SlideShare a Scribd company logo
1 of 5
Download to read offline
Making the Case for Quality

                                                                                                                          September 2011




                         Ford Team Project Builds
                         Relationships, Improves Quality
                                                                                                                         by Janet Jacobsen

                                     As gas prices continued to rise in
  At a Glance . . .                  early 2010, so did expectations for the
                                     fuel-efficient Ford Fiesta. Many in the
•	 With Ford Fiesta’s launch         industry viewed the Fiesta as the most
   fast approaching, the             significant vehicle introduction in the
   organization wrestled with
                                     Ford Motor Company’s recent his-
   quality concerns over the
   vehicle’s floor carpets.          tory. To uphold Ford’s warranty and
                                     customer satisfaction performance, a
•	 Using quality tools, Ford’s
   body engineering team             flawless launch was vital.
   took on the project,
   uncovering complicated            Unfortunately, early tests indicated sig-
                                                                                 The 2011 Ford Fiesta
   two- and three-way                nificant concerns about the quality of
   interactions in the carpet        the Fiesta’s floor carpet. Despite repeated attempts to correct the problems, Ford and the carpet manu-
   manufacturing process.            facturer, a valued supplier, were unable to solve the issue. Not only was the quality of the Fiesta launch
•	 Once these interactions           at risk, but so too was Ford’s relationship with the supplier.
   were understood, the
   supplier modified its             About Ford Motor Company
   process to produce carpets
   that met Ford’s and the
   supplier’s specifications.        The Ford Motor Company, founded in 1903, designs, develops, manufactures, and services cars
                                     and trucks across six continents under the Ford and Lincoln brand names. The company also pro-
•	 The two-week project
   was completed just                vides services and products in the areas of maintenance, collision, vehicle accessories, and extended
   prior to the start of mass        service warranties under the Genuine Ford Parts, Ford Custom Accessories, and Motorcraft brand
   production of the Fiesta.         names. Based in Dearborn, Mich., the organization employs more than 166,000 people and operates
•	 Ford entered this project         70 plants worldwide.
   in ASQ’s International
   Team Excellence Award             The carpet supplier for the Fiesta is HP Pelzer Automotive Systems, a worldwide Tier 1 supplier of
   competition, where it             automotive interior trim and acoustic components. The organization’s North American headquarters
   earned finalist honors.
                                     are in Troy, Mich., and the manufacturing plant for the Fiesta’s carpet is located in Eudora, Kan.

                                     Identifying Quality Concerns

                                     With the Ford Fiesta just months away from arriving at dealerships, pre-launch reviews pinpointed
                                     a concern—the vehicle’s carpet contained visible brush marks. Simply put, the carpet’s appearance
                                     would not be acceptable to the customer. Ford typically uses warranty and customer satisfaction data to
                                     identify top priority projects. In this case, because the Fiesta was a new product, Ford relied on antici-
                                     pated warranty and customer satisfaction impact based on historical benchmarks. Addressing the carpet
                                     quality before manufacturing commenced would alleviate customer concerns and avoid warranty costs.




      ASQ	                                                         www.asq.org 	                                                 Page 1 of 5
The carpet quality issue was also straining Ford’s relationship                •	   Wendy Pinter, Ford Body Engineering supervisor
with HP Pelzer, as the two organizations spent countless hours                 •	   Jane Aselage, trim manager, Ford Global Car Programs
working to achieve product appearance standards and specifica-                 •	   Jan Ladewig, research and development director, HP Pelzer
tions. The deteriorating relationship jeopardized Ford’s corporate             •	   Tom Hanners, plant manager, HP Pelzer
goals and strategies. The One Ford Plan focuses on working                     •	   Ryan Yamnitz, process engineer, HP Pelzer
together as a team and fostering technical excellence to deliver               •	   Kurt Mueller, quality manager, HP Pelzer
results. The souring relationship between Ford and HP Pelzer                   •	   Steve VanHeusden, Ford program manager, HP Pelzer
put elements of the One Ford Plan, shown in Figure 1, at risk.
Finger-pointing, blaming, not working together to solve issues                  Members were selected based on their areas of technical exper-
and share data, and conducting unscientific studies neither fos-                tise and the responsibilities identified within the project. Each
tered technical excellence nor helped deliver results.                          person’s participation was dependent on the needs for a par-
Figure 1— isk and impact of the carpet quality issue,
         R                                                                      ticular phase of the project, which followed the define, measure,
         quantified using a 10-point scale, on                                  analyze, improve, and control (DMAIC) framework of the Six
         Ford’s corporate goals and strategies                                  Sigma methodology.
                                     Risk of not   Magnitude      Measure
     Organizational goal/strategy   delivering X   of impact =   of severity   Defining the Stakeholders
     One Team/One Plan                   8             9             72
     Foster technical excellence         6             7             42
                                                                               After defining the project scope, one of the first tasks was creating
     Own working together                8             8             64
                                                                               a supplier, inputs, process, outputs, customers (SIPOC) diagram to
     Deliver results                    10             9             90
                                                                               define stakeholders. Internal stakeholders included the Fiesta pro-
                                                                               gram team, the Fiesta (Cuautitlan, Mexico) assembly plant, and
 Using the DMAIC Framework                                                     members of the Body Six Sigma team, while external stakeholders
                                                                               included HP Pelzer, and most important, the end customer—future
With a clear need for analytical expertise, Ford’s Body Six Sigma              owners of the Fiesta. The raw materials supplier was not included
team, a group of Six Sigma Black Belts, was called to lead this                because data showed that raw material quality and variation were
vital project in March 2010. The improvement team included the                 not root causes of the quality issues.
following representatives from Ford and the supplier:
                                                                               Measuring Critical-to-Quality Factors
•	      Scott Sterbenz, Six Sigma Master Black Belt, Ford Body
        Engineering, team leader and DMAIC expert                               Scott Sterbenz, Six Sigma Master Black Belt and team leader,
•	      Pramod Thanedar, Six Sigma Black Belt, Ford Body                        says the initial meeting with members of the improvement team
        Engineering                                                             focused on the automotive carpet manufacturing process, as
•	      Gary Danhoff, Six Sigma Black Belt, Ford Body Engineering               illustrated in Figure 2. “We are big believers in knowing how
Figure 2— arpet manufacturing process
         C
                                                                                                                  Raw
                                                                                                                material
                                                                                                                bales of
                                                                                                                 staple
                                                                                                     Bale        fibers    Carpet brush marks
                                                                                                     Opener



         The card
       opens fibers
         and lays                                                              Flat needling of loose two-dimensionally
       them into a                                                                 oriented fibers. Pad is bonded by
        loose two-                                                                adding vertical orientation to fibers.
       dimensional
           felt.




