2. AMMICO COMPANY PROFILE
TABLE OF CONTENTS
DESCRIPTION SECTION
Introduction to the Company 1
Company Organization 2
List of Key Personnel 3
Details of Equipment Owned by Ammico 4
List of Projects in Progress 5
List of Piling Works Projects Completed 6
List of Marine Works Projects Completed 7
List of Earthworks Projects Completed 8
Resumes of Key Personnel 9
Copies of Various Trade Licenses 10
Photo Gallery 11
ISO & OHSAS Certificates and Company Policies 12
Safety Awards 13
4. INTRODUCTION TO AMMICO
Ammico is a leading specialist contracting company with forty years international experience.
Over these years, Ammico has developed expertise that is second to none in the following:
Foundation Engineering
BORED CAST-IN-SITU PILING INCLUDING SECANT PILES
DIAPHRAGM WALL INSTALLATION
EARTH RETENTION SYSTEMS FOR DEEP EXCAVATIONS
DEWATERING FOR DEEP EXCAVATIONS
INSTALLATION OF PERMANENT, TEMPORARY AND REMOVABLE GROUND ANCHORS
JET GROUTING, MICROPILING, SOIL NAILING, SHOTCRETING
SOIL IMPROVEMENT USING VIBROFLOTATION TECHNIQUE & DYNAMIC COMPACTION
Ground Engineering & Civil Works
SITE PREPARATION & EARTHWORKS
DEEP EXCAVATION WORKS / ROCK CUTTING
LAYING OF UNDERGROUND UTILITIES AND ASSOCIATED CIVIL WORKS
Marine Works
OFFSHORE PILING
CONSTURCTION OF JETTIES
SHORE PROTECTION, BREAKWATERS
The company maintains a fleet of state of the art equipment for execution of its works and
invests heavily each year in purchase of new equipment and in maintaining the existing
equipment in prime working order.
Ammico’s true strength, however, is its dedicated and highly professional team, each member
of which excels in his respective discipline. The capabilities of this resource are continuously
enhanced by encouraging teamwork and by rewarding initiative and innovation, by regular
training of existing staff and by induction of new personnel with promising potential.
The company gives utmost importance to honouring of commitments and establishing
harmonious working relationships with its clients. It is a source of great pride for Ammico that
all projects it has undertaken so far have been completed to the entire satisfaction of the clients.
During the past four decades, Ammico has established a reputation for speed and quality of
work, technical skill and know-how of its staff and its ability to deliver under demanding site
conditions and tight schedules. We cherish this reputation and shall strive tirelessly to improve
in all our present and future endeavours.
8. Sr.
No.
Name Designation Education Experience
1 Jamal Nasir Chief Executive Officer M.S.Civil Engineering 29 years
2 Muzaffar Iqbal Anjum Deputy General Manager B.S.Civil Engineering 19 years
3 Mohammad Ashfaq Anwar Country Manager - Saudi Arabia M.S. Civil Engineering 20 years
4 Sher Ali Ismaily Manager - Earthworks Division B.S. Civil Engineering 28 years
5 Uygar Koprucu Manager - Marine Division B.S.Civil Engineering 15 years
6 Shehzad Akmal Contract Manager B.Tech (Hons) Degree 19 years
7 Gorkem Dora Design & Proposal Manager B.S.Civil Engineering 18 years
8 Hammad Hakeem HSE Manager B.S. Chemical Engineering 12 years
9 Toheed Ahmed QA/QC Manager B.S. Civil Engineering 12 years
10 Muhammad Imran Superintendent Plant and Equipment B.S Mechanical Engineering 14 years
11 Mohammad Ramzan Saqib Asst. General Manager M. Com 21 years
12 Mohammad Imran Farooqi Asst. General Manager - KSA M.B.A 20 years
13 Balaji Pattabhiraman Admin & Commercial Manager M. Com 27 years
14 Hafiz Ashfaq Ahmed Procurement Manager M. Com 9 years
15 P. Kumaresan Project Manager B.S.Civil Engineering 21 years
16 Pankaj Kohli Project Manager - Earthworks Division B.S.Civil Engineering 17 years
17 Uday Shankar Shah Project Manager B.S. Civil Engineering 20 years
18 Joel E. Santayo Project Manager B.S. Civil Engineering 15 years
19 Shahid Baig Project Manager B.Technical Civil Eng. 15 years
20 Umair Farooq Project Manager B.S. Geological Eng. 6 years
21 Mo. Mahmoud Hamed Omran Project Manager B.S. Civil Engineering 9 years
22 Hussein Yousry Abdelhameed Project Manager B.S. Mechanical Engineering 9 years
23 Rajesh Belle Sadananda Project Manager B.S. Civil Engineering 22 years
24 Gurvant Singh Construction Manager Dip. in Civil Engineering 20 years
25 John Mathai Construction Manager Dip. in Civil Engineering 19 years
26 Hashim Khan Project Cordinator Post Graduate 15 years
27 Amjad Hussain Civil Engineer B. Tech Civil Engineering 14 years
28 Uday Kumar Das Civil Engineer B.S. in Civil & Environmntal E 8 years
29 Md Shiful Islam Civil Engineer B.S. in Civil Engineering 7 years
30 Nareshkumar Venugopal Civil Engineer B.S. in Civil Engineering 3 years
31 Selvamurugan Chellasamy Civil Engineer B.S. in Civil Engineering 1 year
32 Dave Castano Site Engineer B.E. Electrical Eng. 20 years
33 Ibrar Hussain Site Engineer Dip. in Civil Engineering 8 years
34 Ismail Khan Site Engineer Dip. in Civil Engineering 8 years
35 James Ryan Riotita Site Engineer B.S. Civil Engineering 9 years
36 Yub Raj Yonghang Site Engineer B.S. Civil Engineering 1 year
37 Warlito Balbuena Site Engineer B.S. Civil Engineering 15 years
38 Muhammad Waqas Arshad Site Engineer B.Sc Civil Engineering 3 years
39 Muhammad Zaheer Site Engineer Dip[. In Civil Engineering 9 years
40 Farrukh Saleem QA/QC Engineer B.S. Geological Engineering 3 years
41 Joel Sto.Thomas QA/QC Engineer B.S. Civil Engineering 11 years
42 Kafayat Ullah QA/QC Engineer B.S. Geological Engineering 3 years
43 Mudassar Altaf Butt QA/QC Engineer B.S. Civil Engineer 1 year
44 Muhammad Asad QA/QC Engineer B.S. Civil Engineer 1 year
45 Muhammad Irfan QA/QC Engineer B.S. Geological Engineering 3 years
46 Vamsi Krishna QA/QC Engineer B. Tech Civil Engineering 5 years
47 Ghulam Hussain Sr.Quantity Surveyor Dip. in Civil Engineering 21 years
CORPORATE MANAGEMENT
SITE MANAGEMENT
LIST OF KEY PERSONNEL
List of Key Personnel 1/5
9. Sr.
No.
Name Designation Education Experience
LIST OF KEY PERSONNEL
48 Muhammad Azam Javaid Site Superintendent Dip. in Civil Engineering 33 years
49 Khursheed Ahmad Khan Sr. Supervisor Intermediate 7 years
50 Mohammad Niyaz Ahmed Sr. Supervisor Dip.in Civil Engineering 13 years
51 Muhammad Arshad Gill Site Supervisor Dip. in Civil Engineering 22 years
52 Muhammad Khalil Site Superintendent Dip. in Civil Engineering 24 years
53 Zaffar Iqbal Sr. Supervisor Dip. in Civil Engineering 24 years
54 Nilesh Thakkar In-Charge Excavation Dip. in Civil Engineering 11 years
55 Abhay Kanta Thakur Site Supervisor Intermediate 14 years
56 Ali Raza Site Supervisor D.A.E. (Civil Enginering) 2 years
57 Basker Thommai John Site Supervisor S.S.L.C. 9 years
58 Hasan Ablak Site Supervisor Intermediate 3 years
59 Husnain Abbas Site Supervisor Intermediate 4 years
60 Masood Javed Site Supervisor B.A. 23 years
61 Muhammad Asad Site Supervisor Dip. in Civil Engineering 1 year
62 Muhammad Kaleem Site Supervisor Dip. in Civil Engineering 3 years
63 Nasar Iqbal Site Supervisor Intermediate 4 years
64 Padam Bahadur Karki Site Supervisor Intermediate 9 years
65 Rabindra Kumar Bhagat Site Supervisor Dip. in Civil Engineering 9 years
66 Raja Muntazer Mehdi Site Supervisor P.M.D.C. 7 years
67 Muhammad Zia Usman Site Supervisor Dip. in Civil Engineering 17 years
68 Romeo Umbao Escana Logistic Co-ordinator Secondary Graduate 20 years
69 Kaushal Kumar Mandal Logistic Co-ordinator Intermediate 9 years
70 Suryaman Dev Katuwal Site Supervisor Dip. in Civil Engineering 10 years
71 Tahir Mehmood Site Supervisor Post Graduate 1 year
72 Naresh Prasad Gupta Rauniyar Site Supervisor Dip. in Civil Engineering 15 years
73 Ajay Kumar Panday Foreman S.S.L.C. 4 years
74 Arman Ahmad Foreman M.A. 6 years
75 Benudhara Patro Foreman B.S.C. 4 years
76 Jeganathan Karuppusamy Foreman S.S.L.C. 13 years
77 Karuppiah Muthu Foreman S.S.L.C. 15 years
78 Lok Bahadur Kutawal Foreman Intermediate 9 years
79 Mahendra Kuwar Foreman Dip. in Civil Engineering 16 years
80 Muhammad Pehalwan Foreman Intermediate 12 years
81 Musha Muslim Abdul Karim Foreman Intermediate 21 years
82 Necmi Elici Foreman Intermediate 20 years
83 Racleo Guanzon Foreman Intermediate 5 years
84 Sanjit Mandal Foreman Intermediate 3 years
85 Sujit Kumar Pande Foreman I. Com 4 years
86 Kalai Arasan Dumaipandi Foreman Intermediate 17 years
87 Someswara Rao Erkudalai Foreman Intermediate 16 years
88 Venkatesh Pokale Foreman S.S.L.C. 9 years
89 Zaheer Ahmed Boat Captain Tug Master 24 years
90 Sebastin Mathew Boat Master Tug Master 22 years
91 Khalid Hussain Construction Manager Dip. in Civil Engineering 24 years
92 Bam Bahadur Basnet Surveyor Dip. in Civil Engineering 12 years
93 Jalal Din Surveyor Dip. in Civil Engineering 8 years
94 Muhammad Sidique Ahmed Surveyor Dip. in Civil Engineering 5 years
95 Vivek Chaudhary Surveyor Dip. in Civil Engineering 14 years
96 Waqar Ali Surveyor Dip. In Land Surveying 5 years
97 Waqas Haider Surveyor Dip. in Civil Engineering 4 years
98 Raman Bam Surveyor SLC 6 years
99 Kumar Shrestha Surveyor Intermediate 8 years
100 Keshab Lal Shrestha Asst. Surveyor Intermediate 3 years
101 Thangamani Maria Iruthayam Lab Technicator S.S.L.C. 5 years
102 Sanjay Kumar Purve Lab Technicator SLC 8 years
List of Key Personnel 2/5
10. Sr.
No.
