GUIDELINES FOR PROJECT 1 AT DEGREE ENGINEERING EXAMINATIONS

The following document provides the Guidelines for Project 1 at the seventh semester of Degree Engineering
Colleges. These have been prepared by the Council of Deans for Degree Engineering Programs so that
students can present their work of the full semester well.
However if a College has got the Reports prepared by its students in a different format, the
students may not be asked to change the format. If the Principals/ Heads of Departments of the
College find that their format has some merit, as compared to the format, specified in the following
Guidelines, they may write to gic@gtu.edu.in so that the Council of Deans for Degree Engineering Programs
may use the information to improve the Guidelines.

                             GENERAL PROJECT INSTRUCTIONS:

1   The total EXAMINATION timing PER TEAM will be approximately 20 Minutes including
    Presentation & Viva. Presentation has to be via PPT, preferably.
2   Please ensure that the feedback form about the project is filled for every project separately by
    every external examiner.
3   Each student has to prepare and submit at least 45-50 pages Spiral bound Report with CD-R
    (including CD case), consisting of .doc & .pdf format of report and .ppt format of presentation.
    The Report may be submitted to the Department within one week of the Project Viva Exam, after
    incorporating all the corrections, pointed out by the examiners.
4   All copies of the Report with CD-R (including CD case) must be submitted on the day of exam.

    Total Copies of Seminar Report = Student’s copy + Copy for College Guide + Department Copy
    + Copy for External guide(s) who had allocated the project definition


Regarding the Industry Mentor as a Member of the Examination Committee:

The Principal/ Director of every Degree Engineering College/ Institute may invite the industry
mentor of a project to be the third member of the Examination Committee.

Note: The University will pay the Travelling Allowance as per the University norms to the industry
mentor, when he works as the examiner.



Contents:
Page #
2        Format of the Report
5        Appendix 1: Format of the cover page of the Report
6        Appendix 2: Certificate by the Guide and the Head of Department
7        Appendix 3: List of Tables
8        Appendix 4: List of Figures
9        Appendix 5: List of Symbols, Abbreviations and Nomenclature
10       Table of Contents
11       Format of the Page immediately before the first Chapter of the Report starts
                                                                                                        1
<Name of the Institute >



                                  <Name of the Department>

                                SEMINAR/PROJECT REPORT

                                               FOR

                                   B.E. 7TH /8 TH SEMESTER



1.    ARRANGEMENT OF CONTENTS:

      The sequence in which the project report material should be arranged and bound should be as
      follows:

             1.     Cover Page & Title Page
             2.     Certificate
             3.     Acknowledgement
             4.     Abstract
             5.     List of Tables
             6.     List of Figures
             7.     List of Symbols, Abbreviations and Nomenclature
             8.     Table of Contents
             9.     Chapters
             10.    Appendices
             11.    References

      The table and figures shall be introduced in the appropriate places.

2.    PAGE DIMENSION AND BINDING SPECIFICATIONS:

      The dimension of the project report should be in A4 size. The project report should be
      bound using flexible cover of the thick white art paper. The cover should be printed in
      black letters and the text for printing should be identical.

3.    PREPARATION FORMAT:

3.1   Cover Page & Title Page – A specimen copy of the Cover page & Title page of the project
      report are given in Appendix 1.

3.2   Certificate – The Certificate shall be in double line spacing using Font Style Times New
      Roman and Font Size 14, as per the format in Appendix 2.
             .
                                                                                                2
3.3    Acknowledgement - The Certificate shall be in double line spacing using Font Style Times
       New Roman and Font Size 12
3.4    Abstract – Abstract should be one page synopsis of the project report typed 1.5 line spacing,
       Font Style Times New Roman, italics and Font Size 14.

3.5    List of Tables – The list should use exactly the same captions as they appear above the
       tables in the text. One and a half spacing should be adopted for typing the matter under this
       head. A specimen copy of the Table of Contents of the project report is given in Appendix 3.

