SlideShare a Scribd company logo
1 of 13
EXERCISE NO. 1

                        SHEAR ANGLE MEASUREMENT

AIM :

To measure the shear angle to the given conditions.

TOOLS AND EQUIPMENTS REQUIRED :

Lathe, Single point turning tool, Micrometer.

PROCEDURE :

1. The workpiece is held in the chuck.

2. The known depth of cut is given (uncut chip thickness, t1).

3. The chip is taken for thickness inspection. Find the mean chip thickness, t 2.

4. Calculate the chip thickness ratio, r c = t1 / t2

5. Calculate the shear angle for the given rake angle of the tool.
                         rc cos
                tan  = -----------
                        1 - rc sin    where,  - rake angle.

1. Repeat the same procedure to get few more readings and calculate the
   mean shear angle.

2. Repeat the experiment for different depth of cuts.




                                                 Powered By www.technoscriptz.com
t2
                                                    Tool
                         t1




                                  Workpiece




NOTE :

1. The value of Shear angle depends on the cutting conditions, tool geometry,
   tool material and work material.

2. If the Shear angle is small, the plane of the shear is large, the chip is
   thicker, more force is required to remove the chip.

3. If the shear angle is large, the plane of shear will be shorter and the chip is
   thin. Hence, less force is required to remove the chip.




                                             Powered By www.technoscriptz.com
CHIP THICKNESS :
                                               LC = Least Count
    DEPTH PITCH SCALE HEAD SCALE HEAD SCALE          CHIP
SL. OF CUT  READING   COINCIDENCE   READING      THICKNESS
NO.
    t1 (mm)   (PSR)       (HSC)   HSR = HSC*LC t2 = PSR + HSR
 1    0.25
 2    0.25
 3    0.25
 4    0.25

 1     0.50
 2     0.50
 3     0.50
 4     0.50



SHEAR ANGLE :

      UNCUT      CHIP      CHIP   SHEAR ANGLE
SL.    CHIP   THICKNESS THICKNESS               AVERAGE
NO. THICKNESS             RATIO               SHEAR ANGLE
       t1 (mm)      t2 (mm)      rc = t1 / t2
 1       0.25
 2       0.25
 3       0.25
 4       0.25

 1       0.50
 2       0.50
 3       0.50
 4       0.50


RESULT :

Thus the shear angle is found for different depth of cuts.




                                                Powered By www.technoscriptz.com
EXERCISE NO. 2

     MACHINING AN INTERNAL KEYW AY USING SLOTTING MACHINE

Aim :

To machine an internal keyway in the given workpiece to the dimensions as
shown in the figure using Slotting Machine.

                             2
                     5
     Ø5
       0                                  2
                                        Ø6




Tools Required :

Slotting Machine, Scriber, Divider, Steel Rule.

Procedure :

1. The given workpiece is measured for its initial dimensions.
2. With the help of scriber mark the keyway dimensions in the workpiece.
3. Fix the workpiece in the vice of the slotting machine.
4. After fixing the workpiece and the slotting tool, allow the ram to vertically
   reciprocate.
5. Start the slotting process by giving the required depth by horizontally
   moving the vice.
6. Slowly increase the depth of cut and repeat the procedure to make the
   required shape.
7. The workpiece is now checked for final dimensions.

Result :
Thus, internal keyway is machined in the given workpiece to the dimensions
as shown in the figure using Slotting Machine.


                                              Powered By www.technoscriptz.com
EXERCISE NO. 3

                            SURFACE GRINDING
AIM :

To grind the workpiece to the given tolerance using surface grinding machine.




                                50




                                                                 50
                 70                                 70

                               10                                     9±0.01


TOOLS AND EQUIPMENTS REQUIRED :

Surface Grinding machine, Micrometer.

