor attributes as well as
assigning resources to each activity.
4. Project Planning:
4.1. Project Scheduling and Work breakdown structure (WBS)
The time estimation and resource allocation are depending on the project activities, which tasks need to
be performed by which resource in which timeframe. The project timeframe is required to reflect all
project associated activities within project time, while planning the project timeframe we control the
project resource overlapping activities. Also some of the project activities start directly or depend on other
prerequisite tasks. Delivering project associated tasks within timeframe and controlling the deliverable
tasks is the project manager’s work. Project manager need to communicate and control all allocated
resources within the project.
Work Breakdown Structure (WBS) is a good approach for project scheduling and resources scheduling. In
this approach first the project is decomposed into activities and tasks, resources for each tasks are
identified. Task dependencies are identified in the WBS and based on their dependencies and priorities
they are scheduled. Gantt chart is very useful for WBS where a complete view of project activities are
viewed in one chart.
Christmas land project timeframe and WBS (Gantt chart)
4.2. Quality Management
Quality is very important in such projects, where customer experience plays a huge role in the success of
project as well as long-term viability of the business.
We will adhere to Total Quality Management (TQM) principles and address quality as end to end process,
from raw material to the customer experience everything should be part of the quality management
practices.
We are planning to address the quality management through three stages process:
4.2.1. Planning Quality:
Quality should be planned into project activities not Inspect into, meaning everyone should know in
advance what quality standards or processes to follow rather than inspected by the quality manager or
supervisor and told them how to do it.
The Quality metrics should be defined from the initial planning stage of the project, as we are establishing
recreational park, we need to consider environmental, legal, safety and other such process required by
law, as well as provide good customer care, maintain the equipment for optimum performance all the
time and provide good quality entertainment.
All these and other services as well as obligations need to be identified and planned in light of stakeholder
requirements and legal framework.
4.2.2. Quality Assurance:
Once everything is planned we will make sure that this plan is implemented as required. Some of the
practices for quality assurance could be:
Processes: we make sure all the processes involved in the project are carried out appropriately and within
the specified time limit, these processes could include arrival of raw material on time, hiring of the right
people, appropriate disposal of the wastages, implementation of the environmental considerations as
outlined by law and others.
Doing things right: everyone involved in the project should know how to do their work right, these could
include adherence to industry best practices, requirements of the law and usage of the right tools, in most
case it will be required to provide the project personnel and other stakeholders training to highlight or
convey the knowledge of “doing things right”
Adherence to the Project requirements: In most cases when we are managing medium to large scale
projects, people are lost in details and they forget the bigger picture the main objectives of the project,
we will make sure that everyone understand why the project is being implemented and what the end
results we are expecting to meet.
4.2.3. Quality Control:
It’s one of the most common challenge in quality and requirements management that we plan something
very well and it’s also implemented as planned, but it’s not what the customer want, as a result the end
product is not acceptable to the customer.
Through quality control practices and processes we will make sure the work is carried out as by the overall
objectives of the project, and we make sure the end product is acceptable to all involved.
4.3. Risk and Opportunity Management
Risk is basically the impact of uncertainty on project activity, some of the risks we can consider for this
project;
Adherence to the government/ local laws: we consider if it’s not properly planned and not
Usage of right Raw material:
Hiring of experienced personnel:
Lack/ No adherence to quality practices:
Risk of acceptability of the end products:
Maintenance of the recreational/ game equipment:
Safety processes/ practices:
4.4. Problem-Solving and Decision-making
We will work through projectized approach for the project, where the project manager will have the
ultimate responsibility and authority for making project relevant issues, he/she will be reportable to the
project management board, which can have their periodic meetings.
All problems and conflicts will be addressed through at the grass root level, will be addressed at the first
level of happening, then if we could not address them at that stage, we will escalate it one stage, and it
will move up towards the project manager and management board.
5. Project Closure (Development):
5.1. Project Completion and Review
The project will work through phase wise approach, meaning each phase will have an end deliverable,
which will be verified and if required accepted by the customer/stakeholder.
As we will be managing our project WBS and will complete our Work Packages in time-phased manner,
every deliverable completed will be handed over to project team or stakeholder and moved to another
task, so towards the end of the project limited issues will be needed to complete, meanwhile if we face a
problem or rejection of certain deliverable we can fix it without losing anytime or extending the end date
of the project.
Toward the end of the project, the formal closure will take place, which will fulfills all the legal and other
requirements.
