Reporting Automation
REMIND OPA PART 1
Done survey outside
city / island
effectively in 5
working days
GOAL
STATEMENT
Review Data and
Drawing
Schedule
Confirmation
Execute Site Survey
Reporting
Customer
Acceptance &
Approval
Hand over to
proposal team
PROJECT
SCOPE
Commonly Site
Survey Activities
Not On Schedule,
especially when
execute survey out
of city or Island
PROBLEM
STATEMENT
in line with the
development of PLS,
many project
opportunities
waiting for done to
survey, so the site
survey activities has
to be done
effectively
PROJECT
BACKGROUND
PRIMARY
METRIC
•EFECTIVELY SURVEY DURATION IN 5
WORKING DAYS
SECONDARY
METRIC
•ACCELERATE OFFERING PROPOSAL TO
CUSTOMER
•READY TO DO MORE SITE SURVEY PROJECT
The Most Important SUGGESTIONS FROM AUDIENCES :
1. Mr. Yustinus Sigit :
held a Kick of Meeting with customer before do survey , The kick of meeting
involving KAM/Sales, Surveyor, and PIC of Customer
2. Mr. Aris Dwi Nugroho :
Recording method not effectively, because after writing on papers, surveyor still
has to input to excel form, so if possible make it easy reporting
3. Mrs. Riana Nurtriyono
supposed improvements have been made and applied to several projects before
OPA
ANALYZE OPA PART 1
ANALYZE OPA PART 1 :
Reporting at night every day
ANALYZE OPA PART 1
Easily recording
data
Easily reporting
Report can be
read clearly and
be submitted to
customer
directly after site
survey at the
time
GOAL
STATEMENT
Make the easy
recording
aplication by
web base
PROJECT
SCOPE
writing data on
paper usually the
result was not
clear, hard to
read,
complicated to
reporting.
PROBLEM
STATEMENT
in line with the
development of
PLS, many
project
opportunities
waiting for done
to survey, so the
site survey
activities has to
be done
effectively and
clearly
PROJECT
BACKGROUND
PROJECT CHAPTER
Define
SITE
SURVEY
PROJECT LIST
Measure
PRIMARY
METRIC
• EFECTIVELY RECORDING DATA
SECONDARY
METRIC
• ACCELERATE OFFERING SITE SURVEY REPORT
• OBTAIN APPROVAL BY CUSTOMER DIRECTLY
• READY TO DO MORE SITE SURVEY PROJECT
Analyze
Legal software
Only can be installed
Have no fulltime
IT partner
Cannot share to
anyone any time
ISHIKAWA DIAGRAM
Improvement Reporting Automation
FOREWORD > introducing Our Forms
Used to record kinds of all
Existing Lamps
Used to counts lamps each rooms / area
Site survey standard form, be submitted to
customer and as reference for making proposal
Used to record Lighting Panels
FLOW CHART DESIGN (1)
SOFTWARE
APLIKASI /
PROGRAM
FORM A &
FORM B
(Excel Form)
FORM C
(Excel Form)
PRINT OUT
report
Link
sofware - excel
Link
Excel - Excel
PLANING SOFTWARE 1
SOFTWARE 1
Digunakan untuk
Mengisi form A
Diharapkan bisa
Di input langsung
Ke Form Excel A
DAFTAR JENIS LAMPU
1. KODE LAMPU TL318TL318
2. NAMA & TIPE LAMPU TBS 3x18 WTBS 3x18 W
3. KATEGORI LAMPU TLTL
4. FITTING LAMPU T8T8
5. WARNA CAHAYA LAMPU 40004000
6. DAYA LAMPU 1818
7. JENIS BALLAST MM
8. JUMLAH LAMPU / RUMAH LAMPU 33
9. LUX LEVEL 179179
10. APLIKASI PEMASANGAN INDOORINDOOR
11. LOKASI LAMPU TERPASANG RECESSEDRECESSED
12. DIAMETER DOWNLIGHT 2626
13. PHOTO LAMPU
PLANING SOFTWARE 2
SOFTWARE 2
Digunakan untuk
Mengisi form B
Software ini digunakan
saat pendataan
Lampu, sehingga akan
Lebih sering dipakai
DATA LAMPU EXISTING
1. LOCATION / FLOOR
2. AREA / ROOM
3. KODE LAMPU
4. JUMLAH TITIK LAMPU
5. BATTERY EMERGENCY
6. APLIKASI BATTERY
7. LUX LEVEL AVERAGE
8. JENIS CEILING
9. DIMMER
PERFORM WEB BASE (1)
First Planning , with HTML and Delphi program
language
Status = Not to be continued > its too difficult and
bad performance
Obtain good idea :
- Use web base
- Use PHP & MySQL program
- Get the book reference
FORM LOGIN USER
FORM CONTENTS
Project sharing partner
• VISIT OUR
TRIAL WEB
SITE
TIME
TO
DEMO
www.nansunan.url.ph
the application still need continues improvement to solve some
function until this tools accordant with Philips PLS business
process for survey
Some problems till now cannot be solved, are :
“Forgot Password’ function
Multi User capability
Convert to PLS standard form (excel form)
User level function capability
MY ACTIVITIES WHILE STILL WAITING FOR SURVEY
MAKE DESIGNED AND ESTIMATE MG SUITE SEMARANG
TOTAL PROJECT VALUE = Rp.654.716.620
- PCK = Rp. 400.977.920
- - SIGNAGE = Rp. 253.738.700
DIALUX
“TOKO MAS’ DESIGN
ROAD LIGHTING DESIGN
DIALUX
CALCULUX
NOTHING IMPOsSIBLE
LET’S BE INOVATING
LEARNING
Thank you