3.6    List of Figures – The list should use exactly the same captions as they appear below the
       figures in the text. One and a half spacing should be adopted for typing the matter under this
       head. A specimen copy of the Table of Contents of the project report is given in Appendix 4.

       Figure copied from some paper or website has to be captioned with “Courtesy of _________”

3.7    List of Symbols, Abbreviations and Nomenclature – One and a half spacing should be
       adopted or typing the matter under this head. Standard symbols, abbreviations etc. should be
       used. A specimen copy of the Table of Contents of the project report is given in Appendix 5.

3.8    Table of Contents – The table of contents should list all material following it as well as any
       material which precedes it. The title page and Certificate will not find a place among the
       items listed in the Table of Contents but the page numbers of which are in lower case Roman
       letters. One and a half spacing should be adopted for typing the matter under this head. A
       specimen copy of the Table of Contents of the project report is given in Appendix 6.

3.9 Chapters – The chapters may be broadly divided into following sequence
      3.9.1 Introduction to Project
      3.9.2 Brief History of the work
      3.9.3 Literature Survey
      3.9.4 Working / Implementation of the Project work/ simulation
      3.9.5 Result Analysis
      3.9.6 Conclusion

       The main text will be divided into several chapters and each chapter may be further divided
       into several divisions and sub-divisions, as required.

              Each chapter should be given an appropriate title.
              Tables and figures in a chapter should be placed in the immediate vicinity of the
               reference where they are cited.

              Footnotes should be used sparingly. They should be typed single space and placed
               directly underneath in the very same page, which refers to the material they annotate.

3.10   Appendices – Appendices are provided to give supplementary information, which is
       included in the main text may serve as a distraction and cloud the central theme.



                                                                                                        3
       Appendices should be numbered using Arabic numerals, e.g. Appendix 1, Appendix
               2, etc.
              Appendices, Tables and References appearing in appendices should be numbered and
               referred to at appropriate places just as in the case of chapters.

              Appendices shall carry the title of the work reported and the same title shall be made
               in the contents page also.

3.11   List of References –The listing of references should be typed 4 spaces below the heading
       “REFERENCES” in alphabetical order in single spacing left – justified. The reference
       material should be listed in the alphabetical order of the first author. The name of the
       author/authors should be immediately followed by the year and other details.

       Website citation has to be very specific not like ‘google.com’ or ‘wikipedia.org ’.

       Figure copied from some paper or website has to be captioned with “Courtesy of
       ____________”

       A typical illustrative list given below relates to the citation example quoted above.


       REFERENCES

       1.      Ariponnammal, S. and Natarajan, S. (1994) ‘Transport Phonomena of Sm Sel – X
               Asx’, Pramana – Journal of Physics Vol.42, No.1, pp.421-425.

       2.      Barnard, R.W. and Kellogg, C. (1980) ‘Applications of Convolution Operators to
               Problems in Univalent Function Theory’, Michigan Mach, J., Vol.27, pp.81–94.

       3.      Shin, K.G. and Mckay, N.D. (1984) ‘Open Loop Minimum Time Control of
               Mechanical Manipulations and its Applications’, Proc.Amer.Contr.Conf., San Diego,
               CA, pp. 1231-1236.

3.11.1 Table and figures - By the word Table, is meant tabulated numerical data in the body of the
       project report as well as in the appendices. All other non-verbal materials used in the body of
       the project work and appendices such as charts, graphs, maps, photographs and diagrams
       may be designated as figures.


4.     TYPING INSTRUCTIONS:

       The impression on the typed copies should be black in colour.

       Single spacing should be used for typing the general text. The general text shall be typed in
       the Font style ‘Times New Roman’ and Font size 12.