5.2. Performance Improvement
One of the main jobs of the project manager is continuous improvement and learning; we will use learning
curve theory, best practices and other mechanisms to continuously look for continuous improvement in
our behavior, project activities and deliverables.
6. Conclusion
Christmas Land project is a very huge opportunity for the Salford City Council to promote the city and
attract the attention of stakeholders not only for the project but also for the future of the city. Christmas
is an event where people across the country tries their best to spend their vacations in best recreational
facilities with their family, thus it is best opportunity for businesses and bankers to invest on such projects.
Notwithstanding its benefits and future impacts on the city, the project does entail its own complexities
and risks that needs careful study when planning. High number of stakeholders with different objectives
each is a challenge for the project whereas the project objective should be narrowed down to mitigate
the risk of losing focus while it should encompass the expectations and objectives of stakeholders at the
same time. Hence the project’s success and failure highly depends on the identification and analysis of
stakeholders and selection of objective(s) for the project. Initial planning of the project needs careful and
concentration in that the scope of the project should be carefully defined in which the boundaries of the
project, activities associated in the project including the timeframe and any expected uncertainties of the
project should be considered.
When planning the project a detailed work breakdown structure should be defined so that activities with
same resources should not overlap each other. Dependencies of activities should be considered as well as
resource allocation and time boundaries for each activity should be defined. A professional quality control
mechanism should be defined for the project so that each activities performance are evaluated at several
stages to mitigate risk of low quality delivery of service. The project has its associated risks which should
be clearly defined and approaches to mitigate such risks should be considered beforehand.
After implementation of the project, the closure of the project is a very important phase where lessons
learned should be documented from the project for future success of projects. The city council can further
develop the project into a permanent recreational facility for the city residents where any festivals and
events can be conducted in the project environment. After reviewing the project performance of activities
can be identified and best practices can be listed that brought the project to success.
7. Bibliography
Covey, S. R. (1990). The Seven Habits of Highly Effective People. New York: Free Press.
Kerzner, H. (2009). Project Management - A Systems Approach to Planning, Scheduling and Controlling.
New York: WILEY.
Linning, S. (2015, January 13). Winter Blunderland' designed by Laurence Llewelyn-Bowen went bust
owing creditors nearly £1MILLION. MailOnline. Retrieved from
http://www.dailymail.co.uk/news/article-2908122/Winter-Blunderland-designed-Laurence-
Llewelyn-Bowen-went-bust-owing-creditors-nearly-1MILLION.html
Maylor, H. (2010). Project Management. Prentice Hall FINANCIAL TIMES.

01 Mid-term Assignment - Christmas Land Project_khawar_v3

  • 1.
    Mid-term Assignment Ahmad RezaKhawar MSc Information Systems Management Student ID @00450058
  • 2.
    Christmas land projectis good business opportunity for investment, because most of the people in the cities are interested to visit these type of recreational areas with their families during their vacations. Christmas land type business are running on very short period of time with very high profits and the bankers and other investors are interested to finance these businesses. People from across the country are planning their vacations to visit such recreational places, hence the project is able to gain high number of customers.
  • 3.
    It is adifficult to acquire all stakeholders’ expectations in a project, especially when we have multiple number of stakeholders as each stakeholder’s objective is different. In order to tackle this problem and carry the project to success by achieving each stakeholder’s expectation we have to narrow down objectives of the project by harmonizing stakeholders’ objectives. To achieve customer satisfaction we need to use different quality control approaches to ensure conformance of performance to our pre-defined standards which is defined with consideration to customer’s needs and expectations. Time to time every individual task of the project should be controlled to start and end based on the project schedule. Considering our high quality of service and good marketing approach we can target 100,000 number of visitors/customers for our project.
  • 4.
    Our main entityfor the Christmas Land project, as for any other project, is the Stakeholders. Selecting, assigning and management of stakeholders are very critical and hard work of the project. When planning and designing the project we have to define tasks for every stakeholder. Sometimes activities and tasks of stakeholders may overlap each other which does not only create conflict but also slows down the project. It is project manager’s job while designing the project to manage and control activities of stakeholders not to overlap each other.
  • 5.
    One of themain factors on which Success and failure of the project depends is Project Team. The actual implementer of the project are the project team who are involved in the project from the beginning till end. Thus staffing the project – selecting members for project team – and positioning them is an important task that should be carefully considered while planning and designing the project. To mitigate any risk of delivering low quality outcome from the project, it is important to select a team of highly qualified professionals with professional background of delivering successful projects, especially in projects similar to Christmas Land. Infrastructure and assets or materials used in the project are another important factor on which success and failure of the project depend. Step by step quality check should be done for materials in order to have best outcome. Selecting best suppliers for our material and professional contractors for the design of environment have also significant impact on project outcome. In order to attract more customers and gain their satisfaction the environment should have a unique and attracting design which needs experienced contractors and designer with successful past experience
  • 6.
