1.1

Integrated Building Management Solution

1.1.1

Systems Integration

With the integration of all systems to the UPI, the relevant organization will achieve the
provision of best practise standard services and value added enhanced services to the
inhabitants and visitors of the smart community. This will improve the unique experience
of living and visiting a city of the 21st century with all the comfort, enjoyment and security
people can imagine and even beyond of this.
The measurable effects of integrated systems are immediate and notable in five primary
areas:
1. Reduced installation costs
Using IELV for new developments, online documentation and recorded current
and future changes or additions.
2. Increased information access
Including diagnostics and maintenance issues e.g. pro-active maintenance.
3. Information and Integration management
Centralises information at single location and combines information for analysis
and reporting against energy usage, equipment operation and temperatures.
4. Site-wide user interface
Offers single-seat operation, eliminating the costs of duplicated front-end
equipment. This increases operator efficiency by simplifying operator access to
multiple systems, thus reducing operator training costs.
5. Inter-process Integration
How one system effects another creates a smart building. While time schedules
might synchronise lights and cooling, ventilation and other building systems,
security systems allow entry and can be used for triggering superior systems to
turn on HVAC and lights. Furthermore, usage information can be recorded for
tenant billing.
iBMS is an advancement of building automation control system (BACS), building
management systems (BMS) and building security systems (SMS). These components
are no longer stand-alone systems. The integration of all systems into one solution
provides the basis for optimised building operations with reduced operating costs.
In a nutshell, the iBMS solution:
•
•
•
•

Integrates all systems
Monitors and controls building management systems
Improves management capability & building efficiencies
Reduces costs.

An iBMS consists of central control, central communications and remote control systems
to monitor and control the following systems (but not limited to):
•
•
•

Heating, ventilation, and air conditioning systems.
Smoke detection
Energy and power management
•
•
•
•
•
•
•
•
•
•
•

Plumbing systems
Building and exterior lighting
Fire alarm and detection
Intrusion detection and security access
Emergency power generator and UPS
Power supply
CCTV
Boiler/ Pool Management System
Audio Visual System
Elevator Monitoring System
Irrigation System.

