April 8, 2020
MATERIALS BULLETIN NO. 20-12
DCE MEMORANDUM NO. 20-14
(FHWA Approved: 4/8/2020)
TO: DISTRICT CONSTRUCTION ENGINEERS
DISTRICT MATERIALS AND RESEARCH ENGINEERS
FROM: Dan Hurtado, P.E., Director, Office of Construction
Timothy Ruelke, P.E., Director, Office of Materials
COPIES: Will Watts, Scott Arnold, Ananth Prasad, Mark Musselman, Chad Thompson,
Richard Hewitt, Howie Moseley, John Westphal, Pat Upshaw, Juan Castellanos,
Dino Jameson, John Shoucair
SUBJECT: CONTACTLESS TICKETING
To ensure social distancing and to prevent the transmission of COVID-19 via physical contact,
paper delivery tickets for construction materials may no longer by exchanged by hand at the
project site. Contractors, QC, VT and CEI personnel shall adopt one of the following methods or,
alternatives agreed upon by all by project personnel which satisfy the requirement that no paper
be exchanged by hand at the project site.
Direct Electronic Submission
Digital copies of electronic delivery tickets which are generated at the material source
(i.e. rolling mill, concrete batch plant, asphalt plant, borrow pit, etc.) may be directly
transmitted from the point of origin to the QC and VT inspector at the project site by
electronic means. The electronic image of the delivery ticket will be the official project
record. QC and VT personnel shall provide electronic contact information to the
Contractor for the purposes of direct electronic submission.
Electronic Image of Paper Documents
Paper delivery tickets which are generated at the material source may be photographed by
the delivery driver and provided to QC and VT inspector by electronic means prior to
unloading at the project site. This could be accomplished using the driver’s smart-phone
camera, and sent via email or SMS/text, so long as the ticket information is legible.
Drivers must not photograph delivery tickets while driving. QC, VT and CEI personnel
may develop their own communication protocol for dissemination of photographic ticket
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
MATERIALS BULLETIN NO. 20-12
DCE MEMORANDUM NO. 20-14
Page 2
information received by the driver. The electronic image of the delivery ticket will be the
official project record. QC and VT personnel shall provide electronic contact information
to the Contractor for the purposes of submission of electronic images of paper
documents.
e-Ticketing (Asphalt only)
For asphalt delivery, an e-ticketing system that meets the requirements of the attached
modifications to Section 320 and 330 of the Standard Specifications may be used. The
electronic version of the delivery ticket will be the official project record. For projects
which choose to implement e-ticketing, these modifications must be incorporated into the
contract via Supplemental Agreement.
Remote Review
QC and VT personnel may use a long-reach grabber tool to retrieve the paper ticket from
the truck driver, photograph the paper ticket, and return the paper ticket back to the truck
driver without handling the paper ticket. Alternatively, project personnel may use a
“selfie stick” to photograph the ticket while the truck driver in the truck cab holds up the
ticket. In these instances, the electronic image may be used at the jobsite, but the paper
ticket will be the official project record. Paper tickets shall be submitted on a weekly
basis via US Postal service or private courier service. Paper tickets shall be handled in
accordance with CDC and Department of Health guidelines.
This memorandum serves as blanket approval to process a supplemental agreement or work
order to incorporate this change into the contract. The Department may reimburse the
contractor for reasonable costs associated with the cost of implementing an e-ticketing system.
Any such costs must be agreed to by the District Construction Engineer prior to
implementation of the system.
The requirements of the memorandum are effective on all FDOT construction projects
effective April 20, 2020 and shall remain in effect until rescinded by the Director, Office of
Construction.
For questions regarding this memo, please contact the following:
Asphalt: Rich Hewitt (386) 943-5305
Concrete: John Westphal (850) 414-4141
Earthwork: Dino Jameson (352) 955-2933
Aggregates: John Shoucair (352) 955-2925
DH/TR/RH
Attachment
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
Page 1 of 4
CONTROL OF THE WORK
HOT MIX ASPHALT – PLANT METHODS AND EQUIPMENT – ELECTRONIC
TICKETING.
SUBARTICLE 320-3.2 is deleted and the following substituted:
320-3.2 Electronic Weigh Systems: Equip the asphalt plant with an electronic weigh
system that has an automatic printout, is certified every six months by an approved certified scale
technician, and meets monthly comparison checks with certified truck scales as specified in 320-
3.2.3. Weigh all plant produced hot mix asphalt on the electronic weigh system, regardless of the
method of measurement for payment.
Include, as a minimum, the following information in the electronic delivery ticket:
1. Sequential load number
2. Project’s Financial Identification Number (FIN)
3. Date
4. Name and location of plant
5. Mix design number
6. Separate, individual, data entry locations for recording mix temperature
by:
a. Plant QC
b. Plant VT
c. Roadway QC
d. Roadway VT
7. Truck number
8. Gross, tare, and net tonnage per truck
9. Daily cumulative tonnage of mix for the mix design
