SlideShare a Scribd company logo
1 of 75
Image by Bombardier.com, Project in Sao Paulo,Brazil




                                            FINAL REPORT
Merging the future




                                                                   1
ABOUT US




                                                           Main Office:
                                                           777 Glades Road, IS-114
                                                           Boca Raton, Florida 33431
                                                           (786) 285-1339




Mission Statement:
“Our mission at New Heights Engineering is to
incorporate fundamental and technological engineering
principals to develop innovative and sustainable designs   Satellite Office:
that will improve local communities and reduce global      2735 NE 164th
                                                           North Miami Beach, FL 33160
impact”




                                                                                         2
PROFESSIONAL
EXPERIENCE

            Enisio Dos Santos Jr.                     Mario Gimma

            Project Manger                            Consultant


Certified General Contractor                Demolition and Construction
(CGC # 1510419)                             PE Internship
• Secondary Qualifier for GC Firm                     GIS Research
• Senior Estimator                                    Historical Research
           Over $ 10 Mil                              Pump Design
           Prepared Bid Packages            Customer Service
• Project Manager                                     Client Relations
           Oversee daily operation                    Inventory
           Manage Schedule and Compliance             Training
           Prepare Close-out Documents
• Drafter
           Shop Drawings
           Prepare As-Built
           3D to facilitate construction




                                                                            3
PROFESSIONAL
EXPERIENCE


             Hamzah Riaz                                   Phillip Quinn
             Consultant                                    Consultant

County Engineering Intern                    Engineering Intern
• Inspect county infrastructure              • Research Data Collector
• Research construction code regulations         • Data collection for analysis
• Attend bid meetings                        • Jobsite Manager
• Foundation bearing calculations                • Oversee daily operations
• Create Cantilever wall bearing and slope       • Building owner relations
  calculations                               • Customer Service
• Update structural bridge reports               • Client Relations
• County commissioner relations                  • Conflict Resolution




                                                                                  4
HVAC
                      Mario                  Structure
                                             Enisio &
  LEED                                          Phil
  Mario


                       New
Foundation            Heights                  Transportation
  Phil &                                            Phil
  Enisio




             Cost               Hydraulics
             Enisio              Hamzah




                                                                5
PROJECT DESCRIPTION

 Town Center at Boca Raton
        Station 9


• Elevated track system
• 4-car train with 24 passenger
  capacity each
• Monorail Station (15,000 SF)
    o Lobby
    o Concourse
    o Ticketing office
    o Food stalls
    o Free standing kiosk
    o Maintenance area
    o ADA restrooms




                                  6
SITE
DESCRIPTION


6000 Glades Road
Boca Raton, Florida 33431

Site Facts:

• Agricultural Land Prior to 1980’s

• Initial Development 1983

• Property Owned by Town
  Center Boca Trust

• Managed by Simons LLC.

• Largest Shopping Mall in Palm Beach




                                                                               7
                                        Images by Google Earth and Bing Maps
SITE DATA



                                  • Total Site Area
                                     • 142 AC

                                  • Gross Building Area
                                     • 1,914,070 SF

                                  • Parking
                                     • 7996 Conventional
                                     • 234 ADA
                                     • 253 Valet




                                                           8
            Images by Bing Maps
SURROUNDING AREA USE



         Single Family Homes


                                                   Major
                                                   Office
                                                   Complex



Single
                                                    Hotel
Family     Apartments
Homes
                             Apartments




                        Picture from Google Maps




                                                             9
ENVIRONMENTAL

SITE ASSESSMENT




                  10
SITE VISIT




                                             11
         Pictures From New Heights; Google
SITE VISIT




                                             12
         Pictures From New Heights; Google
REC SUMMARY
                         # Found     Risk      Possible REC’s   REC’s   Past REC’s
 Storage Tanks             6       Moderate
 LUST's                    2        Critical
 Dry Cleaners Cleanup      1         Low
 RCRA Generators           23
      SQG                  8         Low
      CESQG                15        Low
 Site Reconnaissance       11
      Barrels              1        Critical
      Car Wash             1       Moderate
      Auto Center          1       Moderate
      Grease Disposal      1       Moderate
      Generator            5         Low
 Past use
      Agricultural Use




