SlideShare a Scribd company logo
1 of 3
CELL: 0322-4354868, 0306-0677635
Street: 24 House: 01 Bhania road
Sharif Pura Lahore.
Email: m.sadam35@gmail.com
Muhammad Sadam
PROFILE:
To get job in a reputable organization where I work for the productivity of the organization &
Personal growth, where I can perform my skills at the best on the basis of experience and
Knowledge.
EDUCATION:
Bachelor in Technology (B-tech) (Hones -Mechanical) (2012-2014)
PRESTON University Lahore.
Result: 1st Division; CGPA-3.4
Bachelor in Technology (B-tech) (Pass-Mechanical) (2010-2012)
Preston Institute of Management Science and Technology Lahore.
Result: 1st Division; CGPA-3.4
Diploma of Associate Engineer(D.A.E) (Mechanical) (2007-2010)
Punjab Polytechnic Institute Lahore.
Result: 1st Division; 72%
EMPLOYMENT:
Fabcon Design & Engineering LAHORE, PAKISTAN
(28-May/2014– To Till Date)
Position as Lead Draftsman.
Responsibilities:
 Thoroughly Study all design Calculation provided by Design Engineer & Check
Critical requirements.
 Perform Detail design (In CAD or Inventor) Meeting all requirements including
standards, Client Specifications and Statuary requirements if any.
 3D Modeling & Fabrication Drawing of Pedestrian Bridges, PEB Sheds, Bus stations,
Boilers (Water Tube / Fire Tube / WHR) Economizers, Pressure & Non Pressure
Parts like Deaerators, Storage Tanks, Ducting, Structure and Foundation Detailing.
Project Experience:
 Milac Foods Ltd: - Water Tube Boiler, Economizer, Air pre-Heater.
 Metro Bus Service (Rawalpindi-Islamabad): - 8 Pedestrian Bridges at Different
Locations in Above Mention Sites.
 FWO: - 2 Turn Table & Moving Form Work.
 MES (Sargodha): 14 Pre Engineering Shed
 Layyah & Al-Moiz Suger Mils (Layyah & D.G Khan): - Modification in 140 & 80
TPH water tube Boilers & There Structure.
 MES (Rawalpindi): Water pond Shed.
 MES (Rawalpindi): Pedestrian Bridge Judicial Complex.
 Yutain Chemicals Pakistan: S.S Storage Tank.
 Sitara Chemicals Pakistan: 3 Water Storage Tanks & 2 Pre Engineering Sheds.
DESCON Engineering LTD. (LMW) LAHORE, PAKISTAN
(23-July/2012– 28-May/2014)
Position as Mechanical Draftsman
Responsibilities:
 Thoroughly Study all design Calculation provided by Design Engineer & Check
Critical requirements.
 Perform Detail design (In CAD or Inventor) Meeting all requirements including
standards, Client Specifications and Statuary requirements if any.
 3D Modeling & Fabrication Drawing of Boilers (Water Tube / Fire Tube / WHR)
Economizers, Pressure & Non Pressure Parts Like Deaerators, Storage Tanks,
Ducting, Structure and Foundation Detailing.
Project Experience:
 YUNUS Textile Mills (Karachi): - Water Tube Boiler, Economizer, Deaerator.
 RAFHAN MAIZ Product Co. (Faisalabad): - Water Tube Boiler, Deaerator, Ducting,
Stack, Plate Forms
 JOHN ZINK KEU GmbH, SADARA (UAE): - WHR Boiler, Flash Vessel & Ducts.
 SENORO GAS DEVELOPMENTPROJECT (UAE):- WHR Boiler &
Steam Drum.
 LUBEREF YANBURefinery Expansion (UAE):- 3WHR Boilers Shell And Tube
Type & 1Steam Super Heater.
 Pakistan Oil Limited:- Fire Tube Boiler, Economizer, Ducting, Stack, Plate Forms
 Coca Cola Pakistan Limited: - Fire Tube Boiler, Economizer.
Gain Control System. LAHORE, PAKISTAN
(29-Oct/2010 –25- July/2012)
Position as Designer & Proposal Executive.
Responsibilities:
 To design the Electrical Panel, Their completePower, Control & G.A drawings.
 Sales and marketing of VACON Frequency drives, switchgear, NANHUA
products (Aviation and Emergency lights) and CIMON PLC.
 Proposal making of all Electrical Panels including LV Switchgear, PLC panels,
MCC,VFD, AMF/ATS, PFI, Cable tray and power DB’s, control panels.
Project Experience:
 ICI Paint: - Electrical panel, (Lahore)
 Telenor: - Data Center Electrical Panel and services work (Kotlakpat Industrial
Area)
 Engro Food Supply Chain: - Electrical panel fabrication
 Aster Group: - Electrical panel fabrication
 INTECH:- Pressure and Temperature Demo unit Instrumentation and Fabrication
 KSB Pump: - PLC Based SCADA System for water filtration plant Panel Designing and
Fabrication
Global Mechanica. LAHORE, PAKISTAN
(May 2009 – December 2009)
Designer as an AutoCAD Operator
 ElectricalDrawings.
 Instrument assembly Drawings.
 Mechanical Drawings.
 HVAC Drawings.
 Piping Drawings.
Computer Skills:
 Diploma in Computer Basic:
 Microsoft Office Word, Excel, Power Point, Outlook, etc.
 Graphics Photo shop + Coral Draw
 Auto cad (2D + 3D) Latest Versions
 CNC Programming (Delcam Power Shape +Power Mill)
 Autodesk Inventor (3D designing & 2D Detailing)
 Tekla Steel Structure (3D+2D designing and CAD conversion)
Personal Highlights:
 Possess exceptional problem solving skills.
 Keep perception for location error defuses.
 Highly motivated to achieve set goal.
 Perform equally well while working individually or as a part of team.
Reference: Will be furnished, if required.

