Project first prototype (1)
1.
2.
3.
4.
5.
6. Part Part Manufact Quan Unit Total
Name descrip Material uring tity Cost Cost
Process
tion
This part -Drilling
Structures deal with -Wood -Cutting
product
because -Nail - 2 40 80
structures
have an
Hamme
effect on ring
strength
in any
part of
product.
This part -Drilling
made
from -Cutting
Chair wood and -Wood - 1 300 300
hold by
nail . In
-Nail Hamme
7. Part Part Materi Manufact Quan Unit Total
Name descrip al uring tity Cost Cost
Process
tion
This part -Drilling
made
Table from -Wood -Cutting
wood and - 1 200 200
hold by
nail. In
-Nail Hamme
this part ring
you can -
put a
book , Dubbing
Laptop or -
Tablet
and can
Painting
do work
in
document
type.
11. Record the number of hours spent in each
manufacturing process.
-Cutting= 3 hrs.
-Drilling= 2hr.
-Hammering= 1.30 hrs.
-Dubbing= 1.30hrs.
-Painting =2hrs.
Total = 10 hrs.
12. Provide difficulties and problems encountered
during the prototype development.
- It’s hard to move because product didn’t have
rollers.
- Material have a high cost.
- Use time to make too much.
13. Provide the solutions for your second prototype.
- Find rollers and shaft . And assembly it with
product (First prototype)
- Find a material that people didn’t use it.
- Manage a time and prepare manufacturing
processes that my product use.