                                                                                     13
RECOMMENDATIONS
• Based on the guidelines in ASTM 1527-05 our site is of
  moderate risk


• A phase 2 environmental assessment was recommended


• Test for constituents of petroleum
        • Benzenes
        • Toulene
        • Xylenes




                                                           14
SITE

SELECTION




            15
SITE OPTIONS




                                                 16
               Images Courtesy of Google Earth
OPTION 4

                                         CRITERIA           Rating



                                   Community Integration     High



                                      Mall Integration       High




                                   Transportation Modes
                                                           Moderate
                                        Integration




                                        Aesthetics         Moderate



  Images courtesy of Google Maps




                                                                      17
SITE

PLAN




       18
19
20
21
ELEVATIONS




             22
23
24
25
26
27
28
29
STRUCTURES




             30
31
1st FL LAYOUT   2ND FL LAYOUT




                                32
NORTH ELEVATION




WEST ELEVATION




                  33
STRUCTURAL SUMMARY
      ROOF
      • Able to sustain -62.04 PSF
        pressure
      • 5” Thick concrete slab over
        metal deck
      • Minimum ¼” slope

      ROOF STRUCTURAL
      FRAMING
      • Steel I Beams W44x230
      • Steel Joist 32LH06
      • Steel Stiffeners

      COLUMNS
      • 18”x 18” Columns (Main)
      • 12” x 12” Columns (1st Floor)

      ONE WAY SLAB
      • 6” Thick




                                        34
FOUNDATION




             35
SOIL PROFILE

                                                       Strong sand underlain by weak
        MEDIUM FINE BROWN SAND
              ϒ =94.16 PCF                                         sand
2’               Ø= 27.6


         MEDIUM FINE TAN SAND
              ϒ =112.5 PCF
                 Ø= 31.3
5’
                                     5’ WATER TABLE

      MEDIUM FINE LIGHT BROWN SAND
               ϒ =107.8 PCF
                  Ø= 30.5
9’




      MEDIUM FINE LIGHT GREY SAND
              ϒ =99.58 PCF
                 Ø= 28.9                     Design Bearing Capacity 3,400 lb/ft2
                                                         at 3’ BGS
15’




                                                                                       36
CRITICAL LOADS




           105 KIPS   212 KIPS




                                 37
COLUMNS LAYOUT

 8 - 212 kip footings


 10 - 105 kip footings




                         38
105 KIP FOOTING




 2.6 in2 steel reinforcement




                               39
212 KIP FOOTING




 3.67 in2 steel reinforcement




                                40
TRANSPORTATION




                 41
TIMED TRANSFER STATION




                         42
AIMSUN SIMULATION

           Saint Andrews and Glades




                                      43
44
DELAY TIME


             40 second avg

             LOS D




             35 second avg
             LOS C




                             45
HCM LOS




          Highway Capacity Manual




                                    46
HYDRAULICS &
  DRAINAGE




               47
SITE LOCATION & UTILITIES


          10” WM
N
                            12” SM




        Sears




                                     48
GENERAL OVERVIEW




                   49
1ST FL ELEVATION
MEN’S RESTROOM
                                         18'

                  5.25'           2.5'         2.5'            5'       1.5'

                 Baby
                 Changing
                 Station                                     Handicap




                                                                               5'
                            Water Water
                                                             Water
N                           Closet Closet
                                                             Closet




                                                                                    14'
          2.5'
    19'

          2.5'




                                                      2.5'     2.5'
                                                       12'
          5'




                                                                                          50
                            12'
WOMEN’S RESTROOM
                                               18'
                    1.5'    5.25'           2.5'      2.5'         2.5'   2.5'



           5'               Handicap          Water Water Water Water
                            Water             Closet Closet Closet Closet
                            Closet
N
     14'




                      Baby
           4.177'




                      Changing
                      Station




                                                                                      19'
           2'




                            2.5'     2.5'      2.5'
                                    12'




                                                                                 5'
                                                             12'




                                                                                            51
DRAINAGE FIXTURE UNITS

            FIXTURES               QUANTITY   FIXTURE UNITS
     Future Retail/ Service Sink      3        2              6