320-3.2.1 Electronic Ticketing (e-Ticketing) System: Provide an e-Ticketing
System (including any necessary software and hardware) capable of monitoring, collecting,
storing, and reporting the information required by the Contract for all loads of asphalt mix
delivered to the project. After each truck is loaded, electronically record and use a web service to
upload the ticket information to the E-ticketing software database. The E-ticketing system shall
provide each truck load’s ticket information to users of the e-ticketing software.
E-ticketing software must provide the Engineer the ability to access real-time
monitoring of asphalt truck load ticket information as described herein.
The e-Ticketing system shall be integrated with the Load Read-Out scale
system at the asphalt plant site.
The e-ticketing system shall have offline capabilities to prevent data loss
in the event of power loss or loss of connectivity.
320-3.2.1.1 e-Ticketing System Construction Requirements: Install and
operate equipment in accordance with the manufacturer’s specifications.
320-3.2.1.2 Data Deliverables: Provide to the Engineer a means of
gathering report summaries by way of iOS or Android apps, web pages, or any other method at
the disposal of the Engineer. The Engineer may request data at any time during paving
operations. In addition to providing reports referenced in this specification, provide monthly
reports, as well as, a final, end of project report in the e-ticketing software and in a comma
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
Page 2 of 4
separated value (.csv) file. Provide all e-ticketing database data required in this Section in the
monthly and end of project reports and .csv files.
320-3.2.1.3 Real-Time Continuous e-Ticketing Data Items: Provide the
Engineer access to the e-Ticketing system data viewer which displays the following information
in real-time with a web-based or App-based system compatible with iOS, Windows, or Android
environments:
1. Each Truck:
a. Unique Truck ID
b. Sequential Truck Load Number
c. Mix Design Number
d. Net Weight of material being transported (to the nearest
0.01 ton)
e. Running Daily Total of Net Weight of material being
transported (to the nearest 0.01 ton)
f. Project’s Financial Identification Number
2. Project Location
320-3.2.1.4 Daily Summary: Provide the following summary information
to the Engineer electronically within 4 hours of beginning operations on the next working day:
1. List of Individual Loads
a. Contractor Name
b. Project’s Financial Identification Number (FIN)
c. Unique Truck ID
d. Sequential Load Number
e. Net Weight for Payment (nearest 0.01 tons)
f. Net Weight of Waste (nearest 0.01 tons)
g. Date Paved
h. Mix Temperature Measurements (Plant QC, Plant VT,
Roadway QC, and Roadway VT)
i. Time Loaded at Plant site
320-3.2.2: Electronic Weigh Systems: Utilize any one of the following three
electronic weigh systems.
320-3.2.2.1 Electronic Weigh System on the Truck Scales: Provide an
electronic weigh system on all truck scales, which is equipped with an automatic recordation
system that is approved by the Engineer. Use scales of the type that directly indicate the total
weight of the loaded truck. Use scales meeting the requirements for accuracy, condition, etc., of
the Bureau of Weights and Measures of the Florida Department of Agriculture, and re-certify
such fact every six months, either by the Bureau of Weights and Measures or by a registered
scale technician.
320-3.2.2.2 Electronic Weigh System on Hoppers Beneath a Surge or
Storage Bin: Provide an electronic weigh system on the hopper (hopper scales or load cells)
beneath the surge or storage bin, which is equipped with an automatic recordation system
approved by the Engineer.
320-3.2.3 Monthly Electronic Weigh System Comparison
Checks: Check the accuracy of the electronic weighing system at the commencement of
production and thereafter at least every 30 days during production by one of the following two
methods and maintain a record of the weights in the Scale Check Worksheet.
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
Page 3 of 4
320-3.2.3.1. Electronic Weigh System on Truck Scales:
1. The Engineer will randomly select a loaded truck of asphalt mix,
a loaded aggregate haul truck, or another vehicle type approved by the Engineer and record the
truck number and gross weight from the Contractor’s delivery ticket.
2. Weigh the selected truck on a certified truck scale, which is not
owned by the Contractor and record the gross weight for the comparison check. If another
certified truck scale is not available, the Engineer may permit another set of certified truck scales
owned by the Contractor to be used. The Engineer may elect to witness the scale check.
3. The gross weight of the loaded truck as shown on the
Contractor’s delivery ticket will be compared to the gross weight of the loaded truck from the
other certified truck scale. The maximum permissible deviation is 8 pounds per ton of load,
based on the certified truck scale weight.
4. If the distance from the asphalt plant to the nearest certified
truck scale is enough for fuel consumption to affect the accuracy of the comparison checks, a
fuel adjustment may be calculated by using the truck odometer readings for the distance
measurement, and 6.1 miles per gallon for the fuel consumption rate, and 115 ounces per gallon
