Land Development Update-NAIOP/NVBIA Joint Meeting: Sept. 8, 2016

  1. 1. Land Development Update NAIOP/NVBIA Joint Meeting September 8, 2016
  2. 2. Booster Shot Hiring 9/12/2016 2 Agency Division Classification Status Comments 1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 DPZ Zoning Evaluation Planner III S27 1 - Filled Filled as Planner III 5 FCDOT Transportation Planner II S24 1 - Filled 6 FCDOT Transportation Planner II S24 1 - Filled 7 Fire Marshal Fire Inspector II S20 1 - Filled 8 Fire Marshal Fire Inspector II S20 1 - Filled 9 Fire Marshal Administrative Assistant II S13 1 - Filled 10 Fire Marshal Engineer III S27 1 - Filled 11 Health Department Environmental Health Environmental Health Spec II S23 1 - Filled 12 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 13 LDS Director's Office Management Analyst I S21 1 - Filled 14 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 15 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 16 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 17 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 18 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 19 LDS IT Business Analyst III S27 1 - Filled 20 LDS Director's Office Planner IV S29 1 - Filled 21 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 22 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled 23 LDS Site Development & Inspections Senior Engineering Inspector S21 1 - Filled 24 LDS Director's Office Assistant Director S34 1 - Filled LDS Operations Director 25 LDS HR Human Resources Generalist II S24 1 - Filled 26 LDS Building Plan Review & Inspections Engineer IV S29 1 - Filled Reclassified from Eng III to Eng IV 27 Urban Forestry Urban Forester II S24 1 - Filled 28 Fire Marshal Engineer III S27 2 -Interviews re-advertised; interviews in progress
  3. 3. Average Site Plan Timelines 9/12/2016 3 Plan Types Target May - July Last Period (Apr - June) Avg for 2015 Avg for 2014 Infill Lot Grading Plan (INF, Non- bonded Single Family) 21 18 19 26.0 25.9 Major Plan First Submission (SP, SD, PI) 60 52 53 58.5 66.8 Major (SP, SD, PI) Second DPE 14 / 28 22 23 22.2 33.1 Major (SP, SD, PI) Subsequent Non-DPE 45 39 36 62.1 68.6
  4. 4. SDID Review Times by Branch Three Months Average Review Times SDID North Branch Central Branch South Branch Current Period Last Period Current Period Current Period Last Period Current Period Current Period Last Period Current Period Current Period Last Period Current Period Plan Types Target May-July April-June #ofPlans Approval % May-July April-June #ofPlans Approval % May-July April-June #ofPlans Approval % May-July April-June #ofPlans Approval % Infill Lot Grading Plan (INF, Non-bonded Single Family) 21 Days 18 19 230 81 15 16 131 88 23 24 50 74 21 22 49 69 Major Plan First Submission (SP, SD, PI) 60 Days 52 53 20 0 42 50 5 0 61 62 4 0 53 49 11 0 Major (SP, SD, PI) Second DPE 14 -28 Days 22 23 10 90 18 18 5 100 17 17 1 100 28 34 4 75 Major (SP, SD, PI) Subsequent Non-DPE 45 Days 39 36 16 75 16 17 1 100 41 36 8 75 41 41 7 71 9/12/2016 4
  5. 5. Average Review Time Residential Building 9/12/2016 5
  6. 6. Average Review Time Commercial Building 9/12/2016 6
  7. 7. Average Review Time Commercial Building 9/12/2016 7
  8. 8. Fairfax First Update 9/12/2016 8
  9. 9. Top 7 Initiatives 9/12/2016 9
  10. 10. Fire Marshal’s Office 9/12/2016 10
  11. 11. Fire Marshal Inventory Plan Type No. on Hand Oldest Date Work Day Lag Sprinkler, Tenant plans without calculations 10 8-31-16 3 Sprinkler, Tenant plans with calculations 6 8-11-16 17 Sprinkler, Shell Bldgs., NFPA 13 systems 8 7-29-16 26 Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 9 8-16-16 14 Town of Herndon Building Tenant 2 9-2-16 1 Fire Alarm, Tenant plans 19 8-31-16 3 Fire Alarm, Shell Bldgs. 9 8-24-16 8 Door Lock / Security plans 1 9-2-16 1 Range Hood/Tanks/Foam/Public Safety Plans /Misc. 8 8-31-16 3 Site Plans/Rezoning 5 / 0 9-2-16 1 High-Piled Storage Plans 2 8-19-16 11 Evacuation / Lockdown Plans 0 -- 0 Burkholder Building Summary 79 7-29-16 XXXXXXXXX FM Architectural Review done at Herrity Building (Class 4 and Greater Building Plans) 11 8-25-16 7 FM Architectural Review (Fast Track Tenant Plans) 0 -- 0 FM Arch. Review (non-Fast Track Tenant Plans) 8 8-30-16 4 Herrity Building (B-2) Summary 19 8-25-16 XXXXXXXXX 9/12/2016 11
  12. 12. Planning & Zoning 9/12/2016 12
  13. 13. New NVBIA/NAIOP Webpage http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm 9/12/2016 13
  14. 14. Thank you 9/12/2016 14

×