PROCEDURE :

1. The given workpiece is checked for its initial dimensions.

2. The permanent magnet worktable is cleaned thoroughly.

3. Keep the workpiece over the worktable and push the lever to “ON” position
   to hold the workpiece.

4. The required depth of cut is given by raising the table.

5. The reciprocating and cross feed is given to grind the required length and
   width of the workpiece respectively.

6. Finally, the finished workpiece is checked for the given dimensions.

RESULT :

Thus the given workpiece is ground to the given tolerance using s urface
grinding machine.



                                             Powered By www.technoscriptz.com
EXERCISE NO. 4

               ASSEMBLY OF BOLT & NUT (ASSEMBLY – I)

AIM :

To machine and assemble a Bolt & Nut to the given dimensions using
required machines.


                                                   M 25.4 x 3.75
    30




                         18




                                                             Chamfer 45° x 2
                   40           10        30


TOOLS AND EQUIPMENTS REQUIRED :

Lathe, Turning tool, Parting tool, Threading tool, Vernier caliper.

PROCEDURE :

1. The given workpiece is checked for its initial dimensions.

2. The workpiece is chucked and turned for the required dimensions.

3. The external thread is made on the workpiece.

4. The internal thread is made on another workpiece.

5. Check for the mating of internal and external threads formed.

RESULT :

Thus, a Bolt & Nut assembly is machined as per the given dimensions and
assembled using the required machines.




                                               Powered By www.technoscriptz.com
EXERCISE NO. 5

              ASSEMBLY OF DIE & PUNCH (ASSEMBLY – II)

AIM :

To machine and assemble a Die & Punch to the given dimensions using
required machines.

                            Ø55




                                                  Ø55
                 Ø50




                                   Ø40


                                          Ø40




                                                         Ø50
                       20   10 5                5 10    20


TOOLS AND EQUIPMENTS REQUIRED :

Lathe, Vernier caliper.

PROCEDURE :

1. The given workpieces are chec ked for its initial dimensions.

2. The workpiece is chucked in lathe and machined to the projection
   dimensions as given in the figure.

3. The other workpiece is machined for recess dimensions as given in the
   figure.

4. Mate both the workpieces.

RESULT :

Thus, a Die & Punch assembly is machined as per the given dimensions and
assembled using the required machines.




                                                Powered By www.technoscriptz.com
EXERCISE NO. 6

               ASSEMBLY OF FLANGE COUPLING (ASSEMBLY – III)

     AIM :

     To machine and assemble the Flange Coupling as shown in the figure using
     required machines.



                 50                                              50
                               PCD 35 mm                                    PCD 35 mm
                                                                            9 mm dia.,
                              8 mm tap, 4 holes                             4 holes

                              10 mm tap                                     10 mm dia.
70




                                                  70




     TOOLS AND EQUIPMENTS REQUIRED :

     Drilling machine, Drill set, Tap set, Bolts & Nuts, Vernier Caliper.

     PROCEDURE :

     1. The given workpieces are checked for its initial dimensions.

     2. The center of the workpieces are marked and the Pitch Circ le Diameter is
        marked in both the workpieces.

     3. The first workpiece is drilled and tapped to the dimensions as shown in the
        figure.

     4. The second workpiece is drilled to the dimensions as shown in the figure.

     5. Both the workpieces are mated together by using bolts and nuts.

     6. Thus a Flange Coupling assembly is made using required machines.


                                                   Powered By www.technoscriptz.com
RESULT :

Thus, a Flange Coupling is machined as per the given dimensions and
assembled using the required machines.




                                     Powered By www.technoscriptz.com
EXERCISE NO. 7

                                CAPSTAN LATHE

AIM :

To machine the workpiece to the given dimensions using capstan lathe.

                      20




                                                     18
                                                     12
                               12          18


TOOLS AND EQUIPMENTS REQUIRED :

Capstan Lathe, Stopper, drill chuck, counter sink bit, drill bit, turning tool,
parting off tool, Vernier Caliper.