for fuel weight.
5. During production, when an additional certified truck scale is
not available for comparison checks, the Engineer may permit the Contractor to weigh the truck
on his certified scales used during production and then weigh it on another certified truck scale,
as soon the other scale is available for the comparison checks.
In addition to the periodic checks as specified above, check the
scales at any time the accuracy of the scales becomes questionable. When such inaccuracy does
not appear to be sufficient to seriously affect the weighing operations, the Engineer will allow a
period of two calendar days for the Contractor to conduct the required scale check. However, in
the event the indicated inaccuracy is sufficient to seriously affect the mixture, the Engineer may
require immediate shut-down until the accuracy of the scales has been checked and necessary
corrections have been made. Include the cost of all scale checks in the bid price for asphalt
concrete, at no additional cost to the Department.
320-3.2.3.2. Electronic Weigh System on Hoppers Beneath a Surge or
Storage Bin:
1. The Engineer will randomly select a loaded truck of asphalt mix
and record the truck number, and the net weight of the asphalt mix from the Contractor’s
delivery ticket.
2. Weigh the selected truck on a certified truck scale, which is not
owned by the Contractor and record the gross weight for the comparison check. If another
certified truck scale is not available, the Engineer may permit another set of certified truck scales
owned by the Contractor to be used. The Engineer may elect to witness the scale check.
3. Deliver the asphalt mix to the project, then weigh the selected
empty truck on the same certified truck scales. Record the tare weight of the truck.
4. Compare the net weight of the asphalt mix from the delivery
ticket to the calculated net weight of the asphalt mix as determined by the certified truck scale
weights. The maximum permissible deviation is 8 pounds per ton of load, based on the certified
truck scale weight.
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
Page 4 of 4
5. Use the fuel adjustment as specified in 320-3.2.3.1(4), when the
distance from the asphalt plant to the nearest certified truck scale is enough for fuel consumption
to affect the accuracy of the comparison checks.
6. During production, when an additional certified truck scale is
not available for comparison checks, the Engineer may permit the Contractor to load a truck with
aggregate from the pugmill, surge or storage bin, and follow the above procedures to conduct the
comparison checks as soon as certified truck scale is available.
If the check shows a greater difference than the tolerance specified
above, then recheck on a second set of certified scales. If the check and recheck indicate that the
printed weight is out of tolerance, have a certified scale technician check the electronic weigh
system and certify the accuracy of the printer. While the system is out of tolerance and before its
adjustment, the Engineer may allow the Contractor to continue production only if provisions are
made to use a set of certified truck scales to determine the truck weights.
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
Page 1 of 1
CONTROL OF THE WORK
HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS
SUBARTICLE 330-2.1 is deleted and the following substituted:
330-2.1 Minimum QC Requirements: Perform as a minimum, the following activities
necessary to maintain process control and meet Specification requirements:
1. Pavement Density: Monitor the pavement temperature with an infrared
temperature device so compaction is completed before the surface temperature of the pavement
drops to the extent that effective compaction may not be achieved or the rollers begin to damage
the pavement. Monitor the roadway density with either 6 inch diameter roadway cores, a nuclear
density gauge, or other density measuring device, at a minimum frequency of once per 1,500 feet
of pavement.
2. Mix Temperature: Determine the mix temperature at the roadway for the first
five loads and one out of every five loads thereafter.
3. Mix Spread Rate: Monitor the mix spread rate at the beginning of each day’s
production, and as needed to control the operations, at a minimum of once per 200 tons placed.
When determining the spread rate, use, at a minimum, an average of five truckloads of mix.
4. Pavement Texture: Monitor the pavement texture to minimize pavement
segregation. Use density gauges, infrared temperature measurement devices, or roadway cores at
the beginning of each day’s production, and as necessary, both at truck exchanges and during
normal paving operations.
5. Reporting: Ensure the accuracy of the QC Roadway Reports on the
Department’s approved form to reflect the actual surface area of the finished work and be in
compliance with the requirements of the Contract Documents.
6. Electronic Ticketing (E-Ticketing): Provide a tablet computer on site with the
Paving Operation capable of running the E-Ticketing software outlined in Section 320. Use the
E-ticketing software to obtain truck ticket information and record mix temperatures. Use the E-
ticketing data for entry into the Asphalt Roadway – Daily Report of Quality Control.
CONTROL OF THE WORK
DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0