                                                                                               To finished goods,
                                                                                          coating, or surface finishing

                                                                                                                 Winding
                                                                                                                 Station




ASQ	                                                                  www.asq.org 	                                                   Page 2 of 5
things work. After all, if you can’t explain how something works,     from actual quality impact resulting from the changes to the
how can you possibly explain how it doesn’t?” says Sterbenz.          needler’s settings.

After discussing the current process with HP Pelzer’s carpet          Analyzing for Root Cause
engineering experts, the team developed a fishbone diagram and
an f(x) cascade. The y = f(x) cascade is a physics and engineer-      Despite careful planning, the team experienced some unexpected
ing-based flowchart that uses why and how questions to identify       issues during the DOE. The first four runs took three hours to
potential root causes. The two key questions are asked until spe-     finish. Sterbenz says the biggest obstacle was simply coordinat-
cific measurables are identified. If, through the analyze phase,      ing the experiment because the carpet manufacturing process is
these measurables are determined to be the key process input          complex and uses a continuous roll of material. It would have
                                                                      been wasteful to conduct each DOE run combination on indi-
variables (KPIVs), then control of these KPIVs automatically
                                                                      vidual rolls. The only alternative was making changes to the
leads to control of the key process output variables (KPOVs),
                                                                      machine settings on the fly and marking the roll where those
which is the big Y in the y = f(x) equation. In this case, the
                                                                      changes were made, which required great coordination and more
y = f(x) cascade brought the team to the needler, which is a
                                                                      manpower than originally anticipated. “It took us a few hours
machine that has a bed of needles that penetrate the raw material
                                                                      and a few botched runs to work out the logistics, but we got it.
to produce the pile of the carpet. The needler and the needler set-
                                                                      This created some stressful moments where I thought the DOE
tings became the factors in the design of experiments (DOE).          would be abandoned, but through teamwork and some quick
It is essentially through the DOE that certain needler settings       problem solving, we succeeded,” explains Sterbenz.
were determined to be the KPIVs. At the end of the project,
Sterbenz says the team was able to control the KPIVs and there-       The next step was analyzing the DOE using an analysis of vari-
fore control the big Y—the carpet quality parameters.                 ance table, Pareto chart, and plots of the interactions and main
                                                                      effects. When analyzing the data from the brush marks, it became
He explains that it was clear from the start that the needler was     clear why HP Pelzer struggled to achieve the specified quality by
critically important to the carpet’s overall quality. Fortunately,    unsystematically adjusting the needler’s settings—there were two
the needler had a limited number of settings to manipulate, offer-    significant three-way interactions and several significant two-way
ing an ideal situation for using DOE to optimize the process and      interactions. The analysis for softness/plushness was less complex
conduct root cause analysis. Although HP Pelzer had changed           with only two significant effects, and this simplified the process of
the needler settings in past studies, Ford’s Black Belts found that   simultaneously optimizing both responses.
the trials had been done unscientifically by changing one factor
at a time.                                                            Sterbenz explains that the DOE not only provided a list of sig-
                                                                      nificant variables and interactions, but also a transfer function
Once the DOE planning was complete, the Ford team mem-                between the inputs and the response. The transfer function is the
bers traveled to HP Pelzer’s plant in Eudora, Kan., where they        mathematical and/or physics relationship between the KPIV and
viewed carpet samples produced when the needler settings were         the KPOV. In this case, the transfer function shows the math-
altered. They quickly noticed that while some carpets were quite      ematical relationship between the settings in the needler (KPIV)
plush, others were the unappealing texture of felt. At this point,    and the carpet quality (KPOV).
the team decided that brush marking and softness/plushness
                                                                      Using the supplier’s knowledge of the carpet process and the
would both be treated as responses in the DOE.
                                                                      analysis of the DOE, the team felt certain that the variables that
Next, the team assembled an evaluation jury comprised of Ford         control brush marking and softness/plushness were identified. It
and HP Pelzer representatives to conduct a gauge repeatability        was clear to all that previous needler setting adjustments were
                                                                      not successful because of significant interactions among the
and reproducibility (RR) study on the two responses. Brush
                                                                      variables. Now armed with mathematical models for each of
markings and softness/plushness were each rated using an ordi-
                                                                      the responses, the team set targets and, after validation, moved
nal ranking scale, with 1–10 used for brush markings and 1–5
                                                                      ahead with using optimization solvers to uncover the best set-
used for softness/plushness. The higher the rating, the better the
                                                                      tings for both brush marks and softness/plushness.
quality. Since both responses were attribute and ordinal in nature,
Kendall’s Co-efficient of Concordance was used as the indicator       The data analysis was shared at a full team meeting when the
of success. This formula measures directional agreement with          optimum needler settings were presented. Unfortunately, these
a value of greater than 0.7 for both responses, indicating that       settings were not acceptable because they could damage the
the team could trust the jury to evaluate the carpets fairly and      needler if used for extended periods and one of the factor set-
consistently. In addition, the team knew that shifts in the ratings   tings could adversely affect the carpet’s durability. These two
were not because of variation in the jury’s opinion, but instead      new constraints meant that additional analysis was needed.