An iBMS approach eliminates silos of data and ensures that all data can be viewed and
analysed, enabling important building systems to be centralised for monitoring and
control purposes (Figure 1). System integration has the advantage of avoiding wastage
and the unnecessary costs associated with the inappropriate deployment of manpower
and labour resources to identify and resolve operating problems with plant, equipment
and associated building and facilities assets. The implementation of an iBMS can
therefore help decrease the number of building operations personnel required as well as
lessen the chance of human error in identifying and resolving building operational
problems.
The reporting functionality of an iBMS enables both clients and facilities managers to
obtain accurate and continuous data on the actual running costs of such areas as
energy and lighting, and enables pro-active analysis to be carried out to reduce the high
costs of a building’s operation.
Figure 1: Intelligent Integrated Building Management Solution iBMS
1.1.2 Command & Control Centre (CCC)
The CCC is the central point of integration for all owned or operated or 3rd party operated
and interconnected facilities (Figure 2). It provides central integration of building systems,
security systems and municipality systems.
Figure 2: Command & Control Centre CCC
All systems will be connected to a Control & Command Centre (CCC), which uses
remote access to the systems through a standard interface and provides maintenance
and security services. From the CCC it will be possible to get a complete view of all the
connected buildings, get a summary of data, receive alarms & view all operating
parameters relating to life safety, energy consumption and key parameters which are
vital to maintain the conditions in the building.
The core functions are but not limited to:
• Central interface to the SOC (CAFM system), NOC, SCRs and LCRs
• Central alarm management
• Central monitoring
• iBMS related measures
• Reporting.
1.1.3 Benefits
The benefits of implementing an Integrated System Solution for BMS and Security
Services include:
Overall benefits:
• Integrated technology solutions and support to Facilities Management operations
• Single Source Solution & Responsibility for unified monitoring & control of all
developments
• Build a unified supervision/ control instance of all planned & unscheduled events
– 24/7 basis
• Build a central supervision and control of decentralised (local, peripheral)
buildings and their BMS
• To achieve higher efficiency of employees by repeated use of identical
technology
• To automate workflows, quality assurance, reproducibility
• To automate accounting
• Enable Effective Energy management
• Support Data Centre management
• Achieve Operating Cost savings via improved operating efficiencies, reduced
head count
• Better control & higher service quality
• Meaningful & proactive reporting
• Improved levels of customer satisfaction of hotel guests, tenants and owners
• Capability to provide services and generate additional revenue from other (3rd
party) developments.
• Connectivity of the iBMS for future Premium Class FM Services to be provided.
Operator’s benefits:
• Integrate & optimise operational processes (proactive management & reporting)
• Enable a proper coordination of different service providers/suppliers/maintenance
suppliers
• Monitor and control; not just monitoring facilities systems and services
• Transparency in cost and processes
• Cost optimisation
• Resource optimisation
User’s / Owner’s benefits:
• Reduction in operating expenditure (OPEX)
• Greater control of assets & performance
• Minimising Risks
• Improved service quality
• Reduced system downtime
• Improved reporting and decision making / analysis functionality
• Conservation of building asset value
• Focus on core business.
1.1.4 Savings
Based on a Centralised Command and Control Centre (CCC) for BMS, FM and Security
Services against traditional localised control, an annual saving of 10% of operational
costs can be achieved. This equates to approximate savings of $ 1,85m in Year 1 of
operation rising to $ 46m in Year 10 and $ 74m in Year 20. The 20-year-period
cumulated savings sum up to $ 667m.
The integration of the systems into a CCC will result in substantial reductions in the
number of operator staff required as it will not be necessary to have operators based at
each location. Due to the reduced staff on site, the savings per year in staffing alone
would be around $ 4,414,000. In addition to the saving, there would be significant
improvement in speed and efficiency and this, combined with fast access to data and
trending information, would add up to enormous savings over a 20 year period.
The calculation model is based only for standard iBMS/ Security/ Municipality services.
There are additional enhanced services that could be delivered to various customers
The ramp up of the CCC will be done in 4 steps according the development of GFA
during the 20 years period. The first step of the CCC ramp up will be done. Step 1 has
duration of two years. This period is used for operation as well as for training and to gain
experience with workflow, operational procedures and for optimising daily routines. At
the end of Year 2 the second Step of the CCC ramp up will be done. Step 2 also has
duration of two years. This period is used for optimised operation and to get well attuned
to each other. At the end of Year 4 the third Step of the CCC ramp up will be done. Step
3 has duration of five years. In this period full operation is executed. Control-Room is
fully equipped and staffed. At the end of the 9th Year the final Step of the CCC ramp up
will be done. This final step guarantees expandability for future operations up to 2030.

1.1.5 Logical Integration of Operations and Control Rooms
In terms of a logical integration that enables the different specialised centres to work
together it is strongly recommended to interconnect them over the UPI (Figure 3). Then
data from one centre will be accessible from the other centres and vice versa. The
Organization has the huge opportunity to make these data available to local authorities
and governmental departments for their individual use.
Figure 3: Logical Integration of Operations and Control Centres

More Related Content

What's hot

Process Control in Chemical Industry
Process Control in Chemical IndustryProcess Control in Chemical Industry
Process Control in Chemical Industryjournal ijrtem
 
Multi-agent controlled building management system
Multi-agent controlled building management systemMulti-agent controlled building management system
Multi-agent controlled building management systemVimukkthi Vithanage
 
Building Management Services
Building Management Services Building Management Services
Building Management Services Aroh Thombre
 
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
VET4SBO Level 2   module 4 - unit 2 - v0.5 enVET4SBO Level 2   module 4 - unit 2 - v0.5 en
VET4SBO Level 2 module 4 - unit 2 - v0.5 enKarel Van Isacker
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processesTIP Technologies
 
Computer integrated manufacturing
Computer integrated manufacturingComputer integrated manufacturing
Computer integrated manufacturingSyed Ajeesh
 
Automated manufacturing systems
Automated manufacturing systemsAutomated manufacturing systems
Automated manufacturing systemsMR Z
 
Building management system
Building management systemBuilding management system
Building management systemcharan malyala
 
