1. INAYAT UR RAHMAN MUGHAL
Land Surveyor 18 Year Experience
Contact Number: +00966552436534/0598623680
E-mail Address: inayatrahman714@yahoo.com/inayatmughal35@gmail.com
OBJECTIVE:
To serve in a responsible position that will enhance the growth of the community as well as improve the overall
spirit of the public in the planning process through personal knowledge of site inspection and professional
knowledge of compliance with subdivision and zoning regulations through the practice of land surveying.
ACADEMIC QUALIFICATION:
Secondary School Certificate (Science Group)
TECHNICAL QUALIFICATION:
Diploma in Surveying from Government College of Technology Rasul Mandi Bahauddin, under Punjab Board of
Technical Education Lahore.
COMPUTER SKILLS:
AutoCAD, MS Word, MS Excel and internet application
WORK EXPERIENCE:
January, 2014 ~ to date
Title of position:
Project:
Mohammed A. Al Swailem Company, (Saudi Arabia)
Senior Surveyor
Infrastructure for Housing Project in the regions of the Kingdom (Package-2)
Ar Ar City
Responsibilities:
Preparation of survey data for Potable Water, Sanitary, Storm Water and Power.
Joint checking of Layout data with Consultant.
Implementation of survey works as per approved drawings, contract documents and specifications.
Execution of survey works, i.e. Potable Water, Sanitary, Storm Water and Power.
Assisting to the Civil Engineer in preparation of progress report subject to work scheduled.
Maintaining and assembling the records related to survey works.
JULY 2012~ December, 2014
Title of position:
Project:
Mohammed A. Al Swailem Company, (Saudi Arabia)
Senior Surveyor
Haramain High Speed Rail (Section 4)
Responsibilities:
Execution of survey works like Earth works, Sub-Ballast and Structural works, e.g. (Slope protections, Rip Raps,
Spur dike, Diversion dike, Stepped chute and Stream diversion)
Conducted and supervised field surveys associated with land surveys.
Developed, prepared and reviewed land and real property surveys.
Performed mission planning for Global Positioning System (GPS) surveys and establishment of High Accuracy
Reference Network (HARN) within the project.
Performed and supervised various surveying functions including topography surveys, construction surveys, etc.
Page 1 of 3
2. Monitored and pro-actively identified and corrected technical, schedule and financial issues through effective
communication with the Project Manager and other management staff.
Coordinate work assignments with the schedule of the contractor to ensure timely completion of projects.
Review and analyze work methods to increase efficiency and productivity and provide input into the writing of
performance standards
Keep detailed and accurate records of crew activities, survey data.
Report on events and activities which may affect operations.
Determine existing and proposed right-of-way.
Oversee the measurement of completed construction work to determine "as-built" quantities for the
construction project, which are used in computing the cost of the project.
Work with contractors in providing survey data for expediting construction projects.
U. A.E EXPERINCE
Oct 2009 ~ Nov 2011
Title of position:
Project:
Mohammed A. Al Mohsen Al khurafi Company, (Abu Dhabi)
Chief Surveyor
Al Ain Dubai Road Stage 1 widening & Upgrading
Responsibilities:
Preparation of survey data for Horizontal and Vertical alignments.
Supervision of survey works like Earth works, Sub-Ballast, Ballast, Railway track laying, Telecommunication
cable, Signaling manholes, Ducts and Structural works, e.g. (Bridges, Camel crossings and Culverts).
Supervision of survey works for Plating’s (Confinements) at Nafud area.
Checking the executed job of contractor as per approved drawings and specifications.
Independently communicated on technical matters with the client, i.e. Ministry of Finance officials for the Land
acquisition and Obstructions.
Joint survey with contractor for Horizontal and Vertical alignments.
Joint checking of Natural Ground Levels with Contractor and Re-establishment of Bench Marks.
Reviewing of shop drawings for Culverts.
Maintaining and assembling the records related to survey works.
Assisting to the Civil Engineer & Resident Engineer and updating through weekly & monthly progress reports.
Oct, 2006 ~ Oct 2009
Title of position:
Project(s):
Mohammed A. Al Mohsen Al khurafi Company, (Abu Dhabi)
SENIOR SURVEYOR
Infrastructure Project for Dubai International City (Stage 1 & 2)
Responsibilities:
Preparation of survey data for Potable Water, Sanitary, Storm Water and Power.
