SlideShare a Scribd company logo
InsulStone               ™


     Added Value Design Solutions:
Cost Competitive
Insulation Value (2 ¼” foam = R-11)
Damp Wall/Mold Prevention (Built-in Rain-screen)
Earthquake Resistance (shingle-like)
Hurricane (High Winds)
Flame Spread & Smoke Generation – “0”
Construction Site Value
















The InsulStone™ System

                                    Wainscot Cap
Corner/End



                Flats




                                                   Corner/End



             Only 4 – Parts (Lego-like)            Starter
1” Crown
By 2” Leg
 Staple
Stand-offs provide a10 MM rain-screen drainage and
ventilation zone between the panel and the wall.
Fastener locations are clearly   Fascia stand- offs reduce problems
marked for the installer!        from:
                                 •Hydraulic freeze/thaw effect
                                 •Effervescence
   Hot-melt silicone adhesive (Holds windows in skyscrapers)
   Adhesive method developed in co-operation with
    Dow Corning
   50 year Limited Warranty
   Adhesion and Structural Uniform Load Test rated at
    127 lbs/SF transverse loading.
   Each panel is individually fastened to the wall (Panel
    weight: 8-10 lbs/ft²)

   Support ledger not required
   Structural Uniform Load Test Rated at 127 lbs/SF
    (ASTM E330)

   Individually fastened panels flex with the wall
Dual Rain-screen Drainage

      Fastener
   1” Crown X 2”
  Leg Galv. Staple

                                    Drainage
 Drainage                           Plane #2
 Plane #1

                                      Sheathing
                                     OSB/Plywood
                                      7/16” min.
Manufactured
 Stone, or                                 Stud
   Brick

                                         Sheetrock

                                     Starter Section
                                        Fastener
                                       Starter
                                       Section
2012                       Outcome of 2012 IECC Residential Chapter Final Action Hearings
                                            Analysis of ICF International

       Based on estimates from the measures that were approved by the ICC’s Government Membership, the threshold of
       30% energy savings of the 2012 IECC beyond the 2006 IECC was met or surpassed. Significant adopted changes
       to the IECC include:

       1. A better thermal envelope – i.e., window,
          door, insulation – in all Climate Zones. In
          2006, the number of climate zones in the IECC
          was reduced to eight in an effort to shorten the
          IECC, make it easier to use and employ a
           common map for both commercial and
          residential codes. The simplified map (shown
          for the continental US) replaced many pages of
           maps and commercial envelope tables and
          allowed IECC users to easily determine the
           requirements that apply anywhere in the US.
          Note: Hawaii, Guam, Puerto Rico and the
          Virgin Islands are in Climate Zone 1; Alaska is
          in Climate Zones 7/8).

          Final changes to insulation & fenestration component requirements are listed below (improvements over 2009
          IECC are shaded in green):
                             Ceiling R-value      Wood Frame R-value      Basement R-value Crawl Space R-value
                               2009      2012      2009             2012          2009       2012         2009    2012
                               IECC      IECC      IECC             IECC          IECC       IECC         IECC    IECC
            Climate Zone
                                30        30          13             13             0          0           0       0
                  1
                                30        38          13             13             0          0           0       0
                  2
                  3             30        38          13      20 or 13+5** 5/13*** 5/13                   5/13    5/13
                                38        49          13        20 or 13+5       10/13       10/13       10/13   10/13
           4 exc. Marine
                                38        49 20 or 13+5         20 or 13+5       10/13       15/19       10/13   15/19
           4 Marine & 5
                  6             49        49 20 or 13+5 20+5 or 13+10 15/19                  15/19       10/13   15/19

               7&8              49        49          21     20+5 or 13+10 15/19             15/19       10/13   15/19

          * Floor and Slab insulations levels remain unchanged.
          ** Commonly available insulation in 2x6 cavity (R20) or in 2x4 cavity with sheathing (R13+x)
          *** R5 continuous insulation or R13 for framed cavity insulation
“Installation”
InsulStone Insulated Wall Cladding
               ™




                   ICC - EG315
“Masonry Veneer Systems with Foam Plastic Backing”


                   InsulStone   ™


             Simplifying Construction!
   1” crown by 2” staples are the most common
    and fastest way to install InsulStone™ over
    sheathing.(see InsulStone installation guide for details)
                                 ™




    Washer head screws can be used to attach
    directly to studs (16” centers) or to CMU or
    concrete. (see InsulStone installation guide for details).
                             ™
Determine the location of the starter and select 2 points with a laser level
at each side of the section of wall, mark and snap a line for the starter.
Step #1:          Install the corners first and fill the field to the last
                  panel. (randomly locate the splices)

Step #2:          Cut the 2 panels as illustrated to fit remaining space.
                  Use the left over piece for the splice in the next row.