     Drinking Water Fountains         4        0.5            2



            FIXTURES               WOMEN      FIXTURE UNITS
               Sinks                  6        2              12

           Water Closet               5        4              20



            FIXTURES                 MEN      FIXTURE UNITS

               Sinks                  4        2              8

              Urinals                 3        2              6

           Water Closet               3        4              12

                                                              66




                                                                   52
DF
                                                                                      1½” PVC
                                           1½” PVC                   DF
                                                                                        Pipe
                                             Pipe

     N
                                                                     Men’s           Sink    Women’s
                                    Sink                             Restroom                Restroom

                                                     Women's
                       Men’s                         Restroom
                       Restroom
                                                                          DF
      1½”
                                                                                    Lobby
     Meter

                      DF

                                                                WM


WM                    DF
                                                                       DF
                                  Retail Services
                           Sink                       Sink
        1½”
     Backflow
     Preventer
                                                                                 Retail Services
                                                                          Sink                     Sink




                                                                                                          53
FIXTURES PIPE SPECS


                                                      Demand   Supply Pipe Size
          FIXTURES               TRAP SIZE (Inches)
                                                       (GPM)      (Inches)



   Future Retail/ Service Sink          1/2            0.5           1/2


   Drinking Water Fountains            1 1/4           0.75          1/2


             Sinks                     1 1/2           0.5           1/2


            Urinals                      2             0.5           3/4


         Water Closet                    3             0.8            1




                                                                                  54
FIXTURES




           55
STORM WATER DRAINAGE
      CONCEPT




                       56
ROOF DRAINAGE CONCEPT




                        57
EXFILTRATION TRENCH


                                           𝑉
               𝐿=
                  𝐾 𝐻2 𝑊 + 2𝐻2 𝐷 𝑢 − 𝐷2 + 2𝐻2 𝐷 𝑠 + 1.39 ∗ 10−4 𝑊𝐷 𝑢
                                      𝑢

Where:
         D = Pipe Diameter: 18”
         W = trench width = 4ft. (minimum)
         H2 = depth to water table = 4ft.
         Du = non-saturated trench depth = 4ft.
         Ds = saturated trench depth = 5ft.

         V = volume treated (acre– inches) = 1.79 acre - inches
                         𝑓𝑡 3
                          s                                       5.0
         K =0.00025
                      𝑓𝑡 2 −𝑓𝑡                                    ft
         L = length of trench (feet): 70 ft.
 Total Length with Safety Factor: 70 ft * 2 =
 140 ft                                                                 4.0




                                                                              58
59
LANDSCAPING




              60
61
VEGITATION




             LIVE WALL CROSS VINE
                  $3 Per Plant




                                    62
VEGITATION




             WALK PATH LEATHER FERN
                     $0.75 EACH




                                      63
CARPET
$108.00 PER PALET




                    64
HVAC




       65
Future Retail Space = 1,197 ft2
Tickets and General Offices = 1,042 ft2

Restrooms = 123 ft2

Total Square Feet (ft2) = 2,400 ft2
 ≈1,200 ft2

From HVAC Software:

24,000 Btu’s 3.0 - 3.5 Tons

1977 CFM (Cubic Feet per Min)




                                          66
67
SKYMARK BY JOHNSON



 $5,600.00 per Unit

2 UNITS REQUIRED
 FOR THE DESIGN

                                                2-20 TON
                                             13 to 15 SEERS


                            TOTAL COST:

                      $5,600.00 * 2 = $11,200.00




                                                              68
LEED




       69
1) SS: 20 of 26

2) WE: 6 of 10

3) EA: 22 of 35

4) MR: 7 of 14

5) IEQ :14 of 15

Total =64 Points




                   70
71
COST




       72
RS Means Cost Estimator

  •   Substructures   -      $ 101,000.00
  •   Shell           -      $ 975,500.00
  •   Interiors       -      $ 578,000.00
  •   Services        -      $ 1,016,500.00

  • Sub-Total     -          $ 2,671,000.00
  • Contractor P&O           $ 668,000.00
  • A/E                      $ 233,500.00



                          Total Cost

                  $ 3,572,500.00




                                              73
ACKNOWLEDGEMENTS
•   Dr. Daniel E. Meeroff

•   Dr. Frederick Bloetscher, P.E.

•   Mr. Albert Muniz, P.E.