    2015 Christmas Land Project BUSINESSCASE UNIVERSITY OF SALFORD Ahmad Reza Khawar STID @00450058
  • 7.
    Contents 1. Literature View......................................................................................................................................7 2.Introduction ..........................................................................................................................................7 3. Project Initiation: ..................................................................................................................................8 3.1. Objectives......................................................................................................................................8 3.2. Stakeholder Analysis:....................................................................................................................9 3.3. Success and failure of the project.................................................................................................9 3.4. Initial Planning.............................................................................................................................10 4. Project Planning:.................................................................................................................................11 4.1. Project Scheduling and Work breakdown structure (WBS)........................................................11 4.2. Quality Management..................................................................................................................13 4.2.1. Planning Quality:.................................................................................................................13 4.2.2. Quality Assurance: ..............................................................................................................13 4.2.3. Quality Control:...................................................................................................................14 4.3. Risk and Opportunity Management............................................................................................14 4.4. Problem-Solving and Decision-making .......................................................................................14 5. Project Closure (Development):..........................................................................................................14 5.1. Project Completion and Review..................................................................................................14 5.2. Performance Improvement ........................................................................................................15 6. Conclusion...........................................................................................................................................15 7. Bibliography ........................................................................................................................................15
  • 8.
    1. Literature View Thisdocument is a business case report that is intended for the conceptualization, plan and design of a Tourism Attraction Area for Christmas in Salford City. The report is developed based on the researches on similar projects that are previously conducted in UK; lessons learned from projects are taken to recommend successful approaches for the implementation of the project. The ‘Blunderland’ project of Harrogate is studied in detail in the report, examples are provided that caused failure of the project and solutions are pointed to proactively prevent such problems. The recommendations in the document for each approaches in project management are given based on the research from some highly read books in the subject. Project initiation and planning approaches described by Dr. Maylor in his book Project Manage are suggested in the document. 2. Introduction Having fun has always been people’s dream, and businesses on creating fun for people is top of the all running and successful businesses in the world. Most of the recreational events are planned and established on special religious holidays, as people respect and organize their vacations on such events. Christmas land is one of these investment business opportunities that can be a good point of attraction for businessmen’s interest. Assuredly, not all the recreational projects are successful sometimes these type of project fail if they are not carefully planned and designed. The ‘Blunderland’ project of Harrogate’s is a good example which eventually failed. According to Calleam Consulting Ltd “updated 16 Dec 2014: The Magical Journey did in fact reopen after a three day closure. Unfortunately, with just 9 days to go before Christmas, a key financial backer has withdrawn from the project and the event has now closed its doors permanently”. The report states the causes of the failure of this project as “poor management and lack of quality”. If we ponder on the project, one of the main reasons behind first closure of the project from project management’s perspective was not considering the uncertainties of the project. The organizer of the project did not consider unexpected weather change of the environment which resulted in the failure of the project. Planning Christmas land project in Salford City council is an opportunity for promoting the city and attract tourists to the community and improve the local businesses and also introduce the city to the new commerce. Setting up the Christmas land project in the Salford City with 100s of attraction and exciting games for the visitors will change the Salford city view. Shareholders are not the only people that gain benefits and revenue from this project, however the other stakeholders will also gain benefits from Christmas land project. Along this the community will have long-term benefits. Defining and designing of Christmas land project is a very complex task, it requires a detailed scrutiny of the availability of the resources in the markets, environmental challenges such as unexpected climate
  • 9.
