3. Lowell Project
2,000 SF
$ 168,000
3 month Duration
Original consultant and contractor removed
from project. Scope re-evaluated to fit owners
needs and budget guidelines. Modifications
included valuable energy-efficient sustainable
elements.
6. Washtenaw Project
3,300 SF
$ 290,000
5 month Duration
Increased 1,100 SF to 3,300 SF with added 2nd story.
New 2-car garage, 3 new baths, 20’ x 10’ finished
basement. Custom cabinetry in kitchen and living
area, new granite countertops. New mechanical
systems, new windows and extensive masonry
repairs.
9. West 103rd Street
3,000 SF
$ 60,000
2 month Duration
Vinyl windows installed and exterior building
scraped, primed and re-painted. New oak floors
installed in kitchen/dining area with existing wood
floors re-sanded. Gourmet kitchen and 2 new
bathrooms with cabinets and entire home re-wired
to 200 amp service.
12. Hollywood Street
2,500 SF
$ 270,000
5 month Duration
This home was taken down to the foundation to
build a new modern 2 story framed home with a
detached garage. New kitchen, 2 full baths and
concrete poured flooring was installed in addition
to Hardi-board siding, aluminum windows and TPO
roofing system.
15. West Grace Street
1,600 SF
$ 45,000
2 month Duration
Kitchen and master suite make-over. Moroccan
Walnut flooring, espresso stained maple cabinets,
granite counter-tops, subway tile backsplash and
porcelain tile in bathroom. Upgraded to 200 amp
electrical service and various lighting throughout.
18. West Thomas Street
2,000 SF
$ 180,000
5 month Duration
4-Unit building where owner duplexed his unit with
unfinished attic. 2 new bedrooms and 2 new bath
were added. All mechanicals replaced-plumbing,
electrical and HVAC. Renovated kitchen with
cabinetry, tile backsplash, quartz counter tops and
new appliances.