•   Mr. Ed Small

•   Mr. Richard Lindenberg




                                     74
?
75

More Related Content

What's hot

Project Experience
Project ExperienceProject Experience
Project Experienceejfrench4
 
Melksham area board 10 oct 2012
Melksham area board 10 oct 2012Melksham area board 10 oct 2012
Melksham area board 10 oct 2012Colgoo
 
Sem Projects
Sem ProjectsSem Projects
Sem Projectsjnirutna
 
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLISFOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLISjcesar1963
 
Solution Blue Projects (4)
Solution Blue Projects (4)Solution Blue Projects (4)
Solution Blue Projects (4)dcpingel
 
Project Management Profile
Project Management ProfileProject Management Profile
Project Management ProfileColin Harrop
 
Michael Schulz Portfolio Low Res
Michael Schulz Portfolio Low ResMichael Schulz Portfolio Low Res
Michael Schulz Portfolio Low ResMichael Schulz
 
Gulf pacific arable spec dec 2011
Gulf pacific arable spec dec 2011Gulf pacific arable spec dec 2011
Gulf pacific arable spec dec 2011owhbarnes
 
Protech Khuthele Company Summary
Protech Khuthele Company SummaryProtech Khuthele Company Summary
Protech Khuthele Company Summaryfionahampsonsearle
 
Redi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West PrecastRedi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West PrecastEagle West Cranes JB
 
NYC Projects 2006-09
NYC Projects 2006-09NYC Projects 2006-09
NYC Projects 2006-09smetts
 
Michael Schulz Portfolio
Michael Schulz PortfolioMichael Schulz Portfolio
Michael Schulz PortfolioMichael Schulz
 

What's hot (15)

Project Experience
Project ExperienceProject Experience
Project Experience
 
Portfolio
PortfolioPortfolio
Portfolio
 
Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...
Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...
Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...
 
Melksham area board 10 oct 2012
Melksham area board 10 oct 2012Melksham area board 10 oct 2012
Melksham area board 10 oct 2012
 
Sem Projects
Sem ProjectsSem Projects
Sem Projects
 
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLISFOSTER & PARTNERS CAMPUS BIOMETROPOLIS
FOSTER & PARTNERS CAMPUS BIOMETROPOLIS
 
Solution Blue Projects (4)
Solution Blue Projects (4)Solution Blue Projects (4)
Solution Blue Projects (4)
 
Project Management Profile
Project Management ProfileProject Management Profile
Project Management Profile
 
Michael Schulz Portfolio Low Res
Michael Schulz Portfolio Low ResMichael Schulz Portfolio Low Res
Michael Schulz Portfolio Low Res
 
Gulf pacific arable spec dec 2011
Gulf pacific arable spec dec 2011Gulf pacific arable spec dec 2011
Gulf pacific arable spec dec 2011
 
Protech Khuthele Company Summary
Protech Khuthele Company SummaryProtech Khuthele Company Summary
Protech Khuthele Company Summary
 
Redi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West PrecastRedi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West Precast
 
Greening my City - Kay Cheng
Greening my City - Kay ChengGreening my City - Kay Cheng
Greening my City - Kay Cheng
 
NYC Projects 2006-09
NYC Projects 2006-09NYC Projects 2006-09
NYC Projects 2006-09
 
Michael Schulz Portfolio
Michael Schulz PortfolioMichael Schulz Portfolio
Michael Schulz Portfolio
 

Similar to Final Presentation

neighborhood scenario planning | Eliot Allen
neighborhood scenario planning | Eliot Allenneighborhood scenario planning | Eliot Allen
neighborhood scenario planning | Eliot AllenOpenPlans
 
DVL Design Group Brochure
DVL Design Group BrochureDVL Design Group Brochure
DVL Design Group Brochureplangham
 
2012 Annual Client Summit: CEO Welcome
2012 Annual Client Summit: CEO Welcome2012 Annual Client Summit: CEO Welcome
2012 Annual Client Summit: CEO WelcomeEDR
 
Bldg Maint Brochure
Bldg Maint BrochureBldg Maint Brochure
Bldg Maint Brochuremcgrawrpm
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationStanford University
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webberONEIA
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webberONEIA
 