Name Designation Education Experience
LIST OF KEY PERSONNEL
103 Zeeshan Haider Raza Planning Manager B.S. Civil Engineering 6 year
104 Umair Javaid Warraich Planning Engineer B.S. Civil Engineering 1 year
105 Md Arifur Rahman Khan Planning Engineer B.S. Civil Engineering 3 years
106 Majid Naeem Civil Engineer B.S. Civil Engineering 1 year
107 Muhammad Mujtaba Khadeer Autocad Operator Dip. in Architecture 14 years
108 Muhammad Aurangzeb Autocad Operator B.A. Journalism 14 years
109 Nilo C. Jalco Autocad Operator Civil Engineering Technology 15 years
110 Muhammad Shahid Autocad Operator B. Civil Technology 11 years
111 Salaovdeen Sulaiman A.M Finance B.B.A. 10 years
112 Asif Ali Accounts Officer B.Com 6 years
113 Badi Uz Zaman Accounts Officer M.B.A 7 years
114 Maaz Anser Accounts Officer A.C.C.A. 8 years
115 Mohamed Irshath Sihabudeen Accounts Officer Intermediate 6 years
116 Kalai Chelvan Accounts Officer M.B.A. Finance 8 years
117 Phajle Rabbani Asst. Accounts Officer Intermediate 3 years
118 Khaled Taher Admin Officer Intermediate 30 years
119 Ali Ahmed Fadul Admin Officer Intermediate 20 years
120 Ramesh Putti Admin Officer Intermediate 10 years
121 Adrian Willam Lalangan Admin Officer B.S. Management Accounting 6 years
122 Raheel Khalid HR Officer B.B.A. 8 years
123 Qaisar Iqbal HR Officer M.B.A 7 years
124 Mushtaq Hussain HR Officer Intermediate 2 year
125 Sandip Kumar Mandal Document Controller Intermediate 9 years
126 Anil Kumar Bodige Document Controller Intermediate 1 year
127 Bhogendra Raj Dhungana Document Controller S.S.L.C. 2 years
128 Jefry Sanchez Document Controller Intermediate 5 years
129 Nasir Ahmed Document Controller Intermediate 1 year
130 Prem Prasad Lamichhane Document Controller B.A. 5 years
131 Srinu Jagiri Document Controller Intermediate 6 years
132 Iftikhar Ul Hassan Procurement Officer DAE (Mechanical) 6 years
133 Ram Mohan Kodicharla Purchaser Intermediate 5 years
134 Nabaraj Ghimire Purchaser Intermediate 10 years
135 Suresh Kumar Mahato Purchaser Intermediate 7 years
136 Amit Kumar Mandal Purchaser Intermediate 4 years
137 Kashif Imran Store In Charge B.A. 6 years
138 Usmani Shakeel Ahmed Store Officer T.Y.B.Com 13 years
139 Subash Chand HSE Superintendent Dip. In Fire and Safety 14 years
140 Abid Hussain Abid Safety Supervisor BA 6 years
141 Asraf Iqbal Usmani HSE Officer Dip.in Safety Management 7 years
142 Imtiaz Ahmad Khan Lodhi Safety Officer Dip. In HSE Engineering 13 years
143 Jaikesh Kumar Yadav Safety Officer Dip. In Industrial Safety 5 years
144 Jawed Alam Safety Officer Intermediate 4 years
145 Obaidullah Safety Officer B.A. Geography 7 years
146 Taimoor Abbas Safety Officer D.A.E (Electronics) 1 year
147 Vinod Kumar Yadav Safety Officer D.A.E (Electronics) 5 years
148 Dedevendra Singh Safety Officer Bachelor of Art 4 years
149 Meraj Usmani Safety Officer Dip. in Civil Engineering 6 years
150 Mohammad Musharraf Khan Safety Officer Dip. In Industrial Safety 5 years
151 Kashifur Rahman Safety Officer Dip. In Industrial Safety 5 years
152 Hem Sagar Katuwal Safety Officer SLC 4 years
153 Thakur Prasad Mishra Safety Officer SLC 5 years
154 Mohammad Aamir Khan Safety Officer SLC 5 years
PLANNING & ENGINEERING
SUPPORT SERVICES
HEALTH, SAFETY & ENVIRONMENT
List of Key Personnel 3/5
11. Sr.
No.
Name Designation Education Experience
LIST OF KEY PERSONNEL
155 Gopal Bahadur Khatri Safety Supervisor SLC 7 years
156 Jayvi Espinosa Male Nurse B.S. Nursing 3 years
157 Shiju Mathew Male Nurse B.S. Nursing 1 year
158 Ghulam Muhammad Muddasir Mechanical Engineer B.S. Mechanical Engineering 1 year
159 Muhammad Nasir Jaffar Mechanical Engineer B.S. Mechanical Engineering 1 year
160 Muhammad Raza Mechanical Engineer B.S. Mechanical Engineering 1 year
161 Zafar Iqbal Mechanical Engineer B.S. Mechanical Engineering 1 year
162 Abdul Wahid Abdulsamthu Mechanical Engineer B.E. Mechanical Engineering 3 years
163 Imran Afzal Mechatronics Engineer B.E Mechatronics Eng. 1 year
164 Kashif Shabir Mechatronics Engineer B.E Mechatronics Eng. 3 years
165 Muhammad Umair Nazar Mechatronics Engineer B.E Mechatronics Eng. 9 years
166 Rashid Khalid Mechatronics Engineer B.S. Mechanical Engineering 1 year
167 Mohsin Ali Manzoor Workshop Superintendent D.A.E. (Mechanical) 8 years
168 Khuram Shehzad Assoc. Mechatronics Engr. D.A.E (Mechatronics Tech.) 3 years
169 Muhamad Tahir Abid Assoc. Mechatronics Engr. B.T. (Eectrical) 3 years
170 Kashif Razzaq Assoc. Mechanical Engr. D.A.E. (Mechanical Eng.) 1 year
171 Muhammad Nasir Assoc. Mechanical Engr. D.A.E. (Mechanical Eng.) 1 year
172 Shahbaz Ahmad Assoc. Mechanical Engr. D.A.E. (Mechanical Eng.) 1 year
173 Waheed Khan Assoc. Mechanical Engr. D.A.E. (Power Mechanical) 6 years
174 Yasir Ali Assoc. Mechanical Engr. D.A.E. (Mechanical Eng.) 1 year
175 Muhammad Awais Mechanical Supervisor D.A.E. (Mechanical Eng.) 6 years
176 Jatinder Singh Mechanical Supervisor Dip. In Automobile Engr. 5 years
177 Muhammad Abdulah Sarwar Mechanical Foreman Intermediate 10 years
178 Sajjad Ahmed Mechanical Foreman D.A.E. (Mechanical Eng.) 11 years
179 Seran Krishnamurthy Mechanical Foreman Intermediate 15 years
180 Mohammed Akram Chief Mechanic D.A.E. (Mechanical Eng.) 29 years
181 Javed Anwar Hydraulic Mechanic Intermediate 3 years
182 Muhammad Anwar Hydraulic Mechanic Intermediate 4 years
183 Mohammad Sarfaraz Hydraulic Mechanic Non Matric 15 years
184 Madhesan Nadesan Hydraulic Mechanic Intermediate 2 years
185 Swami Bhargav Vijaykumar Hydraulic Mechanic Intermediate 14 years
186 Kapil Kumar Pathak Heavy Diesel Mechanic ITI 3 years
187 Swaminath Rajdev Gupta Heavy Diesel Mechanic Intermediate 14 years
188 Krishnapradeep SuriyanarayananHeavy Diesel Mechanic Intermediate 5 years
189 Mohammad Gouse Shaikh Heavy Diesel Mechanic Intermediate 5 years
190 Alejandro Salamanca Mechanic Intermediate 3 years
191 Arnel Gabaca Mechanic Intermediate 5 years
192 Ghulam Abbas Mechanic Intermediate 4 years
193 Hasta Bahadur Bk Mechanic Intermediate 14 years
194 Khadim Hussain Mechanic Intermediate 13 years
195 Krishna Prasad Paudel Mechanic Intermediate 14 years
196 Kumar Rai Mechanic Intermediate 14 years
197 Mahboob Hussain Mechanic Intermediate 20 years
198 Md. Nadeem Arshad Mechanic Dip. In Auto Mechanic 1 year
199 Mingmar Gole Mechanic Intermediate 14 years
200 Muhammad Afzal Mechanic Intermediate 8 years
201 Muhammad Aslam Babar Mechanic Intermediate 11 years
202 Muhammad Murtaza Mechanic Intermediate 7 years
203 Muhammad Riaz Mechanic Intermediate 15 years
204 Multan Chand Mechanic Intermediate 14 years
205 Rustam Alam Mechanic Intermediate 6 years
206 Saman Pradeep Arachilage Mechanic Intermediate 15 years
207 Zaheer Abbas Mechanic Intermediate 7 years
208 Dilip Rajbanshi Mechanic Intermediate 4 years
PLANT & EQUIPMENT
List of Key Personnel 4/5
12. Sr.
No.
