Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Thermal presentation
1.
2. mparison between houses w.r.t bio climatic chart : -
Construction : -
The house was constructed in 2005 .
Materials : -
Location : -
This house is located in Gulshan Ravi
Samnabad , Lahore.
New house
The material used in this house are : -
Cement , Sand , Concrete , Plaster ,marble & Tiles , Brick work , Paint,marble .
3. Old house
• Brick work
• Lime stone
• Kanker lime
• Mud
• Jute fiber for insulation
• Massh ki daal as a plaster
Location : -
This house is located in Hakiman Bazar, Lahore
Construction : -
This house was constructed in Akbar’s time
period and was renovated in 1860
Materials : -
The material used in this house are : -
22. Conclusion : -
•As the bio climatic chart shows both the building are not in the comfort zone.
In new building the materiel used is local material which is very easily available
In old house museum the material is very expensive and need an expert
craftsmanship which is not easily available, now a days.
Both houses have a good ventilation while the old house is nearer to the comfort
zone due to its masonry and limestone work and its wall thickness.