MetConsole_AWOS_A4_2015
MetConsole_AWOS_A4_2015MetConsole_AWOS_A4_2015
MetConsole_AWOS_A4_2015Yakov Elizarov
 
EAM Solution brochure _English_7070
EAM Solution brochure _English_7070EAM Solution brochure _English_7070
EAM Solution brochure _English_7070adrie aarts
 
Building automation standards and integration
Building automation standards and integrationBuilding automation standards and integration
Building automation standards and integrationAbdullah Albazzour
 
Real time monitoring proposal 2011
Real time monitoring proposal 2011Real time monitoring proposal 2011
Real time monitoring proposal 2011Eduardo Carvajal
 
Chapter 1 introduction to automation
Chapter 1   introduction  to automationChapter 1   introduction  to automation
Chapter 1 introduction to automationMohamad Sahiedan
 

What's hot (20)

series-9-module-5-oct-11-
series-9-module-5-oct-11-series-9-module-5-oct-11-
series-9-module-5-oct-11-
 
Bms system
Bms  systemBms  system
Bms system
 
Process Control in Chemical Industry
Process Control in Chemical IndustryProcess Control in Chemical Industry
Process Control in Chemical Industry
 
Multi-agent controlled building management system
Multi-agent controlled building management systemMulti-agent controlled building management system
Multi-agent controlled building management system
 
Building Management Services
Building Management Services Building Management Services
Building Management Services
 
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
VET4SBO Level 2   module 4 - unit 2 - v0.5 enVET4SBO Level 2   module 4 - unit 2 - v0.5 en
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
 
System
SystemSystem
System
 
Process Control
Process ControlProcess Control
Process Control
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processes
 
Computer integrated manufacturing
Computer integrated manufacturingComputer integrated manufacturing
Computer integrated manufacturing
 
Automated manufacturing systems
Automated manufacturing systemsAutomated manufacturing systems
Automated manufacturing systems
 
shwetabisht
shwetabishtshwetabisht
shwetabisht
 
Building management system
Building management systemBuilding management system
Building management system
 
Spectrum Power™ OMS
Spectrum Power™ OMSSpectrum Power™ OMS
Spectrum Power™ OMS
 
MetConsole_AWOS_A4_2015
MetConsole_AWOS_A4_2015MetConsole_AWOS_A4_2015
MetConsole_AWOS_A4_2015
 
EAM Solution brochure _English_7070
EAM Solution brochure _English_7070EAM Solution brochure _English_7070
EAM Solution brochure _English_7070
 
Building automation standards and integration
Building automation standards and integrationBuilding automation standards and integration
Building automation standards and integration
 
30120140504024
3012014050402430120140504024
30120140504024
 
Real time monitoring proposal 2011
Real time monitoring proposal 2011Real time monitoring proposal 2011
Real time monitoring proposal 2011
 
Chapter 1 introduction to automation
Chapter 1   introduction  to automationChapter 1   introduction  to automation
Chapter 1 introduction to automation
 

Similar to iBMS - SmartCity fundamentals (Example)

Building efficiency services & ICT.pdf
Building efficiency services & ICT.pdfBuilding efficiency services & ICT.pdf
Building efficiency services & ICT.pdfKhairulAmri730768
 
Tutorial 1 Solution IBMS ET1521.pdf
Tutorial  1 Solution IBMS ET1521.pdfTutorial  1 Solution IBMS ET1521.pdf
Tutorial 1 Solution IBMS ET1521.pdfOoiYeongLih1
 
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATIONIBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATIONIRJET Journal
 
6.0 IP CCTV video integration
6.0 IP CCTV video integration 6.0 IP CCTV video integration
6.0 IP CCTV video integration Nader Elmansi
 
BUILDING AUTOMATION.pdf
BUILDING AUTOMATION.pdfBUILDING AUTOMATION.pdf
BUILDING AUTOMATION.pdfveertasingh1
 
Data Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetData Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetGE_India
 
Fluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFrederic Baudart, CMRP
 
AIO-1401-0100 AIO Systems CMS LV
AIO-1401-0100 AIO Systems CMS LVAIO-1401-0100 AIO Systems CMS LV
AIO-1401-0100 AIO Systems CMS LVOladunjoye Temitope
 