More Related Content

What's hot (19)

HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
 
CV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusCV-Mohamed Shafi Younus
CV-Mohamed Shafi Younus
 
LVS Varma
LVS VarmaLVS Varma
LVS Varma
 
Resume Pad
Resume PadResume Pad
Resume Pad
 
my CV PDF
my CV PDFmy CV PDF
my CV PDF
 
RESUME joge
RESUME jogeRESUME joge
RESUME joge
 
kamlesh cv
kamlesh cvkamlesh cv
kamlesh cv
 
Tony resume
Tony resumeTony resume
Tony resume
 
TAMAGHNA_CV
TAMAGHNA_CVTAMAGHNA_CV
TAMAGHNA_CV
 
Suntharesar Shummugham Resume
Suntharesar Shummugham ResumeSuntharesar Shummugham Resume
Suntharesar Shummugham Resume
 
SARAVANAN K
SARAVANAN KSARAVANAN K
SARAVANAN K
 
Professional Profile
Professional ProfileProfessional Profile
Professional Profile
 
Mechanical Engineer
Mechanical  EngineerMechanical  Engineer
Mechanical Engineer
 
SREEJITH_CV
SREEJITH_CVSREEJITH_CV
SREEJITH_CV
 
SAMER CV
SAMER CVSAMER CV
SAMER CV
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
CV-SADDAM
CV-SADDAMCV-SADDAM
CV-SADDAM
 
Sathisha MR Project
Sathisha MR ProjectSathisha MR Project
Sathisha MR Project
 

Viewers also liked

Walmart Design Competition
Walmart Design CompetitionWalmart Design Competition
Walmart Design CompetitionKelsey Casey
 
Techniques for designing jobs - compensation management - Manu Melwin Joy
Techniques for designing jobs -  compensation management - Manu Melwin JoyTechniques for designing jobs -  compensation management - Manu Melwin Joy
Techniques for designing jobs - compensation management - Manu Melwin Joymanumelwin
 
T p directory wapda house
T p directory wapda houseT p directory wapda house
T p directory wapda houseaabdul
 
Schooling By Design Ch 7 What Is The Job Of The Academic Leader
Schooling By Design Ch 7 What Is The Job Of The Academic LeaderSchooling By Design Ch 7 What Is The Job Of The Academic Leader
Schooling By Design Ch 7 What Is The Job Of The Academic LeaderSue Fox
 
Pakistan International Airlines
Pakistan International AirlinesPakistan International Airlines
Pakistan International AirlinesAdnan Warraich
 
Module 3 - Job Analysis, Job Design, Job Evaluation
Module 3 - Job Analysis, Job Design, Job EvaluationModule 3 - Job Analysis, Job Design, Job Evaluation
Module 3 - Job Analysis, Job Design, Job Evaluationcharmaine dalisay
 
