2. ACHIEVEMENTS : FY 22-23
Standardization (GA, PID, CSV-BOM).
Wind Chill Implementation - 3d Model.
Regular Internal Training and Motivation program.
More Organised with structured approach and Systematic Review
Mechanism.
ECN for Change control.
Reduced Lead time for standard orders. (1 day for Hospital
Sterilizer/Washer )
Resolved Assly. Related issues like Hinge Door, MC- Stand etc.
QUALI
TY
3. ACHIEVEMENTS : FY 22-23
Shell and Tube Drain Cooler instead of PHE.
Included EPSG -100 in CE listed jobs.
Executed Electric Boiler complying to EN285 guidelines (incl.
Pyrogen separation)
New Chamber and door design for Hor. sliding washer
Shell type pre heater design Instead of Coil heating design in
INNOVATI
ON
4. ACHIEVEMENTS : FY 22-23
Xylem Pump for UL requirement and 208 v.
Steam Trap (Introduced Spirax instead of
Forbes)
Butterfly valve in Chilled water line from
Globe valve.
Introduced SMC instead of Festo
Utilized Some Non Moving Items
PRIC
E
6. ACTIVITIES
GA, P&ID, Layout.
Conceptualisation & Detail
Engineering.
Bills of Material
Component selection, specification
and design
ASME / IBR Calculation & Approvals
Regular Update in design and Doc.
as per Client Feedback
FAT Compliance Update.
Product improvement for
Sustainance, Ease of Assly and
Manufacturing
Standardization :- Bought out, Item
code and BOM
Wind Chill Implementation
Resolve Issue in Fabrication,
Production, Service.
Regular Support to purchase Team
DCR, Service request
Implementation.
Technical Discussion with Vendors
JOB
SPECIFIC
GENER
AL
9. Design more reliable, User Friendly Machine.
Eliminate Possibility of Mistakes.
Reduce Engineering Lead Time.
Reduce Cost.
Reduce The Variety of Bought Items.
WHY
TARGET : FY 23 -
24
10. Configurators for Standardize CSV BOM.
Standard 3-D model in Windchill
Checklist Implementation.
Job Tracking and review.
Bought out Component unification and standardisation
Redefining BOM structure in 3-D model and ERP
TARGET : FY 23 -
24
HOW
11. # Total Job Executed in 2022 -
459
HIGHLIGHTS : FY 22 -
23
N-STD TYPE-2
VENTILATOR , SUPER HEATER,
DHS,
ASME / IBR / CE JOB (CALC +
DRG.)
NON-STD CHAMBER / DOOR SIZE
N-STD TYPE-1
PIPING BASED ON UTILITY
SIDE AND LAYOUT
PANEL BASED ON LAYOUT
NON-STD CYCLE
COMBINATION
STD
PSG TEST KIT
PSG SAMPLER
HOSPITAL STERILIZER
STD SPARE
FILTER PRESS
12. Combo ventilator / Sterilizer – CE
Certified for M/S Bremer
ASME Jobs of M/s Speciality Pharma
Ventilator for M/s Sovereign
pharma.
Hinge door sterilizers for M/s
Serum
Combo MC/PSG for M/s FDC
CE Certified EPSG for M/s Romelag
Terminal Sterilizers: 448
Complicated cycle in M/s BE
sterilizers ( 223 with 3 SIP filters)
200 EPSG for M/s Medreich
En285 compliant Boiler for M/s.
Syngene
GMP washer for M/s Reliance
Disinfector Washer for Hospital
Washers
Clean Steam Generators
HIGHLIGHTS : FY 22 -
23
13. 30/03/23
CRITICAL ISSUES
Alternate Material.
Bom Update.
Changes AFTER Layout approval (Eg: Amneal, Bremer, Sovereign,
Serum)
Frequent Priority change (both internal and external)
FAT Compliance (Major changes)
PDF merger / Excel requirement
High Attrition (Highly Detrimental For our kind of Complex
industry)
Improve Work Culture and Employee participation
Policy update keeping in mind Gen- Y People.
14. TEAM
STRENGTH
Average Age of My Team is 28.7 Years.
Average Experience of My Team in PIPL is 1.3 Years
Average Total Experience of my Team is 1.9 Years
15. Area of Focus: People as our Greatest
Asset
Self motivated, Self driven Team with Long
Term Association.
Technically sound and Independent People.
Time management
Cost Reduction
Innovation
16. SKILL ENHANCEMENT
REQUIRED
Sterilizer /ventilator / Superheated Water/ DHS operation logic and Cycle
knowledge.
FEA , Fatigue Analysis, Section VIII - DIV 2
Creo Piping Module – Efficiency Improvement
Industrial Visit to visualize actual Machine.
FAT Training with OEM level parameters
IBR
Welding processes
Component Selection
EN285 / US Pharmacopoea