ASQ	                                                         www.asq.org 	                                                   Page 3 of 5
Figure 3— ord Fiesta carpet before and after the DOE
         F
       Baseline carpets:                                                    DOE optimized carpets:
       • 3.0 rating for brush marking                                       • 8.2 rating for brush marking
       • 2.5 rating for softness/plushness                                  • 3.8 rating for softness/plushness




                                                                                                  No brush marking


                    Brush marking

Improving Carpet Quality                                               •	   Communicating the new process to HP Pelzer employees.
                                                                       •	   Programming the needler with the new settings.
Despite the new constraints, the team determined two new opti-         •	   Monitoring the quality of the carpets produced.
mized factor settings for the needler. The new settings were           •	   Monitoring the condition of the needler.
projected to deliver significantly higher levels of quality for both
brush marks and plushness/softness. The next step was produc-           In addition to improving the carpet for the new Fiesta, the team
ing samples of both options for the jury to evaluate. Happily,          wanted to ensure that future models were protected as well. By
neither sample had visible brush markings, and the softness/            documenting the gauge RR methodology and the transfer
plushness was much improved over the baseline. The jury’s rat-          function development process with the supplier, along with
ings—8.2 (out of 10, and both samples were rated the same) for          implementing quality and maintenance control plans, the team
brush markings and 3.7 (out of 5 for option one) and 3.8 (for           played a role in the quality of both current and future models.
option two) on softness/plushness—closely matched the math-
ematical model predictions. Ultimately, the team selected option        Project Yields Tangible Benefits
two because it produced a slightly more plush carpet. Figure 3
shows the difference in the carpet quality after the DOE.              While production of the Fiesta had not begun, the project, which
                                                                       took less than two weeks to complete, provided valuable benefits
The final samples were tested to ensure that additional factors        for Ford and HP Pelzer, such as protecting customer satisfaction,
such as color, sheen, wear, durability, stain resistance, and uni-     avoiding warranty claims, and eliminating scrap materials, as
form pile direction were not compromised. The samples passed           shown in Figure 4 (on next page).
all validation testing.
                                                                       The intangible benefits were significant as well:
Setting Controls to Sustain Improvements
                                                                       •	   A stronger relationship with the supplier.
Plans to implement the final improvement actions quickly and           •	   Increased technical knowledge.
maintain the results involved the following tasks:                     •	   The creation of a new optimization process for the supplier.
                                                                       •	   A great product for customers.
                                                                       •	   The creation of a Six Sigma program by HP Pelzer to
                                                                            increase efficiency and improve quality.




ASQ	                                                          www.asq.org 	                                                  Page 4 of 5
Figure 4—Tangible benefits for both Ford and the supplier
 Realized Tangible Benefit      Recipient                        Value                                     Validation

 Warranty avoidance             Ford                             $630 per claim                            No warranty claims (mass production
                                                                                                           started in May 2010).

 Scrap avoidance                HP Pelzer                        $1,200 per roll                           No scrapped carpet rolls (mass
                                                                                                           production began in April 2010).

 Customer satisfaction 	        Ford                             Proprietary calculation                   No customer complaints about carpet quality
 Loss avoidance                 _____________________________	   _____________________________________	    on either internal or external surveys.
                                External customer                Carpets that look and feel as expected




This project also clearly achieved the goals of the One Ford               Engineering competed in the 2011 ITEA and was named as one
strategy. Ford’s relationship with the supplier was strengthened           of 29 finalists. Team members shared their story with a live audi-
through teamwork and the mutual sharing of expertise.                      ence at the 2011 World Conference on Quality and Improvement,
                                                                           where they captured the best OEM/supplier relationship award and
Sterbenz says that team building and understanding the critical            earned second place in the team display competition.
KPIVs were the keys to the success of this project. “It was sur-
prising to us that scientific experiments had not been conducted           Sterbenz says this project was a good candidate for the ITEA
prior to this project to fully understand the KPIVs. Now that              process because the team used quality tools to reduce the defect
the KPIVs are understood, we have much better control over                 rate to zero, and after one year, there have been no warranty
the process and understand how to control the sensitivity of               claims on the carpet and no scrapped carpets. “That is total suc-
certain factors.”                                                          cess and the epitome of teambuilding,” he states.

Improvement projects typically encounter resistance during the              For More Information
implementation phase. In this case, questions came earlier when
the DOE was conducted and the supplier was concerned about                •	       To learn more about this project, contact Scott Sterbenz at
potential damage to the needler and possible adverse side effects                  ssterben@ford.com.
on carpet durability. These issues were addressed by providing            •	       Complete details on ASQ’s ITEA process are available at
training and successful examples, along with leveraging the sta-                   wcqi.asq.org/team-competition.
tistical expertise of Ford’s Six Sigma Black Belts.                       •	       Read more case studies on successful quality improvement
                                                                                   projects in the ASQ Knowledge Center at asq.org/
Sharing the Success Story                                                          knowledge-center.

Ford, an enterprise member of ASQ, believes in the value of shar-          About the Author
ing quality success stories because tools or methods used in one
project can often be useful in another. The results of this improve-       Janet Jacobsen is a freelance writer specializing in quality and
ment project were shared with several other teams at Ford and HP           compliance topics. A graduate of Drake University, she resides
Pelzer and with a wider audience through ASQ’s International               in Cedar Rapids, Iowa.
Team Excellence Award (ITEA) process. Team Ford—Body




ASQ	                                                             www.asq.org 	                                                            Page 5 of 5

More Related Content

What's hot

5. The Lost Dutchman´s Mine
5. The Lost Dutchman´s Mine5. The Lost Dutchman´s Mine
5. The Lost Dutchman´s MineLUIS NARBONA
 
Variance Analysis solution
Variance Analysis solutionVariance Analysis solution
Variance Analysis solutionLou Foja
 
Zagor lib col 14 bjegunac
Zagor lib col 14   bjegunacZagor lib col 14   bjegunac
Zagor lib col 14 bjegunacStripovizijacom
 
Sorah Kahaf with tajweed
Sorah Kahaf with tajweedSorah Kahaf with tajweed
Sorah Kahaf with tajweedAbdulSamiMalik
 
Zagor lud kolor 001 duhovi kapetana fishlega (walker & enwil & emer...
Zagor lud kolor 001   duhovi kapetana fishlega (walker & enwil & emer...Zagor lud kolor 001   duhovi kapetana fishlega (walker & enwil & emer...
Zagor lud kolor 001 duhovi kapetana fishlega (walker & enwil & emer...zoran radovic
 