Step #3:          Apply adhesive to the foam only.

Step #4:          Press the sections together as illustrated on right.

    (Note: 2 colors of stone are used for illustration purposes only)
   Electrical Boxes and Hose Bibs are flat stones
    designed for cover plate or light fixture
    installation. The stone is mounted on foam the
    same thickness as the stone. Use deck screws to
    attach this accessory, then cut surrounding stones
    to fit to the plate. Use adhesive to seal the cut
    edges to the accessory plate.
Quoins and Keystones
InsulStone           ™

              Commercial Grade
Insulated Sand Stone Panels 11 ½” x 22 ½”




                                     InsulStone™ is sand
                                       and red colored
   High-Density Concrete Fascia
   Harder than Mfg. Stone – 5,000 + PSI
   Mortar-less “Stack & Staple”
   Natural Sand finish or internally colored
    finishes
   R-11 Nominal Insulation Value
   Built-in Rain-screen
   8-10 lbs. square foot
www.insulstone.com
Insulstone Mortar Less Stone Veneer

More Related Content

Similar to Insulstone Mortar Less Stone Veneer

RIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical DetailsRIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical Details
RIW Ltd
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quick
kristenjames
 
Versaloc
VersalocVersaloc
Versaloc
kristenjames
 
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Anupama Krishnan
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
dhineshkumar002
 
Work methodology of roof waterproof treatment work with crown izonil 3
Work methodology of roof waterproof treatment work with crown izonil  3Work methodology of roof waterproof treatment work with crown izonil  3
Work methodology of roof waterproof treatment work with crown izonil 3
Md Abdur Rahaman
 
Catalogo prodotti 2018_eng_t8_qsp5e
Catalogo prodotti 2018_eng_t8_qsp5eCatalogo prodotti 2018_eng_t8_qsp5e
Catalogo prodotti 2018_eng_t8_qsp5e
NiallByrne19
 
Gyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdfGyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdf
Canberra Institute of technology
 
Aerocon Panels | Aerocon Blocks | Aadam Enterprises
Aerocon Panels | Aerocon Blocks | Aadam EnterprisesAerocon Panels | Aerocon Blocks | Aadam Enterprises
Aerocon Panels | Aerocon Blocks | Aadam Enterprises
Udayaraj K
 
dassoXTR, dassoCTECH Innovative Bamboo Exterior Material
dassoXTR, dassoCTECH Innovative Bamboo Exterior MaterialdassoXTR, dassoCTECH Innovative Bamboo Exterior Material
dassoXTR, dassoCTECH Innovative Bamboo Exterior Material
Ryan Wong
 
Sikafloor 20 n-purcem
Sikafloor 20 n-purcemSikafloor 20 n-purcem
Sikafloor 20 n-purcem
Khoi Binh Huynh
 
Tobslak tbyrothane 1 k
Tobslak tbyrothane 1 kTobslak tbyrothane 1 k
Tobslak tbyrothane 1 k
Tobslak International
 
Liquid Asphaltic Composition (LAC) - RIW
Liquid Asphaltic Composition (LAC) - RIW Liquid Asphaltic Composition (LAC) - RIW
Liquid Asphaltic Composition (LAC) - RIW
RIW Ltd
 
Prefabricated panels
Prefabricated panelsPrefabricated panels
Prefabricated panels
Moldtech SL
 
Acopladores para armaduras
Acopladores para armadurasAcopladores para armaduras
Acopladores para armaduras
CORTARTEC
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor planDanny Chiverton
 