Name Designation Education Experience
LIST OF KEY PERSONNEL
209 Radhey Kumar Ray Mechanic Intermediate 5 years
210 Surendran Chinnaian Mechanic Intermediate 6 years
211 Ali Hussain Assistant Mechanic Intermediate 4 years
212 Amir Bhakta Shrestha Assistant Mechanic Intermediate 5 years
213 Binod Kumar Singh Assistant Mechanic Intermediate 4 years
214 Mastakim Miya Assistant Mechanic Intermediate 6 years
215 Dinesh Bk Assistant Mechanic Intermediate 5 years
216 Md. Rahmatulla Assistant Mechanic Intermediate 14 years
217 Surendra Kumar Dastatma Assistant Mechanic Intermediate 3 years
218 Suresh Kumar Sah Assistant Mechanic Intermediate 4 years
219 Suman Basnet Assistant Mechanic Intermediate 3 years
220 Man Kumar Gurung Assistant Mechanic Intermediate 3 years
221 Tekraj Kuwar Assistant Mechanic Intermediate 3 years
222 Prem Prasad Dangal Assistant Mechanic Intermediate 3 years
223 Dipendra Lama Assistant Mechanic Intermediate 3 years
224 Ehtesham Ul Haq Electrical Engineer B.S. Electrical Egineering 15 years
225 Umesh Chandra Gupta Electrical Engineer
Bachelor of Electrical &
Electronics Engr. 3 years
226 Babar Rasool Electical Diploma D.A.E. (Electrical) 1 year
227 Nasir Majeed Electical Diploma D.A.E. (Electrical) 3 years
228 Shakil Anjum Electrical Diploma D.A.E. (Electrical) 21 years
229 Mohan Kumar Sah Electrical Diploma Dip. In Electrical Engr. 5 years
230 Ram Kripak Sah Electrical Motor Winder Dip. In Electrical Engr. 10 years
231 Hem Bahadur Buddhathoki Electrician D.A.E. (Electrical) 5 years
232 Man Bahadur Thapa Electrician Intermediate 7 years
233 Mohammad Irshad Alam Electrician Intermediate 4 years
234 Muhammad Ashraf Electrician D.A.E. (Electrical) 7 years
235 Renato Alburo Electrician Electrical Technology 8 years
236 Tol Bahadur Chhetri Electrician Intermediate 4 years
237 Umar Ikabal Electrician SLC 4 years
238 Santosh Kumar Bhandari Electrician SLC 3 years
239 Jamil Ahmad Usmani Electrician SLC 3 years
240 Iftikhar Ahmad Auto Electrician Dip. In Electrical Tech. 7 years
241 Mahammed Aqeel Auto Electrician Intermediate 5 years
242 Nauman Nazir Auto Electrician Intermediate 3 years
243 Mohammad Faiyaz Ahmed Auto Electrician Intermediate 6 years
244 Harbhajan Singh Auto Electrician Intermediate 9 years
245 Toufiq Siddique Auto Electrician Intermediate 5 years
246 Sherfuddin Abdul Karim Auto Electrician Intermediate 8 years
247 Mohammad Mustakim Auto Electrician Intermediate 7 years
248 Sajid Ali Auto Electrician Intermediate 6 years
249 Zahid Rasool Auto Electrician D.A.E. (Electrical) 10 years
List of Key Personnel 5/5
14. PILING EQUIPMENT OWNED BY AMMICO
Type of Equipment Manufacturer
Country of
Manufacture
Year of
Manufacture
No. of
Units
CUTTERS / DIAPHRAGM WALL
Diaphragm Wall Cutter Bauer BC - 40 Germany 2009 - 2010 2
Details of Equipment Owned by Ammico 1/5
ap ag Wa Cutte aue C 0 Germany 2009 2010 2
Diaphragm Wall Cutter Bauer BC - 32 Germany 2007 - 2008 3
Diaphragm Wall Cutter Casagrande FD-60 Italy 2008 1
Total : 6
PILING / DRILLING RIG
Hydraulic Rotary Rig Bauer BG- 40 Germany 2009 2
Hydraulic Rotary Rig Bauer BC - 36 Germany 2009 3
Hydraulic Rotary Rig Bauer BG - 30 Germany 1999 2
Hydraulic Rotary Rig Bauer BG 28 Germany 2007 2008 5Hydraulic Rotary Rig Bauer BG - 28 Germany 2007-2008 5
Hydraulic Rotary Rig Bauer BG - 25 Germany 2004- 2005 2
Hydraulic Rotary Rig Casagrande C600HD Italy 2007 1
Hydraulic Rotary Rig SANY SR280 China 2007 1
Hydraulic Rotary Rig SANY SR260 China 2008 7
Hydraulic Rotary Rig SANY SR250 China 2008 1
Hydraulic Rotary Rig SANY SR220C China 2005-2006 4
Hydraulic Rotary Rig Bauer BG - 14 Germany 1990 1
Hydraulic Rotary Rig Mait HR - 110 Italy 1989 1
Hydraulic Rotary Rig HEMCO HR 35 China 2011 1
Hydraulic Rotary Rig HEMCO HR 22 China 2011 4
Pile Driver Nippon DH658-135M-M9SD Japan 1996 1
Total : 36
CRANES
Crawler Crane 250 Ton Fushan QUY 250 China 2011 1
Crawler Crane 120 Tons Fushan QUY 120 A China 2010 1Crawler Crane 120 Tons Fushan QUY 120 A China 2010 1
Crawler Crane 120 Tons Liebher HS885 HD Germany 2005 1
Crawler Crane 100 Tons Liebher H875 HD Germany 2008 2
Crawler Crane 100Tons Bauer MC64 Germany 2010 2
Crawler Crane 90Tons Casagrande C900 Italy 2008 1
Crawler Crane 80 Tons Fushan QUY80A China 2008 4
Crawler Crane 55 Tons Sumitomo SC550-02 Japan 1998 2
Crawler Crane 50 Tons Sany SCC500D China 2006-2007 6
C l C 50 T S CX500 C K 1997 1Crawler Crane 50 Tons Samsung CX500 C Korea 1997 1
Crawler Crane 50 Tons XCMG 50 China 2006 2
Crawler Crane 35 Tons Hitachi KH - 125 Japan 1996 1
Mobile Crane 50 Tons XCMG 50 China 2011 2
Mobile Crane 25 Tons XCMG 25 China 2011 2
Rough terrain Crane 25 Tons KATO KR255 Japan 1995 2
Total : 30
ANCHOR DRILL RIGANCHOR DRILL RIG
Hydraulic Anchor Drill KR-806-2D Germany 2009 2
Hydraulic Anchor Drill KR-806-3D Germany 2000-2009 2
Hydraulic Anchor Drill KR-807D Germany 1990 1
Hydraulic Anchor Drill Casagrande C-6 Italy 2006-2007 2
Total : 7
DESANDING PLANTS
Desander Unit (CENTER) Bauer - GS-500 Germany 2007 3
Desander Unit (LEFT) Bauer BE 250 60 Germany 2007 3Desander Unit (LEFT) Bauer - BE-250-60 Germany 2007 3
Desander Unit (RIGHT) Bauer - BE-250-60 Germany 2007 3
Desander Unit (CENTER) ZX500 China 2009 1
Desander Unit (LEFT) ZX500 China 2009 1
Desander Unit (RIGHT) ZX500 China 2009 1
Total : 12
Details of Equipment Owned by Ammico 1/5
15. Type of Equipment Manufacturer
Country of
Manufacture
Year of
Manufacture
No. of
Units
VIBRATORY HAMMERS
Vibratory Hammer ICE815L Holland - 4
Vibratory Hammer ICE416L Holland - 2
Total : 6
GROUTING EQUIPMENT
Grout Pump Bauer - KP60 Germany 2009 2
Details of Equipment Owned by Ammico 2/5
Grout Pump Bauer - KP60 Germany 2009 2
Grout Pump Risen - RG70S China 2007 1
Grout Pump Hany - 2515-AX-00 Switzerland 2010-2011 2
Grout Pump Chuan Chan C500A China 2009 2
Jet Grouting Plant Metax (CIMA) Italy 2010 1
Concrete Pump with Mixer Eurodrill UK 2008 2
Blast Machine UK-CBSC-100 UK 2011 2
Shortcrete Machine Aliva UK 2010 2
lTotal : 14
MISCELLANEOUS EQUIPMENT
Mobile Concrete Pump SANY SY5292THB-37 China - 2
Mobile Concrete Pump SANY SY5295THB-37 China - 2
Diesel Generator 500 KVA Caterpillar USA - 6
Diesel Generator 250 KVA Caterpillar USA - 8
Diesel Generator 100 KVA Caterpillar USA - 10
Diesel Generator 72 KVA Caterpillar USA - 2Diesel Generator 72 KVA Caterpillar USA 2
Diesel Generator 625 KVA Cummins USA - 1
Diesel Generator 100 KVA Cummins USA - 6
Welding Generator Shindawa China - 7
Welding Generator Miller U.K - 2
Air Compressor 900 CFM Ingersolrand USA - 4
Air Compressor 750 CFM Atlas Capco USA - 5
Air Compressor 400 CFM Denyo Japan - 2
N th l d /
Vibratory Jack Hammers Caterpillar
Netherland /
Holland
- 7
Surveying Total Station Various Various - 3
Surveying Theodolites Various Various - 2
Survey Levels Various Various - 4
Prestressing Equipment Various UAE - 5
Drilling Buckets & Augers Various UAE - 70
Tremmie Pipes Various Qatar - 6p Q
Concrete Buckets Various UAE - 3
Bentonite Tanks & Silos Various UAE - 70
Water Pumps P&W U.K - 38
Submersible Pumps Tsurumi Japan - 60
Total : 325
TRANSPORT
Pickup Mitsubishi Japan - 28
Pickup Nissan Japan - 11Pickup Nissan Japan - 11
Cars Honda / Nissan / Toyota Japan - 16
Bus - 55 Seater GMC USA - 5
Bus - 55 Seater Tata India - 6
Bus - 24 Seater Nissan Japan - 7
Van - 14 Seater Nissan Japan - 5
Total : 78
Details of Equipment Owned by Ammico 2/5
16. EARTHWORKS EQUIPMENT OWNED BY AMMICO
Type of Equipment Manufacturer
Country of
Manufacture
Year of
Manufacture
No. of
Units
EXCAVATOR
Excavator Hitachi Zaxis 870 Japan 2007 1
Details of Equipment Owned by Ammico 3/5
p
Excavator Hitachi Zaxis 800 Japan 2004 - 2006 2
Excavator Hitachi EX 550E Japan 1998 1
Excavator Hitachi Zaxis 800 Japan ₋ 2
Excavator Hitachi 210/350 Japan 2006 - 2009 18
Excavator Hitachi EX240 Japan 2011 3
Excavator Hyundai Rolex 300-305-LC-7 Korea 2009 - 2011 9
Excavator Caterpillar 375C USA 2008 - 2009 6
Excavator Caterpillar 330C USA 2008 - 2009 2Excavator Caterpillar 330C USA 2008 - 2009 2
Excavator Caterpillar 320C USA 2003 - 2009 24
Excavator Volvo 210/360 Sweden 2000 - 2009 14
Long Boom Excavators Various 2003 - 2009 5
Mini Excavator Yanmar 5T ₋ 2
Total: 89
DUMP TRUCK/ LOADER
Dump Truck - 32 m3 Mercedes / Volvo Germany ₋ 65
Dump Truck - 19 m3 Mercedes / Volvo Germany ₋ 35
Shovel (Loader) Caterpillar 950G/966G/966H USA ₋ 15
Shovel (Loader) XCMG China ₋ 4
Shovel (Loader) Komatsu WA-420 Japan ₋ 2
Shovel (Loader) Hitachi 966H / 310/ 250 Japan 2007 - 2008 8
Backhoe Loader JCB Site Master U.K. 1998 - 2008 8
Total: 137
TRENCHER/ BULLDOZERTRENCHER/ BULLDOZER
Trencher (Drum Cutter) Tesmec TRS 1475-186RH U.K. 2011 1
Bulldozer Komatsu D155A / D275 Japan 2010 - 2011 2
Bulldozer Caterpillar D9 / D8R USA 2005 - 2011 8
Total: 11
MOTOR GRADER/ MOBILE CRUSHER
Motor Grader Caterpillar 140 G/H USA ₋ 4
Motor Grader Caterpillar 14 G USA ₋ 2
M t G d C t ill 12 G USA 4Motor Grader Caterpillar 12 G USA ₋ 4
Mobile Crusher Extec C-12+ U.K. ₋ 1
Mobile Crusher McCloskey I54 CANADA ₋ 1
Total: 12
PRIME MOVER/ VIBRATORY ROLLER
Prime mover with low bed 100T Mercedes Germany ₋ 2
Prime mover with low bed 50T Daff Netherland ₋ 1
Vibratory Roller 10T Dynapac CA250 Sweden 2006 - 2008 8y y p
Vibratory Roller 20T Bomag BW219 UK 2004 - 2007 2
Vibratory (Tandem/ Hand Rollers) Various Capacities Various ₋ 26
Total: 39
WATER/ DIESEL TANKER
Water Tankers Hino Japan ₋ 6
Water Tankers Mercedes Germany ₋ 4
Diesel Tanker WOQOD Leased China ₋ 3
Total: 13Total: 13
Details of Equipment Owned by Ammico 3/5
17. MARINE EQUIPMENT OWNED BY AMMICO
Type of Equipment Manufacturer
Country of
Manufacture
Year of
Manufacture
No. of
Units
BARGE / TUG BOAT
L.O.A.: 123ft
Details of Equipment Owned by Ammico 4/5
Jackup Barge ( Emirate Provided)
Breadth: 78.7ft
Depth: 14.7ft
Leg Length: 174ft
Location: Mesaieed
Holland 1979 1
Spud Barge - S224
Dimension: 180ftX50ftX14 ft
Spuds: 02 No's, spud + crane
truck & boom rest
Japan 1976 1
truck & boom rest.