More Related Content

Similar to Florida DOT Contactless Ticketing eTicketing FDOT Specifications

IRJET- IoT System for Monitoring and Diagnostics of Engine
IRJET-  	  IoT System for Monitoring and Diagnostics of EngineIRJET-  	  IoT System for Monitoring and Diagnostics of Engine
IRJET- IoT System for Monitoring and Diagnostics of EngineIRJET Journal
 
IHMC presentation to UPU Committee 3 October 28 2013
IHMC presentation to UPU Committee 3 October 28 2013IHMC presentation to UPU Committee 3 October 28 2013
IHMC presentation to UPU Committee 3 October 28 2013Charles Prescott
 
Unit 5 INTERNATIONAL THEORY
Unit 5 INTERNATIONAL THEORYUnit 5 INTERNATIONAL THEORY
Unit 5 INTERNATIONAL THEORYMansi Tyagi
 
Network optimization statement
Network optimization statementNetwork optimization statement
Network optimization statementCharlesTOMMO1
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali
 
IRJET - Centralized Data for Transport Automation System using Android St...
IRJET -  	  Centralized Data for Transport Automation System using Android St...IRJET -  	  Centralized Data for Transport Automation System using Android St...
IRJET - Centralized Data for Transport Automation System using Android St...IRJET Journal
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
 
MTCTE PROCEDURE ver 2.1 Release May 2021.pdf
MTCTE PROCEDURE ver 2.1 Release May 2021.pdfMTCTE PROCEDURE ver 2.1 Release May 2021.pdf
MTCTE PROCEDURE ver 2.1 Release May 2021.pdfVikramS58
 
Requirement for Seamless Mobile Communications during World Cup 2022
Requirement for Seamless Mobile Communications during World Cup 2022Requirement for Seamless Mobile Communications during World Cup 2022
Requirement for Seamless Mobile Communications during World Cup 2022CharlesTOMMO1
 
The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...Shane Emerson
 
Maritime Environmental and Operational Data Management useing Quantum\'s Mari...
Maritime Environmental and Operational Data Management useing Quantum\'s Mari...Maritime Environmental and Operational Data Management useing Quantum\'s Mari...
Maritime Environmental and Operational Data Management useing Quantum\'s Mari...collinstr
 
Veterans Program Letter
Veterans Program LetterVeterans Program Letter
Veterans Program LetterRob Wilson
 
Tender specimen__How to write a Facinating Tender Notice!!!
Tender specimen__How to write a Facinating Tender Notice!!!Tender specimen__How to write a Facinating Tender Notice!!!
Tender specimen__How to write a Facinating Tender Notice!!!Hashim Hasnain Hadi
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session IiiAnil Patil
 
8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf
8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf
8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdfAnarulIslam17
 

Similar to Florida DOT Contactless Ticketing eTicketing FDOT Specifications (20)

