DINH VU INDUSTRIAL ZONE AT GLANCE


                                 1 – General Information


  Location       Hai An dist., Hai Phong city


   Office        5/F Harbour View Office tower, No. 4 Tran Phu Str., Hai Phong City

                 Tel.: 84 31 3 836 269

                 Fax: 84 31 3 859 130

                 Email: dviz@vnn.vn

                 Website: www.dinhvu.com


Infrastructure   Dinh Vu Industrial Zone Joint Stock Company a joint stock company
  developer      between a Foreign partner and Hai Phong People’s Committee;
  (Investor)
                       Infra Asia ( Hong kong), together with
                       IPEM (International Port Engineering & Management NV) – Belgium
                       Rent A Port – Belgium



                 Dinh Vu Industrial Zone is an integral part of Dinh Vu Peninsula Economic
    Area
                 Project, consisting of following developments
                  •    Industrial Zone:               945 ha
                  •    Port zone:                      130 ha
                  •    Residential/Commercial zone: 65 ha




                            2 – Location and regional relation


Hanoi center     102 km
 (Capital of
  Vietnam)


    Road         Direct linked with highway No. 5 road and new expressway of 100m, linking
                 DVIZ with other important national roads such road No.18 going to Quang
                 Ninh, road No. 10 going to Thai Binh and Nam Dinh, as well as, highway No. 1
                 to the South.


                 20,000 DWT Dinh Vu General port inside the industrial zone
  Seaports
                 10,000 DWT and 20,000 DWT liquid jetties inside the industrial zone to serve
                 petrochemical clients.
                 3 km from existing Haiphong port, biggest port in the Northern part of
                                                                                                1
Vietnam.
                      Close to Lach Huyen Deep sea port of 80,000 DWT, starting construction by
                      2011.


       Airport        15 minutes from Cat bi airport

                      2.5 hours from Noi Bai airport


      Railway         Directly linked with future international railway network Haiphong – Hanoi –
                      Laocai – Kunming in China. This network design is under process.


                                          3 – Infrastructure


                      Phase 1 of 164 ha: completed
 Construction plan
                      Second phase of 378 ha: Stage 1 of 30 ha is available for lease, other stages
                      are under construction.
                      Remaining area: shall be developed subject to phase 2 and other
                      conditions
                      20,000 DWT liquid Jetty is under construction and expected to be
                      operational by the end of 2010.


   Power supply       Operational Power station : 126 MVA

                      Central power station: 500 MVA, stage 1 of 250 MVA is operational


   Water supply       12,500 m3/day (40,000 m3/day upon full development)


Telecommunication     2000 lines are designed for the whole area. ADSL, internet service is
                      available.


   Internal traffic   Main road: 68 meter roads; Secondary road: 34, 31 meter; Lot road: 15 meter


  Fire prevention     270 m3/hour


 Construction ratio   70% of leased land area; 30% for green and parking area


                                         4 – Tax incentives


Tenants in the zone can enjoy tax incentives applied for economic zone:


Corporate Income      * 10% for 15 years, 25% thereafter
       Tax


                                                                                                     2
* 100% exemption for 4 years commencing from first profit making year

                      * 50% reduction for 9 years after exemption period


Personal Income       50% reduction to normal rate
      Tax


                                 5 – Land rental and utility charges


                      US $60 ~ $90/ m2/ leasing term (except for the seafront land), subject to
   Land rental
                      Investment scope, Land location, land size
                      US$ 60 – US$ 70 : Non petrochemical industry
                      US$ 60 – US$ 90: Petrochemical industry
                      Applied to 31/12/2010.

                      - Apply government rate
   Power price
                       •   Normal hour :        US$ 0.0492/Kwh
(22 KV transmission
        line)          •   Peak hour :          US$0.0961/Kwh
                       •   Off-peak hour :      US$ 0.0273/Kwh
                       (Exchange rate: 1 USD = 19,000 VND)

                      - In addition, tenant shall pay 3% mark up power operation and
                      management fee.