PROCEDURE :

1. Prepare the tooling layout for the given workpiece.

2. Set the tools in their respective positions of the tool stations.

3. The workpiece is chucked and checked for the rotation.

4. The adjustment to the length of feed for each tool is adjusted by rotating
   the adjustment screws.

5. Feed the tools in the required sequence to machine the given workpiece.

RESULT :

Thus the given workpiece is machined to the given dimensions using capstan
lathe.




                                                Powered By www.technoscriptz.com
EXERCISE NO. 8

                             SPUR GEAR MILLING

AIM :

To machine a spur gear to the given module and number of teeth in the given
workpiece.

                          Ø5
                             0
                         Ø18




TOOLS AND EQUIPMENTS REQUIRED :

Milling machine, Vernier caliper, Mandrel.

PROCEDURE :

1. Calculate the gear tooth proportions.

            Blank diameter     = ( Z+ 2) m
            Tooth depth        = 2.25 m
            Tooth width        = 1.5708 m
   where,
            Z = Number of teeth required
            m = module

2. Indexing calculation
            Index crank movement = 40 / Z

3. The dividing head and the tail stock are bolted on the machine table. Their
   axis must be set parallel to the machine table.

4. The gear blank is held between the dividing head and tailstock using a
   mandrel. The mandrel is connected with the spindle of dividing head by a
   carrier and catch plate.


                                             Powered By www.technoscriptz.com
5. The cutter is mounted on the arbor. The cutter is centre d accurately with
   the gear blank.

6. Set the speed and feed for machining.

7. For giving depth of cut, the table is raised till the periphery of the gear
   blank just touches the cutter.

8. The micrometer dial of vertical feed screw is set to zero in this positio n.

9. Then the table is raised further to give the required depth of cut.

10.      The machine is started and feed is given to the table to cut the first
      groove of the blank.

11.      After the cut, the table is brought back to the starting position.

12.      Then the gear blank is indexed for the next tooth space.

13.      This is continued till all the gear teeth are cut.

CALCULATION :

Z = No. of teeth      = 23

m = module            = 2 mm

Blank Diameter        = (Z + 2) m
                      = (23 + 2) 2
                      = 50 mm

Tooth Depth           = 2.25 m
                      = 2.25 * 2
                      = 4.5 mm

Indexing Calculation         = 40 / Z
                             = 40 / 23
                             = 1 17/23


RESULT :

Thus the required gear is machined using the milling machine to the required
number of teeth.




                                                  Powered By www.technoscriptz.com
EXERCISE NO. 9

            MACHINING OF HEXAGON IN SHAPING MACHINE


Aim :

To machine a hexagon in the given workpiece to the dimensions as shown in
the figure using Shaping Machine.

                              29                        15




Tools Required :

Shaping Machine, Scriber, Divider, Steel Rule, Chalk piece, Bevel Protractor.


Procedure :

1. The given workpiece is measured for its initial dimensions.
2. With the help of scriber, mark the hexagon dimensions in the workpiece.
3. Fix the workpiece in the vice of the shaping machine.
4. After fixing the workpiece and the shaping tool, allow the ram to
   reciprocate.
5. Start the shaping process by giving the required depth by lowering the tool.
6. Slowly increase the depth of cut and repeat the procedure to make the
   hexagon shape.
7. The workpiece is now checked for final dimensions.


Result :

Thus, a hexagon is machined in the given workpiece to the dimensi ons as
shown in the figure using Shaping Machine.