                                              *****
                                                                                                    4
Appendix 1
      <TITLE OF THE PROJECT>
           <Font Size 18><1.5 line spacing>


               A PROJECT REPORT
                      <Font Size 14>

                      Submitted by
                  <Font Size 14><Italic>

       <NAME OF THE CANDIDATE>
                    <Font Size 16>


     In fulfillment for the award of the degree

                           of
          <Font Size 14><1.5 line spacing><Italic>

      BACHELOR OF ENGINEERING
                    <Font Size 16>

                           in

            <Name of the Department>
                    <Font Size 14>

                Institute Logo




       <Name of the Institute with City>
                    <Font Size 14>

Gujarat Technological University, Ahmedabad
             <Font Size 16><1.5 line spacing>

                    December, 2011
                                                              5
Appendix 2
                               <Name of the Institute>
                               <Name of the Department>
                                       2011
                                     <Font Size 14>




                                    CERTIFICATE
                                                           Date:

This is to certify that the dissertation entitled “SEMINAR/PROJECT TITLE” has been
carried out by NAME OF THE STUDENTS under my guidance in fulfillment of the degree of
Bachelor of Engineering in <Branch Name> (7 th Semester/8 th Semester) of Gujarat
Technological University, Ahmedabad during the academic year 2011-12.



Guides:




                                                           Head of the Department
                                                       .




                                                                                    6
Appendix 3
                                 LIST OF TABLES

Table No     Table Description                    Page No
Table 5.1
Table 5.2
Table 5.3
Table 5.4

Table 5.5
Table 5.6
Table 5.7
Table 5.8
Table 5.9
Table 5.10




                                                             7
Appendix 4
                                 LIST OF FIGURES



Figure No   Figure Description                     Page No




                                                              8
Appendix 5
       LIST OF SYMBOLS, ABBREVIATIONS AND NOMENCLATURE



Symbol     Abbreviations
Name




                                                          9
Appendix 6
                                TABLE OF CONTENTS

              Acknowledgement                          i
              Abstract                                 ii
              List of Figures                         iv
              List of Tables                          vii
              List of Abbreviations                    x
              Table of Contents                       xi
Chapter : 1   Title of chapter(page 1 starts)
              1.1                                      1
              1.2                                      2
              1.3                                      2
              1.4                                      3
              1.5                                      4
Chapter : 2   Title of chapter(page 5 starts)
              2.1                                      5
              2.2                                      5
              2.3                                      6
              2.4                                      7
                    2.4.1                              7
                    2.4.2                              8
              2.5                                      8
                    2.5.1                              8
                    2.5.2                              9
Chapter : 3   Title of chapter(page 10 starts)
              3.1                                     10
              3.2                                     10
                    3.2.1.                            10
                    3.2.2.                            11




                                                            10
Appendix 7
Format of the Page immediately before the first Chapter of the Report starts




                              <Title of the Project>

                                  A PROJECT REPORT

                                         Submitted by

                             <Name(s) of the student(s)>
                       In fulfillment for the award of the degree

                                              of

                       BACHELOR OF ENGINEERING

                                              in

                                     <Branch Name>

                                 Institute Logo




                         <Name of the Institute with City >

               Gujarat Technological University, Ahmedabad
                                   DECEMBER 2011




                                                                                       11

More Related Content

What's hot

CENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURE
CENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURECENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURE
CENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDUREConsultant
 
DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...
DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...
DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...LalitGoyal27
 
Project Report on Hand gesture controlled robot part 1
Project Report on Hand gesture controlled robot part 1Project Report on Hand gesture controlled robot part 1
Project Report on Hand gesture controlled robot part 1Pragya
 
Helicopter Vibration Reduction Techniques
Helicopter Vibration Reduction TechniquesHelicopter Vibration Reduction Techniques
Helicopter Vibration Reduction TechniquesAnandu Sunil
 
Instrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), KotaInstrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), KotaRam Swaroop Kushwah
 