    change, targeted customerswith their budgets and city existing law. Considering these factors beforehand will mitigate the project risk and also facilitate other associated tasks within Christmas land project. In Christmas Land project of Salford City Council we need to clearly define any uncertainties associated with the project and project environment. The Christmas Land project should be intended to deliver high level quality services to the customers with conformance to many different stakeholder’s expectation from the project. Moreover planning this project in budget within timeframe is the most difficult task, Christmas land project cost estimation should be done based on the market price with 10% margin to secure the project from any uncertainty in the market prices. One of the major failure factor of the ‘Blunderland’ project was poor cost and benefits analysis. Regarding MailOnline reported “there were claims that the crisis-hit attraction crumbled under pressure to pay its staff wages of more than £100,000 per month - just nine days before Christmas”. It shows a vast cost difference in their plan when designing the project. To assure the Christmas land project is designed based on the stakeholder’s expectation, it’s required to apply different project management approaches, in that the Total Quality Management TQM is one of the successful approaches to keep maintain the project and provide high level services to the customers within time in the right place. 3. Project Initiation: 3.1. Objectives Planning the project main objective, which is to accomplish the project within timeframe and budget, is a complex work in planning and designing stage. Having multiple objectives for a project is also considered as a factor that may result to the failure of the project. Minimizing number of objectives for the project will facilitate concentration on the project and project objectives while multiple objectives will result on losing focus from the project. Keeping everyone happy is a difficult task, and having multiple number of stakeholders will result in maximization of project objective since each stakeholder will have its own expectation and objective from the project. To narrow down multiple objectives into few objectives that encompasses the expectation of all stakeholders is one of the major task in Design stage of the project. Most projects fail because of having multiple objectives. Likewise projects with ambiguous and unclear objective are considered to be failed projects. The ‘Blunderland’ project, for instance, is a project in which objectives were not accurately considered during budget estimation, nor during execution of the project. In a small change in the budget and plan of the project, focus from the project objective was completely distracted. The quality and performance were completely ignored and instead all focus was routed to minimization of project cost. To make the Christmas land project successful we limit the main objectives of the project. Following are considered as main objectives of Christmas Land project: Customer satisfaction with high level services, high level customer care To finish the Project within budget and schedule. Target at least 100,000 visitors in the first year
  • 10.
    To achieve theaforementioned objectives it is required to have an experienced professional team in management, financing and designing. Also good financing for the Christmas land project is another factor that can enhance the project objectives accomplishment. 3.2. Stakeholder Analysis: Christmas land project success is dependent on stakeholder satisfaction, stakeholder can be a team or an individual. Defining stakeholders for the project is tough work, because they have direct impact to the project success and failure. How the stakeholders are managed and assigned to the specific portion of the project is another complex work. The Christmas land requires different number of stakeholders who are involved in different part of the project based the project requirements. According to Dr. Maylor’s book Project Management key questions to be asked about stakeholders are “Who are the stakeholders? What do they want? What influence is this going to have on the project process or outcome?” In general, according to Dr. Maylor, stakeholders are divided into two main groups External stakeholders and internal stakeholders. External stakeholder those who are externally involve with the project and received the project services (e.g. customers, sponsors). Internal stakeholders are those who are associated with the project process (e.g. member of project team or government structure). All stakeholders focus on their own significant benefits and have influence on the project, or sometimes the stakeholders overlap each other activities. To manage this issue within different stakeholders it is required to map related tasks to each stakeholders and give them a proper guidance. The management board will be the actual organizer to the Christmas land and they will take more benefits from this project. Considering that the Christmas land project is a recreational project, many companies will be interested to sponsor it. Establishing such recreational place in main city requires a lot of legal work, and it is required to have the legal team to arrange such work and push for the appropriate laws to be passed through legislative body if not already in place. Residents of the adjacent area are critical stakeholders for the project. They can directly earn benefits from this project (e.g. the Christmas land visitors will use their hotels and shops). Also residents will use the Christmas land to do their marketing and advertisements. Suppliers (contractors) are the companies or individuals that are preparing the Christmas Land environment. Companies that supply raw materials for the project are also considered as stakeholders for the project. Suppliers can be from the local or international companies. 3.3. Success and failure of the project The Christmas Land project success factors and benefits are depending on complexities associated with the “objectives” of the project and the stakeholders’ requirements/expectations. Thus selection of stakeholders and bringing the contradictions and conflicts of requirements from each stakeholder group into harmony and thenceforth defining relevant objectives for the project is of the most important tasks of the Project. Once the project stakeholders are identified and objective(s) set for the project the second most important tasks which defines success and failure of the project is the allocation of resources for the
  • 11.