Joint checking of Layout data with Consultant.
Implementation of survey works as per approved drawings, contract documents and specifications.
Execution of survey works, i.e. Potable Water, Sanitary, Storm Water and Power.
Assisting to the Civil Engineer in preparation of progress report subject to work scheduled.
Maintaining and assembling the records related to survey works.
Apr, 2003 ~ Oct 2006
Title of position:
Project(s):
Mohammed A. Al Mohsen Al khurafi Company, (Abu Dhabi)
SURVEYOR
Infrastructure Project (956)
Responsibilities:
Preparation of survey data for Potable Water, Sanitary, Storm Water and Power.
Joint checking of Layout data with Consultant.
Implementation of survey works as per approved drawings, contract documents and specifications.
Execution of survey works, i.e. Potable Water, Sanitary, Storm Water and Power.
Assisting to the Civil Engineer in preparation of progress report subject to work scheduled.
Maintaining and assembling the records related to survey works.
Calculation for all types of Curves.
Assisting to the Civil Engineers in preparation of progress report subject to work scheduled.
Implementation of survey works as per approved drawings, contract documents and specifications.
Setting out of structure such as Box culverts and Pipe culverts.
Survey calculations (Filling layers, Coordinates and Pavement elevation calculations).
Jan, 2000 ~ Apr 2003: Mohammed A. Al Mohsen Al khurafi Company, (Abu Dhabi)
Title of position: SURVEYOR
Project(s): Infrastructure Project (956)
Page 2 of 3
3. Responsibilities:
Preparation of survey data for Potable Water, Sanitary, Storm Water and Power.
Joint checking of Layout data with Consultant.
Implementation of survey works as per approved drawings, contract documents and specifications.
Execution of survey works, i.e. Potable Water, Sanitary, Storm Water and Power.
Assisting to the Civil Engineer in preparation of progress report subject to work scheduled.
Maintaining and assembling the records related to survey works.
Calculation for all types of Curves.
Assisting to the Civil Engineers in preparation of progress report subject to work scheduled.
Implementation of survey works as per approved drawings, contract documents and specifications.
Setting out of structure such as Box culverts and Pipe culverts.
Survey calculations (Filling layers, Coordinates and Pavement elevation calculations).
Jan, 1998 ~ Jan 2000: Mohammed A. Al Mohsen Al khurafi Company, (Abu Dhabi)
Title of position: SURVEYOR
Project(s): Abu Dhabi to Al Ain Expressway (Con 7)
Responsibilities:
Preparation of survey data for Horizontal and Vertical alignments.
Supervision of survey works like Earth works, Sub-Ballast, Ballast, Railway track laying, Telecommunication
cable, Signaling manholes, Ducts and Structural works, e.g. (Bridges, Camel crossings and Culverts).
Supervision of survey works for Plating’s (Confinements) at Nafud area.
Checking the executed job of contractor as per approved drawings and specifications.
Independently communicated on technical matters with the client, i.e. Ministry of Finance officials for the Land
acquisition and Obstructions.
Joint survey with contractor for Horizontal and Vertical alignments.
Joint checking of Natural Ground Levels with Contractor and Re-establishment of Bench Marks.
Reviewing of shop drawings for Culverts.
Maintaining and assembling the records related to survey works.
Assisting to the Civil Engineer & Resident Engineer and updating through weekly & monthly progress reports.
Additional Talent / Skills:
Operating advance surveying instruments and capable of handling GPS, Total Stations Instrument and Automatic
Levels.
• GPS Trimble R5800
• GPSmap 276C GARMIN
• SOKKIA SET 520K Electronic Total Station
• LIECA TCR 1201 & 1203 Electronic Total Station
• LIECA AUTO LEVEL
• SOKKIA AUTO LEVEL
• WILD AUTO LEVEL
PERSONAL DATA:
Father’s Name
Date of Birth
Religion
Nationality
Marital Status
Home Address
: Bader uz zaman
: 10th
Oct, 1978
: Islam
: Pakistani
: Married
: Village & Post Office Sanger Tehsil & District Manshera, Pakistan.
Language Countries of work
Page 3 of 3
4. Driving License
: Urdu, English &
Arabic
: U.A E & Saudi Arabia
: Pakistani (valid) & Saudi Arabia (valid) & UAE (Valid)
Page 4 of 3