Control engineering overview
Control engineering overviewControl engineering overview
Control engineering overviewDorleControls
 
BACnet & Building Analytics
BACnet & Building AnalyticsBACnet & Building Analytics
BACnet & Building AnalyticsFiras Obeido
 
How network operators improve their efficiency and prepare for market consoli...
How network operators improve their efficiency and prepare for market consoli...How network operators improve their efficiency and prepare for market consoli...
How network operators improve their efficiency and prepare for market consoli...Comarch
 
VET4SBO Level 2 module 6 - unit 3 - v1.0 en
VET4SBO Level 2   module 6 - unit 3 - v1.0 enVET4SBO Level 2   module 6 - unit 3 - v1.0 en
VET4SBO Level 2 module 6 - unit 3 - v1.0 enKarel Van Isacker
 
VET4SBO Level 1 module 4 - unit 2 - v0.9 en
VET4SBO Level 1   module 4 - unit 2 - v0.9 enVET4SBO Level 1   module 4 - unit 2 - v0.9 en
VET4SBO Level 1 module 4 - unit 2 - v0.9 enKarel Van Isacker
 
Meazon white paper_building_energy_profiling
Meazon white paper_building_energy_profilingMeazon white paper_building_energy_profiling
Meazon white paper_building_energy_profilingGiannis Gionas
 
ANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARD
ANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARDANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARD
ANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARDIAEME Publication
 
Case Study - Monitoring and Evaluating the working of Telenor and ZTE
Case Study - Monitoring and Evaluating the working of Telenor and ZTECase Study - Monitoring and Evaluating the working of Telenor and ZTE
Case Study - Monitoring and Evaluating the working of Telenor and ZTEAsim Ranjha
 
VET4SBO Level 3 module 1 - unit 4 - 0.009 en
VET4SBO Level 3   module 1 - unit 4 - 0.009 enVET4SBO Level 3   module 1 - unit 4 - 0.009 en
VET4SBO Level 3 module 1 - unit 4 - 0.009 enKarel Van Isacker
 

Similar to iBMS - SmartCity fundamentals (Example) (20)

Advanced facility management
Advanced facility managementAdvanced facility management
Advanced facility management
 
Building efficiency services & ICT.pdf
Building efficiency services & ICT.pdfBuilding efficiency services & ICT.pdf
Building efficiency services & ICT.pdf
 
Tutorial 1 Solution IBMS ET1521.pdf
Tutorial  1 Solution IBMS ET1521.pdfTutorial  1 Solution IBMS ET1521.pdf
Tutorial 1 Solution IBMS ET1521.pdf
 
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATIONIBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
IBMS IN HIGH RISE BUILDINGS (HVAC AND LIGHTING) COST OPTIMIZATION
 
6.0 IP CCTV video integration
6.0 IP CCTV video integration 6.0 IP CCTV video integration
6.0 IP CCTV video integration
 
BUILDING AUTOMATION.pdf
BUILDING AUTOMATION.pdfBUILDING AUTOMATION.pdf
BUILDING AUTOMATION.pdf
 
Data Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetData Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial Internet
 
Fluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFluke Connect Condition Based Maintenance
Fluke Connect Condition Based Maintenance
 
AIO-1401-0100 AIO Systems CMS LV
AIO-1401-0100 AIO Systems CMS LVAIO-1401-0100 AIO Systems CMS LV
AIO-1401-0100 AIO Systems CMS LV
 
Control engineering overview
Control engineering overviewControl engineering overview
Control engineering overview
 
BACnet & Building Analytics
BACnet & Building AnalyticsBACnet & Building Analytics
BACnet & Building Analytics
 
How network operators improve their efficiency and prepare for market consoli...
How network operators improve their efficiency and prepare for market consoli...How network operators improve their efficiency and prepare for market consoli...
How network operators improve their efficiency and prepare for market consoli...
 