VTU FINAL YEAR PROJECT REPORT Front pages
VTU FINAL YEAR PROJECT REPORT Front pagesVTU FINAL YEAR PROJECT REPORT Front pages
VTU FINAL YEAR PROJECT REPORT Front pagesathiathi3
 
Presentation hal
Presentation halPresentation hal
Presentation halshonali89
 
Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )Ashwani Dixit
 
Project report format
Project report formatProject report format
Project report formatreddy13sara
 
VTU final year project report
VTU final year project reportVTU final year project report
VTU final year project reportathiathi3
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportChanaka Sudheera
 

What's hot (20)

2013 14 gis new tables
2013 14 gis new tables2013 14 gis new tables
2013 14 gis new tables
 
CENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURE
CENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURECENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURE
CENTRAL SECRETARIAT MANUAL OF OFFICE PROCEDURE
 
Siwes it report
Siwes it reportSiwes it report
Siwes it report
 
DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...
DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...
DRDO Summer internship Report,Defence lab jodhpur summer internship report,dr...
 
Project Report on Hand gesture controlled robot part 1
Project Report on Hand gesture controlled robot part 1Project Report on Hand gesture controlled robot part 1
Project Report on Hand gesture controlled robot part 1
 
Helicopter Vibration Reduction Techniques
Helicopter Vibration Reduction TechniquesHelicopter Vibration Reduction Techniques
Helicopter Vibration Reduction Techniques
 
Automated Bus Ticket Booking System
Automated Bus Ticket Booking System Automated Bus Ticket Booking System
Automated Bus Ticket Booking System
 
Instrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), KotaInstrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), Kota
 
VTU FINAL YEAR PROJECT REPORT Front pages
VTU FINAL YEAR PROJECT REPORT Front pagesVTU FINAL YEAR PROJECT REPORT Front pages
VTU FINAL YEAR PROJECT REPORT Front pages
 
Presentation hal
Presentation halPresentation hal
Presentation hal
 
Project report format
Project report formatProject report format
Project report format
 
Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )
 
Project report format
Project report formatProject report format
Project report format
 
VTU final year project report
VTU final year project reportVTU final year project report
VTU final year project report
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
Drone project report
Drone project reportDrone project report
Drone project report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
MBA PROJECT vtu
MBA PROJECT vtu MBA PROJECT vtu
MBA PROJECT vtu
 
Hal analysis of projects
Hal analysis of projectsHal analysis of projects
Hal analysis of projects
 
Hal ppt
Hal pptHal ppt
Hal ppt
 

Viewers also liked

Brand strategy executive summary slideshare
Brand strategy executive summary slideshareBrand strategy executive summary slideshare
Brand strategy executive summary slideshareTony Monda
 
Purchasing documents
Purchasing documentsPurchasing documents
Purchasing documentscrystalpullen
 
Brand equity colgate
Brand equity colgateBrand equity colgate
Brand equity colgateAbinas Mishra
 
project report employee welfare (mithun kumar sheel
project report employee welfare (mithun kumar sheelproject report employee welfare (mithun kumar sheel
project report employee welfare (mithun kumar sheelmithun sheel
 
Project reports_Mahindra n Mahindra Supply chain managemnt
Project reports_Mahindra n Mahindra Supply chain managemntProject reports_Mahindra n Mahindra Supply chain managemnt
Project reports_Mahindra n Mahindra Supply chain managemntVishal Kakuva
 
Brand Awareness
Brand AwarenessBrand Awareness
Brand AwarenessUm Abrar
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Anna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-formatAnna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-formatVeera Victory
 
Project report-format by vishal
Project report-format by vishalProject report-format by vishal
Project report-format by vishalvishal18900
 
Inventory management and budgetary control system
Inventory management and budgetary control systemInventory management and budgetary control system
Inventory management and budgetary control systemSupa Buoy
 