                                           Powered By www.technoscriptz.com

More Related Content

What's hot

What's hot (19)

Machining
MachiningMachining
Machining
 
Indexing or dividing_head
Indexing or dividing_headIndexing or dividing_head
Indexing or dividing_head
 
CS Unitec Beveling Machine
CS Unitec Beveling MachineCS Unitec Beveling Machine
CS Unitec Beveling Machine
 
Grinding report
Grinding reportGrinding report
Grinding report
 
Wt5912 2012 u2-w3
Wt5912 2012 u2-w3Wt5912 2012 u2-w3
Wt5912 2012 u2-w3
 
Ch 8.2 screw thread manufacturing
Ch 8.2 screw thread manufacturingCh 8.2 screw thread manufacturing
Ch 8.2 screw thread manufacturing
 
machining and machine tool (Indexing milling machine)
machining and machine tool (Indexing milling machine)machining and machine tool (Indexing milling machine)
machining and machine tool (Indexing milling machine)
 
Lab report 1 turning
Lab report 1   turningLab report 1   turning
Lab report 1 turning
 
Ipec milling
Ipec millingIpec milling
Ipec milling
 
Ch 7 milling
Ch 7 millingCh 7 milling
Ch 7 milling
 
Unit 4B Thread Manufacturing
Unit 4B Thread ManufacturingUnit 4B Thread Manufacturing
Unit 4B Thread Manufacturing
 
Methods of indexing
Methods of indexingMethods of indexing
Methods of indexing
 
Ch 6 reaming, boring, broaching
Ch 6 reaming, boring, broachingCh 6 reaming, boring, broaching
Ch 6 reaming, boring, broaching
 
Topic:milling machine
Topic:milling machineTopic:milling machine
Topic:milling machine
 
MM REPORT FINAL
MM REPORT FINALMM REPORT FINAL
MM REPORT FINAL
 
THREAD CUTTING AND KNURLING ON LATHE
THREAD CUTTING AND KNURLING ON LATHETHREAD CUTTING AND KNURLING ON LATHE
THREAD CUTTING AND KNURLING ON LATHE
 
lathe
 lathe lathe
lathe
 
lathe machine SK mondal
lathe machine SK mondallathe machine SK mondal
lathe machine SK mondal
 
Week 1 mill 1
Week 1   mill 1Week 1   mill 1
Week 1 mill 1
 

Similar to Me2258 lm

Manufacturing technology lab-1
Manufacturing technology lab-1Manufacturing technology lab-1
Manufacturing technology lab-1Krishna Gali
 
Manufacturimg of comressor blade presentation 4 - copy
Manufacturimg of comressor blade presentation  4 - copyManufacturimg of comressor blade presentation  4 - copy
Manufacturimg of comressor blade presentation 4 - copyanup sharma
 
Workshop Report.pdf
Workshop Report.pdfWorkshop Report.pdf
Workshop Report.pdfHogr kamal
 
Internship at LMTG
Internship at LMTGInternship at LMTG
Internship at LMTGAshish Sethi
 
Amar askandar lathe mechaine
Amar askandar lathe mechaineAmar askandar lathe mechaine
Amar askandar lathe mechaineAmar A.Mahmood
 
Pemrograman cnc tu 3 a
Pemrograman cnc tu 3 aPemrograman cnc tu 3 a
Pemrograman cnc tu 3 aAlen Pepa
 
DRILLING MACHINE.pptx
DRILLING MACHINE.pptxDRILLING MACHINE.pptx
DRILLING MACHINE.pptxNasir41
 
Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3Abdulaziz AlSuwaidi
 

Similar to Me2258 lm (20)

Manufacturing technology lab-1
Manufacturing technology lab-1Manufacturing technology lab-1
Manufacturing technology lab-1
 
Mft lab 1 manual
Mft lab  1  manualMft lab  1  manual
Mft lab 1 manual
 
Manufacturimg of comressor blade presentation 4 - copy
Manufacturimg of comressor blade presentation  4 - copyManufacturimg of comressor blade presentation  4 - copy
Manufacturimg of comressor blade presentation 4 - copy
 
Workshop Report.pdf
Workshop Report.pdfWorkshop Report.pdf
Workshop Report.pdf
 
Machine tools
Machine toolsMachine tools
Machine tools
 
milling.pdf
milling.pdfmilling.pdf
milling.pdf
 
Internship at LMTG
Internship at LMTGInternship at LMTG
Internship at LMTG
 
Amar askandar lathe mechaine
Amar askandar lathe mechaineAmar askandar lathe mechaine
Amar askandar lathe mechaine
 
