SlideShare a Scribd company logo
1 of 1
Download to read offline
KPIs for High Performance Maintenance 
Team 
“TOOL BOX TRAINING” 
Reference: ISO 14224  
 
General Rules which must be followed:                                                                 What is the number of Breaks to the
                                                                                                       maintenance schedule by Maintenance and
1. Metrics cannot be used to penalize anyone; they                                                     by Production?
   are to be used as a navigation tool.
                                                                                                         160
                                                                                                         140
                                                                                                         120
                                                                                                         100
                                                                                                          80                                                             Maint
                                                                                                          60                                                             Prod
                                                                                                          40
                                                                                                          20
                                                                                                           0
                                                                                                               Jan   Feb   Mar   June July   Aug   Sept   Oct   Nov




                                                                                                         Breaks to Maint Schedule
2. Metrics for your maintenance team must be
   focused on how they impact equipment or facility
   performance.                                                                                       The percentage of PM/PdMs which are
                                                                                                       focused on specific failure modes.
    Examples:
     Are our PMs working, preventing failures?
                                                                                                                                                          PMs Critical Assets

          800
                                                                                                                                                          PdMs Critical Assets
          700
          600
                                                                                                                                                          Addresses No Failure
          500
                                                                                                                                                          Modes
          400                                                       PM Labor Hrs
          300                                                       EM Labor Hrs
          200
          100
            0
                January          April        May        August
                                                                                                        % of PM/PdMs Addressing
          PM/PdM Effectiveness                                                                          Failure Modes on Critical Assets



       Is the Mean Time Between Failure of critical                                           3. Guiding Principles for Metrics
        assets increasing?                                                                           a. When a metric demonstrates a problem
                                                                                                         allow the Maintenance Team to
          120
                                         MTBF - Hours                                                    recommend a solution.
          100                                                                                        b. The question to ask of the Maintenance
           80

           60
                                                                    MTBF - Hours
                                                                                                         Team is: “How do the metrics look to
           40

           20                                                                                            you?” and “What do we need to do to
            0
                January          April        May        August                                          change the metric if needed?
          MTBF of Critical Assets                                                                    c. In order for a metric to move positive or
                                                                                                         negative management must have
       Are the maintenance repairs made correctly?                                                      patience and enough data points to
        Rework?                                                                                          ensure the action taken resulted in the
          14
                                                                                                         right affect?
          12

          10
                                                                                                     d. Maintenance Team metrics must be
           8

           6                                                              Rework
                                                                                                         posted for all to see and updated daily or
           4

           2
                                                                                                         weekly.
           0
                 Jan      Feb   Mar   June July   Aug Sept   Oct   Nov
                                                                                                     e. Allow the Maintenance Team to create
                                                                                                         other metrics which work better for your
          Rework                                                                                         situation.
                                                                                                     f. Always ask: “will this metric tell me if a
                                                                                                         process is working or not.”

                                                                                        Page 1 of 1                                                                                  GPAllied
                                                                                                                                                                       4360 Corporate Road 
                                                             “The Problem with Management is they are always measuring the                                                          Suite 110 
                                                                              wrong thing” - Peter Drucker                                                             Charleston, SC 29405 
                                              
                                                                                                                                                                       Office (843) 414‐5760 
                                                                                                                                                                         Fax (843) 414‐5779
                                                                                   www.gpallied.com 
 

More Related Content

Similar to Tool Box Training - KPIs For Maintenance Teams

Mr. aref the “100 million dollars” cultural transformation initiative
Mr. aref   the “100 million dollars” cultural transformation initiativeMr. aref   the “100 million dollars” cultural transformation initiative
Mr. aref the “100 million dollars” cultural transformation initiativequalitysummit
 
Contribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGContribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGAmol Vidwans
 
Seeing what matters using the right vision to manage transition - Alan Shalloway
Seeing what matters using the right vision to manage transition - Alan ShallowaySeeing what matters using the right vision to manage transition - Alan Shalloway
Seeing what matters using the right vision to manage transition - Alan ShallowayAGILEMinds
 
Mopex model From Mattcons
Mopex model From MattconsMopex model From Mattcons
Mopex model From MattconsMattcons
 