Round up 5
Round up 5Round up 5
Round up 5Acasa
 
Zagor ludens 276-hellgate u plamenu
Zagor ludens 276-hellgate u plamenuZagor ludens 276-hellgate u plamenu
Zagor ludens 276-hellgate u plamenuStripovizijacom
 
Turbo Boom! Game Pitch Deck
Turbo Boom! Game Pitch DeckTurbo Boom! Game Pitch Deck
Turbo Boom! Game Pitch DeckPitch Decks
 
Albert Camus - El extranjero.pdf
Albert Camus - El extranjero.pdfAlbert Camus - El extranjero.pdf
Albert Camus - El extranjero.pdfSergioLudea1
 
Oxford dominoes starter moby-dick (1) (1)
Oxford dominoes starter   moby-dick (1) (1)Oxford dominoes starter   moby-dick (1) (1)
Oxford dominoes starter moby-dick (1) (1)VERONICA ROMERO LATORRE
 
Erich ist verschwunden.
Erich ist verschwunden.Erich ist verschwunden.
Erich ist verschwunden.Camelya Esther
 
Redacted brief in AAO Remand, Matter of A-E-G-D.
Redacted brief in AAO Remand, Matter of A-E-G-D. Redacted brief in AAO Remand, Matter of A-E-G-D.
Redacted brief in AAO Remand, Matter of A-E-G-D. Bryan Johnson
 
Français Niveau Intermédiare 600 exercices
 Français Niveau Intermédiare 600 exercices Français Niveau Intermédiare 600 exercices
Français Niveau Intermédiare 600 exercicesBetty Ingrid
 
Certificat de travail Lausanne Palace
Certificat de travail Lausanne PalaceCertificat de travail Lausanne Palace
Certificat de travail Lausanne PalaceLukas Bader
 
Bear & Breakfast Game Pitch Deck
Bear & Breakfast Game Pitch DeckBear & Breakfast Game Pitch Deck
Bear & Breakfast Game Pitch DeckPitch Decks
 
Quran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDF
Quran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDFQuran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDF
Quran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDFCaller To Islam / الداعية الإسلامي
 

What's hot (20)

Tamatem
TamatemTamatem
Tamatem
 
Certificat de travail MTN
Certificat de travail MTNCertificat de travail MTN
Certificat de travail MTN
 
5. The Lost Dutchman´s Mine
5. The Lost Dutchman´s Mine5. The Lost Dutchman´s Mine
5. The Lost Dutchman´s Mine
 
Variance Analysis solution
Variance Analysis solutionVariance Analysis solution
Variance Analysis solution
 
Zagor lib col 14 bjegunac
Zagor lib col 14   bjegunacZagor lib col 14   bjegunac
Zagor lib col 14 bjegunac
 
Sorah Kahaf with tajweed
Sorah Kahaf with tajweedSorah Kahaf with tajweed
Sorah Kahaf with tajweed
 
Quran with Tajwid Surah 71 ﴾القرآن سورۃ نوح﴿ Nuh 🙪 PDF
Quran with Tajwid Surah 71 ﴾القرآن سورۃ نوح﴿ Nuh 🙪 PDFQuran with Tajwid Surah 71 ﴾القرآن سورۃ نوح﴿ Nuh 🙪 PDF
Quran with Tajwid Surah 71 ﴾القرآن سورۃ نوح﴿ Nuh 🙪 PDF
 
Juked
JukedJuked
Juked
 
Zagor lud kolor 001 duhovi kapetana fishlega (walker & enwil & emer...
Zagor lud kolor 001   duhovi kapetana fishlega (walker & enwil & emer...Zagor lud kolor 001   duhovi kapetana fishlega (walker & enwil & emer...
Zagor lud kolor 001 duhovi kapetana fishlega (walker & enwil & emer...
 
Round up 5
Round up 5Round up 5
Round up 5
 
Zagor ludens 276-hellgate u plamenu
Zagor ludens 276-hellgate u plamenuZagor ludens 276-hellgate u plamenu
Zagor ludens 276-hellgate u plamenu
 
Turbo Boom! Game Pitch Deck
Turbo Boom! Game Pitch DeckTurbo Boom! Game Pitch Deck
Turbo Boom! Game Pitch Deck
 
Albert Camus - El extranjero.pdf
Albert Camus - El extranjero.pdfAlbert Camus - El extranjero.pdf
Albert Camus - El extranjero.pdf
 
Oxford dominoes starter moby-dick (1) (1)
Oxford dominoes starter   moby-dick (1) (1)Oxford dominoes starter   moby-dick (1) (1)
Oxford dominoes starter moby-dick (1) (1)
 
Erich ist verschwunden.
Erich ist verschwunden.Erich ist verschwunden.
Erich ist verschwunden.
 
Redacted brief in AAO Remand, Matter of A-E-G-D.
Redacted brief in AAO Remand, Matter of A-E-G-D. Redacted brief in AAO Remand, Matter of A-E-G-D.
Redacted brief in AAO Remand, Matter of A-E-G-D.
 
Français Niveau Intermédiare 600 exercices
 Français Niveau Intermédiare 600 exercices Français Niveau Intermédiare 600 exercices
Français Niveau Intermédiare 600 exercices
 
Certificat de travail Lausanne Palace
Certificat de travail Lausanne PalaceCertificat de travail Lausanne Palace
Certificat de travail Lausanne Palace
 
Bear & Breakfast Game Pitch Deck
Bear & Breakfast Game Pitch DeckBear & Breakfast Game Pitch Deck
Bear & Breakfast Game Pitch Deck
 
Quran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDF
Quran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDFQuran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDF
Quran with Tajwid Surah 77 ﴾القرآن سورۃ المرسلات﴿ Al-Mursalat 🙪 PDF
 

Viewers also liked

Altmetrics how to aall 2014
Altmetrics how to aall 2014Altmetrics how to aall 2014
Altmetrics how to aall 2014Katie Brown
 
Defesa de Tese de Doutorado 22/06/2012
Defesa de Tese de Doutorado 22/06/2012Defesa de Tese de Doutorado 22/06/2012
Defesa de Tese de Doutorado 22/06/2012Antônio Arapiraca
 