Drilling operation
Drilling operationDrilling operation
Drilling operation
 
Pemrograman cnc tu 3 a
Pemrograman cnc tu 3 aPemrograman cnc tu 3 a
Pemrograman cnc tu 3 a
 
Workshop practice ii lecture notes
Workshop practice ii lecture notesWorkshop practice ii lecture notes
Workshop practice ii lecture notes
 
Drilling machine
Drilling machineDrilling machine
Drilling machine
 
DRILLING MACHINE.pptx
DRILLING MACHINE.pptxDRILLING MACHINE.pptx
DRILLING MACHINE.pptx
 
Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3
 
Drilling
DrillingDrilling
Drilling
 
Drilling (1)
Drilling (1)Drilling (1)
Drilling (1)
 
doc.doc
doc.docdoc.doc
doc.doc
 
doc.doc
doc.docdoc.doc
doc.doc
 
Drillings
DrillingsDrillings
Drillings
 
Fitting project Rubric
Fitting project RubricFitting project Rubric
Fitting project Rubric
 

Recently uploaded

CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 

Recently uploaded (20)

CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Me2258 lm

  • 1. EXERCISE NO. 1 SHEAR ANGLE MEASUREMENT AIM : To measure the shear angle to the given conditions. TOOLS AND EQUIPMENTS REQUIRED : Lathe, Single point turning tool, Micrometer. PROCEDURE : 1. The workpiece is held in the chuck. 2. The known depth of cut is given (uncut chip thickness, t1). 3. The chip is taken for thickness inspection. Find the mean chip thickness, t 2. 4. Calculate the chip thickness ratio, r c = t1 / t2 5. Calculate the shear angle for the given rake angle of the tool. rc cos tan  = ----------- 1 - rc sin where,  - rake angle. 1. Repeat the same procedure to get few more readings and calculate the mean shear angle. 2. Repeat the experiment for different depth of cuts. Powered By www.technoscriptz.com
  • 2. t2 Tool t1 Workpiece NOTE : 1. The value of Shear angle depends on the cutting conditions, tool geometry, tool material and work material. 2. If the Shear angle is small, the plane of the shear is large, the chip is thicker, more force is required to remove the chip. 3. If the shear angle is large, the plane of shear will be shorter and the chip is thin. Hence, less force is required to remove the chip. Powered By www.technoscriptz.com
  • 3. CHIP THICKNESS : LC = Least Count DEPTH PITCH SCALE HEAD SCALE HEAD SCALE CHIP SL. OF CUT READING COINCIDENCE READING THICKNESS NO. t1 (mm) (PSR) (HSC) HSR = HSC*LC t2 = PSR + HSR 1 0.25 2 0.25 3 0.25 4 0.25 1 0.50 2 0.50 3 0.50 4 0.50 SHEAR ANGLE : UNCUT CHIP CHIP SHEAR ANGLE SL. CHIP THICKNESS THICKNESS AVERAGE NO. THICKNESS RATIO SHEAR ANGLE t1 (mm) t2 (mm) rc = t1 / t2 1 0.25 2 0.25 3 0.25 4 0.25 1 0.50 2 0.50 3 0.50 4 0.50 RESULT : Thus the shear angle is found for different depth of cuts. Powered By www.technoscriptz.com
  • 4. EXERCISE NO. 2 MACHINING AN INTERNAL KEYW AY USING SLOTTING MACHINE Aim : To machine an internal keyway in the given workpiece to the dimensions as shown in the figure using Slotting Machine. 2 5 Ø5 0 2 Ø6 Tools Required : Slotting Machine, Scriber, Divider, Steel Rule. Procedure : 1. The given workpiece is measured for its initial dimensions. 2. With the help of scriber mark the keyway dimensions in the workpiece. 3. Fix the workpiece in the vice of the slotting machine. 4. After fixing the workpiece and the slotting tool, allow the ram to vertically reciprocate. 5. Start the slotting process by giving the required depth by horizontally moving the vice. 6. Slowly increase the depth of cut and repeat the procedure to make the required shape. 7. The workpiece is now checked for final dimensions. Result : Thus, internal keyway is machined in the given workpiece to the dimensions as shown in the figure using Slotting Machine. Powered By www.technoscriptz.com