IRJET- Glass Fiber Reinforced Gypsum
IRJET-  	  Glass Fiber Reinforced GypsumIRJET-  	  Glass Fiber Reinforced Gypsum
IRJET- Glass Fiber Reinforced Gypsum
IRJET Journal
 
Australian_Cultured_Stone_Technical_Information_Guide_Nick_Thurlbeck
Australian_Cultured_Stone_Technical_Information_Guide_Nick_ThurlbeckAustralian_Cultured_Stone_Technical_Information_Guide_Nick_Thurlbeck
Australian_Cultured_Stone_Technical_Information_Guide_Nick_ThurlbeckNick Thurlbeck
 
Performa edge metal_fascia_and_coping_from_imetco-brochure
Performa edge metal_fascia_and_coping_from_imetco-brochurePerforma edge metal_fascia_and_coping_from_imetco-brochure
Performa edge metal_fascia_and_coping_from_imetco-brochure
Amy Stokes
 
Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil walls
Prakash Ravindran
 

Similar to Insulstone Mortar Less Stone Veneer (20)

RIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical DetailsRIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical Details
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quick
 
Versaloc
VersalocVersaloc
Versaloc
 
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Work methodology of roof waterproof treatment work with crown izonil 3
Work methodology of roof waterproof treatment work with crown izonil  3Work methodology of roof waterproof treatment work with crown izonil  3
Work methodology of roof waterproof treatment work with crown izonil 3
 
Catalogo prodotti 2018_eng_t8_qsp5e
Catalogo prodotti 2018_eng_t8_qsp5eCatalogo prodotti 2018_eng_t8_qsp5e
Catalogo prodotti 2018_eng_t8_qsp5e
 
Gyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdfGyprock-Wet Areas-installation-guide.pdf
Gyprock-Wet Areas-installation-guide.pdf
 
Aerocon Panels | Aerocon Blocks | Aadam Enterprises
Aerocon Panels | Aerocon Blocks | Aadam EnterprisesAerocon Panels | Aerocon Blocks | Aadam Enterprises
Aerocon Panels | Aerocon Blocks | Aadam Enterprises
 
dassoXTR, dassoCTECH Innovative Bamboo Exterior Material
dassoXTR, dassoCTECH Innovative Bamboo Exterior MaterialdassoXTR, dassoCTECH Innovative Bamboo Exterior Material
dassoXTR, dassoCTECH Innovative Bamboo Exterior Material
 
Sikafloor 20 n-purcem
Sikafloor 20 n-purcemSikafloor 20 n-purcem
Sikafloor 20 n-purcem
 
Tobslak tbyrothane 1 k
Tobslak tbyrothane 1 kTobslak tbyrothane 1 k
Tobslak tbyrothane 1 k
 
Liquid Asphaltic Composition (LAC) - RIW
Liquid Asphaltic Composition (LAC) - RIW Liquid Asphaltic Composition (LAC) - RIW
Liquid Asphaltic Composition (LAC) - RIW
 
Prefabricated panels
Prefabricated panelsPrefabricated panels
Prefabricated panels
 
Acopladores para armaduras
Acopladores para armadurasAcopladores para armaduras
Acopladores para armaduras
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
IRJET- Glass Fiber Reinforced Gypsum
IRJET-  	  Glass Fiber Reinforced GypsumIRJET-  	  Glass Fiber Reinforced Gypsum
IRJET- Glass Fiber Reinforced Gypsum
 
Australian_Cultured_Stone_Technical_Information_Guide_Nick_Thurlbeck
Australian_Cultured_Stone_Technical_Information_Guide_Nick_ThurlbeckAustralian_Cultured_Stone_Technical_Information_Guide_Nick_Thurlbeck
Australian_Cultured_Stone_Technical_Information_Guide_Nick_Thurlbeck
 
Performa edge metal_fascia_and_coping_from_imetco-brochure
Performa edge metal_fascia_and_coping_from_imetco-brochurePerforma edge metal_fascia_and_coping_from_imetco-brochure
Performa edge metal_fascia_and_coping_from_imetco-brochure
 
Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil walls
 

Recently uploaded

ÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docx
ÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docxÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docx
ÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docx
ngochaavk33a
 
