SlideShare a Scribd company logo
1 of 6
COVER LETTER
Dear – Sir / Madam
I am interested in working in your organization. I have enclosed my
resume as a first step in exploring the possibilities of employment here. I
would be thankful if I’m given a chance to prove myself on the basis of my
education, skills, talents, abilities and experience.
If given the opportunity to work for you. I assure you that you will find my
work to your utmost satisfaction and need. I am confident that under the
guidance of professionals like you, I can easily and quickly become
orientated to your specific organization activities and needs.
I would appreciate your cooperation. Thank you for your consideration to
my enclosed resume for your further perusal.
Hope for an early and favorable reply.
Sincerely,
Md mukhtar khan
Md Mukhtar Khan
Mobile:+91 9590547994
:+91 8698273627
e-mail:mmk.hvac@gmail.com
Languages Known
 Fluent in English
 Fluent in Hindi, Urdu &
kannada
 Can read & write Arabic at
beginner level
Personal Strengths
 Team Player
 Analytical
 Detail Oriented
 Fast Learner
 Enthusiastic
 Acclimatizing
 Computer Savvy
 A good Listener.
Personal Details
 Date of Birth : 11/11/1992
 Nationality : Indian
 Cast: Muslim
 Marital Status : single
 Permanent Address: H no
21/11/24 beside Aadil shahi
jamia masjid, Hirapur.
Gulbarga.585103.
Curriculum vitae
Objective
Seeking a challenging role in a progressive and forward thinking
organization where I can formulate my educational and training
background to be an integral part of the company’s operations by
delivering outstanding results.
Educational background
 Bachelors of engineering
B.E Mechanical from kbn college of engineering affiliated to visvesvaraya
technological university, Belgaum India.
 Pre university collage
Science (PCMB). From dept of pre university education board Karnataka.
 Matriculation
10th
Grade from Karnataka secondary education Board
 Certification
Hvac designing and drafting IBR Institute Gulbarga.
Acquired skills
 Excellent presentation and inter- personal skills
 Effective team player, easily mingle with people, Public speaking.
 Ability to plan, prioritize and organize team work efficiently and
meet deadlines
 Ability to manage multiple tasks in a pressured environments
 Ability to work in a team and individual environment.
 I have leadership qualities and I believe in results.
 excellent soft skills
 Strong and quick acquiring of new technologies.
 Quick decision making.
 Disciplined, loyal and honest
 Disciplined, dedicated, hard-working and result oriented
Professional experience
Total 3.5 Years of Experience as hvac and mep engineer.
 Hvac site supervisor and draftsman
In Blue star air-conditioning, kmc climate control, Gulbarga, India.
From 18/Oct/2012 to 16/Mar/2015.
 MEP site engineer and designer
In Samsung air-conditioning, Max aircon, Pune, India.
From 04/Aug/2015 to till date
Professional skills
 Skilled in designing, planning, development and installation of building mechanical
equipment and systems for commercial buildings,
 Experience in execution of Electromechanical System Operation & Maintenance for
commercial / residential buildings site.
 In-depth knowledge of HVAC Design, calculations as per ASHRAE,SMACNA Standards
 Skilled in designing mechanical equipment by using AutoCAD.
Projects
1. Project Name: Mahalaxmi gold hub, Gulbarga
Designation: Site supervisor (HVAC).
This project has a mall of 4 floors of gold shops, which is coming in the residential
area of Gulbarga India, developed by M.G. Associates and we have done complete
HVAC design, Installation and ducting as a sub contractor in contracted gold shops,
parking area and in corridors. As per customer requirement and design we have
installed cassette, ductable, split ac and this project is chilled water system.
2. Project Name: Shams Hotel, Gulbarga.
Designation: Site supervisor (HVAC) and draftsman.
Project was three floor hotel and lodging where 140 TR VRF System is installed
.splits ac is installed in rooms , cassette ac in reception and corridors and duct able
in meeting hall and ventilation for parking and toilet. This hotel is situated in wadi,
Gulbarga, India.
3. Project Name: Accenture, Pune
Designation: Site engineer and designer.
A i.t park tower where i have worked as a mep site engineer and designed mep
system, In this project we have designed and installed MEP services like fire
fighting sprinkler system, fire alarms, smoke detectors, public address systems and
cctv in workstations, corridors and open area.
4. Project Name: Ganga legend, pune
Designation: Site engineer and designer.
It is a Commercial building, in bavdhan pune developed by goel Ganga. This project
was of 80TR VRF system Ducting for fresh air and exhaust for open area, toilets and
Installed splits duct able and cassette units for three floors.
5. Project Name: West end Mall, Pune
Designation: project engineer.
A mall consists of chillers plant where Installation of Ahu's and hvac equipments,
Ventilation and exhaust ducting in parking and conditioned air ducting and drafting
and designing in shops and passages with mep equipments installation.
Job Responsibilities:
 Carry out Detailed design engineering and drafting of HVAC & MEP system which
involves, heat load calculations, duct and pipe routing, fire fighting drawing &
specifications.
 Supervising and giving all drawings with dimensions to the duct man and technician.
 Handle a work force of people on the site Preparing and planning the daily and weekly
work schedule .Allotment of works to the foremen and the workers.
 To ensure that the correct measurements are done, so that no problem occurs during
Billing.
 Inspecting the site before taking up projects, check for all relevant drawings with detail
dimensions.
 Co-coordinating with various Vendors/Sub Contractors in Fabrication etc. and Co-
ordinate with subordinates and settles the disputes on site peacefully
 Handing the Approved design to Project Dept for the Execution. * Visiting Sites
periodically to solve real time Problems.
 Finally, to prepare as-built Drawings as per site during the Commissioning with all
required Details.
 Attend appraisal meetings with the project manager/consultant in case of delay/ Change
in drawings/ work/ unavailability of materials and suggest suitably.
 To maintain the healthy relations with Architect, Electrical Dept, Plumbing Dept,
Carpentry Dept etc.
 To ensure fast working process so that the work is completed at the prescribed date.
 To highly coordinate with the Procurement team so that no that there is no delay of
work material on Site.
 To Report daily to my Senior Authorities about the happenings on Site
 To ensure that the work is completed in time with the given specification and standard.
 Preparation detailed Bill of Materials including all Equipment, Filters, Valves, Fans,
Pumps, Ducting piping accessories with technical specifications for all.
Technical skills
Design tools: Autocad2007-2017, (HAP) Hourly Analysis Program, BETA Performance, duct
sizer, pipe sizer, catia v5, solid edge v18, Ansys, CAMD.
Operating system: win xp, win 7, win 8.1, and win 10.
Documentation Tools: MS word, MS power point, MS excel.
Passport details:
 Passport No. : M8896652
 Date of Issue : 07/05/2015
 Date of Expiry : 06/05/2025
 Place of Issue : Bangalore, Karnataka
All information furnished is factual and could be substantiated by testimonials and referrals.
(MD MUKHTAR KHAN)