Location: Mesaieed
Grouper Ann (Tug)
BHP Main Engine: 1000bhp
01 no's Deutz Engine
Location: Mesaieed
Germany 1969 1
Mullet Ann (Tug)
BHP Main Engine: 1000bhp
2 No's Cummin Engines
Location: Mesaieed
Malaysia 1994 1
Crew Boat (Ammico)
Craft Name: Ammico
34ft Fiber Glass Boat equiped
with 2 Yanmar Engines
Location: Mesaieed
Sweden - 1
Crew Boat (Ammico1)
Craft Name: Ammico1
36ft Fiber Glass Boat
Location: Doha
UAE - 1
Location: Doha
Total : 6
Details of Equipment Owned by Ammico 4/5
18. JACK-UP BARGE OWNED BY AMMICO
4 Leg Self Elevating Barge
“Emirates Provider”
GENERAL SPECIFICATION
BUILD
Flag : Monrovia, Liberia
Year : Rebuilt Year 2011
Builder : Scheepswerf
Heusden –Holland
Verolme
Call Sign : A8YZ5
Class : GL + 100A5
Construction Rig,
+ AMC
Official No. : 15160
GRT : 2361
DIMENSIONS
L.O.A : 37.5m
Breadth : 24.0m
Depth : 4.5m
Draft Moving : 2.6m
Leg Length : 53m
Deck Area : 900m2
TANK CAPACITY
Fresh Water : 43,500 USG
Ballast : 69,000 USG
Fuel Oil : 12,500 USG
JACKING SYSTEM
Type : Reciprocating pistons
Variable Load : 1500 Short Tons
Total Elevating Capacity : 2,000 Short tons max.
Total Holding Capacity : 3,600 Short tons
Jacking Speed : 8m per hour
Jacking Capacity Per Leg : 600 Short tons
Maximum Water Depth : 35m
Air Gap (at maximum water depth) : 5m
Penetration : 3m
MACHINERY
Generators : Two Caterpiller 3412 375KW
M.S.D : Marine Sanitation Treatment Plant & Holding Tank
DECK & MOORING EQUIPMENT
Crane : 2 no 3.5 Ton each, Pedestal Mounted
Mooring System : Four single drum 20 Ton hydraulic winches with 914.40m,
38mm Wire Rope
20. No: Project Name Location (City & Country) Type of Facility Contract Value (QR) Period (mm/yy) Owner Name & Repres. Contact Telephone # & Fax #
1
Bitumen Tank Foundation at Mesaieed
Industrial port
Mesaieed Industrial Piling Works 5,564,579.00 Dec-2014 to April-2015
Qatar Fuel - Woqod - Saad J Al
Muraikhi - procurement &
Contracts Manager
P.O.Box: 7777 - Doha Qatar
Telfax - 4430 9240
2
Construction of Abu Hamour
(Musaimeer) Surface & Ground Water
Drainage Tunnel Phase 1 -
Construction of Cut-Off Wall
Abu Hamur Cut-Off Wall Work 25,000,000.00 Dec-2014 to Feb-2015
Salini Impregilo S.p.A. - Mr.
Simone Centis - Contractor's
Representative
P.O.Box: 30637 - Tel: 4474 7272 ,
Fax: 4414 3418
3
Al Bidaa Park - Construction,
Completion and Maintenance of
Underground Car Park nos. 5 7 6
Al Corniche - Doha Piling works 6,516,605.00 Dec-2014 to Apr-2015
Bojamhoor Trading & Contracting
- Mr. Abdel Nasir Abu Hijleh -
Project Manager
P.O.Box: 24159 - Tel 4488 0468
Fax; 4488 0471
4
Construction of South Central Plant No.
05 (CP5) for Qatar Foundation -
Education City
Doha, Qatar Excavation works & Disposal 6,999,900.00 Nov-2014 to Jan-2015
Gulf Contracting Co. W.L.L.
Mr.Grahame McCaig -
General Manager
P.O.Box: 3886 - Tel 4499 4499
Fax: 4499 4500
5
Qatar Integrated Metro Project - Gold
Line Package - RTC/040/2014
Al Sadd, Doha Qatar Installation of Diaphragm Wall 34,000,000.00 July-2014 To June 2015
ALYSJ Joint Venture -
Mr. Andreas Tauschinger -
Project Director
P.O.Box; 24375, Tel: 4410 9400
Fax; 4410 9500
6
Abraj Quartier (AQ 3 & AQ 4)
BP-1 - The Pearl Qatar
The Pearl Qatar Enabling & Piling Works 23,500,000.00 Mar-2014 to Dec-2015
AKY Real Estate - Mr. Medhat
Sleem
P.O.Box: Tel: 4443 9333 Fax:
4450 5588
7
Abraj Quartier (AQ 5 & AQ 6)
BP-1 - The Pearl Qatar
The Pearl Qatar Enabling & Piling Works 23,500,000.00 Mar-2014 to Dec-2015
Al Oraiq Real Estate
Development - Mr. Medhat Sleem
-
P.O.Box: 560 - Tel: 4493 3344
Fax: 4450 5588
8
Al Maroona Beach House in Shamal -
Jetty Works
Shamal, Qatar Jetty Piling Works 9,472,025.00
May-2014 To Dec-2014-
2014
Consolidated Gulf Co.W.L.L. Nr.
Faris Abur - Executive Direcror
P.O.Box: 1231 Tel: 4444 1941
Fax: 4444 1947
9
Qatar Integrated Railway Project - Major
Stations
Doha, Qatar
Diaphragm Wall, Excavation &
Ground Anchors Works – Msheireb
70,000,000.00 Dec-2013 to Feb -2015
SAMSUNG – OHL – QBC JV -
Mr. Mr. Sung Uk Ji - Project
Director
P.O.Box: 207471Tel: +974 4466
3752 Fax: +974 4466 4570
10
Qatar Integrated Railway Project -
Metro - 1 - Green Line Underground
Doha, Qatar
Diaphragm Wall, Piling, Anchoring,
Soil Nailing and Shotcrete Works
62,000,000.00 Dec-2013 to Dec-2014
POOR-SBG-HBK Joint Venture -
Mr. Mr.Michael Ferguson -
Procurement Manager
P.O.Box: 207471Tel: +974 4431
3973 Fax: +974 4432 5688
11
Link Road to the Pearl Lusail
Expressway Package 1
Lusail, Qatar
Secant Piling, Excavation, Disposal
& Backfilling works
126,321,660.89 Jan-2012 to April-2015
Hyundai Engineering &
Construction
Mr. Young II CHA - General
Manager
T: +8227462889 │ F:
+8227463344
LIST OF PROJECTS IN PROGRESS
PROJECT INFORMATION CONTRACT INFORMATION OWNER INFORMATION
Page 1 of 1
27. Sr.
No:
Project Name Project Location Clients Name Description of Work
Starting
Date
Completion
Date
LIST OF MARINE PROJECTS COMPLETED
1 Qatar Navigation Shipyard
New Port Doha,
Qatar
Milaha Logistics (Qatar Navigation)
Mr. Md. A. Yasin Saleh - VP
T: 4494 9789 │ F: 4410 2255
Dredging Works Under Floating Dock "Al
Rufaa II" Sep-12 May-13
2 Banana Island - Holiday Resot
Banana Island,
Qatar
Doha Marine Company
Mr. Ramon Bay
T: 4432 9099 │F: 4476 0096
Sheet Piling Works - temporary Jetty Pile
Installation Feb-13 May-13
3
Gas Sweetening Facilities (GSF)
Project
New Jetty marine works
Mesaieed, Qatar
CCC & Teyseer JV
Mr. Oussama El Jarbi - Project Manager
T: 4433 9555 │ F: 4433 942
Jetty Marine Works
Jun-11 Nov-12
4 New Doha Port Project New Doha Port, Qata
Middle East Dreading Co. (MEDCO)
Mr. Robby Van den Branden
Tel: 5575 1263 / Fax: 4464 7492
Fabrication and Installation of Tidal
Beacom Jun-12 Aug-12
5
EPIC of Berths & Port
Infrastructure for Ras Laffan Port
Expansion Project
Ras Laffan, Qatar
CCC & Teyseer JV
Mr. Imad Khaled - Project Director
Tel: 4410 2333 / Fax: 4410 2429
Silt Removal Works at Southern Container
Berth Jun-12 Sep-12
6
Piling Works to Fixed Walkway @
Al Jassasia
Al Shamal, Qatar
Milaha Logistics (Qatar Navigation)
Mr. Md. Raihan Bin Omar
Tel: 4477 1690 / Fax: 4477 1687
Supply & Installation of Steel Piles
May-12 Jul-12
7 Banana Island Project Near NDIA, Qatar
Urbacon International Co.
Mr. Mowafaq Kharbat
Tel: 4429 2220 / Fax: 4429 2244
Sheet Piling 2 Loading Ramp @ Banana
Island Apr-12 May-12
8
Construction of Temporary Berth
at Marsarabia
The Pearl, Qatar
Mr.Omar Alfardan
-Director of Marsarabia
Tel: 4420 8898 / Fax: 4420 8897
Complete construction of Temporary
Berth,
including installation of marine piles
Jun-10 Oct-10
9
Ras Laffan Port Expansion Project
Main Contractor : Boskalis
Westminster
Ras Laffan, Qatar
Boskalis
Mr.Oscor - Site Manager
Tel: 5816646
Construction of Major Breakwater for
Expansion of RLIC Port by filling 350,000
cu m of fill material, including placement
of rock armour for slope protection.
Feb-06 Apr-06
AMMICO CONTRACTING CO. W.L.L
LIST OF MARINE WORKS PROJECTS COMPLETED
List of Marine Works Projects Completed 1/2
28. Sr.
No:
Project Name Project Location Clients Name Description of Work
Starting
Date
Completion
Date
LIST OF MARINE PROJECTS COMPLETED
10
Jetty & Light House Project at
Corniche for Civil Engineering
Department,Ministry of Municipal
Affairs & Agriculture
West Bay, Qatar
Ministry of Municipal Affairs &
Agriculture, Doha
Installation of piles 500mm & 700mm for
Jetty & Light House Project at Corniche
(Piling Sub-Contractor to AMCON)
Nov-02 Feb-03
11 Temporary Jetty for Halul Project Qatar
Archiredon Construction Co.S.A
Mr. Khaled El Sayed - Poject Manager
Tel: 4467 7706 / Fax: 4467 1886
Installation of piles for Temporary Tetty
for Halul Island. May-02 Nov-02
List of Marine Works Projects Completed 2/2
30. No: Project Name
Location (City &
Country)
Type of Facility Contract Value (QR) Period (mm/yy) Owner Name & Repres. Contact Telephone # & Fax #
1
New Solar Power Plant Foundation - Site
Preparations and Chain link Fencing Works
Ras Laffan, Qatar
Site Stripping, Backfill, Rock
Crushing and Installation of Chain
Link Fencing Works
2,101,800.00 May-2014 to July-2014
Qatar Solar Technologies
Mr.Khalid Al Hajri - CEO Tel: 4454 6700 / Fax:4454 6701
2
Temporary Dewatering Works - Hotel Buffer
Lagoon at Doha Festival City
Duhail, Qatar Excavation and disposal works 155,922.00 July-2014 to July-2014
Mace International - Mr. Innes Alexander -
Project Director
Tel: 44917070 Fax: 44917075
3
Water Desalination Plant for Qatar Electricity
and Water Company Q.S.C. Ras Abu Fontas
A2
Doha, Qatar
Excavation, Backfill, Rock Armor
installation and Disposal works.