    project. In resourceallocation first point of focus should be given to the human resources as they are those who are using other resources and running the project. Delivering a project within time, budget and defined quality while achieving stakeholder’s expectations is a difficult task which requires a team of professionals for board of management as well as skilled team for the execution and implementation of the project. Capital resources, which includes materials, infrastructure and other assets that are required to run the project, is the second point of focus in resource allocation. Success of Christmas Land project depends on the selection of high quality materials and capital resources for the project. The reason that ‘Blunderland’ project was closed permanently after re-opening was selection of low quality materials to minimize cost as the report states “Trees laid low with snow – reality: a few hastily erected plastic Christmas trees in a muddy field”. In Christmas Land project it is required to select best suppliers with past experience in delivering quality products for such events on time. Last but not least of the key success factors for the project is the interior/environmental design of the Christmas Land area. Arranging and setting-up a world class entertainment environment for the visitors in such a unique event requires selection of best contractors and designers for the project. A Challenge for the project is to select contracts and designers in consideration of the project budget. Methods can be used to convince such contractors with low cost, such us providing other benefits in the project for contracts. For instance, advertisement opportunity for contractors is a good point to attract their interest in the project. This way, contractors are considered as the stakeholders of the project and thus tries their best to provide quality service. These are the main factors that help the Christmas land project drive into the success stage, while poor management of these factors will fail the project. 3.4. Initial Planning To run the project within scope and time frame, it’s required to do project initial planning based on the market available resources and costing. Dr. Kerzner in his book Project Management A Systems Approach to Planning Scheduling and Controlling lists “Poor Initial Planning and Market Prognosis” among the nine reasons that are stopping projects. Initial planning is considered the foremost important step after outlining “the requirements, measures and benefits” in that the outcome of the project is clearly defined and the activities involved to deliver this outcome is defined. Based on the data from the requirements, measure and benefits of the project, the project scope and out of scope is clearly defined and documented. The Winton Park of Salford City is recommended for the project as it has wide area where all the required environmental settings for the project can be configured. In order to mitigate any risks and scope creeps in the project, the project scope is defined as follow: Design and Construction of Christmas Tourists Attraction Area in Winton Park with 100 Stalls Provision of 10 beautifully designed wagons with their reindeers
  • 12.
    Provision of 100Santa with real-looking costumes Staffing of the area with welcoming young teens Provision of Christmas gifts for children Advertisement of the project to TV channels and other media In order to achieve the project objectives within the defined scope and within the timeframe, it is required to define a work breakdown structure for the project and assign resources for each activity of the project. Activities in WBS should be logically sequenced in that the predecessor activities should be considered before scheduling any successor activity. Preparing a Gantt chart is one of the best approaches that facilitates the provision of WBS with consideration to predecessor and successor attributes as well as assigning resources to each activity. 4. Project Planning: 4.1. Project Scheduling and Work breakdown structure (WBS) The time estimation and resource allocation are depending on the project activities, which tasks need to be performed by which resource in which timeframe. The project timeframe is required to reflect all project associated activities within project time, while planning the project timeframe we control the project resource overlapping activities. Also some of the project activities start directly or depend on other prerequisite tasks. Delivering project associated tasks within timeframe and controlling the deliverable tasks is the project manager’s work. Project manager need to communicate and control all allocated resources within the project. Work Breakdown Structure (WBS) is a good approach for project scheduling and resources scheduling. In this approach first the project is decomposed into activities and tasks, resources for each tasks are identified. Task dependencies are identified in the WBS and based on their dependencies and priorities they are scheduled. Gantt chart is very useful for WBS where a complete view of project activities are viewed in one chart.
  • 13.
    Christmas land projecttimeframe and WBS (Gantt chart)
  • 14.
    4.2. Quality Management Qualityis very important in such projects, where customer experience plays a huge role in the success of project as well as long-term viability of the business. We will adhere to Total Quality Management (TQM) principles and address quality as end to end process, from raw material to the customer experience everything should be part of the quality management practices. We are planning to address the quality management through three stages process: 4.2.1. Planning Quality: Quality should be planned into project activities not Inspect into, meaning everyone should know in advance what quality standards or processes to follow rather than inspected by the quality manager or supervisor and told them how to do it. The Quality metrics should be defined from the initial planning stage of the project, as we are establishing recreational park, we need to consider environmental, legal, safety and other such process required by law, as well as provide good customer care, maintain the equipment for optimum performance all the time and provide good quality entertainment. All these and other services as well as obligations need to be identified and planned in light of stakeholder requirements and legal framework. 4.2.2. Quality Assurance: Once everything is planned we will make sure that this plan is implemented as required. Some of the practices for quality assurance could be: Processes: we make sure all the processes involved in the project are carried out appropriately and within the specified time limit, these processes could include arrival of raw material on time, hiring of the right people, appropriate disposal of the wastages, implementation of the environmental considerations as outlined by law and others. Doing things right: everyone involved in the project should know how to do their work right, these could include adherence to industry best practices, requirements of the law and usage of the right tools, in most case it will be required to provide the project personnel and other stakeholders training to highlight or convey the knowledge of “doing things right” Adherence to the Project requirements: In most cases when we are managing medium to large scale projects, people are lost in details and they forget the bigger picture the main objectives of the project,
  • 15.