IRJET- IoT System for Monitoring and Diagnostics of Engine
IRJET-  	  IoT System for Monitoring and Diagnostics of EngineIRJET-  	  IoT System for Monitoring and Diagnostics of Engine
IRJET- IoT System for Monitoring and Diagnostics of Engine
 
IHMC presentation to UPU Committee 3 October 28 2013
IHMC presentation to UPU Committee 3 October 28 2013IHMC presentation to UPU Committee 3 October 28 2013
IHMC presentation to UPU Committee 3 October 28 2013
 
Parcel management system 1
Parcel management system 1Parcel management system 1
Parcel management system 1
 
Unit 5 INTERNATIONAL THEORY
Unit 5 INTERNATIONAL THEORYUnit 5 INTERNATIONAL THEORY
Unit 5 INTERNATIONAL THEORY
 
Network optimization statement
Network optimization statementNetwork optimization statement
Network optimization statement
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)
 
Generate E-way Bill Online
Generate E-way Bill OnlineGenerate E-way Bill Online
Generate E-way Bill Online
 
IRJET - Centralized Data for Transport Automation System using Android St...
IRJET -  	  Centralized Data for Transport Automation System using Android St...IRJET -  	  Centralized Data for Transport Automation System using Android St...
IRJET - Centralized Data for Transport Automation System using Android St...
 
Irjet v7 i3290
Irjet v7 i3290Irjet v7 i3290
Irjet v7 i3290
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
MTCTE PROCEDURE ver 2.1 Release May 2021.pdf
MTCTE PROCEDURE ver 2.1 Release May 2021.pdfMTCTE PROCEDURE ver 2.1 Release May 2021.pdf
MTCTE PROCEDURE ver 2.1 Release May 2021.pdf
 
Requirement for Seamless Mobile Communications during World Cup 2022
Requirement for Seamless Mobile Communications during World Cup 2022Requirement for Seamless Mobile Communications during World Cup 2022
Requirement for Seamless Mobile Communications during World Cup 2022
 
Eway bill
Eway billEway bill
Eway bill
 
The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...
 
Maritime Environmental and Operational Data Management useing Quantum\'s Mari...
Maritime Environmental and Operational Data Management useing Quantum\'s Mari...Maritime Environmental and Operational Data Management useing Quantum\'s Mari...
Maritime Environmental and Operational Data Management useing Quantum\'s Mari...
 
Veterans Program Letter
Veterans Program LetterVeterans Program Letter
Veterans Program Letter
 
Tender specimen__How to write a Facinating Tender Notice!!!
Tender specimen__How to write a Facinating Tender Notice!!!Tender specimen__How to write a Facinating Tender Notice!!!
Tender specimen__How to write a Facinating Tender Notice!!!
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session Iii
 
8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf
8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf
8b1f4d38-0aca-45b0-96d5-038e7ec9b6ed.pdf
 
Duongbo english-v3.0-a4
Duongbo english-v3.0-a4Duongbo english-v3.0-a4
Duongbo english-v3.0-a4
 

Recently uploaded

##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 

Recently uploaded (20)

