Research Proposal Presentation



                  Lynda Bourne
                    2034113
                   BUSM 1408



25 August, 2003    Lynda Bourne - 3024113   1
Supporting Project Managers in
                    building sustainable
             relationships for project success.




25 August, 2003         Lynda Bourne - 3024113    2
In the current project environment...
•Many team members
    –will only be part of the team as long as their specialist skills are required
    –come from different organisational backgrounds and cultures
    –may be geographically dispersed
•A small core team will be responsible for project delivery
•Organisations change constantly - a project’s stakeholder set will change:
    –Senior Managers change roles or change companies
    –The ability of stakeholders to influence the project may increase or decrease
•The Project Manager is still accountable for successful delivery of the project; there
are good reasons for project responsibilities to be shared:
    –Sharing workload and coaching of less experienced members
    –Knowledge Management
This project will investigate the effectiveness of a tool - the Stakeholder Circle -
to provide support for the PM and project team in managing the project’s
stakeholders.
     25 August, 2003                 Lynda Bourne - 3024113                          3
Topic description
•   Background
•   Statement of problem
•   Objectives
•   Research question
•   Research Method
     – approach
     – sampling strategy
     – timeframe

• Scope and location of research
25 August, 2003            Lynda Bourne - 3024113   4
Background
•   Managing relationships for project success is acknowledged as being as
    important as the ‘hard’ skills of managing schedules and budgets
•   The Project Manager’s accountabilities include relationship management
    (Stakeholder Management)
•   A project’s stakeholder set does not remain static throughout the project and
    needs to be identified, tracked and managed appropriately throughout the project
    lifecycle
•    In large organisations today, many projects have team members from many
    different organisations. Teams consist of staff, contractors, and staff of other
    organisations
•   As specialists move in and out of projects, there is a small core team that
    manages throughout the lifecycle.
•   This core team should share responsibility for Stakeholder Management:
    workload management, coaching, knowledge management, personality matching
•   To facilitate this sharing it is essential to have a solid process and the support of
    a tool.
     25 August, 2003               Lynda Bourne - 3024113                         5
The Problem
• How can a project manager ensure all
  stakeholders are identified and assessed for
  importance to the project
• How can the PM fulfil responsibilities in:
    –   inspired leadership
    –   relationship (stakeholder) management
    –   knowledge management
    –   HR management


25 August, 2003          Lynda Bourne - 3024113   6
Objectives
Main objective:
     – To identify ways to improve the building and
       maintaining of sustainable project relationships for
       project success.


Sub-objectives:
     – 1. To determine the effectiveness of a visualisation tool
       for stakeholder management.



25 August, 2003          Lynda Bourne - 3024113                7
Research questions

       1. How effective is the use of a visualisation
       tool for project stakeholder management?




25 August, 2003        Lynda Bourne - 3024113           8
Research Methods - approach
• Deductive Approach
    – testing theory through observation and data
• Exploratory Study
    – Purposive, self-selection sampling
• Longitudinal
   – projects must be around 6 months in length
• In-depth interviews at beginning and end with PM
• Group interviews with key team members
• Self-completion diaries
    – to track issues and changes in stakeholder relationships with
      project
25 August, 2003             Lynda Bourne - 3024113                    9
Research Methods - sampling strategy
• Through Project Management professional bodies,
  personal and business I will attempt to identify target
  companies and project to participate in the research.These
  project must have the following characteristics:
     –   A six-month lifecycle timeframe
     –   Specialisation – specialist are only part of the team for the input of their specialist advice
     –   Have a core team of 3 –5 members.

• Select five (5) projects representing a selection of
  industries and project types from the following sectors:
     –   Service Organisations using complex infrastructure including IT solutions as the main
         mechanism for delivery of that service (banks, telcos)
     –   Government (bureaucracy)
     –   Large traditional engineering (eg Ships, Bridges)




25 August, 2003                         Lynda Bourne - 3024113                                            10
Research Methods - Timeframe
                              Day 1                         Day 344

Research Project

Develop Research Proposal
and obtain approval
Develop and test questions
Develop and test tool
Obtain participants
Administer instrument(s)

Ongoing data collection and analysis

Final collection of data

Research Report

25 August, 2003               Lynda Bourne - 3024113   11
Issues
• Ethical issues
     – Privacy
     – Intellectual Property
     – Confidentiality
• Other issues
     – Continuous participation