NYU, Stern: Nestle Powerpoint Presentation
NYU, Stern: Nestle Powerpoint PresentationNYU, Stern: Nestle Powerpoint Presentation
NYU, Stern: Nestle Powerpoint Presentationjsmar16
 
Chapter 04 dessler 12-ce_ppt_ch04
Chapter 04   dessler 12-ce_ppt_ch04Chapter 04   dessler 12-ce_ppt_ch04
Chapter 04 dessler 12-ce_ppt_ch04Irshad Aj
 
operation management project on nestle juice -phpapp02
operation management project on nestle juice -phpapp02operation management project on nestle juice -phpapp02
operation management project on nestle juice -phpapp02Munir Gondal
 
Strategic Management Project on Pepsi Cola Pakistan
Strategic Management Project on Pepsi Cola PakistanStrategic Management Project on Pepsi Cola Pakistan
Strategic Management Project on Pepsi Cola PakistanShiza Kokab
 
Hr planning, recruitment and selection
Hr planning, recruitment and selectionHr planning, recruitment and selection
Hr planning, recruitment and selectionEdwin Vargas
 
Project on-distribution-channel-of-pepsi
Project on-distribution-channel-of-pepsiProject on-distribution-channel-of-pepsi
Project on-distribution-channel-of-pepsiishanpathan
 
Performance appraisal of 5 companies done by shweta-bebarta
Performance appraisal of 5 companies  done by shweta-bebartaPerformance appraisal of 5 companies  done by shweta-bebarta
Performance appraisal of 5 companies done by shweta-bebartaShweta Bebarta
 

Viewers also liked (20)

Walmart Design Competition
Walmart Design CompetitionWalmart Design Competition
Walmart Design Competition
 
Techniques for designing jobs - compensation management - Manu Melwin Joy
Techniques for designing jobs -  compensation management - Manu Melwin JoyTechniques for designing jobs -  compensation management - Manu Melwin Joy
Techniques for designing jobs - compensation management - Manu Melwin Joy
 
Com ppt
Com pptCom ppt
Com ppt
 
Alhuda CIBE - Wapda Sukuk in Pakistan
Alhuda CIBE - Wapda Sukuk in PakistanAlhuda CIBE - Wapda Sukuk in Pakistan
Alhuda CIBE - Wapda Sukuk in Pakistan
 
Organization Structure
Organization StructureOrganization Structure
Organization Structure
 
T p directory wapda house
T p directory wapda houseT p directory wapda house
T p directory wapda house
 
Schooling By Design Ch 7 What Is The Job Of The Academic Leader
Schooling By Design Ch 7 What Is The Job Of The Academic LeaderSchooling By Design Ch 7 What Is The Job Of The Academic Leader
Schooling By Design Ch 7 What Is The Job Of The Academic Leader
 
Pakistan International Airlines
Pakistan International AirlinesPakistan International Airlines
Pakistan International Airlines
 
KN CV 2015 - Gr-D
KN CV 2015 - Gr-DKN CV 2015 - Gr-D
KN CV 2015 - Gr-D
 
Module 3 - Job Analysis, Job Design, Job Evaluation
Module 3 - Job Analysis, Job Design, Job EvaluationModule 3 - Job Analysis, Job Design, Job Evaluation
Module 3 - Job Analysis, Job Design, Job Evaluation
 
NYU, Stern: Nestle Powerpoint Presentation
NYU, Stern: Nestle Powerpoint PresentationNYU, Stern: Nestle Powerpoint Presentation
NYU, Stern: Nestle Powerpoint Presentation
 
Nestle
NestleNestle
Nestle
 
Chapter 04 dessler 12-ce_ppt_ch04
Chapter 04   dessler 12-ce_ppt_ch04Chapter 04   dessler 12-ce_ppt_ch04
Chapter 04 dessler 12-ce_ppt_ch04
 
operation management project on nestle juice -phpapp02
operation management project on nestle juice -phpapp02operation management project on nestle juice -phpapp02
operation management project on nestle juice -phpapp02
 
Strategic Management Project on Pepsi Cola Pakistan
Strategic Management Project on Pepsi Cola PakistanStrategic Management Project on Pepsi Cola Pakistan
Strategic Management Project on Pepsi Cola Pakistan
 