Aall2013socialmediapresentation 130708171321-phpapp01
Aall2013socialmediapresentation 130708171321-phpapp01Aall2013socialmediapresentation 130708171321-phpapp01
Aall2013socialmediapresentation 130708171321-phpapp01Katie Brown
 
Diagnosis Related Groups
Diagnosis Related GroupsDiagnosis Related Groups
Diagnosis Related GroupsJulia Pearl
 
Tax resources 2014 update
Tax resources  2014 updateTax resources  2014 update
Tax resources 2014 updateKatie Brown
 
Calculation of isotopic dipole moments with spectroscopic accuracy
Calculation of isotopic dipole moments with spectroscopic accuracyCalculation of isotopic dipole moments with spectroscopic accuracy
Calculation of isotopic dipole moments with spectroscopic accuracyAntônio Arapiraca
 
L’Institut de radiologie: à la pointe de l’imagerie médicale
L’Institut de radiologie: à la pointe de l’imagerie médicaleL’Institut de radiologie: à la pointe de l’imagerie médicale
L’Institut de radiologie: à la pointe de l’imagerie médicaleJulia Pearl
 
Manmut soal PK Atribut
Manmut soal PK AtributManmut soal PK Atribut
Manmut soal PK Atributracka perkasa
 
Neurochirurgie: la révolution discrète
Neurochirurgie: la révolution discrèteNeurochirurgie: la révolution discrète
Neurochirurgie: la révolution discrèteJulia Pearl
 
International Intellectual Property Legal Research
International Intellectual Property Legal ResearchInternational Intellectual Property Legal Research
International Intellectual Property Legal ResearchKatie Brown
 
Hygiène et stérilisation : une mission collective
Hygiène et stérilisation : une mission collectiveHygiène et stérilisation : une mission collective
Hygiène et stérilisation : une mission collectiveJulia Pearl
 
Are the scientists on to something altmetrics 6 16
Are the scientists on to something altmetrics 6 16Are the scientists on to something altmetrics 6 16
Are the scientists on to something altmetrics 6 16Katie Brown
 
Tugas manajemen mutu
Tugas manajemen mutuTugas manajemen mutu
Tugas manajemen muturacka perkasa
 
"Island of the Spirits" by John Stanmeyer
"Island of the Spirits" by John Stanmeyer"Island of the Spirits" by John Stanmeyer
"Island of the Spirits" by John StanmeyerLans Brahmantyo
 
DEAD PIG DIARY by John Carlile
DEAD PIG DIARY by John CarlileDEAD PIG DIARY by John Carlile
DEAD PIG DIARY by John CarlileLans Brahmantyo
 

Viewers also liked (20)

Altmetrics how to aall 2014
Altmetrics how to aall 2014Altmetrics how to aall 2014
Altmetrics how to aall 2014
 
Defesa de Tese de Doutorado 22/06/2012
Defesa de Tese de Doutorado 22/06/2012Defesa de Tese de Doutorado 22/06/2012
Defesa de Tese de Doutorado 22/06/2012
 
Aall2013socialmediapresentation 130708171321-phpapp01
Aall2013socialmediapresentation 130708171321-phpapp01Aall2013socialmediapresentation 130708171321-phpapp01
Aall2013socialmediapresentation 130708171321-phpapp01
 
Octobre 2005
Octobre 2005Octobre 2005
Octobre 2005
 
Surat dari tahun 2070
Surat dari tahun 2070Surat dari tahun 2070
Surat dari tahun 2070
 
Surat dari tahun 2070
Surat dari tahun 2070Surat dari tahun 2070
Surat dari tahun 2070
 
Versi indo fix
Versi indo fixVersi indo fix
Versi indo fix
 
Diagnosis Related Groups
Diagnosis Related GroupsDiagnosis Related Groups
Diagnosis Related Groups
 
tennis clip_art
tennis clip_arttennis clip_art
tennis clip_art
 
Tax resources 2014 update
Tax resources  2014 updateTax resources  2014 update
Tax resources 2014 update
 
Calculation of isotopic dipole moments with spectroscopic accuracy
Calculation of isotopic dipole moments with spectroscopic accuracyCalculation of isotopic dipole moments with spectroscopic accuracy
Calculation of isotopic dipole moments with spectroscopic accuracy
 
L’Institut de radiologie: à la pointe de l’imagerie médicale
L’Institut de radiologie: à la pointe de l’imagerie médicaleL’Institut de radiologie: à la pointe de l’imagerie médicale
L’Institut de radiologie: à la pointe de l’imagerie médicale
 
Manmut soal PK Atribut
Manmut soal PK AtributManmut soal PK Atribut
Manmut soal PK Atribut
 
Neurochirurgie: la révolution discrète
Neurochirurgie: la révolution discrèteNeurochirurgie: la révolution discrète
Neurochirurgie: la révolution discrète
 
International Intellectual Property Legal Research
International Intellectual Property Legal ResearchInternational Intellectual Property Legal Research
International Intellectual Property Legal Research
 
Hygiène et stérilisation : une mission collective
Hygiène et stérilisation : une mission collectiveHygiène et stérilisation : une mission collective
Hygiène et stérilisation : une mission collective
 
Are the scientists on to something altmetrics 6 16
Are the scientists on to something altmetrics 6 16Are the scientists on to something altmetrics 6 16
Are the scientists on to something altmetrics 6 16
 
Tugas manajemen mutu
Tugas manajemen mutuTugas manajemen mutu
Tugas manajemen mutu
 
"Island of the Spirits" by John Stanmeyer
"Island of the Spirits" by John Stanmeyer"Island of the Spirits" by John Stanmeyer
"Island of the Spirits" by John Stanmeyer
 
DEAD PIG DIARY by John Carlile
DEAD PIG DIARY by John CarlileDEAD PIG DIARY by John Carlile
DEAD PIG DIARY by John Carlile
 

Similar to Ford team-project-builds-relationships

Omnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex Inc.
 