VET4SBO Level 2 module 6 - unit 3 - v1.0 en
VET4SBO Level 2   module 6 - unit 3 - v1.0 enVET4SBO Level 2   module 6 - unit 3 - v1.0 en
VET4SBO Level 2 module 6 - unit 3 - v1.0 en
 
VET4SBO Level 1 module 4 - unit 2 - v0.9 en
VET4SBO Level 1   module 4 - unit 2 - v0.9 enVET4SBO Level 1   module 4 - unit 2 - v0.9 en
VET4SBO Level 1 module 4 - unit 2 - v0.9 en
 
BMS-System
BMS-SystemBMS-System
BMS-System
 
Meazon white paper_building_energy_profiling
Meazon white paper_building_energy_profilingMeazon white paper_building_energy_profiling
Meazon white paper_building_energy_profiling
 
ANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARD
ANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARDANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARD
ANALYSIS OF NETWORK PERFORMANCE MANAGEMENT DASHBOARD
 
Case Study - Monitoring and Evaluating the working of Telenor and ZTE
Case Study - Monitoring and Evaluating the working of Telenor and ZTECase Study - Monitoring and Evaluating the working of Telenor and ZTE
Case Study - Monitoring and Evaluating the working of Telenor and ZTE
 
VET4SBO Level 3 module 1 - unit 4 - 0.009 en
VET4SBO Level 3   module 1 - unit 4 - 0.009 enVET4SBO Level 3   module 1 - unit 4 - 0.009 en
VET4SBO Level 3 module 1 - unit 4 - 0.009 en
 
Managed services
Managed servicesManaged services
Managed services
 

Recently uploaded

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 

iBMS - SmartCity fundamentals (Example)

