1 When demand fluctuations are not extreme using overtime and under time are common strategies
for meeting demand.
Ans = True
2 Planning, analyzing, and improving processes is the essence of operations management.
Ans = True
You can get your own complete guide from
http://bit.ly/iscom-305
3 The high cost of inventory has motivated companies to focus on efficient supply chain management
and quality management.
4 Disaggregation is the process of breaking an aggregate plan into more detailed plans.
5 All of the following are inputs to the aggregate production planning process except:
6 Problems associated with using part-time workers include all of the following except:
7 All of the following are part of DMAIC except:
8 For the process to be capable of meeting design specification the process capability index must be:
9 A gradual, long-term up or down movement of demand is referred to as a trend.
http://universityofphoenixpaper.blogspot.com/
Page 2 of 3
10 One of the reasons Wal-Mart is such an efficient firm is because they utilize cross-docking and thus
decrease their inventory carrying cost.
11 The three major processes encompassed by project management are planning, scheduling, and
product design.
12 Operations management is concerned only with the day-to-day operations of the firm’s productive
system.
13 Traditionally, each segment of the supply chain was managed as a separate, stand-alone entity
focused on its own goals.
14 The set of activities that create and deliver products to the customer is known as the value chain.
15 Dividing a job into a series of small tasks each performed by a different worker is known as:
16 Slack is the amount of time by which an activity can be delayed without delaying any of the
activities that follow it or the project as a whole.
17 In a manufacturing environment, which of the following would be considered inventory?
18 The ratio of a firm’s monthly output to the number of labor hours used in the same month would
be a measure of:
19 Companies that control the production of virtually all of their component parts, including the
source of raw materials are said to be horizontally integrated.
20 Supplier speed is not an issue in outsourcing decisions.
21 Vertical integration is the degree to which a firm produces the parts that go into its products.
22 All of the following are dimensions of quality, except:
23 An exponential smoothing forecasting technique requires all of the following except:
24 Which of the following is not a potential risk of projects?
25 Which mode of transportation transports oil and products in liquid form?
26 Six Sigma is a statistical measure that translates to:
27 One objective of material requirements planning (MRP) is to maintain the highest possible level of
inventory.
28 W. Edwards Deming believed that primary responsibility for quality improvement rested with:
29 A cross-industry supply chain diagnostic tool maintained by the supply Chain Council is called:
30 A print shop is a typical example of a:
31 The cost of reducing activity time is referred to as:
32 Control Limits and Tolerance are one and the same.
33 Steel, paper, paints, and chemicals are examples of industries that most likely use:
34 Material requirements planning (MRP) was designed primarily for systems that produce goods in
batches.
35 Material requirements planning (MRP) is a useful inventory control and production planning system
for all of the following except:
36 Product characteristics that can be evaluated using a discrete response are known as:
37 The type of forecasting method to use depends on:
38 All of the following are assumptions of the EOQ model except:
http://universityofphoenixpaper.blogspot.com/
Page 3 of 3
39 What a company does is best if often referred as the firm’s:
40 Inventory turnover is computed:
41 If the process is in control with respect to its variability it automatically will be in control with
respect to its mean.
42 Annual demand for a product is 40,000 units. The product is used at a constant rate over the 365
days the company is open every year. The annual holding cost for the product is estimated to be $2.50
per unit and the cost of placing each order is $125.00. If the company orders according to the economic
order quantity (EOQ) formula then its optimal order size for this product would be:
43 As production systems move from projects to batch production to mass production to continuous
production:
44 If a firm can sell a product for $40.00 each, then what is the volume needed to break-even if the
fixed cost of production is $125,000.00 and labor and material costs are $30.00 per item?
45 A graph with a bar for each activity displaying when activities are scheduled to start, when they will
be finished, and where extra time is available is known as a:
46 The things that must be done to improve quality will also make the company as a whole more
efficient and productive.
47 All of the following are characteristics of today’s consumer market except:
48 In general, the latest finish time for an activity is equal to:
49 A type of process flowchart that emphasizes customer interaction and service-related terms is
known as:
50 The fundamental objective of Six Sigma is to focus on improvement by increasing process
variance.
You can get your own complete guide from
http://bit.ly/iscom-305

More Related Content

Viewers also liked

types of production system
types of production systemtypes of production system
types of production system
ram4181
 
4.types of manufacturing system and layouts
4.types of manufacturing system and layouts4.types of manufacturing system and layouts
4.types of manufacturing system and layouts
Akash Bakshi
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
Harinadh Karimikonda
 

Viewers also liked (12)

Basic of work study, work measurement & job design om
Basic of work study, work measurement & job design    om Basic of work study, work measurement & job design    om
Basic of work study, work measurement & job design om
 
types of production system
types of production systemtypes of production system
types of production system
 
Types of production systems
Types of production systemsTypes of production systems
Types of production systems
 
Work study - production and operations management
Work study - production and operations managementWork study - production and operations management
Work study - production and operations management
 
4.types of manufacturing system and layouts
4.types of manufacturing system and layouts4.types of manufacturing system and layouts
4.types of manufacturing system and layouts
 
Types of production system
Types of production systemTypes of production system
Types of production system
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
 
Work Study
Work StudyWork Study
Work Study
 
types of production system
types of production systemtypes of production system
types of production system
 
Types of production processes
Types of production processesTypes of production processes
Types of production processes
 
Operations Management: Production System
Operations Management: Production SystemOperations Management: Production System
Operations Management: Production System
 
Open Source Creativity
Open Source CreativityOpen Source Creativity
Open Source Creativity
 

Recently uploaded

Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Recently uploaded (20)

BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

Iscom 305 final exam university of phoenix final exams study guide when demand fluctuations are not extreme using overtime and undertime are common strategies for meeting demand.