More Related Content

What's hot (20)

Wipro Experience Letter
Wipro Experience LetterWipro Experience Letter
Wipro Experience Letter
 
Vedi
VediVedi
Vedi
 
Professional enterprise and development - IBM
Professional enterprise and development - IBMProfessional enterprise and development - IBM
Professional enterprise and development - IBM
 
INTERN REPORT AHMADREZA CHITSAS
INTERN REPORT AHMADREZA CHITSASINTERN REPORT AHMADREZA CHITSAS
INTERN REPORT AHMADREZA CHITSAS
 
Experience Letter - Rajendran
Experience Letter - RajendranExperience Letter - Rajendran
Experience Letter - Rajendran
 
Anirban 2020#cl
Anirban 2020#clAnirban 2020#cl
Anirban 2020#cl
 
Ankush Sharma
Ankush SharmaAnkush Sharma
Ankush Sharma
 
Cover letter For Electronics & Communications Student
Cover letter For Electronics & Communications StudentCover letter For Electronics & Communications Student
Cover letter For Electronics & Communications Student
 
Naveed CV
Naveed CVNaveed CV
Naveed CV
 
Roles_ResponsibilitiesLetter
Roles_ResponsibilitiesLetterRoles_ResponsibilitiesLetter
Roles_ResponsibilitiesLetter
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
Kumaresan CV
Kumaresan CVKumaresan CV
Kumaresan CV
 
