2. Disclaimer
This presentation has been prepared by Mining Gate Mongolia LLC (MGM) for EMGR LLC to
provide an overview of the Khongor Ovoo project. Any statements, opinions, projections,
forecasts or other material contained in this presentation do not constitute a commitment,
representation or warranty by MGM, EMGR or its directors, officers, agents, associates or
employees. The directors, officers, associates, agents and employees of MGM and EMGR shall in
no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of
whatsoever nature arising in any way out of, or in connection with, the information contained in
this presentation. This presentation does not constitute an offer to sell securities and is not a
solicitation of an offer to buy securities. It is not to be distributed to third parties without the
consent of EMGR. An investment in EMGR is considered to be speculative in nature. MGM and
EMGR recommends that you consult your own professional advisor(s).
Certain statements in this presentation may constitute “forward-looking” statements that involve
known and unknown risks, uncertainties and other factors that may cause EMGR’s actual results,
performance or achievements or industry results to be materially different from any future results,
performance or achievements expressed or implied by such forward looking statements. These
statements relate to future events or future performance and reflect business prospects and
opportunities. Forward-looking statements involve significant risks and uncertainties, should not
be read as guarantees of future performance or results, and will not necessarily be accurate
indicators of whether or not such results will be achieved. Forward-looking statements are based
on the beliefs, estimates and opinions of EMGR’s management on the date the statements are
made. EMGR undertakes no obligation to update these forward looking statements in the event
that management’s beliefs, estimates or opinions, or their factors should change.
4. 2014Mongolia Profile
February 2014 EMGR LLC
Mongolia ranks highly against other minerals frontiers across broad criteria.
• Security
Stable environment
Robust democracy
• Regulatory
Supportive new investment law
Experienced regulators
• Economy
Open economy
Established mining service sector
• Markets
Strategic location
Adjacent to north Asia copper markets
5. 2014Highlights
Porphyry
district
February 2014 EMGR LLC
• High-grade copper & copper-gold porphyry mineralization @ 0.05 – 1.5%
• Significant prospects defined by extensive exploration
New
discoveries
• Numerous drill ready targets
• Large license only partially explored
• South Gobi’s power and rail infrastructure
• Adjacent to key Chinese copper market
Strategic
location
Value
proposition
• Low cost, high impact exploration program
• Aspirations to be next Asian mid-tier copper producer
8. 2014
The property is located 480 km south of capital city Ulaanbaatar, 130 km
northeast Umnugobi provincial capital of Dalanzadgad city and 20 km
northwest of Tsogt Ovoo soum center covering an area of 16,210 hectares.
Khongor Ovoo - Location
February 2014 EMGR LLC
10. 2014Khongor Ovoo Exploration History
February 2014 EMGR LLC
1978 – Geological mapping
and survey on 1:200000
scale by V.E.Goldenberg
1983 – Geological mapping
and survey on 1:200000
scale by L.V.Zabotkin
1995 – Geological mapping
and survey on 1:50000 scale
by D.Gansukh
2010 – Geological
exploration and survey by
“EMGR” LLC
11. 2014Geology
February 2014 EMGR LLC
The current copper mineralization
estimated at greater than one
kilometer in length follows steeply
dipping faults related to rifting and
emplacement of adjacent intrusive
rocks. Shattering of the surrounding
wall-rocks during intrusion has
created excellent pathways for
hydrothermal fluid migration and
resultant copper gold deposition.
Structural interpretation of the drill
core has identified a complex
geological history and by timing
the mineralization episode it is now
possible to understand and predict
the general distribution of copper.
14. 2014Strategy 2014-2016
February 2014 EMGR LLC
Advanced exploration
Further exploration , culminating
in internationally recognized
geological report including:
• Conceptual studies
• Due Diligence
• Independent Specialist Reports
• Exploration program review
• 3D Geological modelling
Phase One Phase Two Phase Three
Continued exploration
•Application to government for
upgrade of licenses
• Resource estimation
• Resource project evaluations
• Acquisitions/mergers due
diligence
• JORC and NI 43-101
competent person reports
•Further financing via public
markets and/or strategic
investments
Mining production stage
•Further capital investment to
bring mine into production
•Additional fundraising to
finance further mining activities
•Potential sale to strategic player
15. 2014Conclusion
February 2014 EMGR LLC
With the initial and limited drilling results done in 2011, we’ve identified 2 copper ore bodies:
Ore body Length
(in meters)
Width
(in meters)
Depth
(in meters)
Volume
(in t/m3)
Ore mass
percentage
Average
Cu %
Cu reserve
(in thous.t)
Ore body 1 1200 110 50 2.5 40 0.02 198.0
Ore body 2 600 110 50 2.5 50 0.03 112.5
TOTAL 310.5
In order to increase the properties reserve level, detailed exploration and drilling work needs to be
done at 1:10000 to 1:5000 scale
Khongor Ovoo property is very similar to that of Kharmagtai, recently purchased by Mongol Metals
LLC and Xanadu Mines LLC.