SlideShare a Scribd company logo
1 of 2
MUHAMMAD HUSNI
Instrument Engineer
Place / Date of Birth :
TULUNGAGUNG / 09-12-1985
Nationality
INDONESIA
Marital Status
MARRIED
Religion
MOESLEM
Work Experience
6 YEARS
Contact Person
08563053092 / 082220317294
QUALIFICATION /EXPERIENCE SUMMARY
Experience Summary :
(2013-NOW) PT.SINGGAR MULIA (Eng. Consultant)
(2011-2013) PT. INDOKOMAS BUANA PERKASA (EPCI)
(2009-2011) PT. PINDODELI SINARMAS (pulp & Paper)
Qualification :
INSTRUMENT :
• Contruction/Installation, Pre& Commissioning experience
(Field Instrument Engineer)
• Detail & FEED design engineering experience
• Sizing software by using Instrucalc for control valve,
orifice, pressure safety valve
• frequency & stress calculation for thermowell.
• Field instrument & Fire & Gas Detector Calibration.
• SAP System & Preventive Maintenance System
TELECOM :
• Wireline System ( Fiber Optic, LAN, PA/GA, CCTV,
PABX/Telephone System ).
• Wireless System (VSAT, INMARSAT, Global Maritime
Distress and Safety System (GMDSS), VHF & UHF Radio,
and Meteorological System.
EDUCATION
(2012-Now) Master Degree (S2), Sepuluh Nopember
Institute of Technology, Physics Engineering
(2004-2009) Bachelor Degree (S1), Sepuluh Nopember
Institute of Technology, Physics Engineering
TRAINING
(2013) Belden Signal Transmission Technology Seminar (2012)
Reability & Safety of Tube & Accessories, By Parker
(2011) PLC Siemens S7, By APP SInarmas
(2010) DCS ABB , By ABB Indonesia
SOFTWARE CAPABILITIES
• Instrucalc 8.1.13
• AutoCAD
• MATLAB 2007
• PipeData-PRO72
EMPLOYMENT EXPERIENCES
1. (Mei 2015- Now)
(CLIENT/COMPANY) : PERTAMINA EP
(PROJECT TITLE) : FEED of TEGAL PANCING Project.
POSITION : TELECOM ENGINEER
RESPONSIBILITIES :
(1) Develop Document Telecom (Specification,
datasheet,etc)
2. (Oktober 2014)
(CLIENT/COMPANY) : PERTAMINA EP CEPU
(PROJECT TITLE) : FEED of Jimbaran Tiung Biru Gas
Project.
POSITION : TELECOM ENGINEER
RESPONSIBILITIES :
(2) Develop Document Telecom (Specification,
datasheet,etc)
3. (June 2014-February 2015)
(CLIENT/COMPANY) : SANTOS
(PROJECT TITLE) : AAL DEVELOPMENT PROJECT – FPSO
FEED Project.
POSITION : TELECOM ENGINEER
RESPONSIBILITIES :
(3) Develop Document Telecom (Specification,
datasheet,etc)
4. (June 2014-September 2014)
(CLIENT/COMPANY) : PHE ONWJ
(PROJECT TITLE) : OO-OC-OX Development Project.
RESPONSIBILITIES :
(1) Develop Document Engineering
5. (March 2014-November 2014)
(CLIENT/COMPANY) : PHE ONWJ
(PROJECT TITLE) : EJ-EA & ECOM-FPRO Pipeline Project
RESPONSIBILITIES :
(1) Develop Document Engineering ( Calculation,
datasheet,etc)
(2) Develop Document Drawing ( Hook Up, Instrument
layout,etc)
6. (January 2014-June 2014)
(CLIENT/COMPANY) : PERTAMINA EP
Page 1 of 2 7/24/2015
MUHAMMAD HUSNI
Instrument Engineer
(PROJECT TITLE) : FEED Pakugajah Development Project
RESPONSIBILITIES :
(1) Develop Document Engineering ( Specification,
Calculation, datasheet,etc)
7. (Nov 2013-Jan 2014)
(CLIENT/COMPANY) : PHE ONWJ
(PROJECT TITLE) : Electrical & Instrument Realibility ORF
Tanjung Priok Project.
RESPONSIBILITIES :
(1) Develop Document Engineering ( datasheet,etc)
(2) Develop Document Drawing ( Instrument layout,etc)
8. (Sept 2013-Des 2013)
(CLIENT/COMPANY) : PHE ONWJ
(PROJECT TITLE) : SPA Development Project.
RESPONSIBILITIES :
(1) Develop Document Engineering
9. (July 2013 - August 2013)
(CLIENT/COMPANY) : SANTOS
(PROJECT TITLE) : Peluang WHP Development Project &
MALEO Modification Project.
RESPONSIBILITIES :
(1) QC to check Material from Vendor
(2) FAT Field Instrument on Vendor
10. (April 2013- Jun 2013)
(CLIENT/COMPANY) : PHE ONWJ
(PROJECT TITLE) : YYA Development Project.
RESPONSIBILITIES :
(1) Develop Document Engineerin(Calculation,
datasheet,etc)
11. (March 2012-April 2013)
(CLIENT/COMPANY) : PHE ONWJ
(PROJECT TITLE) : LIMA & ECHO Upgrade F&G Project.
RESPONSIBILITIES :
(1) Develop Document Detail Engineering
(2) Assist Construction Team as Field Engineer
(3) Assist Pre-commissioning team
(4) Assist Commissioning Team
(5) As Built Drawing
12. (August 2011 – March 2012)
(CLIENT/COMPANY) : SANTOS
(PROJECT TITLE) : WORTEL Development Project
RESPONSIBILITIES :
(1) Develop Document Detail Engineering
(2) Assist Construction Team as Field Engineer
(3) Assist Pre-commissioning team
(4) Assist Commissioning Team
(5) As Built Drawing
13. (Dec 2009 – August 2011)
(CLIENT/COMPANY) : PT. PINDODELI SINARMAS
RESPONSIBILITIES :
(1) Plan & Supervisory Preventive Maintenance System
(2) Programming PLC Toshiba
(3) Programming DCS ABB
(4) Operating QCS ABB
Page 2 of 2 7/24/2015
I, the undersigned, certify that to the best of my
knowledge and believe, the biodata contained in this CV
correctly describe myself, my qualifications and my
expertise.
___________________
Muhammad Husni