Naren resume
Naren resumeNaren resume
Naren resume
 
SkillCertificate
SkillCertificateSkillCertificate
SkillCertificate
 
Neelu cpd ppt
Neelu cpd pptNeelu cpd ppt
Neelu cpd ppt
 
rajesh
rajeshrajesh
rajesh
 
Copy of updated cv of makhdum haris
Copy of updated cv of makhdum harisCopy of updated cv of makhdum haris
Copy of updated cv of makhdum haris
 
Sunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical ResumeSunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical Resume
 
Aniket updated resume 3
Aniket updated resume 3Aniket updated resume 3
Aniket updated resume 3
 
deepak
deepakdeepak
deepak
 

Viewers also liked

CURRICULUM VITAE ALKINDY
CURRICULUM VITAE ALKINDYCURRICULUM VITAE ALKINDY
CURRICULUM VITAE ALKINDYAthman Elkindy
 
Plastic bottles(1)
Plastic bottles(1)Plastic bottles(1)
Plastic bottles(1)Alicia Wang
 
Smart Collect presentation BG EN
Smart Collect presentation BG ENSmart Collect presentation BG EN
Smart Collect presentation BG ENEva Ventsislavova
 
Bulgaria me as_an_engineer_2015-2016
Bulgaria me as_an_engineer_2015-2016Bulgaria me as_an_engineer_2015-2016
Bulgaria me as_an_engineer_2015-2016Dan NNN
 
Italy _1st_ My ideal_town
Italy _1st_ My ideal_townItaly _1st_ My ideal_town
Italy _1st_ My ideal_townDan NNN
 
Dictionary
DictionaryDictionary
DictionaryDan NNN
 
Näin teet onnistunutta blogimarkkinointia
Näin teet onnistunutta blogimarkkinointiaNäin teet onnistunutta blogimarkkinointia
Näin teet onnistunutta blogimarkkinointiaA-lehdet Oy
 

Viewers also liked (11)

CURRICULUM VITAE ALKINDY
CURRICULUM VITAE ALKINDYCURRICULUM VITAE ALKINDY
CURRICULUM VITAE ALKINDY
 
Plastic bottles(1)
Plastic bottles(1)Plastic bottles(1)
Plastic bottles(1)
 
Rebekah Resume
Rebekah ResumeRebekah Resume
Rebekah Resume
 
4 to 6 years
4 to 6 years4 to 6 years
4 to 6 years
 
Smart Collect presentation BG EN
Smart Collect presentation BG ENSmart Collect presentation BG EN
Smart Collect presentation BG EN
 
Bulgaria me as_an_engineer_2015-2016
Bulgaria me as_an_engineer_2015-2016Bulgaria me as_an_engineer_2015-2016
Bulgaria me as_an_engineer_2015-2016
 
Italy _1st_ My ideal_town
Italy _1st_ My ideal_townItaly _1st_ My ideal_town
Italy _1st_ My ideal_town
 
Dictionary
DictionaryDictionary
Dictionary
 
Näin teet onnistunutta blogimarkkinointia
Näin teet onnistunutta blogimarkkinointiaNäin teet onnistunutta blogimarkkinointia
Näin teet onnistunutta blogimarkkinointia
 
Stiftung Pressemeldung Bernstorf.pdf
Stiftung Pressemeldung Bernstorf.pdfStiftung Pressemeldung Bernstorf.pdf
Stiftung Pressemeldung Bernstorf.pdf
 
Kapitalmarkt kompakt.pdf
Kapitalmarkt kompakt.pdfKapitalmarkt kompakt.pdf
Kapitalmarkt kompakt.pdf
 

Similar to mech engg cv

Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)shaikh mohd wasim
 
CV_Mechanical Engineer
CV_Mechanical EngineerCV_Mechanical Engineer
CV_Mechanical EngineerKhalid Jamal
 
CV_Mechanical Engineer
CV_Mechanical EngineerCV_Mechanical Engineer
CV_Mechanical EngineerKhalid Jamal
 