25 August, 2003       Lynda Bourne - 3024113   12

More Related Content

Viewers also liked

Branding and User Experience in Turkish Websites
Branding and User Experience in Turkish WebsitesBranding and User Experience in Turkish Websites
Branding and User Experience in Turkish WebsitesDeniz Utku
 
Final project proposal J339T
Final project proposal J339TFinal project proposal J339T
Final project proposal J339TJohana Guerra
 
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project ManagementDiscussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project ManagementRobert_
 
Proposal for photostat branding in delhi university with cashur drive
Proposal for photostat branding in delhi university with cashur driveProposal for photostat branding in delhi university with cashur drive
Proposal for photostat branding in delhi university with cashur driveCashurdrive
 
#HIRED Project Proposal Presentation
#HIRED Project Proposal Presentation#HIRED Project Proposal Presentation
#HIRED Project Proposal PresentationShen Mou
 
Brand Proposal- Candace T, Avery U, Alana G.
Brand Proposal- Candace T, Avery U, Alana G.Brand Proposal- Candace T, Avery U, Alana G.
Brand Proposal- Candace T, Avery U, Alana G.cat524840
 
Integrated Marketing Proposal for USPS - BIC Class Project
Integrated Marketing Proposal for USPS - BIC Class ProjectIntegrated Marketing Proposal for USPS - BIC Class Project
Integrated Marketing Proposal for USPS - BIC Class ProjectAlexandra Suazo
 
Research proposal | Guidelines to make you research paper effective
Research proposal | Guidelines to make you research paper effectiveResearch proposal | Guidelines to make you research paper effective
Research proposal | Guidelines to make you research paper effectiveWrite a Writing
 
Proposal for an android app for digital will
Proposal for an android app for digital willProposal for an android app for digital will
Proposal for an android app for digital willDevesh Singhal
 
Oral proposaldefense
Oral proposaldefenseOral proposaldefense
Oral proposaldefensemfinkenberg
 
Energy drinks Marketing Strategies presentation
Energy drinks Marketing Strategies presentationEnergy drinks Marketing Strategies presentation
Energy drinks Marketing Strategies presentationAmina Raja
 
Positivism & Constructivism
Positivism & ConstructivismPositivism & Constructivism
Positivism & ConstructivismtechnclassLA
 
Research proposal presentation
Research proposal presentationResearch proposal presentation
Research proposal presentationSadaf Batool
 
Energy Drink Consumer Research Proposal
Energy Drink Consumer Research ProposalEnergy Drink Consumer Research Proposal
Energy Drink Consumer Research ProposalStephen Zoeller, MBA
 
Ideas on how to create powerful presentations
Ideas on how to create powerful presentationsIdeas on how to create powerful presentations
Ideas on how to create powerful presentationsCiprian Rusen
 
Research paper powerpoint presentation for public viewing
Research paper powerpoint presentation for public viewingResearch paper powerpoint presentation for public viewing
Research paper powerpoint presentation for public viewingKnuckles McGuire
 
Slideshare Project Proposal
Slideshare Project ProposalSlideshare Project Proposal
Slideshare Project ProposalJeane Paguio
 

Viewers also liked (19)

Branding and User Experience in Turkish Websites
Branding and User Experience in Turkish WebsitesBranding and User Experience in Turkish Websites
Branding and User Experience in Turkish Websites
 
Final project proposal J339T
Final project proposal J339TFinal project proposal J339T
Final project proposal J339T
 
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project ManagementDiscussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
Discussion PMBoK Fifth Edition vs Fourth Edition vs ISO 21500 Project Management
 
Proposal for photostat branding in delhi university with cashur drive
Proposal for photostat branding in delhi university with cashur driveProposal for photostat branding in delhi university with cashur drive
Proposal for photostat branding in delhi university with cashur drive
 
What is branding
What is brandingWhat is branding
What is branding
 
#HIRED Project Proposal Presentation
#HIRED Project Proposal Presentation#HIRED Project Proposal Presentation
#HIRED Project Proposal Presentation
 
Brand Proposal- Candace T, Avery U, Alana G.
Brand Proposal- Candace T, Avery U, Alana G.Brand Proposal- Candace T, Avery U, Alana G.
Brand Proposal- Candace T, Avery U, Alana G.
 