Telcom Solutions
Telcom SolutionsTelcom Solutions
Telcom Solutionshmccormick
 
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 UpdateGBC Finland
 
Data Centres Overview 2012
Data Centres Overview 2012Data Centres Overview 2012
Data Centres Overview 2012alextilley
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningRICHBUTKUS
 
Ashram presentation
Ashram presentationAshram presentation
Ashram presentationindiahfa
 
PTS Service Portfolio
PTS Service PortfolioPTS Service Portfolio
PTS Service Portfolioabbasz
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericssonabbasz
 
Telcom Solutions
Telcom SolutionsTelcom Solutions
Telcom Solutionshmccormick
 

Similar to Final Presentation (20)

neighborhood scenario planning | Eliot Allen
neighborhood scenario planning | Eliot Allenneighborhood scenario planning | Eliot Allen
neighborhood scenario planning | Eliot Allen
 
Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...
Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...
Hawaii Pacific GIS Conference 2012: Application Development - Using a Map App...
 
DVL Design Group Brochure
DVL Design Group BrochureDVL Design Group Brochure
DVL Design Group Brochure
 
BIM with RBF Consulting
BIM with RBF ConsultingBIM with RBF Consulting
BIM with RBF Consulting
 
Reducing Risk with BIM
Reducing Risk with BIMReducing Risk with BIM
Reducing Risk with BIM
 
2012 Annual Client Summit: CEO Welcome
2012 Annual Client Summit: CEO Welcome2012 Annual Client Summit: CEO Welcome
2012 Annual Client Summit: CEO Welcome
 
Bldg Maint Brochure
Bldg Maint BrochureBldg Maint Brochure
Bldg Maint Brochure
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal Presentation
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webber
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webber
 
Site BIM
Site BIMSite BIM
Site BIM
 
Telcom Solutions
Telcom SolutionsTelcom Solutions
Telcom Solutions
 
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
 
Data Centres Overview 2012
Data Centres Overview 2012Data Centres Overview 2012
Data Centres Overview 2012
 
Alternative energy
Alternative energyAlternative energy
Alternative energy
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
Ashram presentation
Ashram presentationAshram presentation
Ashram presentation
 
PTS Service Portfolio
PTS Service PortfolioPTS Service Portfolio
PTS Service Portfolio
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericsson
 