    we will makesure that everyone understand why the project is being implemented and what the end results we are expecting to meet. 4.2.3. Quality Control: It’s one of the most common challenge in quality and requirements management that we plan something very well and it’s also implemented as planned, but it’s not what the customer want, as a result the end product is not acceptable to the customer. Through quality control practices and processes we will make sure the work is carried out as by the overall objectives of the project, and we make sure the end product is acceptable to all involved. 4.3. Risk and Opportunity Management Risk is basically the impact of uncertainty on project activity, some of the risks we can consider for this project; Adherence to the government/ local laws: we consider if it’s not properly planned and not Usage of right Raw material: Hiring of experienced personnel: Lack/ No adherence to quality practices: Risk of acceptability of the end products: Maintenance of the recreational/ game equipment: Safety processes/ practices: 4.4. Problem-Solving and Decision-making We will work through projectized approach for the project, where the project manager will have the ultimate responsibility and authority for making project relevant issues, he/she will be reportable to the project management board, which can have their periodic meetings. All problems and conflicts will be addressed through at the grass root level, will be addressed at the first level of happening, then if we could not address them at that stage, we will escalate it one stage, and it will move up towards the project manager and management board. 5. Project Closure (Development): 5.1. Project Completion and Review The project will work through phase wise approach, meaning each phase will have an end deliverable, which will be verified and if required accepted by the customer/stakeholder. As we will be managing our project WBS and will complete our Work Packages in time-phased manner, every deliverable completed will be handed over to project team or stakeholder and moved to another
  • 16.
    task, so towardsthe end of the project limited issues will be needed to complete, meanwhile if we face a problem or rejection of certain deliverable we can fix it without losing anytime or extending the end date of the project. Toward the end of the project, the formal closure will take place, which will fulfills all the legal and other requirements. 5.2. Performance Improvement One of the main jobs of the project manager is continuous improvement and learning; we will use learning curve theory, best practices and other mechanisms to continuously look for continuous improvement in our behavior, project activities and deliverables. 6. Conclusion Christmas Land project is a very huge opportunity for the Salford City Council to promote the city and attract the attention of stakeholders not only for the project but also for the future of the city. Christmas is an event where people across the country tries their best to spend their vacations in best recreational facilities with their family, thus it is best opportunity for businesses and bankers to invest on such projects. Notwithstanding its benefits and future impacts on the city, the project does entail its own complexities and risks that needs careful study when planning. High number of stakeholders with different objectives each is a challenge for the project whereas the project objective should be narrowed down to mitigate the risk of losing focus while it should encompass the expectations and objectives of stakeholders at the same time. Hence the project’s success and failure highly depends on the identification and analysis of stakeholders and selection of objective(s) for the project. Initial planning of the project needs careful and concentration in that the scope of the project should be carefully defined in which the boundaries of the project, activities associated in the project including the timeframe and any expected uncertainties of the project should be considered. When planning the project a detailed work breakdown structure should be defined so that activities with same resources should not overlap each other. Dependencies of activities should be considered as well as resource allocation and time boundaries for each activity should be defined. A professional quality control mechanism should be defined for the project so that each activities performance are evaluated at several stages to mitigate risk of low quality delivery of service. The project has its associated risks which should be clearly defined and approaches to mitigate such risks should be considered beforehand. After implementation of the project, the closure of the project is a very important phase where lessons learned should be documented from the project for future success of projects. The city council can further develop the project into a permanent recreational facility for the city residents where any festivals and events can be conducted in the project environment. After reviewing the project performance of activities can be identified and best practices can be listed that brought the project to success.
  • 17.
    7. Bibliography Covey, S.R. (1990). The Seven Habits of Highly Effective People. New York: Free Press. Kerzner, H. (2009). Project Management - A Systems Approach to Planning, Scheduling and Controlling. New York: WILEY. Linning, S. (2015, January 13). Winter Blunderland' designed by Laurence Llewelyn-Bowen went bust owing creditors nearly £1MILLION. MailOnline. Retrieved from http://www.dailymail.co.uk/news/article-2908122/Winter-Blunderland-designed-Laurence- Llewelyn-Bowen-went-bust-owing-creditors-nearly-1MILLION.html Maylor, H. (2010). Project Management. Prentice Hall FINANCIAL TIMES.