629,884.00 Dec-2013 to Nov-2014
Gulf Contracting Co. W.L.L.
Mr.Grahame McCaig -
General Manager
P.O.Box: 3886 - Tel 4499 4499
Fax: 4499 4500
4 Qstec Polysilicon Project - Phase 1 Ras Laffan, Qatar Excavation and Earthworks 22,000,000.00 Mar-2012 to April-2014
Punj Lloyd Limited, Mr. Sarab Pal Singh -
Project Manager,
Tel: 44407 4555 Fax: 44407
4500
5 Qatar New Port Project Mesaieed, Qatar
Rock Excavation using surface
drum cutter
582,629.00 May-2013 to Nov-2013
China Harbour Engineering Co.
Mr. Hui Chen - Dty. Commercial Mgr.
T: 4406 6456 │M: 6604 3888
T: 4406 6456 │M: 6604 3888
6 LRT Lusail - Phase 2C1A Viaduct and Depot Lusail, Qatar Excavation and Earthworks 6,545,750.00 Jul-2012 to Oct-2013
QDVC - Mr. Philippe Tavernier- Project
Manager
T: 4453 8400 │ F: 4483 7479
T: 4453 8400 │ F: 4483 7479
7 Dukhan Highway (Central Contract) Project Dukhan, Qatar Excavation and disposal works 330,446.80 May-2013 - Jun-2013
Consolidated Contractors Group S.A.L.
Mr. Khalid Al Naas - Project Controls
Mgr.
T: 4423 7444 | F: 4423 7488
8
Shell GTL Project
Permanent Cabin for Waste Transfer Area
Ras Laffan, Qatar
Asphalt and concrete paving
demolition and laying,
excavation, backfill and
construction of concrete storm
water drain
165,483.60 Apr-2013 - Jun-2013
Madina Group
Mr. P.S.Wijeratne - Project Manager,
T: +974 4460 0818 | M: +974
6622 9429
9
Shell GTL Project
8684 Tank Remedial Works
Ras Laffan, Qatar
Excavation , Backfill, HDPE and
GeoTextile Installation and Wet
sand mix laying works
956,216.05 Nov 2012 - Feb-2013
Madina Group
Mr. P.S.Wijeratne
Project Manager
T: +974 4460 0818 | M: +974
6622 9429
10 National Museum of Qatar Doha, Qatar
Excavation and Backfilling
Works
1,825,196.00 Sep 2012 -May 2013
Hyundai Engineering & Construction
Mr. H.J. (Ho Jun) Lee
- Deputy Procurement Manager
T: +974 4427 9390
11 GASAL O2/N2/H2 Pipeline Backbone Project Ras Laffan, Qatar
Excavation, Rock Crushing and
Back Filling works.
11,382,077.91 Jul -2012 - Apr -2014
Qcon - Mr. R. Krishna Moorthy -
Project Manager
T: +974 5550 5734
LIST OF EXCAVATION WORKS COMPLETED BY AMMICO
PROJECT INFORMATION CONTRACT INFORMATION OWNER INFORMATION
Page 1 of 4
31. No: Project Name
Location (City &
Country)
Type of Facility Contract Value (QR) Period (mm/yy) Owner Name & Repres. Contact Telephone # & Fax #
LIST OF EXCAVATION WORKS COMPLETED BY AMMICO
PROJECT INFORMATION CONTRACT INFORMATION OWNER INFORMATION
12
LRT Lusail - Phase 2C1A Viaduct and Depot
Earthworks
Lusail, Qatar Excavation and Earthworks 6,545,750.00 Jul-2012 to May-2013
QDVC - Mr. Philippe Tavernier - Project
Manager
Tel- 4453 8400 Fax: 4483 7479
13
Shell GTL Project
HOT Slope Tank Repair Works
Ras Laffan, Qatar
Wet sand mix removal and
laying, aluminized steel shape
fabrication and fixing and pea
gravel laying works
262,073.13 Mar-2013 - May-2013
CB&I Eastern Anstalt
Mr. Wasim Iqbal - Project In-charge M: 6659 9200
14
Barzan Onshore Gas Project
(CR)
Ras Laffan Crushing Services 5,500,000.00 Mar-2012 to May-2012
Descon Engineering Qatar - Mr. Talha
Tariq - Manager Commercial
Tel: 4456 9127
Fax: 4456 9126
15
Lusail Development LRT - ESE Phase 2B -
Lusail Lusail, Qatar
Geotextile Reinforced Backfilling
ESE Phase B-Lusail.
4,984,200.00 Oct-2009 to Aug-2011
QDVC (LRT) Mr. Philip Tavernier - LRT
Project Manager
Tel :44538400,Fax :44677278
16
Lusail Development LRT - ESE Phase 2A-
Lusail Lusail, Qatar Excavation & Backfilling works 47,769,119.10 Sep-2010 to Nov-2011
QDVC (LRT) Mr. Philip Tavernier - LRT
Project Manager
Tel :44538400,Fax :44677278
17
Early works Package 1 Polysilicon Project
Ras Laffan, Qatar Site Preparation works 17,500,000.00 Sep-2011 to Dec-2011
Qatar Solar Technologies - Mr.Khalid Al
Hajri - CEO
Tel: 44546700 Fax:44546701
18
Doha Festival City Project - 220 - IKEA Box
Bulk Excavation works
Shamal Road Duhail,
Qatar
Bulk Excavation works 6,511,172.00 Sep-2011 to Dec-2011
Mace International - Mr. Innes Alexander -
Project Director
Tel: 44917070 Fax: 44917075
19
EPIC of New Access Road and Internal
Roads, RLIC Interface Roads, New Main
Enterance & Guardhouses at Oryx GTL Ras
Laffan
Ras Laffan, Qatar
Construction of pipe sleepers, pipe
supports, culverts, drain pits,
construction of AOC manholes,
COC manholes, firewater pits, RC
bund walls
4,105,400.00 Dec-2011 to Feb-2011
Qatar Engineering & Construction
Co.W.L.L.( Qcon), Mr. Mazen Abu
Naba'a - Managing Directo
Tel 4458 7200, Fax 4458 7201
20
Shell Pearl GTL Project - Civil Works for
Onsite and Offsite Tanks Ras Laffan, Qatar
Construction of pipe sleepers, pipe
supports, culverts, drain pits,
construction of AOC manholes,
COC manholes, firewater pits, RC
bund walls
79,591,305.00 Sep-2007 to Jan-2011
CB&I - Pearl GTL - Mr. Tony . Clegg -
Sub Contracts Administrator
Mob. +974 5842663
21
Shell Pearl GTL Project - Earthworks for
Onsite and Offsite Tanks Ras Laffan, Qatar
Construction of earthen bund
walls, installation of
geomembranes (HDPE liner &
LGXPRO), underground services
(AOC/COC/Firewater lines), laying
of cement sand and wet sand
lining on bund walls
139,000,000.00 Sep-2007 to Feb-2011
CB&I - Pearl GTL - Mr. Tony . Clegg -
Sub Contracts Administrator
Mob. +974 5842663
Page 2 of 4
32. No: Project Name
Location (City &
Country)
Type of Facility Contract Value (QR) Period (mm/yy) Owner Name & Repres. Contact Telephone # & Fax #
LIST OF EXCAVATION WORKS COMPLETED BY AMMICO
PROJECT INFORMATION CONTRACT INFORMATION OWNER INFORMATION
22
TTMTA Inaguration Event Project
Ras Laffan, Qatar
Bulk Excavation and Civil Works
for event including grading and
rock wall
2,500,000.00 Feb-2010 to Jan-2011 WRG. UK - Mr.Crish - 33146020 Mob-33146020
23
Nakhilat Shipyard Project
Ras Laffan, Qatar
Placement of subbase type A
material for laydown areas
including sheds for ship repairs
4,390,000.00 Feb-2010 to Dec-2010
Gulf Contracting Co. WLL
P.O.Box:3886, Doha Qatar Tel:
4477000 Fax: 4477555 Email:
gulfhous@qatar.net.qa
Tel: 4477000 Fax: 4477555
24
Common Cooling Water Project - Phase II
Client: QP; EPC Contractor: DODSAL
Ras Laffan, Qatar
Site preparation for laydown area,
including rock lining for sabkha
treatment; Excavation of 5300
sleepers, Excavation of discharge
channel to sea (Approx. 180,000
cu. m.) Excavations for all related
underground utilities.
38,500,000.00 Sep-2006 to Mar-2008
Mr. Arun Dupker Resident Construction
Manager,
Mob : 55542497
25
RasGas Storage Tank
EPC Contractor : CMS&A
Main Contractor : Vinci Contractor
Ras Laffan, Qatar
Site preparation and earthworks
for Tank No. 6, Mesaieed, Qatar.
1,250,000.00 Mar-2007 to July-2007
Venci Construction - Mr. Alexander
Buzani Project Manager
Tel : +316-206-91813
26
Ras Laffan Port Expansion Project
Main Contractor : Boskalis Westminster
Ras Laffan, Qatar
Construction of Major
Breakwater for Expansion of
RLIC Port by filling 350,000 cu m
of fill material. Including
placement of rock armour for
slope protection.
3,550,000.00 Feb-2006 to Apr-2006 Mr.Oscor Site Manager , Boskalis Tel : 55816646
27
Dolphin Project , Ras Laffan
Main Contractor : Scilsaldo, Italy
Ras Laffan, Qatar
Construction of temporary
access road for Onshore Pipe
Project, Ras Laffan.
1,000,000.00 Feb-2006 to Mar-2006
Mr. Luciano Giulietti Site Manager ,
Scilsaldo
Tel : 44748661
28
Dolphin Project , Ras Laffan
Main Contractor : Saipam
Ras Laffan, Qatar
Construction of temporary
access road for Onshore Pipe
Project, Ras Laffan
1,500,000.00 Jan-2006 to Mar-2006 Mr. Conner Site Manager , Saipam Tel : 971-50-2647581
29
Ras Gas, Ras Laffan
Main Contractor : Spacemaker
Ras Laffan, Qatar
Earthworks for Temporary
Facilities,
Tank Train 6 & 7, Ras Laffan.
Site preparation of laydown area
850,000 sq m, including
backfilling, levelling, grading and
compaction.
6,500,000.00 Jan-2006 to May-2006
Mr. Krishnan Business Development
Manager ,Spacemaker
Tel : 55788211
30
Dolphin Project , Process Area Ras Laffan
EPC Contractor : JGC Middle East
Sub Contract to Gama Qatar
Ras Laffan, Qatar
Earthworks for construction of
material handling Laydown Area,
Ras Laffan.