Telcom Solutions
Telcom SolutionsTelcom Solutions
Telcom Solutions
 

Final Presentation

  • 1. Image by Bombardier.com, Project in Sao Paulo,Brazil FINAL REPORT Merging the future 1
  • 2. ABOUT US Main Office: 777 Glades Road, IS-114 Boca Raton, Florida 33431 (786) 285-1339 Mission Statement: “Our mission at New Heights Engineering is to incorporate fundamental and technological engineering principals to develop innovative and sustainable designs Satellite Office: that will improve local communities and reduce global 2735 NE 164th North Miami Beach, FL 33160 impact” 2
  • 3. PROFESSIONAL EXPERIENCE Enisio Dos Santos Jr. Mario Gimma Project Manger Consultant Certified General Contractor Demolition and Construction (CGC # 1510419) PE Internship • Secondary Qualifier for GC Firm GIS Research • Senior Estimator Historical Research Over $ 10 Mil Pump Design Prepared Bid Packages Customer Service • Project Manager Client Relations Oversee daily operation Inventory Manage Schedule and Compliance Training Prepare Close-out Documents • Drafter Shop Drawings Prepare As-Built 3D to facilitate construction 3
  • 4. PROFESSIONAL EXPERIENCE Hamzah Riaz Phillip Quinn Consultant Consultant County Engineering Intern Engineering Intern • Inspect county infrastructure • Research Data Collector • Research construction code regulations • Data collection for analysis • Attend bid meetings • Jobsite Manager • Foundation bearing calculations • Oversee daily operations • Create Cantilever wall bearing and slope • Building owner relations calculations • Customer Service • Update structural bridge reports • Client Relations • County commissioner relations • Conflict Resolution 4
  • 5. HVAC Mario Structure Enisio & LEED Phil Mario New Foundation Heights Transportation Phil & Phil Enisio Cost Hydraulics Enisio Hamzah 5
  • 6. PROJECT DESCRIPTION Town Center at Boca Raton Station 9 • Elevated track system • 4-car train with 24 passenger capacity each • Monorail Station (15,000 SF) o Lobby o Concourse o Ticketing office o Food stalls o Free standing kiosk o Maintenance area o ADA restrooms 6
  • 7. SITE DESCRIPTION 6000 Glades Road Boca Raton, Florida 33431 Site Facts: • Agricultural Land Prior to 1980’s • Initial Development 1983 • Property Owned by Town Center Boca Trust • Managed by Simons LLC. • Largest Shopping Mall in Palm Beach 7 Images by Google Earth and Bing Maps
  • 8. SITE DATA • Total Site Area • 142 AC • Gross Building Area • 1,914,070 SF • Parking • 7996 Conventional • 234 ADA • 253 Valet 8 Images by Bing Maps
  • 9. SURROUNDING AREA USE Single Family Homes Major Office Complex Single Hotel Family Apartments Homes Apartments Picture from Google Maps 9
  • 11. SITE VISIT 11 Pictures From New Heights; Google
  • 12. SITE VISIT 12 Pictures From New Heights; Google
  • 13. REC SUMMARY # Found Risk Possible REC’s REC’s Past REC’s Storage Tanks 6 Moderate LUST's 2 Critical Dry Cleaners Cleanup 1 Low RCRA Generators 23 SQG 8 Low CESQG 15 Low Site Reconnaissance 11 Barrels 1 Critical Car Wash 1 Moderate Auto Center 1 Moderate Grease Disposal 1 Moderate Generator 5 Low Past use Agricultural Use 13
  • 14. RECOMMENDATIONS • Based on the guidelines in ASTM 1527-05 our site is of moderate risk • A phase 2 environmental assessment was recommended • Test for constituents of petroleum • Benzenes • Toulene • Xylenes 14
  • 16. SITE OPTIONS 16 Images Courtesy of Google Earth
  • 17. OPTION 4 CRITERIA Rating Community Integration High Mall Integration High Transportation Modes Moderate Integration Aesthetics Moderate Images courtesy of Google Maps 17
  • 18. SITE PLAN 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 23. 23
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 31. 31
  • 32. 1st FL LAYOUT 2ND FL LAYOUT 32