Hr planning, recruitment and selection
Hr planning, recruitment and selectionHr planning, recruitment and selection
Hr planning, recruitment and selection
 
PIA Project
PIA ProjectPIA Project
PIA Project
 
Project on-distribution-channel-of-pepsi
Project on-distribution-channel-of-pepsiProject on-distribution-channel-of-pepsi
Project on-distribution-channel-of-pepsi
 
Performance appraisal of 5 companies done by shweta-bebarta
Performance appraisal of 5 companies  done by shweta-bebartaPerformance appraisal of 5 companies  done by shweta-bebarta
Performance appraisal of 5 companies done by shweta-bebarta
 
Nestle Case Study
Nestle Case StudyNestle Case Study
Nestle Case Study
 

Similar to SADAM RESUME

Similar to SADAM RESUME (20)

CV,
CV,CV,
CV,
 
Sandeep Suryavanshi CoverLetter and Resume
Sandeep Suryavanshi  CoverLetter and ResumeSandeep Suryavanshi  CoverLetter and Resume
Sandeep Suryavanshi CoverLetter and Resume
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
Resume_Sameer-1 -Simens
Resume_Sameer-1 -SimensResume_Sameer-1 -Simens
Resume_Sameer-1 -Simens
 
CEESPL_COMPANY_PROFILE_F
CEESPL_COMPANY_PROFILE_FCEESPL_COMPANY_PROFILE_F
CEESPL_COMPANY_PROFILE_F
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Resume Haris
Resume HarisResume Haris
Resume Haris
 
shuja's cv for Instrumentation, DCS and Power plant.
shuja's cv for Instrumentation, DCS and Power plant.shuja's cv for Instrumentation, DCS and Power plant.
shuja's cv for Instrumentation, DCS and Power plant.
 
Vinothkumar electrical engineer
Vinothkumar electrical engineerVinothkumar electrical engineer
Vinothkumar electrical engineer
 
Shabbir - Curriculum Vitae
Shabbir - Curriculum VitaeShabbir - Curriculum Vitae
Shabbir - Curriculum Vitae
 
CHANDAN TECHNO LATEST CV 2015 NEW
CHANDAN TECHNO LATEST CV 2015 NEWCHANDAN TECHNO LATEST CV 2015 NEW
CHANDAN TECHNO LATEST CV 2015 NEW
 
Resume
ResumeResume
Resume
 
Saad Resume
Saad ResumeSaad Resume
Saad Resume
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSA
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
M.asif cv
M.asif cvM.asif cv
M.asif cv
 
M.Asif CV
M.Asif CVM.Asif CV
M.Asif CV
 
M.asif cv
M.asif cvM.asif cv
M.asif cv
 
P-Chandrakant_S_Kawathekar_resume17.
P-Chandrakant_S_Kawathekar_resume17.P-Chandrakant_S_Kawathekar_resume17.
P-Chandrakant_S_Kawathekar_resume17.
 