Mark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost
 
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...safisam
 
FordCaseChapter8.doc
FordCaseChapter8.docFordCaseChapter8.doc
FordCaseChapter8.docKevin Sample
 
Honda - business case study
Honda - business case studyHonda - business case study
Honda - business case studyserena boccardo
 
Six sigma, Six sigma initiatives streamline operations
Six sigma, Six sigma initiatives streamline operationsSix sigma, Six sigma initiatives streamline operations
Six sigma, Six sigma initiatives streamline operationsMd.Masudur Rahaman
 
E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012keshav_13
 
six sigma implementation in ford and sony
six sigma implementation in ford and sonysix sigma implementation in ford and sony
six sigma implementation in ford and sonyTushar Jain
 
Ford motor improvement by using tqm tools presented by group 5 047, 068, 074...
Ford motor improvement by using tqm tools presented by group 5  047, 068, 074...Ford motor improvement by using tqm tools presented by group 5  047, 068, 074...
Ford motor improvement by using tqm tools presented by group 5 047, 068, 074...TalhaAli81
 
Ford Motor Company HBR Case Analysis
Ford Motor Company HBR Case AnalysisFord Motor Company HBR Case Analysis
Ford Motor Company HBR Case AnalysisTony Sebastian
 

Similar to Ford team-project-builds-relationships (20)

Omnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex 2019 Newsletter Navigator
Omnex 2019 Newsletter Navigator
 
Ford Motor Company
Ford Motor CompanyFord Motor Company
Ford Motor Company
 
Proton
ProtonProton
Proton
 
PRASOON RESUME up
PRASOON  RESUME upPRASOON  RESUME up
PRASOON RESUME up
 
Mark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost Resume For Upload
Mark Yost Resume For Upload
 
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
Unraveling Data Sharing Challenges to Improve Collaboration atGlobal Ford Pow...
 
FordCaseChapter8.doc
FordCaseChapter8.docFordCaseChapter8.doc
FordCaseChapter8.doc
 
din_CVM2[2]
din_CVM2[2]din_CVM2[2]
din_CVM2[2]
 
Honda - business case study
Honda - business case studyHonda - business case study
Honda - business case study
 
Six sigma, Six sigma initiatives streamline operations
Six sigma, Six sigma initiatives streamline operationsSix sigma, Six sigma initiatives streamline operations
Six sigma, Six sigma initiatives streamline operations
 
Mareesh Resume
Mareesh ResumeMareesh Resume
Mareesh Resume
 
resume
resumeresume
resume
 
Resume
Resume Resume
Resume
 
E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012E&y acma presentation_5th_septembr_2012
E&y acma presentation_5th_septembr_2012
 
TQM ON FORD.pptx
TQM ON FORD.pptxTQM ON FORD.pptx
TQM ON FORD.pptx
 
six sigma implementation in ford and sony
six sigma implementation in ford and sonysix sigma implementation in ford and sony
six sigma implementation in ford and sony
 
manjit_ resume
manjit_ resumemanjit_ resume
manjit_ resume
 
Ford motor improvement by using tqm tools presented by group 5 047, 068, 074...
Ford motor improvement by using tqm tools presented by group 5  047, 068, 074...Ford motor improvement by using tqm tools presented by group 5  047, 068, 074...
Ford motor improvement by using tqm tools presented by group 5 047, 068, 074...
 
Ford Motor Company HBR Case Analysis
Ford Motor Company HBR Case AnalysisFord Motor Company HBR Case Analysis
Ford Motor Company HBR Case Analysis
 
Arshit project
Arshit projectArshit project
Arshit project
 

Recently uploaded

Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 

Recently uploaded (20)

INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 

Ford team-project-builds-relationships

  • 1. Making the Case for Quality September 2011 Ford Team Project Builds Relationships, Improves Quality by Janet Jacobsen As gas prices continued to rise in At a Glance . . . early 2010, so did expectations for the fuel-efficient Ford Fiesta. Many in the • With Ford Fiesta’s launch industry viewed the Fiesta as the most fast approaching, the significant vehicle introduction in the organization wrestled with Ford Motor Company’s recent his- quality concerns over the vehicle’s floor carpets. tory. To uphold Ford’s warranty and customer satisfaction performance, a • Using quality tools, Ford’s body engineering team flawless launch was vital. took on the project, uncovering complicated Unfortunately, early tests indicated sig- The 2011 Ford Fiesta two- and three-way nificant concerns about the quality of interactions in the carpet the Fiesta’s floor carpet. Despite repeated attempts to correct the problems, Ford and the carpet manu- manufacturing process. facturer, a valued supplier, were unable to solve the issue. Not only was the quality of the Fiesta launch • Once these interactions at risk, but so too was Ford’s relationship with the supplier. were understood, the supplier modified its About Ford Motor Company process to produce carpets that met Ford’s and the supplier’s specifications. The Ford Motor Company, founded in 1903, designs, develops, manufactures, and services cars and trucks across six continents under the Ford and Lincoln brand names. The company also pro- • The two-week project was completed just vides services and products in the areas of maintenance, collision, vehicle accessories, and extended prior to the start of mass service warranties under the Genuine Ford Parts, Ford Custom Accessories, and Motorcraft brand production of the Fiesta. names. Based in Dearborn, Mich., the organization employs more than 166,000 people and operates • Ford entered this project 70 plants worldwide. in ASQ’s International Team Excellence Award The carpet supplier for the Fiesta is HP Pelzer Automotive Systems, a worldwide Tier 1 supplier of competition, where it automotive interior trim and acoustic components. The organization’s North American headquarters earned finalist honors. are in Troy, Mich., and the manufacturing plant for the Fiesta’s carpet is located in Eudora, Kan. Identifying Quality Concerns With the Ford Fiesta just months away from arriving at dealerships, pre-launch reviews pinpointed a concern—the vehicle’s carpet contained visible brush marks. Simply put, the carpet’s appearance would not be acceptable to the customer. Ford typically uses warranty and customer satisfaction data to identify top priority projects. In this case, because the Fiesta was a new product, Ford relied on antici- pated warranty and customer satisfaction impact based on historical benchmarks. Addressing the carpet quality before manufacturing commenced would alleviate customer concerns and avoid warranty costs. ASQ www.asq.org Page 1 of 5
  • 2. The carpet quality issue was also straining Ford’s relationship • Wendy Pinter, Ford Body Engineering supervisor with HP Pelzer, as the two organizations spent countless hours • Jane Aselage, trim manager, Ford Global Car Programs working to achieve product appearance standards and specifica- • Jan Ladewig, research and development director, HP Pelzer tions. The deteriorating relationship jeopardized Ford’s corporate • Tom Hanners, plant manager, HP Pelzer goals and strategies. The One Ford Plan focuses on working • Ryan Yamnitz, process engineer, HP Pelzer together as a team and fostering technical excellence to deliver • Kurt Mueller, quality manager, HP Pelzer results. The souring relationship between Ford and HP Pelzer • Steve VanHeusden, Ford program manager, HP Pelzer put elements of the One Ford Plan, shown in Figure 1, at risk. Finger-pointing, blaming, not working together to solve issues Members were selected based on their areas of technical exper- and share data, and conducting unscientific studies neither fos- tise and the responsibilities identified within the project. Each tered technical excellence nor helped deliver results. person’s participation was dependent on the needs for a par- Figure 1— isk and impact of the carpet quality issue, R ticular phase of the project, which followed the define, measure, quantified using a 10-point scale, on analyze, improve, and control (DMAIC) framework of the Six Ford’s corporate goals and strategies Sigma methodology. Risk of not Magnitude Measure Organizational goal/strategy delivering X of impact = of severity Defining the Stakeholders One Team/One Plan  8 9 72 Foster technical excellence  6 7 42 After defining the project scope, one of the first tasks was creating Own working together  8 8 64 a supplier, inputs, process, outputs, customers (SIPOC) diagram to Deliver results 10 9 90 define stakeholders. Internal stakeholders included the Fiesta pro- gram team, the Fiesta (Cuautitlan, Mexico) assembly plant, and Using the DMAIC Framework members of the Body Six Sigma team, while external stakeholders included HP Pelzer, and most important, the end customer—future With a clear need for analytical expertise, Ford’s Body Six Sigma owners of the Fiesta. The raw materials supplier was not included team, a group of Six Sigma Black Belts, was called to lead this because data showed that raw material quality and variation were vital project in March 2010. The improvement team included the not root causes of the quality issues. following representatives from Ford and the supplier: Measuring Critical-to-Quality Factors • Scott Sterbenz, Six Sigma Master Black Belt, Ford Body Engineering, team leader and DMAIC expert Scott Sterbenz, Six Sigma Master Black Belt and team leader, • Pramod Thanedar, Six Sigma Black Belt, Ford Body says the initial meeting with members of the improvement team Engineering focused on the automotive carpet manufacturing process, as • Gary Danhoff, Six Sigma Black Belt, Ford Body Engineering illustrated in Figure 2. “We are big believers in knowing how Figure 2— arpet manufacturing process C Raw material bales of staple Bale fibers Carpet brush marks Opener The card opens fibers and lays Flat needling of loose two-dimensionally them into a oriented fibers. Pad is bonded by loose two- adding vertical orientation to fibers. dimensional felt. To finished goods, coating, or surface finishing Winding Station ASQ www.asq.org Page 2 of 5
  • 3. things work. After all, if you can’t explain how something works, from actual quality impact resulting from the changes to the how can you possibly explain how it doesn’t?” says Sterbenz. needler’s settings. After discussing the current process with HP Pelzer’s carpet Analyzing for Root Cause engineering experts, the team developed a fishbone diagram and an f(x) cascade. The y = f(x) cascade is a physics and engineer- Despite careful planning, the team experienced some unexpected ing-based flowchart that uses why and how questions to identify issues during the DOE. The first four runs took three hours to potential root causes. The two key questions are asked until spe- finish. Sterbenz says the biggest obstacle was simply coordinat- cific measurables are identified. If, through the analyze phase, ing the experiment because the carpet manufacturing process is these measurables are determined to be the key process input complex and uses a continuous roll of material. It would have been wasteful to conduct each DOE run combination on indi- variables (KPIVs), then control of these KPIVs automatically vidual rolls. The only alternative was making changes to the leads to control of the key process output variables (KPOVs), machine settings on the fly and marking the roll where those which is the big Y in the y = f(x) equation. In this case, the changes were made, which required great coordination and more y = f(x) cascade brought the team to the needler, which is a manpower than originally anticipated. “It took us a few hours machine that has a bed of needles that penetrate the raw material and a few botched runs to work out the logistics, but we got it. to produce the pile of the carpet. The needler and the needler set- This created some stressful moments where I thought the DOE tings became the factors in the design of experiments (DOE). would be abandoned, but through teamwork and some quick It is essentially through the DOE that certain needler settings problem solving, we succeeded,” explains Sterbenz. were determined to be the KPIVs. At the end of the project, Sterbenz says the team was able to control the KPIVs and there- The next step was analyzing the DOE using an analysis of vari- fore control the big Y—the carpet quality parameters. ance table, Pareto chart, and plots of the interactions and main effects. When analyzing the data from the brush marks, it became He explains that it was clear from the start that the needler was clear why HP Pelzer struggled to achieve the specified quality by critically important to the carpet’s