VAISAKH- Resume
VAISAKH- ResumeVAISAKH- Resume
VAISAKH- ResumeVaisakh Ev
 
VAISAKH- Resume
VAISAKH- ResumeVAISAKH- Resume
VAISAKH- ResumeVaisakh Ev
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operationrias ahamed
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad Samir
 
Cheikh Tolba -Healthcare Architect- PM
Cheikh Tolba -Healthcare Architect- PMCheikh Tolba -Healthcare Architect- PM
Cheikh Tolba -Healthcare Architect- PMCheikh Tolba
 

Similar to mech engg cv (20)

HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
 
Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
Mayuresh Resume
Mayuresh ResumeMayuresh Resume
Mayuresh Resume
 
CV_Mechanical Engineer
CV_Mechanical EngineerCV_Mechanical Engineer
CV_Mechanical Engineer
 
CV_Mechanical Engineer
CV_Mechanical EngineerCV_Mechanical Engineer
CV_Mechanical Engineer
 
VAISAKH- Resume
VAISAKH- ResumeVAISAKH- Resume
VAISAKH- Resume
 
VAISAKH- Resume
VAISAKH- ResumeVAISAKH- Resume
VAISAKH- Resume
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
Resume - Nilesh
Resume - NileshResume - Nilesh
Resume - Nilesh
 
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
 
c.v moin mech. engg. oil
c.v moin mech. engg. oilc.v moin mech. engg. oil
c.v moin mech. engg. oil
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CV
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
Cheikh Tolba -Healthcare Architect- PM
Cheikh Tolba -Healthcare Architect- PMCheikh Tolba -Healthcare Architect- PM
Cheikh Tolba -Healthcare Architect- PM
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Pratheesan
PratheesanPratheesan
Pratheesan
 