14,000,000.00 Dec-2005 to Aug-2006 Mr. Yamasaki Sr. Civil Engineer ,JGC Tel : 5856578
Page 3 of 4
33. No: Project Name
Location (City &
Country)
Type of Facility Contract Value (QR) Period (mm/yy) Owner Name & Repres. Contact Telephone # & Fax #
LIST OF EXCAVATION WORKS COMPLETED BY AMMICO
PROJECT INFORMATION CONTRACT INFORMATION OWNER INFORMATION
31
Qatar Electricity & Water Corporation
EPC Contractor : CMS&A
Main Contractor : Siemens AG
Ras Laffan, Qatar
Earthfilling works for Ras Laffan
"B" CCPP Project, Ras Laffan.
4,600,000.00 Jun-2006 to Mar-2007 Mr. Chang ,CMS&A Tel : 55845987
32
Common Cooling Sea Water System Phase II
at Ras Laffan
Main Contractor : Afcons
Ras Laffan, Qatar
Earthworks for Cofferdams of
Pump House 1 & 3, Ras Laffan.
6,000,000.00 May-2005 to Mar-2006 Mr. Sheisodia Tel: 5989253
33
Qatar Gas II - Tank Foundations at Ras Laffan
Contractor : CMS&A
Main Contractor : Vinci Contractor
Ras Laffan, Qatar
Site preparation & soil
improvement work by dynamic
compaction for Tank No.4 & 5,
Ras Laffan.
3,750,000.00 Mar-2005 to Sep-2006 Mr. Alexander Buzani Tel : +316-206-91813
34
Qatar Gas II - Tank Foundations at Ras Laffan
Main Contractor : IHI
Ras Laffan, Qatar
Site preparation works for QG II -
Qatar Gas, Ras Laffan.
32,000,000.00 Dec-2004 to Jul-2006 Mr. Toshihisa Ishigaki Project Manager IHI Tel : 4735564
35
Ras Gas Onshore Expansion Project
Ras Laffan, Sub Contract to CMS&A
Ras Laffan, Qatar
Site preparation & earthworks for
Train - 5, Ras Laffan.
4,000,000.00 Jul-2004 to Mar-2005 Mr. Chang CMS&A Tel : 5845987
36
Dolphin Project, Ras Laffan
EPC Contractor : JGC Middle East
Ras Laffan, Qatar
Site preparation works -
excavation and earthfilling, Ras
Laffan.
10,500,000.00 Jun-2004 to Feb-2005 Mr. Yamasaki Sr. Civil Engineer ,JGC Tel : 5856578
37 Sub-Contractors - National Contracting Co.w Doha Qatar
Excavation & earthworks for
32kV & 66kV Electric
Transmission Line.
4,000,000.00 Mar-2003 to Feb-2004
Qatar General Electricity & Water
Corporation
-
38
Qatar Petroleum
EPIC Contractor : Sumsung Corp.
Sub-Contractors - Gulf Housing & Construction
Mesaieed, Qatar
Excavation and earthfilling works
for 2 numbers of LPG Storage
Tanks, Mesaieed.
1,600,000.00 Aug-2002 to Sep-2002 Mr. John Kennedy ,GH&C Tel : 4994499,4994544
39
Common Cooling Water Project Ras Laffan,
Sub Contract to CCIC
Ras Laffan, Qatar Rock excavation, Ras Laffan. 4,600,000.00 Jul-2002 to Mar-2003 Consolidated Contractors Co. -
40
Ras Gas /CMS&A Ras Laffan,
Sub Contract to Gulf Housing
Ras Laffan, Qatar
Site preparation works for RGX
Project-Train 3, & 4 Ras Gas ,
Ras Laffan.
4,600,000.00 Aug-2001 to Apr-2003 Mr. Chang ,CMS&A Tel : 5845987
Page 4 of 4
35. JJAAMMAALL NNAASSIIRR
Page 1 of 1
1983 – 1984 After completing his education at M.I.T., worked with (a)
Steveson & Associates / Vibration Engineering Consultants and
(b) LeMessurier Associates. Both these firms were leading
structural engineering consultants in U.S.A. The work involved
analysis and design of structures.
Designation : Chief Executive Officer
Date of Birth : September 26, 1962
Nationality : Pakistani
Education : Massachusetts Institute of Technology, USA.
B.Sc. Civil Engineering, 1983
M.Sc. Civil Engineering, 1983
Awards : Richard Lee Russel Award given to the top undergraduate
student entering graduate study at M.I.T. Civil Engineering
Department, 1982.
Membership to Chi Epsilon, Civil Engineering Honour Society of
USA.
Aga Khan Foundation International Scholarship for Graduate
Study, 1982.
Dean A. Horn Award for Undergraduate Study in Marine
Research, 1982.
Massachusetts Construction Advancement Program
Scholarship, 1981.
PRACTICAL
EXPERIENCE
2001 – Present
Ammico Contracting
Co. W.L.L.
Doha
Year 2000
Ammico Foundations
Dubai
1984 – 1999
Ammico Constructors
Pakistan
Established Ammico in Qatar in January 2001 and as C.E.O.
played his vital role in turning the company into a leading
geotechnical and marine contracting company in the region. The
company presently employs more than 1000 persons and its
turnover in Year 2008 and Year 2009 exceeded US$150 million.
As Managing Director of the company was responsible for
execution of various piling and shoring projects in Dubai.
Returned to Pakistan in 1984 from USA to join Ammico
Constructors (Pvt) Ltd as Executive Director and helped the
company become one of the leading infrastructure and piling
contractors in the country. He was directly responsible for
construction of a number of canal and river bridges on flowing
water, underpasses, interchanges and piling works for all types
of bridges, buildings and industrial plants.
36. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 1 of 9
Designation : Deputy General Manager
Date of Birth : 25 December, 1971
Nationality : Pakistani
Education : B.Sc. Civil Engineering, UET, Lahore – Pakistan, 1994
Years of experience : Nineteen
With Ammico since : March 1997
SUMMARY OF
EXPERIENCE
: Mr. Muzaffar Iqbal Anjum is a highly a capable manager and has
nineteen years of experience in the field of geotechnical and
marine works. He has personally managed the execution and
completion of a number of large and medium scale projects
involving installation of diaphragm wall, secant wall, ground
anchor, contiguous wall, cast in-situ piling, marine piling, soil
stabilization, earthworks, dewatering, jetty construction and
marine maintenance projects.
Since March 2008, as a Deputy General Manager of the
company, he is responsible for all the operations of the
geotechnical division of Ammico as well as looking after marine
projects.
PRACTICAL
EXPERIENCE
Jan-2014 to Present
Jan-2013 to Present
July 2013 – Dec 2013
Jun 2013 – Dec 2013
AMMICO CONTRACTING CO. W.L.L., DOHA
Mr. Muzaffar Iqbal Anjum, in the capacity of Deputy General
Manager, is responsible for planning and execution of all works at
site.
Qatar Integrated Railway Project – Major Station –Musheireb
Scope of work for the project included:
- Installation of diaphragm wall
- Installation of ground anchors
Qatar Integrated Railway project – Metro 1 – Green Line
Underground
Scope of work for the project included:
‐ Installation of Diaphragm Wall Workas
‐ Installation of Soil Nailing and Shotcrete Work
‐ Installation of Anchoring Works
‐ Piling works
Construction of Lusail Tower, Com-11, Lusail, Qatar.
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project included; installation of soldier piles
as shoring system for a length of 70lm and 351 nos. working piles
with diameters of 600mm to 1200mm.
Re-work Package for Qatar National Bank Head Quarters
Building Project, West Bay, Doha (5B + G + 105)
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project includes design and installation of
removable ground anchors for a previously installed diaphragm
37. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 2 of 9
Feb 2013 – Jun 2013
Jan 2013 – Dec
Jan 2013 – Dec 2013
Sep 2012 – Jan 2013
Jan 2012 – Present
Nov 2012 – Mar 2013
July 2012 – Jan 2013
Jun 2012 – Jan 2013
wall 550lm in length.
T.J Pearl Mansion, Isola Dana, The Pearl Qatar.
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project includes 80,500 m3 excavation,
dewatering and installation of 640mm thick and 11m deep
cantilever diaphragm for a length of 785lm. It also includes 659
nos. of working piles with 400-600mm diameter and 4-10m depth.
Doha Oasis Mixed Use Development, Musheireb, Doha.
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project includes 912,150 m3 excavation,
installation of 340 lm shoring system consisting of contiguous
piles of diameter 750mm & length 19 meter at a centre to centre
distance of 1.4 meters, shotcrete, 800 nos. of working piles with
800mm diameter & 11m length and 40 nos. of working piles with
1000mm diameter & 17m length.
Lookout Restaurant & SPA, Banana Island, Doha, Qatar
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project included 80m sheet pile for SPA
area. Installation of 62 nos. of 12m length, 11 mm thickness &
475 mm diameter onshore/offshore steel piles. Installation of 28
nos. of 12m length, 11 mm thickness & 475 mm diameter
onshore/offshore steel piles in the Lookout area. Installation of
143 nos. of 16 - 19m length, 11 mm thickness & 475 mm
diameter onshore/offshore steel piles in the Over water villa area.
Qatar Navigation Shipyard, Messaieed, Qatar
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project involved dredging and silt removal
works under floating dock "Al Rufaa II" at Mesaieed Industrial
City (MIC).
Link Road to Pearl Lusail Expressway Package 1, Doha,
Qatar
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project involved secant piling works,
excavation disposal and backfilling for 49 no. of shafts.
Residential Villa at Pearl Qatar for Mr. Omar Alfardan
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project involved installation of 203 nos.
piles of diameter 800mm and length 11m and 56 piles of
1000mm diameter having length 12m.
Al-Wahab Tower, For Ezdan Real Estate, Al Dafna, Doha,
Qatar
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project involved installation king post and
timber beam shoring works for 2 storey basement.
Le Boulevard Project @ Al Saad, Doha, Qatar
Managing the project in the capacity of Deputy General Manager.
Scope of work for the project involved the installation of 277lm
concrete diaphragm wall 22.5m depth with a 17.5m deep
excavation for four basement structure.
Gas Sweetening Facilities (GSF) Project, Mesaieed Industrial
38. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 3 of 9
Aug 2011 – Nov 2012
Jun 2011 – Mar 2013
Sep 2011 – Jun 2012
Jul 2011 – Nov 2011
Dec 2010 – Jun 2011
July 2010 – Aug 2011
Aug 2010 – Oct 2010
June 2010 – Oct 2010
City.
This project is situated in live plant facilities of Qatar Petroleum in
Mesaieed, Qatar. The scope of work for this project included
procurement, fabrication and installation of 43 no., 762mm
diameter steel tubular piles with 25mm thickness. The fabrication
and installation of precast pile caps, beams and slabs as well as
cast in situ concrete in various stages. Land reclamation and
revetment works and construction of culvert is also included in
the project scope.
Mr. Muzaffar Anjum was personally involved in all the physical
activities of the project. He handled this project with meticulous
planning skills, with concise communication among project team
members and an active approach towards decision making and
negotiations with the client and subcontractors.
Doha Land Phase-2 & Phase-3 Project, Doha, Qatar
The scope of work included the installation of 625lm concrete
diaphragm wall to 18m & 23m depth, removable anchors,
excavation to 13.7m & 17.2m below existing ground level for the
4 & 5 basements respectively, dewatering and installation of
900mm, installation of 1500mm & 1800mm diameter concrete
piles. The project had a total of 3500 number piles.
