“Describe a time when you led a team in solving a problem within Manufacturing. What tools/techniques
did you use and how did you ensure the team worked well?”
Presentation Question :
3. FARSHID HESAMI
After a problem occured either in a manufacturing Plant or in the Field, it is most important for engineer to have a
clear understanding of the problem.Therefore a detailed reporting is essential.
In fact that Company is not focused on a single way,certain problem solving / reporting methods are qualified,
such as :
Answer :
What tools/techniques……
8D Report
Six Sigma
Ishikawa
A3 (used with Toyota )
5Phase (used with GM)
7Step (used with Chrysler)
PDCA (Plan, Do, Check, Act)
PDSA (Plan, Do, Study, Act)
Fault Tree Analysis (FTA)
problem solving methods:
4. FARSHID HESAMI
Causal analysis and
problem resolution
8D Report (Ford)
5Phase (GM)
7Step (Chrysler) My Answer is 8D method
5. FARSHID HESAMI
Why 8D?
More Solid & Comprehensive than the others.
The most popular one been applied in the field.
Provide a guidance by Systematic Approach in Problem Solving.
8D is a problem-solving methodology for product and process problems.
6. FARSHID HESAMI
The effective implementation of the 8D :
Reliability.
Design verification, product and process validation.
Potential failure mode and consequence analysis (FMEA(
Production parts approval process (PPAP(.
Statistical process control (SPC).
7. FARSHID HESAMI
8D benefits :
Properly completing the 8D process, in addition to identifying the
ROOT CAUSE
For suppliers .
For Customer .
8D benefits :
8. FARSHID HESAMI
Q : How ensure the team worked well ?
A : Teamwork problem solving
Skills
More talents
More experience
More knowledge
More technical competence
Communication
Cross departmental lines
Increase productivity
Increase dignity morale
Participation
Consensus decision-making
Buy in‘‘ to change
Job enrichment
Effectiveness
Better solution
Solutions more likely to be accept
Response to complete stated mission
9. FARSHID HESAMI
•8D – Report ( the 8 disciplines(
D1 – Select the Team
D2 – Describe the Problem
D3 – Implement and verify
containment actions
D4 – Define and verify Root Cause(s)
Identify potential Causes
Select most likely Causes
Is the potential
Cause a Root Cause ?
Identify possible
Corrective Actions
yes
no
D6 – Implement permanent
Corrective Actions
D8 – Congratulate the Team
D7 – Prevent Recurrence
D5 – Verify Corrective Actions
10. FARSHID HESAMI
Problem of missing a hole in Front bumper
Problem description :
Front modules frame missing a hole
Part Name :
Front bumper Reinforcement
Supplier name :
xxxxxxx
Date of complaint :
2017/04/12 / Night
Complaint source:
Production Line 20
Total defect quantity:
305 / Batch Kw50
Defect type:
Missing a hole
11. FARSHID HESAMI
Root cause fishbone :
Materials
Method/Progress
Environment
Q-Defect
Man
Is there inspection system ?
Is there no implementation of the
Inspection?
Is staff turnover?
Machine
Is the product raw materials will
Affected this issue?
Is there a test capability for this
Hole?
Measurement
Is the devicenis abnormal? Does the production environment
causing this problem?
Is there a error proofing?
Are there inspection requirments
for this hole?
Is there equipment maintenance
requirments?
Implementation of the system
whether the monitor?
12. FARSHID HESAMI
Root process confirmation :
Man : execution
Man problems.............
Employees failed to implemant
requirments for product sampling.
Employees Don't perform inspection of the
equipment maintenance system.
Machine : Model quality
Machine problems.............
Punch fracture,it should confirm the status
of the punch material(To be confirmed).
Method :Proofing and Monitor
Method problems.............
There is no error proofing in
the welding fixture
13. FARSHID HESAMI
Action execution :
Before
There is no error proofing in the
welding fixture
After
Increase errorproofing pin on the
welding fixture.
14. FARSHID HESAMI
Prevention of system action :
Prevention of system action Execution date Remark
Fixture error proofing .
A test focused on labeling requirements .
Mold punches state investigation .
2017/04/12
2017/04/12
2017/04/12
Compleated
Compleated
Compleated
I . Problem Description(s)
II . Immediate Action(s)
III . Root Cause Determination(s)
IV . Corrective Action Plan(CAP)
V . Verification of CAP(s)
1. Problem Description(s)
2. Root Cause Analysis
3. Interim Action and Effective Date
4. Permanent Corrective Action and Effective date
5. Verification
6. Control
7. Prevention
8D is a problem-solving methodology for product and process problems.
It is structured into eight disciplines, emphasizing team synergy. The team as whole is better and
smarter than the quality sum of the individuals. Each discipline is supported by a checklist of
assessment questions, such as “what is wrong with what”, “what, when, where, how much”.
SPC is the statistical process control (Statistical Process Control). Mainly refers to the application of statistical analysis technology for real-time monitoring of the production process.
Cpk is the English process Capability index abbreviation, process capability index, refers to the process in a certain period of time, in a controlled state (steady state) under the actual processing capacity.
6 Sigma is a business process that significantly increases its bottom line gains by designing and monitoring its daily business activities, minimizing waste of resources while improving customer satisfaction.
8D is used to monitor the process of solving the problem. It is not a detailed report or a complex analysis and description tool, but a collection of each step that contains a solution to the problem, so that the basic information can be found from it.
For suppliers : Through the establishment of group training internal cooperation skills .
For Customer : Enhance confidence in the supplier's products and processes .
Participation مشارکت
Effectiveness اثربخشی
استعدادهای بیشتر
تجربه بیشتر
دانش بیشتر
شایستگی های فنی بیشتر
خطوط دپارتمان صلیب
افزایش بهره وری
افزایش روحیه کرامت
اجماع تصمیم گیری
خرید در '' به تغییر
غنی سازی شغلی
راه حل بهتر
راه حل احتمال بیشتری برای پذیرفتن شود
پاسخ به تکمیل ماموریت اعلام
Man problems : 1- (with sampling record,but the record is untrue,for inspection records witout confirmation).
2-The panch should be replace in JULY .