SOCIOLOGY PPT. SOCIAL SECURITY POWER POINT
SOCIOLOGY PPT. SOCIAL SECURITY POWER POINTSOCIOLOGY PPT. SOCIAL SECURITY POWER POINT
SOCIOLOGY PPT. SOCIAL SECURITY POWER POINT
ssuser8d5e2d1
 
UNIVERSAL HUMAN VALUES- Harmony in the Nature
UNIVERSAL HUMAN VALUES- Harmony in the NatureUNIVERSAL HUMAN VALUES- Harmony in the Nature
UNIVERSAL HUMAN VALUES- Harmony in the Nature
Chandrakant Divate
 
Program Your Destiny eBook - Destiny University.pdf
Program Your Destiny eBook - Destiny University.pdfProgram Your Destiny eBook - Destiny University.pdf
Program Your Destiny eBook - Destiny University.pdf
Michael Herlache, MBA
 
CHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docx
CHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docxCHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docx
CHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docx
ngochaavk33a
 
Ethical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptx
Ethical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptxEthical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptx
Ethical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptx
TANMAYJAIN511570
 
Collocation thường gặp trong đề thi THPT Quốc gia.pdf
Collocation thường gặp trong đề thi THPT Quốc gia.pdfCollocation thường gặp trong đề thi THPT Quốc gia.pdf
Collocation thường gặp trong đề thi THPT Quốc gia.pdf
ngochaavk33a
 

Recently uploaded (7)

ÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docx
ÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docxÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docx
ÔN TẬP CỤM THÀNH NGỮ TIẾNG ANH CỰC HAY.docx
 
SOCIOLOGY PPT. SOCIAL SECURITY POWER POINT
SOCIOLOGY PPT. SOCIAL SECURITY POWER POINTSOCIOLOGY PPT. SOCIAL SECURITY POWER POINT
SOCIOLOGY PPT. SOCIAL SECURITY POWER POINT
 
UNIVERSAL HUMAN VALUES- Harmony in the Nature
UNIVERSAL HUMAN VALUES- Harmony in the NatureUNIVERSAL HUMAN VALUES- Harmony in the Nature
UNIVERSAL HUMAN VALUES- Harmony in the Nature
 
Program Your Destiny eBook - Destiny University.pdf
Program Your Destiny eBook - Destiny University.pdfProgram Your Destiny eBook - Destiny University.pdf
Program Your Destiny eBook - Destiny University.pdf
 
CHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docx
CHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docxCHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docx
CHUYÊN ĐỀ READING ÔN THI HSG THPT HAY.docx
 
Ethical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptx
Ethical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptxEthical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptx
Ethical_dilemmas_MDI_Gurgaon-Business Ethics Case 1.pptx
 
Collocation thường gặp trong đề thi THPT Quốc gia.pdf
Collocation thường gặp trong đề thi THPT Quốc gia.pdfCollocation thường gặp trong đề thi THPT Quốc gia.pdf
Collocation thường gặp trong đề thi THPT Quốc gia.pdf
 