Complete analysis of Mahindra & Mahindra
Complete analysis of Mahindra & MahindraComplete analysis of Mahindra & Mahindra
Complete analysis of Mahindra & MahindraSantosh Tiwari
 
marketing project on colgate
marketing project on colgatemarketing project on colgate
marketing project on colgateAnu Reddy
 
Brand management ppt
Brand management ppt Brand management ppt
Brand management ppt Babasab Patil
 
Colgate toothpaste project
Colgate toothpaste projectColgate toothpaste project
Colgate toothpaste projectMuhammad Hassan
 

Viewers also liked (20)

Project Report Format
Project Report FormatProject Report Format
Project Report Format
 
Brand strategy executive summary slideshare
Brand strategy executive summary slideshareBrand strategy executive summary slideshare
Brand strategy executive summary slideshare
 
Purchasing documents
Purchasing documentsPurchasing documents
Purchasing documents
 
Brand equity colgate
Brand equity colgateBrand equity colgate
Brand equity colgate
 
Colgate brand image
Colgate brand imageColgate brand image
Colgate brand image
 
project report employee welfare (mithun kumar sheel
project report employee welfare (mithun kumar sheelproject report employee welfare (mithun kumar sheel
project report employee welfare (mithun kumar sheel
 
Project reports_Mahindra n Mahindra Supply chain managemnt
Project reports_Mahindra n Mahindra Supply chain managemntProject reports_Mahindra n Mahindra Supply chain managemnt
Project reports_Mahindra n Mahindra Supply chain managemnt
 
Brand Awareness
Brand AwarenessBrand Awareness
Brand Awareness
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Colgate Presentation
Colgate PresentationColgate Presentation
Colgate Presentation
 
Anna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-formatAnna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-format
 
Project report-format by vishal
Project report-format by vishalProject report-format by vishal
Project report-format by vishal
 
Inventory management and budgetary control system
Inventory management and budgetary control systemInventory management and budgetary control system
Inventory management and budgetary control system
 
Ppt on colgate
Ppt on colgatePpt on colgate
Ppt on colgate
 
Colgate
ColgateColgate
Colgate
 
Brand ppt
Brand pptBrand ppt
Brand ppt
 
Complete analysis of Mahindra & Mahindra
Complete analysis of Mahindra & MahindraComplete analysis of Mahindra & Mahindra
Complete analysis of Mahindra & Mahindra
 
marketing project on colgate
marketing project on colgatemarketing project on colgate
marketing project on colgate
 
Brand management ppt
Brand management ppt Brand management ppt
Brand management ppt
 
Colgate toothpaste project
Colgate toothpaste projectColgate toothpaste project
Colgate toothpaste project
 

Similar to Report formate

ANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINES
ANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINESANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINES
ANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINESJERINE SUDHARSON
 
Major project-report-format (1) (1)
Major project-report-format (1) (1)Major project-report-format (1) (1)
Major project-report-format (1) (1)kazilaribullah
 
Anna University Project Report format R-2013
Anna University Project Report format R-2013Anna University Project Report format R-2013
Anna University Project Report format R-2013Santhosh Kumar
 
Sample seminar report
Sample seminar reportSample seminar report
Sample seminar reportFarman Khan
 
Guidelines for making project...........
Guidelines for making project...........Guidelines for making project...........
Guidelines for making project...........viggy vanshi
 
Manual2013 pr (1)
Manual2013 pr (1)Manual2013 pr (1)
Manual2013 pr (1)Robin Son
 
Mba project format
Mba project formatMba project format
Mba project formatAmul Raj
 
Summer Project Format Kalinga management project
Summer Project Format Kalinga management projectSummer Project Format Kalinga management project
Summer Project Format Kalinga management project2611palaksharma
 
In-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSEIn-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSEMargret Anouncia
 
anna university m.e project fomat
anna university m.e project fomatanna university m.e project fomat
anna university m.e project fomatssbala
 

Similar to Report formate (20)

ANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINES
ANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINESANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINES
ANNA UNIVERSITY CHENNAI UG PROJECT GUIDELINES
 
Major project-report-format (1) (1)
Major project-report-format (1) (1)Major project-report-format (1) (1)
Major project-report-format (1) (1)
 
Anna University Project Report format R-2013
Anna University Project Report format R-2013Anna University Project Report format R-2013
Anna University Project Report format R-2013
 
Project doc guidelines new
Project doc guidelines newProject doc guidelines new
Project doc guidelines new
 
Sample seminar report
Sample seminar reportSample seminar report
Sample seminar report
 
Pg formate
Pg formatePg formate
Pg formate
 
Guidelines for making project...........
Guidelines for making project...........Guidelines for making project...........
Guidelines for making project...........
 
Manual2013 pr (1)
Manual2013 pr (1)Manual2013 pr (1)
Manual2013 pr (1)
 
Mba project format
Mba project formatMba project format
Mba project format
 
Anna University UG Project Report Format
Anna University UG Project Report FormatAnna University UG Project Report Format
Anna University UG Project Report Format
 
Pg project format
Pg project formatPg project format
Pg project format
 
Chennai
ChennaiChennai
Chennai
 
Summer Project Format Kalinga management project
Summer Project Format Kalinga management projectSummer Project Format Kalinga management project
Summer Project Format Kalinga management project
 
Ug format
Ug formatUg format
Ug format
 
pr
prpr
pr
 
Ug format
Ug formatUg format
Ug format
 
Format for Project
Format for ProjectFormat for Project
Format for Project
 
In-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSEIn-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSE
 
1182589406
11825894061182589406
1182589406
 
anna university m.e project fomat
anna university m.e project fomatanna university m.e project fomat
anna university m.e project fomat
 

Recently uploaded

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 

Recently uploaded (20)