Integrated Marketing Proposal for USPS - BIC Class Project
Integrated Marketing Proposal for USPS - BIC Class ProjectIntegrated Marketing Proposal for USPS - BIC Class Project
Integrated Marketing Proposal for USPS - BIC Class Project
 
Research proposal | Guidelines to make you research paper effective
Research proposal | Guidelines to make you research paper effectiveResearch proposal | Guidelines to make you research paper effective
Research proposal | Guidelines to make you research paper effective
 
Proposal for an android app for digital will
Proposal for an android app for digital willProposal for an android app for digital will
Proposal for an android app for digital will
 
Oral proposaldefense
Oral proposaldefenseOral proposaldefense
Oral proposaldefense
 
Energy drinks Marketing Strategies presentation
Energy drinks Marketing Strategies presentationEnergy drinks Marketing Strategies presentation
Energy drinks Marketing Strategies presentation
 
Positivism & Constructivism
Positivism & ConstructivismPositivism & Constructivism
Positivism & Constructivism
 
Research proposal presentation
Research proposal presentationResearch proposal presentation
Research proposal presentation
 
Interpretivism
InterpretivismInterpretivism
Interpretivism
 
Energy Drink Consumer Research Proposal
Energy Drink Consumer Research ProposalEnergy Drink Consumer Research Proposal
Energy Drink Consumer Research Proposal
 
Ideas on how to create powerful presentations
Ideas on how to create powerful presentationsIdeas on how to create powerful presentations
Ideas on how to create powerful presentations
 
Research paper powerpoint presentation for public viewing
Research paper powerpoint presentation for public viewingResearch paper powerpoint presentation for public viewing
Research paper powerpoint presentation for public viewing
 
Slideshare Project Proposal
Slideshare Project ProposalSlideshare Project Proposal
Slideshare Project Proposal
 

Similar to Contoh ppt riset

PMI-PMP6 Lecture 02: Project Management Framework_v1.0
PMI-PMP6 Lecture 02: Project Management Framework_v1.0PMI-PMP6 Lecture 02: Project Management Framework_v1.0
PMI-PMP6 Lecture 02: Project Management Framework_v1.0PhuocNT (Fresher.VN)
 
5 aces stakeholder management presentation v6
5 aces   stakeholder management presentation v65 aces   stakeholder management presentation v6
5 aces stakeholder management presentation v6tycshih
 
Human Factors in Project Management Session 1 projects are about people issue 1
Human Factors in Project Management Session 1 projects are about people issue 1Human Factors in Project Management Session 1 projects are about people issue 1
Human Factors in Project Management Session 1 projects are about people issue 1Ian Cammack
 
2017 Design Innovation Project Management
2017 Design Innovation Project Management2017 Design Innovation Project Management
2017 Design Innovation Project Managementerikbohemia
 
GOL - Graduation Project Session 29-Oct-13 in the US Embassy
GOL - Graduation Project Session 29-Oct-13 in the US EmbassyGOL - Graduation Project Session 29-Oct-13 in the US Embassy
GOL - Graduation Project Session 29-Oct-13 in the US EmbassyNourhan Alaa
 
Project Management Training.pptx
Project Management Training.pptxProject Management Training.pptx
Project Management Training.pptxMohameAbullahi
 
Project Management Body of Knowledge. Chapters 1-3
Project Management Body of Knowledge.  Chapters 1-3Project Management Body of Knowledge.  Chapters 1-3
Project Management Body of Knowledge. Chapters 1-3Brian Davis
 
13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder EngagementDavidMcLachlan1
 
Advancing Project Management in Learning Organization
Advancing Project Management in Learning Organization Advancing Project Management in Learning Organization
Advancing Project Management in Learning Organization pmb25
 
Chapter 2 - Team Roles & Responsibilities
Chapter 2 - Team Roles & ResponsibilitiesChapter 2 - Team Roles & Responsibilities
Chapter 2 - Team Roles & Responsibilitiesjcthomasva
 
C2 -the_organizational_context_-_strategy_structure_and_culture
C2  -the_organizational_context_-_strategy_structure_and_cultureC2  -the_organizational_context_-_strategy_structure_and_culture
C2 -the_organizational_context_-_strategy_structure_and_cultureIzah Asmadi
 
Session 1 - Intro - Org .ppt
Session 1 - Intro - Org .pptSession 1 - Intro - Org .ppt
Session 1 - Intro - Org .pptHamdiaAwadMansour
 
Internal communications presentation simone
Internal communications presentation simoneInternal communications presentation simone
Internal communications presentation simoneCIAT
 