overall quality. Fortunately, unsystematically adjusting the needler’s settings—there were two the needler had a limited number of settings to manipulate, offer- significant three-way interactions and several significant two-way ing an ideal situation for using DOE to optimize the process and interactions. The analysis for softness/plushness was less complex conduct root cause analysis. Although HP Pelzer had changed with only two significant effects, and this simplified the process of the needler settings in past studies, Ford’s Black Belts found that simultaneously optimizing both responses. the trials had been done unscientifically by changing one factor at a time. Sterbenz explains that the DOE not only provided a list of sig- nificant variables and interactions, but also a transfer function Once the DOE planning was complete, the Ford team mem- between the inputs and the response. The transfer function is the bers traveled to HP Pelzer’s plant in Eudora, Kan., where they mathematical and/or physics relationship between the KPIV and viewed carpet samples produced when the needler settings were the KPOV. In this case, the transfer function shows the math- altered. They quickly noticed that while some carpets were quite ematical relationship between the settings in the needler (KPIV) plush, others were the unappealing texture of felt. At this point, and the carpet quality (KPOV). the team decided that brush marking and softness/plushness Using the supplier’s knowledge of the carpet process and the would both be treated as responses in the DOE. analysis of the DOE, the team felt certain that the variables that Next, the team assembled an evaluation jury comprised of Ford control brush marking and softness/plushness were identified. It and HP Pelzer representatives to conduct a gauge repeatability was clear to all that previous needler setting adjustments were not successful because of significant interactions among the and reproducibility (RR) study on the two responses. Brush variables. Now armed with mathematical models for each of markings and softness/plushness were each rated using an ordi- the responses, the team set targets and, after validation, moved nal ranking scale, with 1–10 used for brush markings and 1–5 ahead with using optimization solvers to uncover the best set- used for softness/plushness. The higher the rating, the better the tings for both brush marks and softness/plushness. quality. Since both responses were attribute and ordinal in nature, Kendall’s Co-efficient of Concordance was used as the indicator The data analysis was shared at a full team meeting when the of success. This formula measures directional agreement with optimum needler settings were presented. Unfortunately, these a value of greater than 0.7 for both responses, indicating that settings were not acceptable because they could damage the the team could trust the jury to evaluate the carpets fairly and needler if used for extended periods and one of the factor set- consistently. In addition, the team knew that shifts in the ratings tings could adversely affect the carpet’s durability. These two were not because of variation in the jury’s opinion, but instead new constraints meant that additional analysis was needed. ASQ www.asq.org Page 3 of 5
  • 4. Figure 3— ord Fiesta carpet before and after the DOE F Baseline carpets: DOE optimized carpets: • 3.0 rating for brush marking • 8.2 rating for brush marking • 2.5 rating for softness/plushness • 3.8 rating for softness/plushness No brush marking Brush marking Improving Carpet Quality • Communicating the new process to HP Pelzer employees. • Programming the needler with the new settings. Despite the new constraints, the team determined two new opti- • Monitoring the quality of the carpets produced. mized factor settings for the needler. The new settings were • Monitoring the condition of the needler. projected to deliver significantly higher levels of quality for both brush marks and plushness/softness. The next step was produc- In addition to improving the carpet for the new Fiesta, the team ing samples of both options for the jury to evaluate. Happily, wanted to ensure that future models were protected as well. By neither sample had visible brush markings, and the softness/ documenting the gauge RR methodology and the transfer plushness was much improved over the baseline. The jury’s rat- function development process with the supplier, along with ings—8.2 (out of 10, and both samples were rated the same) for implementing quality and maintenance control plans, the team brush markings and 3.7 (out of 5 for option one) and 3.8 (for played a role in the quality of both current and future models. option two) on softness/plushness—closely matched the math- ematical model predictions. Ultimately, the team selected option Project Yields Tangible Benefits two because it produced a slightly more plush carpet. Figure 3 shows the difference in the carpet quality after the DOE. While production of the Fiesta had not begun, the project, which took less than two weeks to complete, provided valuable benefits The final samples were tested to ensure that additional factors for Ford and HP Pelzer, such as protecting customer satisfaction, such as color, sheen, wear, durability, stain resistance, and uni- avoiding warranty claims, and eliminating scrap materials, as form pile direction were not compromised. The samples passed shown in Figure 4 (on next page). all validation testing. The intangible benefits were significant as well: Setting Controls to Sustain Improvements • A stronger relationship with the supplier. Plans to implement the final improvement actions quickly and • Increased technical knowledge. maintain the results involved the following tasks: • The creation of a new optimization process for the supplier. • A great product for customers. • The creation of a Six Sigma program by HP Pelzer to increase efficiency and improve quality. ASQ www.asq.org Page 4 of 5
  • 5. Figure 4—Tangible benefits for both Ford and the supplier Realized Tangible Benefit Recipient Value Validation Warranty avoidance Ford $630 per claim No warranty claims (mass production started in May 2010). Scrap avoidance HP Pelzer $1,200 per roll No scrapped carpet rolls (mass production began in April 2010). Customer satisfaction Ford Proprietary calculation No customer complaints about carpet quality Loss avoidance _____________________________ _____________________________________ on either internal or external surveys. External customer Carpets that look and feel as expected This project also clearly achieved the goals of the One Ford Engineering competed in the 2011 ITEA and was named as one strategy. Ford’s relationship with the supplier was strengthened of 29 finalists. Team members shared their story with a live audi- through teamwork and the mutual sharing of expertise. ence at the 2011 World Conference on Quality and Improvement, where they captured the best OEM/supplier relationship award and Sterbenz says that team building and understanding the critical earned second place in the team display competition. KPIVs were the keys to the success of this project. “It was sur- prising to us that scientific experiments had not been conducted Sterbenz says this project was a good candidate for the ITEA prior to this project to fully understand the KPIVs. Now that process because the team used quality tools to reduce the defect the KPIVs are understood, we have much better control over rate to zero, and after one year, there have been no warranty the process and understand how to control the sensitivity of claims on the carpet and no scrapped carpets. “That is total suc- certain factors.” cess and the epitome of teambuilding,” he states. Improvement projects typically encounter resistance during the For More Information implementation phase. In this case, questions came earlier when the DOE was conducted and the supplier was concerned about • To learn more about this project, contact Scott Sterbenz at potential damage to the needler and possible adverse side effects ssterben@ford.com. on carpet durability. These issues were addressed by providing • Complete details on ASQ’s ITEA process are available at training and successful examples, along with leveraging the sta- wcqi.asq.org/team-competition. tistical expertise of Ford’s Six Sigma Black Belts. • Read more case studies on successful quality improvement projects in the ASQ Knowledge Center at asq.org/ Sharing the Success Story knowledge-center. Ford, an enterprise member of ASQ, believes in the value of shar- About the Author ing quality success stories because tools or methods used in one project can often be useful in another. The results of this improve- Janet Jacobsen is a freelance writer specializing in quality and ment project were shared with several other teams at Ford and HP compliance topics. A graduate of Drake University, she resides Pelzer and with a wider audience through ASQ’s International in Cedar Rapids, Iowa. Team Excellence Award (ITEA) process. Team Ford—Body ASQ www.asq.org Page 5 of 5