SlideShare a Scribd company logo
1 of 8
Training Report : sale and Marketing

    Date             Dept              time       trainer                                      Detail
     30-Jun-10 MD Operation       11.00-12.00   K. Freddy   Introduce "Seksun product " roughly
                                                               Explain about drawing
                                                             -The inpotant point on drawing
                                                             - Simbol and the meaning on drawing
                                                            Suggest for training at process stamping
                                                             - How to know the process
                                                            - How to ask the quation
                                                            Suggest rougthly about calculate cost

     30-Jun-10 Stamping           13.00-15.00   K. KK Lee   Introdue about stamping process & machine
                                                            Tooling have to type
                                                               - Manual
                                                              - Progessive
                                                            The difference between manual & progessive die
                                                              - Processive is fast for produce part that have more detail but it
                                                            expensive cost should produce for the big volume
                                                             - Manual the cost not so high but should use many step and slowly
                                                            to production

                                                            Material
                                                            Normal meterial that we use are Stanless , SUS301 , 304, 430
                                                            CRS,C1010,C1008,
                                                            Minimum thickness for material that we can = 0.1 mm
                                                            Maximum thickness for material that we can = 6.0 mm

                                                            Machine
                                                            The total machine = 19 machine saparate by tonnage
                                                            80T = 5 mc / 60 T = 1 mc /150 T =3 mc / 160 T =2 mc / 200 T = 4 mc
                                                            and 300T = 4 mc
                                                            ( K. KK give me the machine list )

                                                            How to select machine for produce part
                                                            It up on material thickness
Production line
                                                ture line

 5-Jul-10 Material   13.30- 14.30    K. david    - Introduce about current material of seksun
                                                 - suggest about how to made quotation about material cost
                                                 -How to calculate material weigth
                                                  calculate from "Black side "
                                                 Weigth = t*w*pitch* Density / 1000000
                                                Supplier selection
                                                 For supplier selection have 2 way
                                                 1. Find by myself
                                                2 . Select from vender list
                                                and to comparision and select
                                                remark
                                                 1. from drawing should be carefull customer is under BOI or not
                                                2. How about packaging and transportation

16-Jul-10 Plating    13.30 - 15.00   K. Jan      Introduction about Plating line
                                                   - Ni - Plating
                                                     have 3 process
                                                    1. pre - treatment : for prepare surface before plating
                                                    2. Treatment : platting product
                                                    3. post treatment : process after plating
                                                For the procedure in each process is up on the product and material
                                                "At currently this line is stop "

                                                 - Passivation
                                                   perpost for protect stanlate steel form rusty
                                                  have 3 step for this process
                                                  1. cleaning product surface by alkaline chemical
                                                 2. Cleaning stanless flim by HCl
                                                 3. passivate by Nitrict acid

                                                Remark : They have tacking care for the water treatment that release
                                                from process
Remark
Material                              Coating                         Heating
Siam metal Product   02-7691567       Thai parker        02-3246600 UI Engineering
กรุงเทพเหล็กกล้า     02-2941879       Fengda : K. Tai       892121630 Assab
Central Metal        028023727-8      Central Plating                 Watanabe
Fort Industrial            27285661   Siam Spoke: K ED      892211541
Bio form Tech              27226045   BVK
Nippon kinzuku
United coil center         23381340
tumbling
02-75083670   MFS K kitiya 08-18274981
              SM Polishing

More Related Content

Similar to Training report (6)

Maxuni Presentation 2012 English
Maxuni Presentation 2012 EnglishMaxuni Presentation 2012 English
Maxuni Presentation 2012 English
 
3D Printing vs GFRP Moulding - Time & Cost comparison
3D Printing vs GFRP Moulding - Time & Cost comparison3D Printing vs GFRP Moulding - Time & Cost comparison
3D Printing vs GFRP Moulding - Time & Cost comparison
 
Project first prototype (1)
Project first prototype (1)Project first prototype (1)
Project first prototype (1)
 
Catalogue
CatalogueCatalogue
Catalogue
 
4 steps to vsm
4 steps to vsm4 steps to vsm
4 steps to vsm
 
PMS FY 22-23.pptx
PMS FY 22-23.pptxPMS FY 22-23.pptx
PMS FY 22-23.pptx
 

Training report

  • 1. Training Report : sale and Marketing Date Dept time trainer Detail 30-Jun-10 MD Operation 11.00-12.00 K. Freddy Introduce "Seksun product " roughly Explain about drawing -The inpotant point on drawing - Simbol and the meaning on drawing Suggest for training at process stamping - How to know the process - How to ask the quation Suggest rougthly about calculate cost 30-Jun-10 Stamping 13.00-15.00 K. KK Lee Introdue about stamping process & machine Tooling have to type - Manual - Progessive The difference between manual & progessive die - Processive is fast for produce part that have more detail but it expensive cost should produce for the big volume - Manual the cost not so high but should use many step and slowly to production Material Normal meterial that we use are Stanless , SUS301 , 304, 430 CRS,C1010,C1008, Minimum thickness for material that we can = 0.1 mm Maximum thickness for material that we can = 6.0 mm Machine The total machine = 19 machine saparate by tonnage 80T = 5 mc / 60 T = 1 mc /150 T =3 mc / 160 T =2 mc / 200 T = 4 mc and 300T = 4 mc ( K. KK give me the machine list ) How to select machine for produce part It up on material thickness
  • 2. Production line ture line 5-Jul-10 Material 13.30- 14.30 K. david - Introduce about current material of seksun - suggest about how to made quotation about material cost -How to calculate material weigth calculate from "Black side " Weigth = t*w*pitch* Density / 1000000 Supplier selection For supplier selection have 2 way 1. Find by myself 2 . Select from vender list and to comparision and select remark 1. from drawing should be carefull customer is under BOI or not 2. How about packaging and transportation 16-Jul-10 Plating 13.30 - 15.00 K. Jan Introduction about Plating line - Ni - Plating have 3 process 1. pre - treatment : for prepare surface before plating 2. Treatment : platting product 3. post treatment : process after plating For the procedure in each process is up on the product and material "At currently this line is stop " - Passivation perpost for protect stanlate steel form rusty have 3 step for this process 1. cleaning product surface by alkaline chemical 2. Cleaning stanless flim by HCl 3. passivate by Nitrict acid Remark : They have tacking care for the water treatment that release from process
  • 3.
  • 5.
  • 6.
  • 7. Material Coating Heating Siam metal Product 02-7691567 Thai parker 02-3246600 UI Engineering กรุงเทพเหล็กกล้า 02-2941879 Fengda : K. Tai 892121630 Assab Central Metal 028023727-8 Central Plating Watanabe Fort Industrial 27285661 Siam Spoke: K ED 892211541 Bio form Tech 27226045 BVK Nippon kinzuku United coil center 23381340
  • 8. tumbling 02-75083670 MFS K kitiya 08-18274981 SM Polishing