Adopting Education Strategy to Jump-Start Member Engagement
Adopting Education Strategy to Jump-Start Member EngagementAdopting Education Strategy to Jump-Start Member Engagement
Adopting Education Strategy to Jump-Start Member EngagementEvent Garde LLC
 
Evaluability Assessments and Choice of Evaluation Methods
Evaluability Assessments and Choice of Evaluation MethodsEvaluability Assessments and Choice of Evaluation Methods
Evaluability Assessments and Choice of Evaluation MethodsDebbie_at_IDS
 
Bixal PMP Study Group Chapter 1 - Dec. 3, 2014
Bixal PMP Study Group Chapter 1 - Dec. 3, 2014Bixal PMP Study Group Chapter 1 - Dec. 3, 2014
Bixal PMP Study Group Chapter 1 - Dec. 3, 2014Jason Luttrell
 

Similar to Contoh ppt riset (20)

0v402i35hzvh
0v402i35hzvh0v402i35hzvh
0v402i35hzvh
 
PMI-PMP6 Lecture 02: Project Management Framework_v1.0
PMI-PMP6 Lecture 02: Project Management Framework_v1.0PMI-PMP6 Lecture 02: Project Management Framework_v1.0
PMI-PMP6 Lecture 02: Project Management Framework_v1.0
 
5 aces stakeholder management presentation v6
5 aces   stakeholder management presentation v65 aces   stakeholder management presentation v6
5 aces stakeholder management presentation v6
 
Human Factors in Project Management Session 1 projects are about people issue 1
Human Factors in Project Management Session 1 projects are about people issue 1Human Factors in Project Management Session 1 projects are about people issue 1
Human Factors in Project Management Session 1 projects are about people issue 1
 
2017 Design Innovation Project Management
2017 Design Innovation Project Management2017 Design Innovation Project Management
2017 Design Innovation Project Management
 
GOL - Graduation Project Session 29-Oct-13 in the US Embassy
GOL - Graduation Project Session 29-Oct-13 in the US EmbassyGOL - Graduation Project Session 29-Oct-13 in the US Embassy
GOL - Graduation Project Session 29-Oct-13 in the US Embassy
 
Project Management Training.pptx
Project Management Training.pptxProject Management Training.pptx
Project Management Training.pptx
 
Project Management Body of Knowledge. Chapters 1-3
Project Management Body of Knowledge.  Chapters 1-3Project Management Body of Knowledge.  Chapters 1-3
Project Management Body of Knowledge. Chapters 1-3
 
Requirements Planning & Management
Requirements Planning & ManagementRequirements Planning & Management
Requirements Planning & Management
 
13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement
 
Advancing Project Management in Learning Organization
Advancing Project Management in Learning Organization Advancing Project Management in Learning Organization
Advancing Project Management in Learning Organization
 
Chapter 2 - Team Roles & Responsibilities
Chapter 2 - Team Roles & ResponsibilitiesChapter 2 - Team Roles & Responsibilities
Chapter 2 - Team Roles & Responsibilities
 
C2 -the_organizational_context_-_strategy_structure_and_culture
C2  -the_organizational_context_-_strategy_structure_and_cultureC2  -the_organizational_context_-_strategy_structure_and_culture
C2 -the_organizational_context_-_strategy_structure_and_culture
 
Session 1 - Intro - Org .ppt
Session 1 - Intro - Org .pptSession 1 - Intro - Org .ppt
Session 1 - Intro - Org .ppt
 
Internal communications presentation simone
Internal communications presentation simoneInternal communications presentation simone
Internal communications presentation simone
 
Adopting Education Strategy to Jump-Start Member Engagement
Adopting Education Strategy to Jump-Start Member EngagementAdopting Education Strategy to Jump-Start Member Engagement
Adopting Education Strategy to Jump-Start Member Engagement
 
Project Planning and Management
Project Planning and ManagementProject Planning and Management
Project Planning and Management
 
Evaluability Assessments and Choice of Evaluation Methods
Evaluability Assessments and Choice of Evaluation MethodsEvaluability Assessments and Choice of Evaluation Methods
Evaluability Assessments and Choice of Evaluation Methods
 
Hm 418 harris ch01 ppt
Hm 418 harris ch01 pptHm 418 harris ch01 ppt
Hm 418 harris ch01 ppt
 