  • 5. EXERCISE NO. 3 SURFACE GRINDING AIM : To grind the workpiece to the given tolerance using surface grinding machine. 50 50 70 70 10 9±0.01 TOOLS AND EQUIPMENTS REQUIRED : Surface Grinding machine, Micrometer. PROCEDURE : 1. The given workpiece is checked for its initial dimensions. 2. The permanent magnet worktable is cleaned thoroughly. 3. Keep the workpiece over the worktable and push the lever to “ON” position to hold the workpiece. 4. The required depth of cut is given by raising the table. 5. The reciprocating and cross feed is given to grind the required length and width of the workpiece respectively. 6. Finally, the finished workpiece is checked for the given dimensions. RESULT : Thus the given workpiece is ground to the given tolerance using s urface grinding machine. Powered By www.technoscriptz.com
  • 6. EXERCISE NO. 4 ASSEMBLY OF BOLT & NUT (ASSEMBLY – I) AIM : To machine and assemble a Bolt & Nut to the given dimensions using required machines. M 25.4 x 3.75 30 18 Chamfer 45° x 2 40 10 30 TOOLS AND EQUIPMENTS REQUIRED : Lathe, Turning tool, Parting tool, Threading tool, Vernier caliper. PROCEDURE : 1. The given workpiece is checked for its initial dimensions. 2. The workpiece is chucked and turned for the required dimensions. 3. The external thread is made on the workpiece. 4. The internal thread is made on another workpiece. 5. Check for the mating of internal and external threads formed. RESULT : Thus, a Bolt & Nut assembly is machined as per the given dimensions and assembled using the required machines. Powered By www.technoscriptz.com
  • 7. EXERCISE NO. 5 ASSEMBLY OF DIE & PUNCH (ASSEMBLY – II) AIM : To machine and assemble a Die & Punch to the given dimensions using required machines. Ø55 Ø55 Ø50 Ø40 Ø40 Ø50 20 10 5 5 10 20 TOOLS AND EQUIPMENTS REQUIRED : Lathe, Vernier caliper. PROCEDURE : 1. The given workpieces are chec ked for its initial dimensions. 2. The workpiece is chucked in lathe and machined to the projection dimensions as given in the figure. 3. The other workpiece is machined for recess dimensions as given in the figure. 4. Mate both the workpieces. RESULT : Thus, a Die & Punch assembly is machined as per the given dimensions and assembled using the required machines. Powered By www.technoscriptz.com
  • 8. EXERCISE NO. 6 ASSEMBLY OF FLANGE COUPLING (ASSEMBLY – III) AIM : To machine and assemble the Flange Coupling as shown in the figure using required machines. 50 50 PCD 35 mm PCD 35 mm 9 mm dia., 8 mm tap, 4 holes 4 holes 10 mm tap 10 mm dia. 70 70 TOOLS AND EQUIPMENTS REQUIRED : Drilling machine, Drill set, Tap set, Bolts & Nuts, Vernier Caliper. PROCEDURE : 1. The given workpieces are checked for its initial dimensions. 2. The center of the workpieces are marked and the Pitch Circ le Diameter is marked in both the workpieces. 3. The first workpiece is drilled and tapped to the dimensions as shown in the figure. 4. The second workpiece is drilled to the dimensions as shown in the figure. 5. Both the workpieces are mated together by using bolts and nuts. 6. Thus a Flange Coupling assembly is made using required machines. Powered By www.technoscriptz.com
  • 9. RESULT : Thus, a Flange Coupling is machined as per the given dimensions and assembled using the required machines. Powered By www.technoscriptz.com