##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 

Florida DOT Contactless Ticketing eTicketing FDOT Specifications

  • 1. Florida Department of Transportation RON DESANTIS GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 KEVIN J. THIBAULT, P.E. SECRETARY www.fdot.gov April 8, 2020 MATERIALS BULLETIN NO. 20-12 DCE MEMORANDUM NO. 20-14 (FHWA Approved: 4/8/2020) TO: DISTRICT CONSTRUCTION ENGINEERS DISTRICT MATERIALS AND RESEARCH ENGINEERS FROM: Dan Hurtado, P.E., Director, Office of Construction Timothy Ruelke, P.E., Director, Office of Materials COPIES: Will Watts, Scott Arnold, Ananth Prasad, Mark Musselman, Chad Thompson, Richard Hewitt, Howie Moseley, John Westphal, Pat Upshaw, Juan Castellanos, Dino Jameson, John Shoucair SUBJECT: CONTACTLESS TICKETING To ensure social distancing and to prevent the transmission of COVID-19 via physical contact, paper delivery tickets for construction materials may no longer by exchanged by hand at the project site. Contractors, QC, VT and CEI personnel shall adopt one of the following methods or, alternatives agreed upon by all by project personnel which satisfy the requirement that no paper be exchanged by hand at the project site. Direct Electronic Submission Digital copies of electronic delivery tickets which are generated at the material source (i.e. rolling mill, concrete batch plant, asphalt plant, borrow pit, etc.) may be directly transmitted from the point of origin to the QC and VT inspector at the project site by electronic means. The electronic image of the delivery ticket will be the official project record. QC and VT personnel shall provide electronic contact information to the Contractor for the purposes of direct electronic submission. Electronic Image of Paper Documents Paper delivery tickets which are generated at the material source may be photographed by the delivery driver and provided to QC and VT inspector by electronic means prior to unloading at the project site. This could be accomplished using the driver’s smart-phone camera, and sent via email or SMS/text, so long as the ticket information is legible. Drivers must not photograph delivery tickets while driving. QC, VT and CEI personnel may develop their own communication protocol for dissemination of photographic ticket DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
  • 2. MATERIALS BULLETIN NO. 20-12 DCE MEMORANDUM NO. 20-14 Page 2 information received by the driver. The electronic image of the delivery ticket will be the official project record. QC and VT personnel shall provide electronic contact information to the Contractor for the purposes of submission of electronic images of paper documents. e-Ticketing (Asphalt only) For asphalt delivery, an e-ticketing system that meets the requirements of the attached modifications to Section 320 and 330 of the Standard Specifications may be used. The electronic version of the delivery ticket will be the official project record. For projects which choose to implement e-ticketing, these modifications must be incorporated into the contract via Supplemental Agreement. Remote Review QC and VT personnel may use a long-reach grabber tool to retrieve the paper ticket from the truck driver, photograph the paper ticket, and return the paper ticket back to the truck driver without handling the paper ticket. Alternatively, project personnel may use a “selfie stick” to photograph the ticket while the truck driver in the truck cab holds up the ticket. In these instances, the electronic image may be used at the jobsite, but the paper ticket will be the official project record. Paper tickets shall be submitted on a weekly basis via US Postal service or private courier service. Paper tickets shall be handled in accordance with CDC and Department of Health guidelines. This memorandum serves as blanket approval to process a supplemental agreement or work order to incorporate this change into the contract. The Department may reimburse the contractor for reasonable costs associated with the cost of implementing an e-ticketing system. Any such costs must be agreed to by the District Construction Engineer prior to implementation of the system. The requirements of the memorandum are effective on all FDOT construction projects effective April 20, 2020 and shall remain in effect until rescinded by the Director, Office of Construction. For questions regarding this memo, please contact the following: Asphalt: Rich Hewitt (386) 943-5305 Concrete: John Westphal (850) 414-4141 Earthwork: Dino Jameson (352) 955-2933 Aggregates: John Shoucair (352) 955-2925 DH/TR/RH Attachment DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