More Related Content

Similar to OPA Sunan

Optima direct post mortem 1
Optima direct post mortem 1 Optima direct post mortem 1
Optima direct post mortem 1 shelleyberg
 
Internship project ppt
Internship project pptInternship project ppt
Internship project pptabdikissi
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...SATN
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016subhash gupta
 
Major Project Report on Designing an Android Application for Electrical Maint...
Major Project Report on Designing an Android Application for Electrical Maint...Major Project Report on Designing an Android Application for Electrical Maint...
Major Project Report on Designing an Android Application for Electrical Maint...Amit Kumar
 
Project of IT243Customer Service For Electroni.docx
Project of IT243Customer Service For Electroni.docxProject of IT243Customer Service For Electroni.docx
Project of IT243Customer Service For Electroni.docxwoodruffeloisa
 
Managing Productivity With Unifier
Managing Productivity With UnifierManaging Productivity With Unifier
Managing Productivity With Unifierp6academy
 
LI-Presentation-FINAL.pptx
LI-Presentation-FINAL.pptxLI-Presentation-FINAL.pptx
LI-Presentation-FINAL.pptxMuhdZaid11
 
Banking Proposal Bidding and response to RFP Presentation
Banking Proposal Bidding and response to RFP PresentationBanking Proposal Bidding and response to RFP Presentation
Banking Proposal Bidding and response to RFP PresentationHarnoor Singh
 
Process planing and manufacturing of a blow mould
Process planing and manufacturing of a blow mouldProcess planing and manufacturing of a blow mould
Process planing and manufacturing of a blow mouldTHANMAY JS
 
Aviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingAviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingThe European GNSS Agency (GSA)
 

Similar to OPA Sunan (20)

Quality application
Quality applicationQuality application
Quality application
 
Optima direct post mortem 1
Optima direct post mortem 1 Optima direct post mortem 1
Optima direct post mortem 1
 
Internship project ppt
Internship project pptInternship project ppt
Internship project ppt
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Embedded system design process
Embedded system design processEmbedded system design process
Embedded system design process
 
BIM Execution plan
BIM  Execution  planBIM  Execution  plan
BIM Execution plan
 
BIM DAY 2016-BIM Execution Plan(English Edition)
BIM DAY 2016-BIM Execution Plan(English Edition)BIM DAY 2016-BIM Execution Plan(English Edition)
BIM DAY 2016-BIM Execution Plan(English Edition)
 
Development of MEOSAR Beacons
Development of MEOSAR Beacons  Development of MEOSAR Beacons
Development of MEOSAR Beacons
 
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...
Technology Transfer Impact on SMME Development - Perspectives from a Small/Mi...
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Investor Pitch Training
Investor Pitch TrainingInvestor Pitch Training
Investor Pitch Training
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016
 
Major Project Report on Designing an Android Application for Electrical Maint...
Major Project Report on Designing an Android Application for Electrical Maint...Major Project Report on Designing an Android Application for Electrical Maint...
Major Project Report on Designing an Android Application for Electrical Maint...
 
Project of IT243Customer Service For Electroni.docx
Project of IT243Customer Service For Electroni.docxProject of IT243Customer Service For Electroni.docx
Project of IT243Customer Service For Electroni.docx
 
Managing Productivity With Unifier
Managing Productivity With UnifierManaging Productivity With Unifier
Managing Productivity With Unifier
 
Internship
InternshipInternship
Internship
 
LI-Presentation-FINAL.pptx
LI-Presentation-FINAL.pptxLI-Presentation-FINAL.pptx
LI-Presentation-FINAL.pptx
 
Banking Proposal Bidding and response to RFP Presentation
Banking Proposal Bidding and response to RFP PresentationBanking Proposal Bidding and response to RFP Presentation
Banking Proposal Bidding and response to RFP Presentation
 
Process planing and manufacturing of a blow mould
Process planing and manufacturing of a blow mouldProcess planing and manufacturing of a blow mould
Process planing and manufacturing of a blow mould
 
Aviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingAviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management Training
 