Insulstone Mortar Less Stone Veneer

  • 1.
  • 2.
  • 3. InsulStone ™ Added Value Design Solutions: Cost Competitive Insulation Value (2 ¼” foam = R-11) Damp Wall/Mold Prevention (Built-in Rain-screen) Earthquake Resistance (shingle-like) Hurricane (High Winds) Flame Spread & Smoke Generation – “0”
  • 5. The InsulStone™ System Wainscot Cap Corner/End Flats Corner/End Only 4 – Parts (Lego-like) Starter
  • 6. 1” Crown By 2” Leg Staple
  • 7.
  • 8. Stand-offs provide a10 MM rain-screen drainage and ventilation zone between the panel and the wall.
  • 9. Fastener locations are clearly Fascia stand- offs reduce problems marked for the installer! from: •Hydraulic freeze/thaw effect •Effervescence
  • 10. Hot-melt silicone adhesive (Holds windows in skyscrapers)  Adhesive method developed in co-operation with Dow Corning  50 year Limited Warranty  Adhesion and Structural Uniform Load Test rated at 127 lbs/SF transverse loading.
  • 11.
  • 12. Each panel is individually fastened to the wall (Panel weight: 8-10 lbs/ft²)  Support ledger not required  Structural Uniform Load Test Rated at 127 lbs/SF (ASTM E330)  Individually fastened panels flex with the wall
  • 13. Dual Rain-screen Drainage Fastener 1” Crown X 2” Leg Galv. Staple Drainage Drainage Plane #2 Plane #1 Sheathing OSB/Plywood 7/16” min. Manufactured Stone, or Stud Brick Sheetrock Starter Section Fastener Starter Section
  • 14.
  • 15. 2012 Outcome of 2012 IECC Residential Chapter Final Action Hearings Analysis of ICF International Based on estimates from the measures that were approved by the ICC’s Government Membership, the threshold of 30% energy savings of the 2012 IECC beyond the 2006 IECC was met or surpassed. Significant adopted changes to the IECC include: 1. A better thermal envelope – i.e., window, door, insulation – in all Climate Zones. In 2006, the number of climate zones in the IECC was reduced to eight in an effort to shorten the IECC, make it easier to use and employ a common map for both commercial and residential codes. The simplified map (shown for the continental US) replaced many pages of maps and commercial envelope tables and allowed IECC users to easily determine the requirements that apply anywhere in the US. Note: Hawaii, Guam, Puerto Rico and the Virgin Islands are in Climate Zone 1; Alaska is in Climate Zones 7/8). Final changes to insulation & fenestration component requirements are listed below (improvements over 2009 IECC are shaded in green): Ceiling R-value Wood Frame R-value Basement R-value Crawl Space R-value 2009 2012 2009 2012 2009 2012 2009 2012 IECC IECC IECC IECC IECC IECC IECC IECC Climate Zone 30 30 13 13 0 0 0 0 1 30 38 13 13 0 0 0 0 2 3 30 38 13 20 or 13+5** 5/13*** 5/13 5/13 5/13 38 49 13 20 or 13+5 10/13 10/13 10/13 10/13 4 exc. Marine 38 49 20 or 13+5 20 or 13+5 10/13 15/19 10/13 15/19 4 Marine & 5 6 49 49 20 or 13+5 20+5 or 13+10 15/19 15/19 10/13 15/19 7&8 49 49 21 20+5 or 13+10 15/19 15/19 10/13 15/19 * Floor and Slab insulations levels remain unchanged. ** Commonly available insulation in 2x6 cavity (R20) or in 2x4 cavity with sheathing (R13+x) *** R5 continuous insulation or R13 for framed cavity insulation
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. “Installation” InsulStone Insulated Wall Cladding ™ ICC - EG315 “Masonry Veneer Systems with Foam Plastic Backing” InsulStone ™ Simplifying Construction!
  • 24.
  • 25.
  • 26. 1” crown by 2” staples are the most common and fastest way to install InsulStone™ over sheathing.(see InsulStone installation guide for details) ™  Washer head screws can be used to attach directly to studs (16” centers) or to CMU or concrete. (see InsulStone installation guide for details). ™
  • 27. Determine the location of the starter and select 2 points with a laser level at each side of the section of wall, mark and snap a line for the starter.
  • 28.
  • 29. Step #1: Install the corners first and fill the field to the last panel. (randomly locate the splices) Step #2: Cut the 2 panels as illustrated to fit remaining space. Use the left over piece for the splice in the next row. Step #3: Apply adhesive to the foam only. Step #4: Press the sections together as illustrated on right. (Note: 2 colors of stone are used for illustration purposes only)
  • 30. Electrical Boxes and Hose Bibs are flat stones designed for cover plate or light fixture installation. The stone is mounted on foam the same thickness as the stone. Use deck screws to attach this accessory, then cut surrounding stones to fit to the plate. Use adhesive to seal the cut edges to the accessory plate.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41. InsulStone ™ Commercial Grade Insulated Sand Stone Panels 11 ½” x 22 ½” InsulStone™ is sand and red colored
  • 42.
  • 43. High-Density Concrete Fascia  Harder than Mfg. Stone – 5,000 + PSI  Mortar-less “Stack & Staple”  Natural Sand finish or internally colored finishes  R-11 Nominal Insulation Value  Built-in Rain-screen  8-10 lbs. square foot