  • 3. Page 1 of 4 CONTROL OF THE WORK HOT MIX ASPHALT – PLANT METHODS AND EQUIPMENT – ELECTRONIC TICKETING. SUBARTICLE 320-3.2 is deleted and the following substituted: 320-3.2 Electronic Weigh Systems: Equip the asphalt plant with an electronic weigh system that has an automatic printout, is certified every six months by an approved certified scale technician, and meets monthly comparison checks with certified truck scales as specified in 320- 3.2.3. Weigh all plant produced hot mix asphalt on the electronic weigh system, regardless of the method of measurement for payment. Include, as a minimum, the following information in the electronic delivery ticket: 1. Sequential load number 2. Project’s Financial Identification Number (FIN) 3. Date 4. Name and location of plant 5. Mix design number 6. Separate, individual, data entry locations for recording mix temperature by: a. Plant QC b. Plant VT c. Roadway QC d. Roadway VT 7. Truck number 8. Gross, tare, and net tonnage per truck 9. Daily cumulative tonnage of mix for the mix design 320-3.2.1 Electronic Ticketing (e-Ticketing) System: Provide an e-Ticketing System (including any necessary software and hardware) capable of monitoring, collecting, storing, and reporting the information required by the Contract for all loads of asphalt mix delivered to the project. After each truck is loaded, electronically record and use a web service to upload the ticket information to the E-ticketing software database. The E-ticketing system shall provide each truck load’s ticket information to users of the e-ticketing software. E-ticketing software must provide the Engineer the ability to access real-time monitoring of asphalt truck load ticket information as described herein. The e-Ticketing system shall be integrated with the Load Read-Out scale system at the asphalt plant site. The e-ticketing system shall have offline capabilities to prevent data loss in the event of power loss or loss of connectivity. 320-3.2.1.1 e-Ticketing System Construction Requirements: Install and operate equipment in accordance with the manufacturer’s specifications. 320-3.2.1.2 Data Deliverables: Provide to the Engineer a means of gathering report summaries by way of iOS or Android apps, web pages, or any other method at the disposal of the Engineer. The Engineer may request data at any time during paving operations. In addition to providing reports referenced in this specification, provide monthly reports, as well as, a final, end of project report in the e-ticketing software and in a comma DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
  • 4. Page 2 of 4 separated value (.csv) file. Provide all e-ticketing database data required in this Section in the monthly and end of project reports and .csv files. 320-3.2.1.3 Real-Time Continuous e-Ticketing Data Items: Provide the Engineer access to the e-Ticketing system data viewer which displays the following information in real-time with a web-based or App-based system compatible with iOS, Windows, or Android environments: 1. Each Truck: a. Unique Truck ID b. Sequential Truck Load Number c. Mix Design Number d. Net Weight of material being transported (to the nearest 0.01 ton) e. Running Daily Total of Net Weight of material being transported (to the nearest 0.01 ton) f. Project’s Financial Identification Number 2. Project Location 320-3.2.1.4 Daily Summary: Provide the following summary information to the Engineer electronically within 4 hours of beginning operations on the next working day: 1. List of Individual Loads a. Contractor Name b. Project’s Financial Identification Number (FIN) c. Unique Truck ID d. Sequential Load Number e. Net Weight for Payment (nearest 0.01 tons) f. Net Weight of Waste (nearest 0.01 tons) g. Date Paved h. Mix Temperature Measurements (Plant QC, Plant VT, Roadway QC, and Roadway VT) i. Time Loaded at Plant site 320-3.2.2: Electronic Weigh Systems: Utilize any one of the following three electronic weigh systems. 320-3.2.2.1 Electronic Weigh System on the Truck Scales: Provide an electronic weigh system on all truck scales, which is equipped with an automatic recordation system that is approved by the Engineer. Use scales of the type that directly indicate the total weight of the loaded truck. Use scales meeting the requirements for accuracy, condition, etc., of the Bureau of Weights and Measures of the Florida Department of Agriculture, and re-certify such fact every six months, either by the Bureau of Weights and Measures or by a registered scale technician. 320-3.2.2.2 Electronic Weigh System on Hoppers Beneath a Surge or Storage Bin: Provide an electronic weigh system on the hopper (hopper scales or load cells) beneath the surge or storage bin, which is equipped with an automatic recordation system approved by the Engineer. 320-3.2.3 Monthly Electronic Weigh System Comparison Checks: Check the accuracy of the electronic weighing system at the commencement of production and thereafter at least every 30 days during production by one of the following two methods and maintain a record of the weights in the Scale Check Worksheet. DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
  • 5. Page 3 of 4 320-3.2.3.1. Electronic Weigh System on Truck Scales: 1. The Engineer will randomly select a loaded truck of asphalt mix, a loaded aggregate haul truck, or another vehicle type approved by the Engineer and record the truck number and gross weight from the Contractor’s delivery ticket. 2. Weigh the selected truck on a certified truck scale, which is not owned by the Contractor and record the gross weight for the comparison check. If another certified truck scale is not available, the Engineer may permit another set of certified truck scales owned by the Contractor to be used. The Engineer may elect to witness the scale check. 3. The gross weight of the loaded truck as shown on the Contractor’s delivery ticket will be compared to the gross weight of the loaded truck from the other certified truck scale. The maximum permissible deviation is 8 pounds per ton of load, based on the certified truck scale weight. 