OPA Sunan

  • 2. REMIND OPA PART 1 Done survey outside city / island effectively in 5 working days GOAL STATEMENT Review Data and Drawing Schedule Confirmation Execute Site Survey Reporting Customer Acceptance & Approval Hand over to proposal team PROJECT SCOPE Commonly Site Survey Activities Not On Schedule, especially when execute survey out of city or Island PROBLEM STATEMENT in line with the development of PLS, many project opportunities waiting for done to survey, so the site survey activities has to be done effectively PROJECT BACKGROUND PRIMARY METRIC •EFECTIVELY SURVEY DURATION IN 5 WORKING DAYS SECONDARY METRIC •ACCELERATE OFFERING PROPOSAL TO CUSTOMER •READY TO DO MORE SITE SURVEY PROJECT
  • 3. The Most Important SUGGESTIONS FROM AUDIENCES : 1. Mr. Yustinus Sigit : held a Kick of Meeting with customer before do survey , The kick of meeting involving KAM/Sales, Surveyor, and PIC of Customer 2. Mr. Aris Dwi Nugroho : Recording method not effectively, because after writing on papers, surveyor still has to input to excel form, so if possible make it easy reporting 3. Mrs. Riana Nurtriyono supposed improvements have been made and applied to several projects before OPA
  • 5. ANALYZE OPA PART 1 : Reporting at night every day ANALYZE OPA PART 1
  • 6. Easily recording data Easily reporting Report can be read clearly and be submitted to customer directly after site survey at the time GOAL STATEMENT Make the easy recording aplication by web base PROJECT SCOPE writing data on paper usually the result was not clear, hard to read, complicated to reporting. PROBLEM STATEMENT in line with the development of PLS, many project opportunities waiting for done to survey, so the site survey activities has to be done effectively and clearly PROJECT BACKGROUND PROJECT CHAPTER Define
  • 7. SITE SURVEY PROJECT LIST Measure PRIMARY METRIC • EFECTIVELY RECORDING DATA SECONDARY METRIC • ACCELERATE OFFERING SITE SURVEY REPORT • OBTAIN APPROVAL BY CUSTOMER DIRECTLY • READY TO DO MORE SITE SURVEY PROJECT
  • 8. Analyze Legal software Only can be installed Have no fulltime IT partner Cannot share to anyone any time ISHIKAWA DIAGRAM
  • 10. FOREWORD > introducing Our Forms Used to record kinds of all Existing Lamps Used to counts lamps each rooms / area
  • 11. Site survey standard form, be submitted to customer and as reference for making proposal
  • 12. Used to record Lighting Panels
  • 13. FLOW CHART DESIGN (1) SOFTWARE APLIKASI / PROGRAM FORM A & FORM B (Excel Form) FORM C (Excel Form) PRINT OUT report Link sofware - excel Link Excel - Excel
  • 14. PLANING SOFTWARE 1 SOFTWARE 1 Digunakan untuk Mengisi form A Diharapkan bisa Di input langsung Ke Form Excel A DAFTAR JENIS LAMPU 1. KODE LAMPU TL318TL318 2. NAMA & TIPE LAMPU TBS 3x18 WTBS 3x18 W 3. KATEGORI LAMPU TLTL 4. FITTING LAMPU T8T8 5. WARNA CAHAYA LAMPU 40004000 6. DAYA LAMPU 1818 7. JENIS BALLAST MM 8. JUMLAH LAMPU / RUMAH LAMPU 33 9. LUX LEVEL 179179 10. APLIKASI PEMASANGAN INDOORINDOOR 11. LOKASI LAMPU TERPASANG RECESSEDRECESSED 12. DIAMETER DOWNLIGHT 2626 13. PHOTO LAMPU
  • 15. PLANING SOFTWARE 2 SOFTWARE 2 Digunakan untuk Mengisi form B Software ini digunakan saat pendataan Lampu, sehingga akan Lebih sering dipakai DATA LAMPU EXISTING 1. LOCATION / FLOOR 2. AREA / ROOM 3. KODE LAMPU 4. JUMLAH TITIK LAMPU 5. BATTERY EMERGENCY 6. APLIKASI BATTERY 7. LUX LEVEL AVERAGE 8. JENIS CEILING 9. DIMMER
  • 16. PERFORM WEB BASE (1) First Planning , with HTML and Delphi program language Status = Not to be continued > its too difficult and bad performance
  • 17. Obtain good idea : - Use web base - Use PHP & MySQL program - Get the book reference
  • 18.
  • 19.
  • 23.
  • 24. • VISIT OUR TRIAL WEB SITE TIME TO DEMO www.nansunan.url.ph
  • 25. the application still need continues improvement to solve some function until this tools accordant with Philips PLS business process for survey Some problems till now cannot be solved, are : “Forgot Password’ function Multi User capability Convert to PLS standard form (excel form) User level function capability
  • 26. MY ACTIVITIES WHILE STILL WAITING FOR SURVEY
  • 27. MAKE DESIGNED AND ESTIMATE MG SUITE SEMARANG TOTAL PROJECT VALUE = Rp.654.716.620 - PCK = Rp. 400.977.920 - - SIGNAGE = Rp. 253.738.700
  • 30. NOTHING IMPOsSIBLE LET’S BE INOVATING LEARNING