SADAM RESUME

  • 1. CELL: 0322-4354868, 0306-0677635 Street: 24 House: 01 Bhania road Sharif Pura Lahore. Email: m.sadam35@gmail.com Muhammad Sadam PROFILE: To get job in a reputable organization where I work for the productivity of the organization & Personal growth, where I can perform my skills at the best on the basis of experience and Knowledge. EDUCATION: Bachelor in Technology (B-tech) (Hones -Mechanical) (2012-2014) PRESTON University Lahore. Result: 1st Division; CGPA-3.4 Bachelor in Technology (B-tech) (Pass-Mechanical) (2010-2012) Preston Institute of Management Science and Technology Lahore. Result: 1st Division; CGPA-3.4 Diploma of Associate Engineer(D.A.E) (Mechanical) (2007-2010) Punjab Polytechnic Institute Lahore. Result: 1st Division; 72% EMPLOYMENT: Fabcon Design & Engineering LAHORE, PAKISTAN (28-May/2014– To Till Date) Position as Lead Draftsman. Responsibilities:  Thoroughly Study all design Calculation provided by Design Engineer & Check Critical requirements.  Perform Detail design (In CAD or Inventor) Meeting all requirements including standards, Client Specifications and Statuary requirements if any.  3D Modeling & Fabrication Drawing of Pedestrian Bridges, PEB Sheds, Bus stations, Boilers (Water Tube / Fire Tube / WHR) Economizers, Pressure & Non Pressure Parts like Deaerators, Storage Tanks, Ducting, Structure and Foundation Detailing. Project Experience:  Milac Foods Ltd: - Water Tube Boiler, Economizer, Air pre-Heater.  Metro Bus Service (Rawalpindi-Islamabad): - 8 Pedestrian Bridges at Different Locations in Above Mention Sites.  FWO: - 2 Turn Table & Moving Form Work.  MES (Sargodha): 14 Pre Engineering Shed  Layyah & Al-Moiz Suger Mils (Layyah & D.G Khan): - Modification in 140 & 80 TPH water tube Boilers & There Structure.
  • 2.  MES (Rawalpindi): Water pond Shed.  MES (Rawalpindi): Pedestrian Bridge Judicial Complex.  Yutain Chemicals Pakistan: S.S Storage Tank.  Sitara Chemicals Pakistan: 3 Water Storage Tanks & 2 Pre Engineering Sheds. DESCON Engineering LTD. (LMW) LAHORE, PAKISTAN (23-July/2012– 28-May/2014) Position as Mechanical Draftsman Responsibilities:  Thoroughly Study all design Calculation provided by Design Engineer & Check Critical requirements.  Perform Detail design (In CAD or Inventor) Meeting all requirements including standards, Client Specifications and Statuary requirements if any.  3D Modeling & Fabrication Drawing of Boilers (Water Tube / Fire Tube / WHR) Economizers, Pressure & Non Pressure Parts Like Deaerators, Storage Tanks, Ducting, Structure and Foundation Detailing. Project Experience:  YUNUS Textile Mills (Karachi): - Water Tube Boiler, Economizer, Deaerator.  RAFHAN MAIZ Product Co. (Faisalabad): - Water Tube Boiler, Deaerator, Ducting, Stack, Plate Forms  JOHN ZINK KEU GmbH, SADARA (UAE): - WHR Boiler, Flash Vessel & Ducts.  SENORO GAS DEVELOPMENTPROJECT (UAE):- WHR Boiler & Steam Drum.  LUBEREF YANBURefinery Expansion (UAE):- 3WHR Boilers Shell And Tube Type & 1Steam Super Heater.  Pakistan Oil Limited:- Fire Tube Boiler, Economizer, Ducting, Stack, Plate Forms  Coca Cola Pakistan Limited: - Fire Tube Boiler, Economizer. Gain Control System. LAHORE, PAKISTAN (29-Oct/2010 –25- July/2012) Position as Designer & Proposal Executive. Responsibilities:  To design the Electrical Panel, Their completePower, Control & G.A drawings.  Sales and marketing of VACON Frequency drives, switchgear, NANHUA products (Aviation and Emergency lights) and CIMON PLC.  Proposal making of all Electrical Panels including LV Switchgear, PLC panels, MCC,VFD, AMF/ATS, PFI, Cable tray and power DB’s, control panels. Project Experience:  ICI Paint: - Electrical panel, (Lahore)  Telenor: - Data Center Electrical Panel and services work (Kotlakpat Industrial Area)  Engro Food Supply Chain: - Electrical panel fabrication
  • 3.  Aster Group: - Electrical panel fabrication  INTECH:- Pressure and Temperature Demo unit Instrumentation and Fabrication  KSB Pump: - PLC Based SCADA System for water filtration plant Panel Designing and Fabrication Global Mechanica. LAHORE, PAKISTAN (May 2009 – December 2009) Designer as an AutoCAD Operator  ElectricalDrawings.  Instrument assembly Drawings.  Mechanical Drawings.  HVAC Drawings.  Piping Drawings. Computer Skills:  Diploma in Computer Basic:  Microsoft Office Word, Excel, Power Point, Outlook, etc.  Graphics Photo shop + Coral Draw  Auto cad (2D + 3D) Latest Versions  CNC Programming (Delcam Power Shape +Power Mill)  Autodesk Inventor (3D designing & 2D Detailing)  Tekla Steel Structure (3D+2D designing and CAD conversion) Personal Highlights:  Possess exceptional problem solving skills.  Keep perception for location error defuses.  Highly motivated to achieve set goal.  Perform equally well while working individually or as a part of team. Reference: Will be furnished, if required.