  • 34. STRUCTURAL SUMMARY ROOF • Able to sustain -62.04 PSF pressure • 5” Thick concrete slab over metal deck • Minimum ¼” slope ROOF STRUCTURAL FRAMING • Steel I Beams W44x230 • Steel Joist 32LH06 • Steel Stiffeners COLUMNS • 18”x 18” Columns (Main) • 12” x 12” Columns (1st Floor) ONE WAY SLAB • 6” Thick 34
  • 36. SOIL PROFILE Strong sand underlain by weak MEDIUM FINE BROWN SAND ϒ =94.16 PCF sand 2’ Ø= 27.6 MEDIUM FINE TAN SAND ϒ =112.5 PCF Ø= 31.3 5’ 5’ WATER TABLE MEDIUM FINE LIGHT BROWN SAND ϒ =107.8 PCF Ø= 30.5 9’ MEDIUM FINE LIGHT GREY SAND ϒ =99.58 PCF Ø= 28.9 Design Bearing Capacity 3,400 lb/ft2 at 3’ BGS 15’ 36
  • 37. CRITICAL LOADS 105 KIPS 212 KIPS 37
  • 38. COLUMNS LAYOUT 8 - 212 kip footings 10 - 105 kip footings 38
  • 39. 105 KIP FOOTING 2.6 in2 steel reinforcement 39
  • 40. 212 KIP FOOTING 3.67 in2 steel reinforcement 40
  • 43. AIMSUN SIMULATION Saint Andrews and Glades 43
  • 44. 44
  • 45. DELAY TIME 40 second avg LOS D 35 second avg LOS C 45
  • 46. HCM LOS Highway Capacity Manual 46
  • 47. HYDRAULICS & DRAINAGE 47
  • 48. SITE LOCATION & UTILITIES 10” WM N 12” SM Sears 48
  • 49. GENERAL OVERVIEW 49 1ST FL ELEVATION
  • 50. MEN’S RESTROOM 18' 5.25' 2.5' 2.5' 5' 1.5' Baby Changing Station Handicap 5' Water Water Water N Closet Closet Closet 14' 2.5' 19' 2.5' 2.5' 2.5' 12' 5' 50 12'
  • 51. WOMEN’S RESTROOM 18' 1.5' 5.25' 2.5' 2.5' 2.5' 2.5' 5' Handicap Water Water Water Water Water Closet Closet Closet Closet Closet N 14' Baby 4.177' Changing Station 19' 2' 2.5' 2.5' 2.5' 12' 5' 12' 51
  • 52. DRAINAGE FIXTURE UNITS FIXTURES QUANTITY FIXTURE UNITS Future Retail/ Service Sink 3 2 6 Drinking Water Fountains 4 0.5 2 FIXTURES WOMEN FIXTURE UNITS Sinks 6 2 12 Water Closet 5 4 20 FIXTURES MEN FIXTURE UNITS Sinks 4 2 8 Urinals 3 2 6 Water Closet 3 4 12 66 52
  • 53. DF 1½” PVC 1½” PVC DF Pipe Pipe N Men’s Sink Women’s Sink Restroom Restroom Women's Men’s Restroom Restroom DF 1½” Lobby Meter DF WM WM DF DF Retail Services Sink Sink 1½” Backflow Preventer Retail Services Sink Sink 53
  • 54. FIXTURES PIPE SPECS Demand Supply Pipe Size FIXTURES TRAP SIZE (Inches) (GPM) (Inches) Future Retail/ Service Sink 1/2 0.5 1/2 Drinking Water Fountains 1 1/4 0.75 1/2 Sinks 1 1/2 0.5 1/2 Urinals 2 0.5 3/4 Water Closet 3 0.8 1 54
  • 55. FIXTURES 55
  • 56. STORM WATER DRAINAGE CONCEPT 56
  • 58. EXFILTRATION TRENCH 𝑉 𝐿= 𝐾 𝐻2 𝑊 + 2𝐻2 𝐷 𝑢 − 𝐷2 + 2𝐻2 𝐷 𝑠 + 1.39 ∗ 10−4 𝑊𝐷 𝑢 𝑢 Where: D = Pipe Diameter: 18” W = trench width = 4ft. (minimum) H2 = depth to water table = 4ft. Du = non-saturated trench depth = 4ft. Ds = saturated trench depth = 5ft. V = volume treated (acre– inches) = 1.79 acre - inches 𝑓𝑡 3 s 5.0 K =0.00025 𝑓𝑡 2 −𝑓𝑡 ft L = length of trench (feet): 70 ft. Total Length with Safety Factor: 70 ft * 2 = 140 ft 4.0 58
  • 59. 59
  • 61. 61
  • 62. VEGITATION LIVE WALL CROSS VINE $3 Per Plant 62
  • 63. VEGITATION WALK PATH LEATHER FERN $0.75 EACH 63
  • 65. HVAC 65
  • 66. Future Retail Space = 1,197 ft2 Tickets and General Offices = 1,042 ft2 Restrooms = 123 ft2 Total Square Feet (ft2) = 2,400 ft2 ≈1,200 ft2 From HVAC Software: 24,000 Btu’s 3.0 - 3.5 Tons 1977 CFM (Cubic Feet per Min) 66
  • 67. 67
  • 68. SKYMARK BY JOHNSON $5,600.00 per Unit 2 UNITS REQUIRED FOR THE DESIGN 2-20 TON 13 to 15 SEERS TOTAL COST: $5,600.00 * 2 = $11,200.00 68
  • 69. LEED 69
  • 70. 1) SS: 20 of 26 2) WE: 6 of 10 3) EA: 22 of 35 4) MR: 7 of 14 5) IEQ :14 of 15 Total =64 Points 70
  • 71. 71
  • 72. COST 72
  • 73. RS Means Cost Estimator • Substructures - $ 101,000.00 • Shell - $ 975,500.00 • Interiors - $ 578,000.00 • Services - $ 1,016,500.00 • Sub-Total - $ 2,671,000.00 • Contractor P&O $ 668,000.00 • A/E $ 233,500.00 Total Cost $ 3,572,500.00 73
  • 74. ACKNOWLEDGEMENTS • Dr. Daniel E. Meeroff • Dr. Frederick Bloetscher, P.E. • Mr. Albert Muniz, P.E. • Mr. Ed Small • Mr. Richard Lindenberg 74
  • 75. ? 75