mech engg cv

  • 1. COVER LETTER Dear – Sir / Madam I am interested in working in your organization. I have enclosed my resume as a first step in exploring the possibilities of employment here. I would be thankful if I’m given a chance to prove myself on the basis of my education, skills, talents, abilities and experience. If given the opportunity to work for you. I assure you that you will find my work to your utmost satisfaction and need. I am confident that under the guidance of professionals like you, I can easily and quickly become orientated to your specific organization activities and needs. I would appreciate your cooperation. Thank you for your consideration to my enclosed resume for your further perusal. Hope for an early and favorable reply. Sincerely, Md mukhtar khan
  • 2.
  • 3. Md Mukhtar Khan Mobile:+91 9590547994 :+91 8698273627 e-mail:mmk.hvac@gmail.com Languages Known  Fluent in English  Fluent in Hindi, Urdu & kannada  Can read & write Arabic at beginner level Personal Strengths  Team Player  Analytical  Detail Oriented  Fast Learner  Enthusiastic  Acclimatizing  Computer Savvy  A good Listener. Personal Details  Date of Birth : 11/11/1992  Nationality : Indian  Cast: Muslim  Marital Status : single  Permanent Address: H no 21/11/24 beside Aadil shahi jamia masjid, Hirapur. Gulbarga.585103. Curriculum vitae Objective Seeking a challenging role in a progressive and forward thinking organization where I can formulate my educational and training background to be an integral part of the company’s operations by delivering outstanding results. Educational background  Bachelors of engineering B.E Mechanical from kbn college of engineering affiliated to visvesvaraya technological university, Belgaum India.  Pre university collage Science (PCMB). From dept of pre university education board Karnataka.  Matriculation 10th Grade from Karnataka secondary education Board  Certification Hvac designing and drafting IBR Institute Gulbarga. Acquired skills  Excellent presentation and inter- personal skills  Effective team player, easily mingle with people, Public speaking.  Ability to plan, prioritize and organize team work efficiently and meet deadlines  Ability to manage multiple tasks in a pressured environments  Ability to work in a team and individual environment.  I have leadership qualities and I believe in results.  excellent soft skills  Strong and quick acquiring of new technologies.  Quick decision making.  Disciplined, loyal and honest  Disciplined, dedicated, hard-working and result oriented Professional experience Total 3.5 Years of Experience as hvac and mep engineer.  Hvac site supervisor and draftsman In Blue star air-conditioning, kmc climate control, Gulbarga, India. From 18/Oct/2012 to 16/Mar/2015.  MEP site engineer and designer In Samsung air-conditioning, Max aircon, Pune, India. From 04/Aug/2015 to till date
  • 4. Professional skills  Skilled in designing, planning, development and installation of building mechanical equipment and systems for commercial buildings,  Experience in execution of Electromechanical System Operation & Maintenance for commercial / residential buildings site.  In-depth knowledge of HVAC Design, calculations as per ASHRAE,SMACNA Standards  Skilled in designing mechanical equipment by using AutoCAD. Projects 1. Project Name: Mahalaxmi gold hub, Gulbarga Designation: Site supervisor (HVAC). This project has a mall of 4 floors of gold shops, which is coming in the residential area of Gulbarga India, developed by M.G. Associates and we have done complete HVAC design, Installation and ducting as a sub contractor in contracted gold shops, parking area and in corridors. As per customer requirement and design we have installed cassette, ductable, split ac and this project is chilled water system. 2. Project Name: Shams Hotel, Gulbarga. Designation: Site supervisor (HVAC) and draftsman. Project was three floor hotel and lodging where 140 TR VRF System is installed .splits ac is installed in rooms , cassette ac in reception and corridors and duct able in meeting hall and ventilation for parking and toilet. This hotel is situated in wadi, Gulbarga, India. 3. Project Name: Accenture, Pune Designation: Site engineer and designer. A i.t park tower where i have worked as a mep site engineer and designed mep system, In this project we have designed and installed MEP services like fire fighting sprinkler system, fire alarms, smoke detectors, public address systems and cctv in workstations, corridors and open area. 4. Project Name: Ganga legend, pune Designation: Site engineer and designer. It is a Commercial building, in bavdhan pune developed by goel Ganga. This project was of 80TR VRF system Ducting for fresh air and exhaust for open area, toilets and Installed splits duct able and cassette units for three floors. 5. Project Name: West end Mall, Pune Designation: project engineer.
  • 5. A mall consists of chillers plant where Installation of Ahu's and hvac equipments, Ventilation and exhaust ducting in parking and conditioned air ducting and drafting and designing in shops and passages with mep equipments installation. Job Responsibilities:  Carry out Detailed design engineering and drafting of HVAC & MEP system which involves, heat load calculations, duct and pipe routing, fire fighting drawing & specifications.  Supervising and giving all drawings with dimensions to the duct man and technician.  Handle a work force of people on the site Preparing and planning the daily and weekly work schedule .Allotment of works to the foremen and the workers.  To ensure that the correct measurements are done, so that no problem occurs during Billing.  Inspecting the site before taking up projects, check for all relevant drawings with detail dimensions.  Co-coordinating with various Vendors/Sub Contractors in Fabrication etc. and Co- ordinate with subordinates and settles the disputes on site peacefully  Handing the Approved design to Project Dept for the Execution. * Visiting Sites periodically to solve real time Problems.  Finally, to prepare as-built Drawings as per site during the Commissioning with all required Details.  Attend appraisal meetings with the project manager/consultant in case of delay/ Change in drawings/ work/ unavailability of materials and suggest suitably.  To maintain the healthy relations with Architect, Electrical Dept, Plumbing Dept, Carpentry Dept etc.  To ensure fast working process so that the work is completed at the prescribed date.  To highly coordinate with the Procurement team so that no that there is no delay of work material on Site.  To Report daily to my Senior Authorities about the happenings on Site  To ensure that the work is completed in time with the given specification and standard.  Preparation detailed Bill of Materials including all Equipment, Filters, Valves, Fans, Pumps, Ducting piping accessories with technical specifications for all. Technical skills Design tools: Autocad2007-2017, (HAP) Hourly Analysis Program, BETA Performance, duct sizer, pipe sizer, catia v5, solid edge v18, Ansys, CAMD. Operating system: win xp, win 7, win 8.1, and win 10. Documentation Tools: MS word, MS power point, MS excel. Passport details:  Passport No. : M8896652  Date of Issue : 07/05/2015  Date of Expiry : 06/05/2025  Place of Issue : Bangalore, Karnataka All information furnished is factual and could be substantiated by testimonials and referrals.