  • 1. http://universityofphoenixpaper.blogspot.com/ Page 1 of 3 ISCOM 305 Final Exam You can get your own complete guide from http://bit.ly/iscom-305 A + Tutorial Guaranteed 1 When demand fluctuations are not extreme using overtime and under time are common strategies for meeting demand. Ans = True 2 Planning, analyzing, and improving processes is the essence of operations management. Ans = True You can get your own complete guide from http://bit.ly/iscom-305 3 The high cost of inventory has motivated companies to focus on efficient supply chain management and quality management. 4 Disaggregation is the process of breaking an aggregate plan into more detailed plans. 5 All of the following are inputs to the aggregate production planning process except: 6 Problems associated with using part-time workers include all of the following except: 7 All of the following are part of DMAIC except: 8 For the process to be capable of meeting design specification the process capability index must be: 9 A gradual, long-term up or down movement of demand is referred to as a trend.
  • 2. http://universityofphoenixpaper.blogspot.com/ Page 2 of 3 10 One of the reasons Wal-Mart is such an efficient firm is because they utilize cross-docking and thus decrease their inventory carrying cost. 11 The three major processes encompassed by project management are planning, scheduling, and product design. 12 Operations management is concerned only with the day-to-day operations of the firm’s productive system. 13 Traditionally, each segment of the supply chain was managed as a separate, stand-alone entity focused on its own goals. 14 The set of activities that create and deliver products to the customer is known as the value chain. 15 Dividing a job into a series of small tasks each performed by a different worker is known as: 16 Slack is the amount of time by which an activity can be delayed without delaying any of the activities that follow it or the project as a whole. 17 In a manufacturing environment, which of the following would be considered inventory? 18 The ratio of a firm’s monthly output to the number of labor hours used in the same month would be a measure of: 19 Companies that control the production of virtually all of their component parts, including the source of raw materials are said to be horizontally integrated. 20 Supplier speed is not an issue in outsourcing decisions. 21 Vertical integration is the degree to which a firm produces the parts that go into its products. 22 All of the following are dimensions of quality, except: 23 An exponential smoothing forecasting technique requires all of the following except: 24 Which of the following is not a potential risk of projects? 25 Which mode of transportation transports oil and products in liquid form? 26 Six Sigma is a statistical measure that translates to: 27 One objective of material requirements planning (MRP) is to maintain the highest possible level of inventory. 28 W. Edwards Deming believed that primary responsibility for quality improvement rested with: 29 A cross-industry supply chain diagnostic tool maintained by the supply Chain Council is called: 30 A print shop is a typical example of a: 31 The cost of reducing activity time is referred to as: 32 Control Limits and Tolerance are one and the same. 33 Steel, paper, paints, and chemicals are examples of industries that most likely use: 34 Material requirements planning (MRP) was designed primarily for systems that produce goods in batches. 35 Material requirements planning (MRP) is a useful inventory control and production planning system for all of the following except: 36 Product characteristics that can be evaluated using a discrete response are known as: 37 The type of forecasting method to use depends on: 38 All of the following are assumptions of the EOQ model except:
  • 3. http://universityofphoenixpaper.blogspot.com/ Page 3 of 3 39 What a company does is best if often referred as the firm’s: 40 Inventory turnover is computed: 41 If the process is in control with respect to its variability it automatically will be in control with respect to its mean. 42 Annual demand for a product is 40,000 units. The product is used at a constant rate over the 365 days the company is open every year. The annual holding cost for the product is estimated to be $2.50 per unit and the cost of placing each order is $125.00. If the company orders according to the economic order quantity (EOQ) formula then its optimal order size for this product would be: 43 As production systems move from projects to batch production to mass production to continuous production: 44 If a firm can sell a product for $40.00 each, then what is the volume needed to break-even if the fixed cost of production is $125,000.00 and labor and material costs are $30.00 per item? 45 A graph with a bar for each activity displaying when activities are scheduled to start, when they will be finished, and where extra time is available is known as a: 46 The things that must be done to improve quality will also make the company as a whole more efficient and productive. 47 All of the following are characteristics of today’s consumer market except: 48 In general, the latest finish time for an activity is equal to: 49 A type of process flowchart that emphasizes customer interaction and service-related terms is known as: 50 The fundamental objective of Six Sigma is to focus on improvement by increasing process variance. You can get your own complete guide from http://bit.ly/iscom-305