Bixal PMP Study Group Chapter 1 - Dec. 3, 2014
Bixal PMP Study Group Chapter 1 - Dec. 3, 2014Bixal PMP Study Group Chapter 1 - Dec. 3, 2014
Bixal PMP Study Group Chapter 1 - Dec. 3, 2014
 

Contoh ppt riset

  • 1. Research Proposal Presentation Lynda Bourne 2034113 BUSM 1408 25 August, 2003 Lynda Bourne - 3024113 1
  • 2. Supporting Project Managers in building sustainable relationships for project success. 25 August, 2003 Lynda Bourne - 3024113 2
  • 3. In the current project environment... •Many team members –will only be part of the team as long as their specialist skills are required –come from different organisational backgrounds and cultures –may be geographically dispersed •A small core team will be responsible for project delivery •Organisations change constantly - a project’s stakeholder set will change: –Senior Managers change roles or change companies –The ability of stakeholders to influence the project may increase or decrease •The Project Manager is still accountable for successful delivery of the project; there are good reasons for project responsibilities to be shared: –Sharing workload and coaching of less experienced members –Knowledge Management This project will investigate the effectiveness of a tool - the Stakeholder Circle - to provide support for the PM and project team in managing the project’s stakeholders. 25 August, 2003 Lynda Bourne - 3024113 3
  • 4. Topic description • Background • Statement of problem • Objectives • Research question • Research Method – approach – sampling strategy – timeframe • Scope and location of research 25 August, 2003 Lynda Bourne - 3024113 4
  • 5. Background • Managing relationships for project success is acknowledged as being as important as the ‘hard’ skills of managing schedules and budgets • The Project Manager’s accountabilities include relationship management (Stakeholder Management) • A project’s stakeholder set does not remain static throughout the project and needs to be identified, tracked and managed appropriately throughout the project lifecycle • In large organisations today, many projects have team members from many different organisations. Teams consist of staff, contractors, and staff of other organisations • As specialists move in and out of projects, there is a small core team that manages throughout the lifecycle. • This core team should share responsibility for Stakeholder Management: workload management, coaching, knowledge management, personality matching • To facilitate this sharing it is essential to have a solid process and the support of a tool. 25 August, 2003 Lynda Bourne - 3024113 5
  • 6. The Problem • How can a project manager ensure all stakeholders are identified and assessed for importance to the project • How can the PM fulfil responsibilities in: – inspired leadership – relationship (stakeholder) management – knowledge management – HR management 25 August, 2003 Lynda Bourne - 3024113 6
  • 7. Objectives Main objective: – To identify ways to improve the building and maintaining of sustainable project relationships for project success. Sub-objectives: – 1. To determine the effectiveness of a visualisation tool for stakeholder management. 25 August, 2003 Lynda Bourne - 3024113 7
  • 8. Research questions 1. How effective is the use of a visualisation tool for project stakeholder management? 25 August, 2003 Lynda Bourne - 3024113 8
  • 9. Research Methods - approach • Deductive Approach – testing theory through observation and data • Exploratory Study – Purposive, self-selection sampling • Longitudinal – projects must be around 6 months in length • In-depth interviews at beginning and end with PM • Group interviews with key team members • Self-completion diaries – to track issues and changes in stakeholder relationships with project 25 August, 2003 Lynda Bourne - 3024113 9
  • 10. Research Methods - sampling strategy • Through Project Management professional bodies, personal and business I will attempt to identify target companies and project to participate in the research.These project must have the following characteristics: – A six-month lifecycle timeframe – Specialisation – specialist are only part of the team for the input of their specialist advice – Have a core team of 3 –5 members. • Select five (5) projects representing a selection of industries and project types from the following sectors: – Service Organisations using complex infrastructure including IT solutions as the main mechanism for delivery of that service (banks, telcos) – Government (bureaucracy) – Large traditional engineering (eg Ships, Bridges) 25 August, 2003 Lynda Bourne - 3024113 10
  • 11. Research Methods - Timeframe Day 1 Day 344 Research Project Develop Research Proposal and obtain approval Develop and test questions Develop and test tool Obtain participants Administer instrument(s) Ongoing data collection and analysis Final collection of data Research Report 25 August, 2003 Lynda Bourne - 3024113 11
  • 12. Issues • Ethical issues – Privacy – Intellectual Property – Confidentiality • Other issues – Continuous participation 25 August, 2003 Lynda Bourne - 3024113 12