More Related Content

Similar to CV M.HUSNI

Similar to CV M.HUSNI (20)

RESUME Anusorn T. Safety
RESUME Anusorn T. SafetyRESUME Anusorn T. Safety
RESUME Anusorn T. Safety
 
Lawrence CV på English 2
Lawrence CV på English 2Lawrence CV på English 2
Lawrence CV på English 2
 
TEGUH RAHARDJO - Process Safety Engineer (July 2015)
TEGUH RAHARDJO - Process Safety Engineer (July 2015)TEGUH RAHARDJO - Process Safety Engineer (July 2015)
TEGUH RAHARDJO - Process Safety Engineer (July 2015)
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
AHMAD BARKATI Resume
AHMAD BARKATI ResumeAHMAD BARKATI Resume
AHMAD BARKATI Resume
 
Orkun_Bozkurt_CV.PDF
Orkun_Bozkurt_CV.PDFOrkun_Bozkurt_CV.PDF
Orkun_Bozkurt_CV.PDF
 
Photo resume 131115
Photo resume 131115Photo resume 131115
Photo resume 131115
 
CV - AZAM RAHMAN - Jr Surveyor
CV - AZAM RAHMAN - Jr SurveyorCV - AZAM RAHMAN - Jr Surveyor
CV - AZAM RAHMAN - Jr Surveyor
 
CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -CV-CHAMEKH Abdallah - E&I -
CV-CHAMEKH Abdallah - E&I -
 
Chan Mye Tun -CV
Chan Mye Tun -CVChan Mye Tun -CV
Chan Mye Tun -CV
 
CV YOHANES NOEGROHO
CV YOHANES NOEGROHOCV YOHANES NOEGROHO
CV YOHANES NOEGROHO
 
Anthony pangras latest
Anthony pangras latestAnthony pangras latest
Anthony pangras latest
 
CV_GUNCEL (1)
CV_GUNCEL (1)CV_GUNCEL (1)
CV_GUNCEL (1)
 