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 

Report formate

  • 1. GUIDELINES FOR PROJECT 1 AT DEGREE ENGINEERING EXAMINATIONS The following document provides the Guidelines for Project 1 at the seventh semester of Degree Engineering Colleges. These have been prepared by the Council of Deans for Degree Engineering Programs so that students can present their work of the full semester well. However if a College has got the Reports prepared by its students in a different format, the students may not be asked to change the format. If the Principals/ Heads of Departments of the College find that their format has some merit, as compared to the format, specified in the following Guidelines, they may write to gic@gtu.edu.in so that the Council of Deans for Degree Engineering Programs may use the information to improve the Guidelines. GENERAL PROJECT INSTRUCTIONS: 1 The total EXAMINATION timing PER TEAM will be approximately 20 Minutes including Presentation & Viva. Presentation has to be via PPT, preferably. 2 Please ensure that the feedback form about the project is filled for every project separately by every external examiner. 3 Each student has to prepare and submit at least 45-50 pages Spiral bound Report with CD-R (including CD case), consisting of .doc & .pdf format of report and .ppt format of presentation. The Report may be submitted to the Department within one week of the Project Viva Exam, after incorporating all the corrections, pointed out by the examiners. 4 All copies of the Report with CD-R (including CD case) must be submitted on the day of exam. Total Copies of Seminar Report = Student’s copy + Copy for College Guide + Department Copy + Copy for External guide(s) who had allocated the project definition Regarding the Industry Mentor as a Member of the Examination Committee: The Principal/ Director of every Degree Engineering College/ Institute may invite the industry mentor of a project to be the third member of the Examination Committee. Note: The University will pay the Travelling Allowance as per the University norms to the industry mentor, when he works as the examiner. Contents: Page # 2 Format of the Report 5 Appendix 1: Format of the cover page of the Report 6 Appendix 2: Certificate by the Guide and the Head of Department 7 Appendix 3: List of Tables 8 Appendix 4: List of Figures 9 Appendix 5: List of Symbols, Abbreviations and Nomenclature 10 Table of Contents 11 Format of the Page immediately before the first Chapter of the Report starts 1
  • 2. <Name of the Institute > <Name of the Department> SEMINAR/PROJECT REPORT FOR B.E. 7TH /8 TH SEMESTER 1. ARRANGEMENT OF CONTENTS: The sequence in which the project report material should be arranged and bound should be as follows: 1. Cover Page & Title Page 2. Certificate 3. Acknowledgement 4. Abstract 5. List of Tables 6. List of Figures 7. List of Symbols, Abbreviations and Nomenclature 8. Table of Contents 9. Chapters 10. Appendices 11. References The table and figures shall be introduced in the appropriate places. 2. PAGE DIMENSION AND BINDING SPECIFICATIONS: The dimension of the project report should be in A4 size. The project report should be bound using flexible cover of the thick white art paper. The cover should be printed in black letters and the text for printing should be identical. 3. PREPARATION FORMAT: 3.1 Cover Page & Title Page – A specimen copy of the Cover page & Title page of the project report are given in Appendix 1. 3.2 Certificate – The Certificate shall be in double line spacing using Font Style Times New Roman and Font Size 14, as per the format in Appendix 2. . 2
  • 3. 3.3 Acknowledgement - The Certificate shall be in double line spacing using Font Style Times New Roman and Font Size 12 3.4 Abstract – Abstract should be one page synopsis of the project report typed 1.5 line spacing, Font Style Times New Roman, italics and Font Size 14. 3.5 List of Tables – The list should use exactly the same captions as they appear above the tables in the text. One and a half spacing should be adopted for typing the matter under this head. A specimen copy of the Table of Contents of the project report is given in Appendix 3. 3.6 List of Figures – The list should use exactly the same captions as they appear below the figures in the text. One and a half spacing should be adopted for typing the matter under this head. A specimen copy of the Table of Contents of the project report is given in Appendix 4. Figure copied from some paper or website has to be captioned with “Courtesy of _________” 3.7 List of Symbols, Abbreviations and Nomenclature – One and a half spacing should be adopted or typing the matter under this head. Standard symbols, abbreviations etc. should be used. A specimen copy of the Table of Contents of the project report is given in Appendix 5. 3.8 Table of Contents – The table of contents should list all material following it as well as any material which precedes it. The title page and Certificate will not find a place among the items listed in the Table of Contents but the page numbers of which are in lower case Roman letters. One and a half spacing should be adopted for typing the matter under this head. A specimen copy of the Table of Contents of the project report is given in Appendix 6. 