  • 10. EXERCISE NO. 7 CAPSTAN LATHE AIM : To machine the workpiece to the given dimensions using capstan lathe. 20 18 12 12 18 TOOLS AND EQUIPMENTS REQUIRED : Capstan Lathe, Stopper, drill chuck, counter sink bit, drill bit, turning tool, parting off tool, Vernier Caliper. PROCEDURE : 1. Prepare the tooling layout for the given workpiece. 2. Set the tools in their respective positions of the tool stations. 3. The workpiece is chucked and checked for the rotation. 4. The adjustment to the length of feed for each tool is adjusted by rotating the adjustment screws. 5. Feed the tools in the required sequence to machine the given workpiece. RESULT : Thus the given workpiece is machined to the given dimensions using capstan lathe. Powered By www.technoscriptz.com
  • 11. EXERCISE NO. 8 SPUR GEAR MILLING AIM : To machine a spur gear to the given module and number of teeth in the given workpiece. Ø5 0 Ø18 TOOLS AND EQUIPMENTS REQUIRED : Milling machine, Vernier caliper, Mandrel. PROCEDURE : 1. Calculate the gear tooth proportions. Blank diameter = ( Z+ 2) m Tooth depth = 2.25 m Tooth width = 1.5708 m where, Z = Number of teeth required m = module 2. Indexing calculation Index crank movement = 40 / Z 3. The dividing head and the tail stock are bolted on the machine table. Their axis must be set parallel to the machine table. 4. The gear blank is held between the dividing head and tailstock using a mandrel. The mandrel is connected with the spindle of dividing head by a carrier and catch plate. Powered By www.technoscriptz.com
  • 12. 5. The cutter is mounted on the arbor. The cutter is centre d accurately with the gear blank. 6. Set the speed and feed for machining. 7. For giving depth of cut, the table is raised till the periphery of the gear blank just touches the cutter. 8. The micrometer dial of vertical feed screw is set to zero in this positio n. 9. Then the table is raised further to give the required depth of cut. 10. The machine is started and feed is given to the table to cut the first groove of the blank. 11. After the cut, the table is brought back to the starting position. 12. Then the gear blank is indexed for the next tooth space. 13. This is continued till all the gear teeth are cut. CALCULATION : Z = No. of teeth = 23 m = module = 2 mm Blank Diameter = (Z + 2) m = (23 + 2) 2 = 50 mm Tooth Depth = 2.25 m = 2.25 * 2 = 4.5 mm Indexing Calculation = 40 / Z = 40 / 23 = 1 17/23 RESULT : Thus the required gear is machined using the milling machine to the required number of teeth. Powered By www.technoscriptz.com
  • 13. EXERCISE NO. 9 MACHINING OF HEXAGON IN SHAPING MACHINE Aim : To machine a hexagon in the given workpiece to the dimensions as shown in the figure using Shaping Machine. 29 15 Tools Required : Shaping Machine, Scriber, Divider, Steel Rule, Chalk piece, Bevel Protractor. Procedure : 1. The given workpiece is measured for its initial dimensions. 2. With the help of scriber, mark the hexagon dimensions in the workpiece. 3. Fix the workpiece in the vice of the shaping machine. 4. After fixing the workpiece and the shaping tool, allow the ram to reciprocate. 5. Start the shaping process by giving the required depth by lowering the tool. 6. Slowly increase the depth of cut and repeat the procedure to make the hexagon shape. 7. The workpiece is now checked for final dimensions. Result : Thus, a hexagon is machined in the given workpiece to the dimensi ons as shown in the figure using Shaping Machine. Powered By www.technoscriptz.com