CV Syahrul
CV SyahrulCV Syahrul
CV Syahrul
 
CV Adi Cahyadi
CV Adi CahyadiCV Adi Cahyadi
CV Adi Cahyadi
 
CV_SATYA PRAKASH
CV_SATYA PRAKASHCV_SATYA PRAKASH
CV_SATYA PRAKASH
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
 

CV M.HUSNI

  • 1. MUHAMMAD HUSNI Instrument Engineer Place / Date of Birth : TULUNGAGUNG / 09-12-1985 Nationality INDONESIA Marital Status MARRIED Religion MOESLEM Work Experience 6 YEARS Contact Person 08563053092 / 082220317294 QUALIFICATION /EXPERIENCE SUMMARY Experience Summary : (2013-NOW) PT.SINGGAR MULIA (Eng. Consultant) (2011-2013) PT. INDOKOMAS BUANA PERKASA (EPCI) (2009-2011) PT. PINDODELI SINARMAS (pulp & Paper) Qualification : INSTRUMENT : • Contruction/Installation, Pre& Commissioning experience (Field Instrument Engineer) • Detail & FEED design engineering experience • Sizing software by using Instrucalc for control valve, orifice, pressure safety valve • frequency & stress calculation for thermowell. • Field instrument & Fire & Gas Detector Calibration. • SAP System & Preventive Maintenance System TELECOM : • Wireline System ( Fiber Optic, LAN, PA/GA, CCTV, PABX/Telephone System ). • Wireless System (VSAT, INMARSAT, Global Maritime Distress and Safety System (GMDSS), VHF & UHF Radio, and Meteorological System. EDUCATION (2012-Now) Master Degree (S2), Sepuluh Nopember Institute of Technology, Physics Engineering (2004-2009) Bachelor Degree (S1), Sepuluh Nopember Institute of Technology, Physics Engineering TRAINING (2013) Belden Signal Transmission Technology Seminar (2012) Reability & Safety of Tube & Accessories, By Parker (2011) PLC Siemens S7, By APP SInarmas (2010) DCS ABB , By ABB Indonesia SOFTWARE CAPABILITIES • Instrucalc 8.1.13 • AutoCAD • MATLAB 2007 • PipeData-PRO72 EMPLOYMENT EXPERIENCES 1. (Mei 2015- Now) (CLIENT/COMPANY) : PERTAMINA EP (PROJECT TITLE) : FEED of TEGAL PANCING Project. POSITION : TELECOM ENGINEER RESPONSIBILITIES : (1) Develop Document Telecom (Specification, datasheet,etc) 2. (Oktober 2014) (CLIENT/COMPANY) : PERTAMINA EP CEPU (PROJECT TITLE) : FEED of Jimbaran Tiung Biru Gas Project. POSITION : TELECOM ENGINEER RESPONSIBILITIES : (2) Develop Document Telecom (Specification, datasheet,etc) 3. (June 2014-February 2015) (CLIENT/COMPANY) : SANTOS (PROJECT TITLE) : AAL DEVELOPMENT PROJECT – FPSO FEED Project. POSITION : TELECOM ENGINEER RESPONSIBILITIES : (3) Develop Document Telecom (Specification, datasheet,etc) 4. (June 2014-September 2014) (CLIENT/COMPANY) : PHE ONWJ (PROJECT TITLE) : OO-OC-OX Development Project. RESPONSIBILITIES : (1) Develop Document Engineering 5. (March 2014-November 2014) (CLIENT/COMPANY) : PHE ONWJ (PROJECT TITLE) : EJ-EA & ECOM-FPRO Pipeline Project RESPONSIBILITIES : (1) Develop Document Engineering ( Calculation, datasheet,etc) (2) Develop Document Drawing ( Hook Up, Instrument layout,etc) 6. (January 2014-June 2014) (CLIENT/COMPANY) : PERTAMINA EP Page 1 of 2 7/24/2015
  • 2. MUHAMMAD HUSNI Instrument Engineer (PROJECT TITLE) : FEED Pakugajah Development Project RESPONSIBILITIES : (1) Develop Document Engineering ( Specification, Calculation, datasheet,etc) 7. (Nov 2013-Jan 2014) (CLIENT/COMPANY) : PHE ONWJ (PROJECT TITLE) : Electrical & Instrument Realibility ORF Tanjung Priok Project. RESPONSIBILITIES : (1) Develop Document Engineering ( datasheet,etc) (2) Develop Document Drawing ( Instrument layout,etc) 8. (Sept 2013-Des 2013) (CLIENT/COMPANY) : PHE ONWJ (PROJECT TITLE) : SPA Development Project. RESPONSIBILITIES : (1) Develop Document Engineering 9. (July 2013 - August 2013) (CLIENT/COMPANY) : SANTOS (PROJECT TITLE) : Peluang WHP Development Project & MALEO Modification Project. RESPONSIBILITIES : (1) QC to check Material from Vendor (2) FAT Field Instrument on Vendor 10. (April 2013- Jun 2013) (CLIENT/COMPANY) : PHE ONWJ (PROJECT TITLE) : YYA Development Project. RESPONSIBILITIES : (1) Develop Document Engineerin(Calculation, datasheet,etc) 11. (March 2012-April 2013) (CLIENT/COMPANY) : PHE ONWJ (PROJECT TITLE) : LIMA & ECHO Upgrade F&G Project. RESPONSIBILITIES : (1) Develop Document Detail Engineering (2) Assist Construction Team as Field Engineer (3) Assist Pre-commissioning team (4) Assist Commissioning Team (5) As Built Drawing 12. (August 2011 – March 2012) (CLIENT/COMPANY) : SANTOS (PROJECT TITLE) : WORTEL Development Project RESPONSIBILITIES : (1) Develop Document Detail Engineering (2) Assist Construction Team as Field Engineer (3) Assist Pre-commissioning team (4) Assist Commissioning Team (5) As Built Drawing 13. (Dec 2009 – August 2011) (CLIENT/COMPANY) : PT. PINDODELI SINARMAS RESPONSIBILITIES : (1) Plan & Supervisory Preventive Maintenance System (2) Programming PLC Toshiba (3) Programming DCS ABB (4) Operating QCS ABB Page 2 of 2 7/24/2015 I, the undersigned, certify that to the best of my knowledge and believe, the biodata contained in this CV correctly describe myself, my qualifications and my expertise. ___________________ Muhammad Husni