North coast tafe staff workshop
North coast tafe staff workshopNorth coast tafe staff workshop
North coast tafe staff workshopE2 Consulting
 
People CMM
People CMMPeople CMM
People CMMQAI
 
Sapphire Online 2009 Or1005
Sapphire Online 2009 Or1005Sapphire Online 2009 Or1005
Sapphire Online 2009 Or1005Shereen Zubair
 
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...Innovum
 
Mba syllabus 2012
Mba syllabus 2012Mba syllabus 2012
Mba syllabus 2012jinu24
 

Similar to Tool Box Training - KPIs For Maintenance Teams (12)

Mr. aref the “100 million dollars” cultural transformation initiative
Mr. aref   the “100 million dollars” cultural transformation initiativeMr. aref   the “100 million dollars” cultural transformation initiative
Mr. aref the “100 million dollars” cultural transformation initiative
 
Contribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGContribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARG
 
Seeing what matters using the right vision to manage transition - Alan Shalloway
Seeing what matters using the right vision to manage transition - Alan ShallowaySeeing what matters using the right vision to manage transition - Alan Shalloway
Seeing what matters using the right vision to manage transition - Alan Shalloway
 
Mopex model From Mattcons
Mopex model From MattconsMopex model From Mattcons
Mopex model From Mattcons
 
North coast tafe staff workshop
North coast tafe staff workshopNorth coast tafe staff workshop
North coast tafe staff workshop
 
PCMM by QAI
PCMM by QAIPCMM by QAI
PCMM by QAI
 
People CMM
People CMMPeople CMM
People CMM
 
Sapphire Online 2009 Or1005
Sapphire Online 2009 Or1005Sapphire Online 2009 Or1005
Sapphire Online 2009 Or1005
 
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
Do employers want what schools create? Hernán Araneda, gerente de Innovum, Fu...
 
Mba syllabus 2012
Mba syllabus 2012Mba syllabus 2012
Mba syllabus 2012
 
Defect prevention
Defect preventionDefect prevention
Defect prevention
 
Abrige catlogue
Abrige catlogueAbrige catlogue
Abrige catlogue
 

More from Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 

More from Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 

Tool Box Training - KPIs For Maintenance Teams

  • 1. KPIs for High Performance Maintenance  Team  “TOOL BOX TRAINING”  Reference: ISO 14224     General Rules which must be followed:  What is the number of Breaks to the maintenance schedule by Maintenance and 1. Metrics cannot be used to penalize anyone; they by Production? are to be used as a navigation tool. 160 140 120 100 80 Maint 60 Prod 40 20 0 Jan Feb Mar June July Aug Sept Oct Nov Breaks to Maint Schedule 2. Metrics for your maintenance team must be focused on how they impact equipment or facility performance.  The percentage of PM/PdMs which are focused on specific failure modes. Examples:  Are our PMs working, preventing failures? PMs Critical Assets 800 PdMs Critical Assets 700 600 Addresses No Failure 500 Modes 400 PM Labor Hrs 300 EM Labor Hrs 200 100 0 January April May August % of PM/PdMs Addressing PM/PdM Effectiveness Failure Modes on Critical Assets  Is the Mean Time Between Failure of critical 3. Guiding Principles for Metrics assets increasing? a. When a metric demonstrates a problem allow the Maintenance Team to 120 MTBF - Hours recommend a solution. 100 b. The question to ask of the Maintenance 80 60 MTBF - Hours Team is: “How do the metrics look to 40 20 you?” and “What do we need to do to 0 January April May August change the metric if needed? MTBF of Critical Assets c. In order for a metric to move positive or negative management must have  Are the maintenance repairs made correctly? patience and enough data points to Rework? ensure the action taken resulted in the 14 right affect? 12 10 d. Maintenance Team metrics must be 8 6 Rework posted for all to see and updated daily or 4 2 weekly. 0 Jan Feb Mar June July Aug Sept Oct Nov e. Allow the Maintenance Team to create other metrics which work better for your Rework situation. f. Always ask: “will this metric tell me if a process is working or not.” Page 1 of 1  GPAllied 4360 Corporate Road  “The Problem with Management is they are always measuring the Suite 110  wrong thing” - Peter Drucker  Charleston, SC 29405    Office (843) 414‐5760  Fax (843) 414‐5779 www.gpallied.com