National Library, Education City, Rayyan, Qatar.
The scope of works included the installation of 438 no. of 500mm
– 1200mm diameter concrete piles.
Qatar Faculty of Islamic Studies, Education City, Rayyan,
Qatar.
The scope of work for this project included the installation of 698
nos concrete piles with 500mm – 1500mm diameter piles.
Earthworks, Shoring, Anchors & Soil Nailing Works at
Sheraton Park Project, West Bay, Doha.
The scope of work for this project included; excavation of
approximately 1,100,000 m3, backfilling of approximately
250,000 m3, installation of 605 lm concrete secant pile wall, 241
Lm of concrete contiguous pile wall, 380 no. anchors and
installation of 1700 no. soil nails.
Jetty Boil-Off Gas Recovery Project, Ras Laffan Industrial
City, Ras Laffan, Qatar
The scope of work for this project included the installation of 1036
concrete piles of 600mm diameter and 8m long below cut off
level.
Lusail Development Sewage Treatment Works
The scope of work for this project included installation of concrete
secant piles for shafts, excavation & De-watering for shafts.
Construction of Temporary Berth at Marsa Arabia Project,
The Pearl Qatar
The scope of work for this project was the installation of steel
offshore piles 900mm dia and the design & construction of
39. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 4 of 9
Feb 2010 – Oct 2010
July 2010 – Sep 2010
Apr 2009 – Jan 2010
Sep 2007 – June 2010
Mar 2008 – May 2010
Jun 2009 – Feb 2010
Jul 2009 – Feb 2010
Jul 2008 – Jul 2009
May 2007 – Nov 2008
temporary berth at Marsarabia, The Pearl Qatar, including
associated concrete works, marine grade painting and
miscellaneous metal works and accessories.
Ras Laffan Port Expansion Project, Ras Laffan, Qatar
The scope of work for this project was the installation of concrete
piles dia 900mm and depth up to 27m for coast guard, liquid
petroleum berth and container berth.
12 New Departure Gates Project at Doha International Airport
The scope of work for this project included installation of 600mm
dia bored piles 101 number and 750mm dia concrete bored piles
39 number.
Lusail Transit System / CP 13 – Phase ESE for QDVC
The scope of works for this project included reinforced earth wall
using geotextile membrane upto 7m depth, excavation upto 14m
depth below ground level.
Shell GTL Project – CB&I Condensate Tanks Foundations
Phase II Common off plot project at Ras Laffan
The scope of work for this project included site preparation,
earthworks for thirty eight tank forms of world’s largest GTL plant
project.
Shell GTL Project –CB&I Civil works at Ras Laffan
The scope of work for this project included on-site and off-site
civil works.
Perlita Gardens - The Pearl Qatar
The scope of work for this project included installation of 500mm
dia concrete piles of 14m depth.
Al Quds Tower Project, West Bay, Doha (5B + G + 100)
The scope of work for this project included installation of 670m
concrete diaphragm wall to 30m depth, removable ground
anchor, excavation to 24m below existing ground level for the five
level basement car park, dewatering and installation of 1200mm
and 1500mm dia concrete piles for the one hundred storey tower.
Qatar National Bank Head Quarters Building Project, West
Bay, Doha (5B + G + 105)
The scope of work for this project included installation of 550
meter long concrete diaphragm wall to 22m depth, removable
ground anchor, excavation up to 20m below existing ground level
for five level basement car park, dewatering and installation of
1200mm and 1500mm dia concrete piles for the hundred and five
storey tower.
Mr. Muzaffar Iqbal Anjum, in the capacity of Deputy General
Manager, was responsible for planning and execution of all works
at the site. This challenging project was executed in an
exemplary manner and completed within time and budget.
Doha Convention Center & Tower Project, West Bay, Doha
(3B + G + 114)
The scope of work for this project (which covers an area of
130,000 m2 in the West Bay area of Doha) included the
following: Installation of 1600 meter concrete diaphragm wall up
to 17m depth, excavation up to 21m under the tower footprint,
40. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 5 of 9
Nov 2008 – Jul 2009
Oct 2008 – Mar 2009
May 2008 – Nov 2008
Apr 2008 – Sep 2008
Nov 2007 – Mar 2008
Nov 2007 – Feb 2008
Sep 2007 – Feb 2008
Sep 2007 – Nov 2007
removable ground anchor,excavation for the triple and double
level basement car parks, dewatering, installation of 1500mm dia
concrete piles for the one hundred and fourteen storey tower and
900mm concrete piles for the convention center.
Mr. Muzaffar Iqbal Anjum, in the capacity of Deputy General
Manager, was responsible for planning and execution of all work
at the site. This landmark project (the design height for the tower
is 570m making it one of the tallest under construction buildings
in the world) was executed in an exemplary manner and
completed within time and budget.
Headquarters for The Energy City Qatar, Lusail (2B+G+M+2)
The scope of work for this project included installation of a 561m
concrete diaphragm wall to 16m depth, excavation to 11m below
existing ground level for the three level basement car park,
dewatering and installation of 600mm, 900mm & 1200mm dia
concrete piles for the building structure.
The Pearl, Qatar, VB-09 at Viva Bahriya, for Hamad Al Mana
This project involved installation of 600mm, 900mm and 1200mm
dia concrete piles for the tower structure.
Cultural Village Commercial Plaza Car Park project at West
Bay, Doha, Qatar.
The scope of works for this project included installation of 173m
of concrete diaphragm wall and 600mm, 900mm and 1200mm
dia piles.
Alumina & Coke Silos and Liquid Pitch Tanks, Qatalum
Project, Mesaieed – SNC Lavlin International
This project involved installation of (a) 844 concrete piles of
1000mm dia and 25m depth and (b) 402 concrete piles of
1000mm dia and 23m depth (c) 400 concrete piles of 750mm dia
and 22m depth.
Woqod Tower Project, West Bay, Doha (4B + G + M + 30)
The scope of work for this project included installation of 238m
concrete diaphragm wall to 24m depth, excavation up to 21m
below existing ground level for the four level basement car park,
dewatering and installation of 900mm and 1200mm dia concrete
piles for the thirty storey tower.
Mr. Muzaffar Iqbal Anjum as Projects Manager has executed
completely and successfully following projects:
The Pearl, Qatar, VB 11 & 17 – Viva Bahriya, for Dorrat Al
Doha
This project involved installation of 600mm, 900mm and 1200mm
dia concrete piles with 8m to 38m depth.
The Pearl, Qatar, VB 6 & 7 – Viva Bahriya for First Qatar
The project involved installation of 600mm, 900mm and 1200mm
dia concrete piles with 10m to 25m depth.
The Pearl, Qatar, VB 3,4 & 5 – Viva Bahriya for Dorrat Al
Doha
This project involved installation of 600mm, 900mm and 1200mm
dia concrete piles with 8m to 38m depth.
41. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 6 of 9
Sep 2007 – Jun 2008
Jul 2007 – Nov 2007
Dec 2006 – Jul 2007
Dec 2006 – Jan 2007
Dec 2006 – Jan 2007
Oct 2006 – Jun 2007
Nov 2006 - Dec 2006
Oct 2006 – Mar 2007
Jul 2006 – Oct 2006
Jul 2006 – Oct 2006
May 2006 – Jun 2006
May 2006 – Jun 2006
Lusail Development Marina District Car Park project
The scope of work for this project included excavation and
installation of 600mm dia concrete piles of 11m depth.
2000MW CCPP Project at Mesaieed “A” for Iberdrolla Engg
The scope of work for this project included (a) installation of 545
nos 600mm and 415 nos 1000mm dia concrete piles of 22m
depth for the main plant (b) installation of 135 m of concrete
diaphragm of 19.5m depth for the pump house (c) excavation to
15.5m depth for the pump house (c) construction of the pump
house structure.
Al Shamal Beach Villa Project for Private Engineering Office
This project involved installation of 276 nos 750mm dia concrete
piles of 24m depth.
Silos for Qatofin Project at Mesaieed for Vos Logistics
This project involved installation of 750mm dia concrete piles of
24m depth.
The Pearl, Qatar, Parcel LPW 10 & 11- Bilal Pearl Suites
project for M/s. Ahmed Hassan Bilal
This project involved installation of 500mm and 1200mm dia
concrete piles with 16m and 22m depth respectively.
The Gate Development Project, West Bay, Doha (3B+G+17)
The scope of work for this project included installation of 700m
concrete diaphragm wall of 20m depth, excavation to 13m below
existing ground level for three level basement car park,
dewatering and installation of 900mm and 1200mm dia concrete
piles.
The Pearl, Qatar, Parcel VB 10 project at Viva Baharia, Bilal
Pearl Suites
This project involved installation of 600mm, 900mm and 1200mm
dia concrete piles of 4.5m, 16m and 22mm depth respectively.
Qatafin LLDPE Project at Mesaieed for M/s. Snamprogetti,
Italy
This project involved installation of 207 nos of 750mm dia
concrete piles with 24m depth.
The Pearl, Qatar, Parcel 7A project at Porto Arabia for Al
Darwish United Real Estate & Investment Co. W.L.L.
This project involved installation of 500mm and 1200mm dia
concrete piles of 16m and 22m depth respectively.
The Pearl, Qatar, Parcel 13A & 13B projects at Porto Arabia
for General Retirement and Pension Authority
This project involved installation of 500mm and 1200mm dia
concrete piles of 16m and 22m depth respectively.
The Pearl, Qatar, Parcel 2A project at Porto Arabia for M/s.
Ali Alfardan
This project involved installation of 500mm and 1200mm dia
concrete piles of 16m and 22m depth respectively.
The Pearl, Qatar, Parcel 8A project at Porto Arabia for M.s,
Ali Alfardan and M/s. Jamil Mattar
This project involved installation of 500mm and 1200mm dia
42. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 7 of 9
Jan 2006 – Dec 2006
Jan 2006 – Jun 2006
Dec 2005 – Feb 2006
Dec 2005 – Feb 2006
Nov 2005 – Feb 2006
Dec 2005 – Jan 2006
Sep 2005 – Dec 2005
Apr 2005 – Jul 2005
May 2005 – Oct 2005
Apr 2005 – Jul 2005
concrete piles of 16m and 22m depth respectively.
The Pearl, Qatar, Parcel 1, 2, 3, 4, 5, 10C, 14 and 18 projects
for United Development Co.
The scope of work for this project included installation of 500mm,
600mm, 900mm and 1200mm dia concrete piles with depth
between 12 to 28m for a large number of high rise towers and
low rise structures at The Pearl Qatar.
The Pearl, Qatar, Parcel 6 project at Porto Arabia for M/s.
Sabban Property Investments
This project involved installation of concrete piles 500mm,
1000mm and 1200mm with depths of 18m, 24m and 28m
respectively.
Power Supply to High Rise Building project at West Bay for
Gulf Housing & Construction
The scope of works for this project included piling works for
installation of 750mm and 900mm dia concrete piles with depth of
14m below the cut-off level of piles for Qatar General Electricity &
Water Corporation (Kahramaa).
Dukhan Apartment Tower (B + G + 32) project at West Bay
for H.E. Sheikh Meshal Al Thani
This project involved installation of 600mm and 900mm dia
concrete piles with depth of 10m and 12m respectively.
Doha International Airport Terminal Expansion – Package 3
project for Gulf Housing & Construction Co. W.L.L.