4. If the distance from the asphalt plant to the nearest certified truck scale is enough for fuel consumption to affect the accuracy of the comparison checks, a fuel adjustment may be calculated by using the truck odometer readings for the distance measurement, and 6.1 miles per gallon for the fuel consumption rate, and 115 ounces per gallon for fuel weight. 5. During production, when an additional certified truck scale is not available for comparison checks, the Engineer may permit the Contractor to weigh the truck on his certified scales used during production and then weigh it on another certified truck scale, as soon the other scale is available for the comparison checks. In addition to the periodic checks as specified above, check the scales at any time the accuracy of the scales becomes questionable. When such inaccuracy does not appear to be sufficient to seriously affect the weighing operations, the Engineer will allow a period of two calendar days for the Contractor to conduct the required scale check. However, in the event the indicated inaccuracy is sufficient to seriously affect the mixture, the Engineer may require immediate shut-down until the accuracy of the scales has been checked and necessary corrections have been made. Include the cost of all scale checks in the bid price for asphalt concrete, at no additional cost to the Department. 320-3.2.3.2. Electronic Weigh System on Hoppers Beneath a Surge or Storage Bin: 1. The Engineer will randomly select a loaded truck of asphalt mix and record the truck number, and the net weight of the asphalt mix from the Contractor’s delivery ticket. 2. Weigh the selected truck on a certified truck scale, which is not owned by the Contractor and record the gross weight for the comparison check. If another certified truck scale is not available, the Engineer may permit another set of certified truck scales owned by the Contractor to be used. The Engineer may elect to witness the scale check. 3. Deliver the asphalt mix to the project, then weigh the selected empty truck on the same certified truck scales. Record the tare weight of the truck. 4. Compare the net weight of the asphalt mix from the delivery ticket to the calculated net weight of the asphalt mix as determined by the certified truck scale weights. The maximum permissible deviation is 8 pounds per ton of load, based on the certified truck scale weight. DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
  • 6. Page 4 of 4 5. Use the fuel adjustment as specified in 320-3.2.3.1(4), when the distance from the asphalt plant to the nearest certified truck scale is enough for fuel consumption to affect the accuracy of the comparison checks. 6. During production, when an additional certified truck scale is not available for comparison checks, the Engineer may permit the Contractor to load a truck with aggregate from the pugmill, surge or storage bin, and follow the above procedures to conduct the comparison checks as soon as certified truck scale is available. If the check shows a greater difference than the tolerance specified above, then recheck on a second set of certified scales. If the check and recheck indicate that the printed weight is out of tolerance, have a certified scale technician check the electronic weigh system and certify the accuracy of the printer. While the system is out of tolerance and before its adjustment, the Engineer may allow the Contractor to continue production only if provisions are made to use a set of certified truck scales to determine the truck weights. DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0
  • 7. Page 1 of 1 CONTROL OF THE WORK HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS SUBARTICLE 330-2.1 is deleted and the following substituted: 330-2.1 Minimum QC Requirements: Perform as a minimum, the following activities necessary to maintain process control and meet Specification requirements: 1. Pavement Density: Monitor the pavement temperature with an infrared temperature device so compaction is completed before the surface temperature of the pavement drops to the extent that effective compaction may not be achieved or the rollers begin to damage the pavement. Monitor the roadway density with either 6 inch diameter roadway cores, a nuclear density gauge, or other density measuring device, at a minimum frequency of once per 1,500 feet of pavement. 2. Mix Temperature: Determine the mix temperature at the roadway for the first five loads and one out of every five loads thereafter. 3. Mix Spread Rate: Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons placed. When determining the spread rate, use, at a minimum, an average of five truckloads of mix. 4. Pavement Texture: Monitor the pavement texture to minimize pavement segregation. Use density gauges, infrared temperature measurement devices, or roadway cores at the beginning of each day’s production, and as necessary, both at truck exchanges and during normal paving operations. 5. Reporting: Ensure the accuracy of the QC Roadway Reports on the Department’s approved form to reflect the actual surface area of the finished work and be in compliance with the requirements of the Contract Documents. 6. Electronic Ticketing (E-Ticketing): Provide a tablet computer on site with the Paving Operation capable of running the E-Ticketing software outlined in Section 320. Use the E-ticketing software to obtain truck ticket information and record mix temperatures. Use the E- ticketing data for entry into the Asphalt Roadway – Daily Report of Quality Control. CONTROL OF THE WORK DocuSign Envelope ID: B19786AE-7B9A-4ADD-AE21-6565844572E0