  • 1. 1.1 Integrated Building Management Solution 1.1.1 Systems Integration With the integration of all systems to the UPI, the relevant organization will achieve the provision of best practise standard services and value added enhanced services to the inhabitants and visitors of the smart community. This will improve the unique experience of living and visiting a city of the 21st century with all the comfort, enjoyment and security people can imagine and even beyond of this. The measurable effects of integrated systems are immediate and notable in five primary areas: 1. Reduced installation costs Using IELV for new developments, online documentation and recorded current and future changes or additions. 2. Increased information access Including diagnostics and maintenance issues e.g. pro-active maintenance. 3. Information and Integration management Centralises information at single location and combines information for analysis and reporting against energy usage, equipment operation and temperatures. 4. Site-wide user interface Offers single-seat operation, eliminating the costs of duplicated front-end equipment. This increases operator efficiency by simplifying operator access to multiple systems, thus reducing operator training costs. 5. Inter-process Integration How one system effects another creates a smart building. While time schedules might synchronise lights and cooling, ventilation and other building systems, security systems allow entry and can be used for triggering superior systems to turn on HVAC and lights. Furthermore, usage information can be recorded for tenant billing. iBMS is an advancement of building automation control system (BACS), building management systems (BMS) and building security systems (SMS). These components are no longer stand-alone systems. The integration of all systems into one solution provides the basis for optimised building operations with reduced operating costs. In a nutshell, the iBMS solution: • • • • Integrates all systems Monitors and controls building management systems Improves management capability & building efficiencies Reduces costs. An iBMS consists of central control, central communications and remote control systems to monitor and control the following systems (but not limited to): • • • Heating, ventilation, and air conditioning systems. Smoke detection Energy and power management
  • 2. • • • • • • • • • • • Plumbing systems Building and exterior lighting Fire alarm and detection Intrusion detection and security access Emergency power generator and UPS Power supply CCTV Boiler/ Pool Management System Audio Visual System Elevator Monitoring System Irrigation System. An iBMS approach eliminates silos of data and ensures that all data can be viewed and analysed, enabling important building systems to be centralised for monitoring and control purposes (Figure 1). System integration has the advantage of avoiding wastage and the unnecessary costs associated with the inappropriate deployment of manpower and labour resources to identify and resolve operating problems with plant, equipment and associated building and facilities assets. The implementation of an iBMS can therefore help decrease the number of building operations personnel required as well as lessen the chance of human error in identifying and resolving building operational problems. The reporting functionality of an iBMS enables both clients and facilities managers to obtain accurate and continuous data on the actual running costs of such areas as energy and lighting, and enables pro-active analysis to be carried out to reduce the high costs of a building’s operation.
  • 3. Figure 1: Intelligent Integrated Building Management Solution iBMS 1.1.2 Command & Control Centre (CCC) The CCC is the central point of integration for all owned or operated or 3rd party operated and interconnected facilities (Figure 2). It provides central integration of building systems, security systems and municipality systems.
  • 4. Figure 2: Command & Control Centre CCC All systems will be connected to a Control & Command Centre (CCC), which uses remote access to the systems through a standard interface and provides maintenance and security services. From the CCC it will be possible to get a complete view of all the connected buildings, get a summary of data, receive alarms & view all operating parameters relating to life safety, energy consumption and key parameters which are vital to maintain the conditions in the building. The core functions are but not limited to: • Central interface to the SOC (CAFM system), NOC, SCRs and LCRs • Central alarm management • Central monitoring • iBMS related measures • Reporting.
  • 5. 1.1.3 Benefits The benefits of implementing an Integrated System Solution for BMS and Security Services include: Overall benefits: • Integrated technology solutions and support to Facilities Management operations • Single Source Solution & Responsibility for unified monitoring & control of all developments • Build a unified supervision/ control instance of all planned & unscheduled events – 24/7 basis • Build a central supervision and control of decentralised (local, peripheral) buildings and their BMS • To achieve higher efficiency of employees by repeated use of identical technology • To automate workflows, quality assurance, reproducibility • To automate accounting • Enable Effective Energy management • Support Data Centre management • Achieve Operating Cost savings via improved operating efficiencies, reduced head count • Better control & higher service quality • Meaningful & proactive reporting • Improved levels of customer satisfaction of hotel guests, tenants and owners • Capability to provide services and generate additional revenue from other (3rd party) developments. • Connectivity of the iBMS for future Premium Class FM Services to be provided. Operator’s benefits: • Integrate & optimise operational processes (proactive management & reporting) • Enable a proper coordination of different service providers/suppliers/maintenance suppliers • Monitor and control; not just monitoring facilities systems and services • Transparency in cost and processes • Cost optimisation • Resource optimisation User’s / Owner’s benefits: • Reduction in operating expenditure (OPEX) • Greater control of assets & performance • Minimising Risks • Improved service quality • Reduced system downtime • Improved reporting and decision making / analysis functionality • Conservation of building asset value • Focus on core business.
  • 6. 1.1.4 Savings Based on a Centralised Command and Control Centre (CCC) for BMS, FM and Security Services against traditional localised control, an annual saving of 10% of operational costs can be achieved. This equates to approximate savings of $ 1,85m in Year 1 of operation rising to $ 46m in Year 10 and $ 74m in Year 20. The 20-year-period cumulated savings sum up to $ 667m. The integration of the systems into a CCC will result in substantial reductions in the number of operator staff required as it will not be necessary to have operators based at each location. Due to the reduced staff on site, the savings per year in staffing alone would be around $ 4,414,000. In addition to the saving, there would be significant improvement in speed and efficiency and this, combined with fast access to data and trending information, would add up to enormous savings over a 20 year period. The calculation model is based only for standard iBMS/ Security/ Municipality services. There are additional enhanced services that could be delivered to various customers The ramp up of the CCC will be done in 4 steps according the development of GFA during the 20 years period. The first step of the CCC ramp up will be done. Step 1 has duration of two years. This period is used for operation as well as for training and to gain experience with workflow, operational procedures and for optimising daily routines. At the end of Year 2 the second Step of the CCC ramp up will be done. Step 2 also has duration of two years. This period is used for optimised operation and to get well attuned to each other. At the end of Year 4 the third Step of the CCC ramp up will be done. Step 3 has duration of five years. In this period full operation is executed. Control-Room is fully equipped and staffed. At the end of the 9th Year the final Step of the CCC ramp up will be done. This final step guarantees expandability for future operations up to 2030. 1.1.5 Logical Integration of Operations and Control Rooms In terms of a logical integration that enables the different specialised centres to work together it is strongly recommended to interconnect them over the UPI (Figure 3). Then data from one centre will be accessible from the other centres and vice versa. The Organization has the huge opportunity to make these data available to local authorities and governmental departments for their individual use.
  • 7. Figure 3: Logical Integration of Operations and Control Centres