3.9 Chapters – The chapters may be broadly divided into following sequence 3.9.1 Introduction to Project 3.9.2 Brief History of the work 3.9.3 Literature Survey 3.9.4 Working / Implementation of the Project work/ simulation 3.9.5 Result Analysis 3.9.6 Conclusion The main text will be divided into several chapters and each chapter may be further divided into several divisions and sub-divisions, as required.  Each chapter should be given an appropriate title.  Tables and figures in a chapter should be placed in the immediate vicinity of the reference where they are cited.  Footnotes should be used sparingly. They should be typed single space and placed directly underneath in the very same page, which refers to the material they annotate. 3.10 Appendices – Appendices are provided to give supplementary information, which is included in the main text may serve as a distraction and cloud the central theme. 3
  • 4. Appendices should be numbered using Arabic numerals, e.g. Appendix 1, Appendix 2, etc.  Appendices, Tables and References appearing in appendices should be numbered and referred to at appropriate places just as in the case of chapters.  Appendices shall carry the title of the work reported and the same title shall be made in the contents page also. 3.11 List of References –The listing of references should be typed 4 spaces below the heading “REFERENCES” in alphabetical order in single spacing left – justified. The reference material should be listed in the alphabetical order of the first author. The name of the author/authors should be immediately followed by the year and other details. Website citation has to be very specific not like ‘google.com’ or ‘wikipedia.org ’. Figure copied from some paper or website has to be captioned with “Courtesy of ____________” A typical illustrative list given below relates to the citation example quoted above. REFERENCES 1. Ariponnammal, S. and Natarajan, S. (1994) ‘Transport Phonomena of Sm Sel – X Asx’, Pramana – Journal of Physics Vol.42, No.1, pp.421-425. 2. Barnard, R.W. and Kellogg, C. (1980) ‘Applications of Convolution Operators to Problems in Univalent Function Theory’, Michigan Mach, J., Vol.27, pp.81–94. 3. Shin, K.G. and Mckay, N.D. (1984) ‘Open Loop Minimum Time Control of Mechanical Manipulations and its Applications’, Proc.Amer.Contr.Conf., San Diego, CA, pp. 1231-1236. 3.11.1 Table and figures - By the word Table, is meant tabulated numerical data in the body of the project report as well as in the appendices. All other non-verbal materials used in the body of the project work and appendices such as charts, graphs, maps, photographs and diagrams may be designated as figures. 4. TYPING INSTRUCTIONS: The impression on the typed copies should be black in colour. Single spacing should be used for typing the general text. The general text shall be typed in the Font style ‘Times New Roman’ and Font size 12. ***** 4
  • 5. Appendix 1 <TITLE OF THE PROJECT> <Font Size 18><1.5 line spacing> A PROJECT REPORT <Font Size 14> Submitted by <Font Size 14><Italic> <NAME OF THE CANDIDATE> <Font Size 16> In fulfillment for the award of the degree of <Font Size 14><1.5 line spacing><Italic> BACHELOR OF ENGINEERING <Font Size 16> in <Name of the Department> <Font Size 14> Institute Logo <Name of the Institute with City> <Font Size 14> Gujarat Technological University, Ahmedabad <Font Size 16><1.5 line spacing> December, 2011 5
  • 6. Appendix 2 <Name of the Institute> <Name of the Department> 2011 <Font Size 14> CERTIFICATE Date: This is to certify that the dissertation entitled “SEMINAR/PROJECT TITLE” has been carried out by NAME OF THE STUDENTS under my guidance in fulfillment of the degree of Bachelor of Engineering in <Branch Name> (7 th Semester/8 th Semester) of Gujarat Technological University, Ahmedabad during the academic year 2011-12. Guides: Head of the Department . 6
  • 7. Appendix 3 LIST OF TABLES Table No Table Description Page No Table 5.1 Table 5.2 Table 5.3 Table 5.4 Table 5.5 Table 5.6 Table 5.7 Table 5.8 Table 5.9 Table 5.10 7
  • 8. Appendix 4 LIST OF FIGURES Figure No Figure Description Page No 8
  • 9. Appendix 5 LIST OF SYMBOLS, ABBREVIATIONS AND NOMENCLATURE Symbol Abbreviations Name 9
  • 10. Appendix 6 TABLE OF CONTENTS Acknowledgement i Abstract ii List of Figures iv List of Tables vii List of Abbreviations x Table of Contents xi Chapter : 1 Title of chapter(page 1 starts) 1.1 1 1.2 2 1.3 2 1.4 3 1.5 4 Chapter : 2 Title of chapter(page 5 starts) 2.1 5 2.2 5 2.3 6 2.4 7 2.4.1 7 2.4.2 8 2.5 8 2.5.1 8 2.5.2 9 Chapter : 3 Title of chapter(page 10 starts) 3.1 10 3.2 10 3.2.1. 10 3.2.2. 11 10
  • 11. Appendix 7 Format of the Page immediately before the first Chapter of the Report starts <Title of the Project> A PROJECT REPORT Submitted by <Name(s) of the student(s)> In fulfillment for the award of the degree of BACHELOR OF ENGINEERING in <Branch Name> Institute Logo <Name of the Institute with City > Gujarat Technological University, Ahmedabad DECEMBER 2011 11