This project involved installation of 600mm dia concrete piles at
the New Doha International Airport (NDIA) Project.
Residential Tower project for Sheikha Hanadi at West Bay
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of 170
piles for the tower structure.
QASCO Bar Mill Project at Mesaieed for VIAPOMINI
This project involved installation of 512 nos concrete piles of
600mm dia and 20m depth and 131 nos piles of 750mm dia with
20m depth.
Office Tower (2B +G + 29) project at West Bay for M/s. Saeed
Al Misnad
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of
600mm, 750mm, 1000mm and 1200mm dia concrete piles.
LNG Tanks Project at Qatar Gas II, Ras Laffan for IHI
This project involved installation of 1158 nos concrete piles of
1000mm dia for three number LNG tanks for Qatar Gas II Project.
Umm Bab Residential Tower (2B + G + 31) project at West
Bay for Qatar Islamic Bank
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of
600mm and 900mm dia concrete piles for the tower structure.
Amwal Commercial Tower (3B + G+ 22) project at West Bay
The scope of work for this project included shoring, excavation
43. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 8 of 9
Jan 2005 – Aug 2005
Feb 2005 – Mar 2005
Oct 2004 – Dec 2004
Jul 2004 – Oct 2004
Jul 2004 – Sep 2004
Jun 2004 – Aug 2004
May 2004 – Jun 2004
May 2004 – Jul 2004
Nov 2003 – Mar 2004
May 2003 – Nov 2003
May 2003 – Nov 2003
and dewatering for the three level car park and installation of
600mm and 900mm dia concrete piles.
Residential Tower (B1 + G + 45 + 3PH) project at West Bay
for H.E. Shk. Khalid Ahmed Al Misnad
The scope of work for this project included shoring, excavation
and dewatering and installation of 600mm, 750mm, 1000mm and
1200mm dia concrete piles.
Office Tower (2B + G + 35) project at West Bay for H.E. Shk.
Dr. Jassim Bin Nasser Al Thani (Qatar Islamic Bank)
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of
750mm and 1000mm dia concrete piles.
Residential Tower 44 West Bay (2B + G + 44) project at West
Bay for Shk. Abdullah Al Misnad
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of
750mm and 1000mm dia concrete piles.
Residential Tower (B + G + 40) project at West Bay for Shk.
Khalid Bin Naser Abdullah Al Misnad
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of
750mm dia concrete piles.
Al Zaabi Residential Tower project at West Bay for H.E. Shk.
Ahmed Juma Al Zaabi
This project involved installation of 750mm and 900mm dia.
concrete piles of 19m depth.
Dolphin Tower (Commercial 25 Floors) project at West Bay
for H.H. Sheik. Hamadan Bin Zayed Al Nahyan
This project involved installation of 750mm dia concrete piles
17m depth.
Al Dana Office Tower (2B + G + 29) project at West Bay for
Shk. Khalid Bin Nasr Abdullah Al Misnad
The scope of work for this project included shoring, excavation
and dewatering for the two level car park and installation of
750mm and 1000mm dia concrete piles of 18m depth.
Propane and Butane Tanks project at Ras Laffan for Ras
Gas/CMS&A, EPIC Contractor: CBI.
This project involved installation of 576 nos concrete piles of
1000mm dia for two number LPG tanks for Al Khaleej Project at
Ras Laffan.
Qatar National Library project for Ministry of Agriculture &
Municipal Affairs – Piling sub contractors to M/s Contraco.
The scope of works for this project included installation of 1600
number concrete piles totally of 600mm dia with 14m depth and
1200mm dia with 20m depth respectively.
Crushed Stone Import Facility at Mesaieed for Qatar
Petroleum- Piling sub contractors to Grandi Lavori Fincosit
This project involved installation of 750mm, 1000mm and
1200mm dia concrete piles of 19m depth for landside crane rail
44. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 9 of 9
Dec 2002 – Jan 2003
Oct 2002 – Mar 2003
Nov 2002 – Feb 2003
May 2002 – Nov 2002
Feb 2002 – Apr 2002
Sep 2001 – Oct 2001
Mar 2000 – Dec 2000
Mar 1997 – Feb 2000
beam and bridge for the Gabro Berth at Mesaieed Port.
Common Cooling Water Project at Ras Laffan for Qatar
Petroleum – Piling sub contractors to C.C.I.C.
The scope of works for this project included installation of 300mm
dia concrete micro-piles for big anchor sleepers for this major
project at Ras Laffan.
Transmission Line Towers for Qatar General Electricity &
Water Corporation – Piling sub contractors to National
Contracting Co.
The scope of works for this project included installation of
concrete piles 600mm to 1300mm dia for the transmission line
towers.
Jetty & Light House Project at Corniche for Civil Engineering
Department, Ministry of Municipal Affairs & Agriculture,
Doha – Piling sub contractor to AMCON
This project involved piling in marine conditions using floating
barge. Concrete piles of 500mm and 760mm dia were installed to
12m depth below sea bed.
Temporary Jetty for Halul Project – Piling sub contractors to
Archirdon construction Co. S.A
Installation of piles for temporary jetty for Halul Island
Secant Pile Wall for Sea Water Intake Structure for Ras Gas
Expansion Project at Ras Laffan – Rental of Equipment to
piling sub contractor of C.C.I.C.
Ammico’s scope of work involved rental of piling equipment and
personnel for installation of 1000mm dia concrete secant pile wall
for sea water intake structure.
Giant Stores shopping mall project for Qatar Central Markets
Company – Piling sub contractors to Al Alia Trading &
Contracting Co.
This project involved installation of 450mm and 600mm dia
concrete piles.
AMMICO FOUNDATIONS L.L.C, DUBAI
Worked as Project Manager. Responsibilities included execution
of piling works for the following projects:
- German Cars Showroom project at Port Saeed, Dubai
- Twin G + 1 Villas project at Al Garhoud, Dubai
- External Signage project at City Centre, Ajman.
AMMICO CONSTRUCTORS (P) LTD, LAHORE, PAKISTAN
Worked as Site Engineer/Site Manager. Responsibilities included
piling and civil works for the following projects:
- Piling & Civil works for Saba Power Plant Project,
Pakistan
- Re-construction of Railway Bridge over river Horro,
Taxila.
- Construction of flyover at Taxila.
- Construction of underpass at new campus canal
crossing, Lahore.
- Construction of access road & bridge for Nishat Mills Ltd,
Lahore.
- Piling for 220KV transmission line crossing of river Indus
near Chashma. Work involved piling in flowing waters of
45. MMUUZZAAFFFFAARR IIQQBBAALL AANNJJUUMM
Page 10 of 9
EXPERIENCE PRIOR
TO JOINING AMMICO
Jan 1996 – Feb 1997
Jan 1994 – Dec 1995
river Indus.
ITALCONSULT S.P.A, LAHORE, PAKISTAN
Worked as Site Inspector. Responsibilities included consultancy
inspection on Sargodha – Talibwala Road project at Pakistan.
HANBO STEEL & GENERAL CONSTRUCTION CO, LAHORE,
PAKISTAN
Worked as Site Engineer. Responsibilities included construction
of Sargodha – Talibwala Road project at Pakistan.
46. SSHHEERR AALLII IISSMMAAIILLYY
Page 1 of 5
Designation : Deputy General Manager – Earth Works Division
Date of Birth : December 16, 1960
Nationality : Pakistani
Education : Master of Science – Construction Management, 1985, G.W.
University, U.S.A.
Bachelor of Science, 1984, G.W. University, U.S.A.
Certificates:
Engineering in Training, State of Virginia
Soil Mechanics construction safety, Soil erosion, asphalt,
concrete and quality assurance
Years of experience : Twenty Four
With Ammico since : May 2000
SUMMARY OF
EXPERIENCE
: Mr. Sher Ali is highly a capable manager and has twenty four
years experience in the field of earthworks specialist contracting.
He has personally managed execution and completion of a
number of large and medium scale projects involving installation
of diaphragm walls, secant piles, cast-in-situ piling, deep
excavations, dewatering and associated civil works.
PRACTICAL
EXPERIENCE
May 2012 – Present
Dec 2011 – Present
AMMICO CONTRACTING CO. W.L.L.
Was responsible in the capacity of Deputy General Manager
for following projects:
Gasal O2/N2 PIPE LINE BACK BONE
Qatar Construction and Engineering Company (QCon).
Ras-Laffan industrial city, Qatar.
The scope of work for this project includes machine and manual
excavation for 19 kilometre trench for pipe laying, sand bedding
and filling trench with processed excavated and imported fill
material including making bund.
Poly Silicon Plant Project –Phase-1
Punjlloyd Engineering Limited, Ras LaffanI Industrial City ,
Qatar
The scope of works Includes Excavation and Crushing of
excavated materials.
47. SSHHEERR AALLII IISSMMAAIILLYY
Page 2 of 5
Aug 2011 – Dec 2011
Sep 2011 - Nov 2011
May 2011 – Aug 2011
May 2011 – June 2012
Mar 2011 – May 2011
Dec 2010 – Mar 2011
Aug 2010 – Dec 2010
Sep 2007 - Dec 2010
Mar 2008 – Dec 2010
Jul 2009 – Feb 2010
Poly Silicon Plant Project–Early Works Site Preparation
Project, Qatar Solar Technologies, Ras Laffan Industrial City ,
Qatar.
The Scope Of work for this Projects Site Preparation Including
Excavation, grading leveling Backfilling and Installation Of 4 Km
chain link fence and gates For Entry, Exit And Emergency.
IKEA Mall Bulk Excavation, Doha Festival City, Qatar
The scope of work for this project includes Construction site
Facilities, Installation of Site Hoarding and Bulk Excavation and
Back Fill Works.
Waste Water Disposal Surface Facilities Project,
Qatar Gas, Ras Laffan Industrial City , Qatar.
The Scope of work for this projects Includes Road works, Site
Exploratory Trenches Excavation and Backfilling works.
Doha West Sewage Treatment Plant,
Marubeni Corporation, Saheliya, Doha ,Qatar
The scope of work for this projects Includes Excavation and
Backfilling
Jetty Boil off Gas Recovery Project,
QATAR GAS, Ras Laffan Industrial City , Qatar.
The Scope of work for this projects Includes Road works, Site
Exploratory Trenches Excavation and Backfilling works.
EPIC of New Access Road, RLIC Interface Roads,
Oryx GTL Plant, Ras Laffan Industrial City , Qatar.
The scope of work for this project includes Road Works and
Backfilling Works.
WRG Project, Qatar Gas & Ras Gas Event Project, 77MTA
achievement Ceremony, Ras laffan, Qatar
The scope of work for this project includes Civil works , Earth
works, Roads and Piling works
Was responsible in the capacity of Projects Manager for
following projects:
Shell GTL Project – CB&I Condensate Tanks Foundations
Phase II Common offplot project at Ras Laffan
The scope of work for this project includes site preparation,
earthworks for thirty eight tank forms of world’s largest GTL plant
project.
Shell GTL Project –CB&I Civil works at Ras Laffan
The scope of work for this project includes on-site and off-site
civil works.
Al Quds Tower Project, West Bay, Doha (5B + G + 100)
The scope of work for this project includes installation of 670m of
diaphragm wall to 30m depth, excavation to 24m below existing
ground level for the five level basement car park, dewatering and