   Water price        11,428 VND/m3


Maintenance fee       US $ 0.055/m2/month


Power connection      US $ 15,000 (one time payment for land leasing term)
       fee


Water connection      US $ 10,000 (one time payment for land leasing term)
       fee


   Waste water        to be specified in the Utilities contract
    charge


  Environments        Waste water: tenant has to pretreated waster water to level imposed by
  requirement         DVIZ before discharging into common system.

                      Other standards like noise, dust, etc: follow Vietnamese standards




                                                                                                  3
6 – Other information


Target investors     -   Petrochemical industry

                     -   Heavy Industry

                     -   General light industry required port access


Committed clients   33 clients such as Nakashima, Chevron, Proconco, New hope, Sepangar
                    Oshika,

                    Petrovietnam, Vinachem, Petrolimex, Dinh Vu Steel Billet plant,…


One Stop Service    Free of charge with effectiveness




                                                                                          4

More Related Content

What's hot

Land Law 1 DISPOSAL OTHERWISE THAN BY ALIENATION
Land Law 1 DISPOSAL OTHERWISE THAN BY ALIENATIONLand Law 1 DISPOSAL OTHERWISE THAN BY ALIENATION
Land Law 1 DISPOSAL OTHERWISE THAN BY ALIENATION
xareejx
 
Admiralty jurisdiction
Admiralty jurisdictionAdmiralty jurisdiction
Admiralty jurisdiction
Hamza Ali
 

What's hot (15)

RENT AGREEMENT Format
RENT AGREEMENT FormatRENT AGREEMENT Format
RENT AGREEMENT Format
 
Land Law 1 DISPOSAL OTHERWISE THAN BY ALIENATION
Land Law 1 DISPOSAL OTHERWISE THAN BY ALIENATIONLand Law 1 DISPOSAL OTHERWISE THAN BY ALIENATION
Land Law 1 DISPOSAL OTHERWISE THAN BY ALIENATION
 
Format rent agreement
Format rent agreementFormat rent agreement
Format rent agreement
 
Sb0025
Sb0025Sb0025
Sb0025
 
Contaminated Land, Jim 2 Limited v Walsall Metropolitan Borough Council (APP/...
Contaminated Land, Jim 2 Limited v Walsall Metropolitan Borough Council (APP/...Contaminated Land, Jim 2 Limited v Walsall Metropolitan Borough Council (APP/...
Contaminated Land, Jim 2 Limited v Walsall Metropolitan Borough Council (APP/...
 
1965 convention on transit trade of land locked states-pdf
1965 convention on transit trade of land locked states-pdf1965 convention on transit trade of land locked states-pdf
1965 convention on transit trade of land locked states-pdf
 
UNCLOS 3
UNCLOS 3UNCLOS 3
UNCLOS 3
 
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
 
Record of rights
Record of rightsRecord of rights
Record of rights
 
Land Assignment Act.
Land Assignment Act.Land Assignment Act.
Land Assignment Act.
 
Territorial sea
Territorial seaTerritorial sea
Territorial sea
 
Admiralty jurisdiction
Admiralty jurisdictionAdmiralty jurisdiction
Admiralty jurisdiction
 
Port of New Orleans: Riverfront Development Issues
Port of New Orleans: Riverfront Development IssuesPort of New Orleans: Riverfront Development Issues
Port of New Orleans: Riverfront Development Issues
 
Law of th sea ali
Law of th sea aliLaw of th sea ali
Law of th sea ali
 
Abhinav semenar of thoma
Abhinav semenar of thomaAbhinav semenar of thoma
Abhinav semenar of thoma
 

Viewers also liked (7)

Classroom Handbook 2013
Classroom Handbook 2013Classroom Handbook 2013
Classroom Handbook 2013
 
Prophet muhammad
Prophet muhammadProphet muhammad
Prophet muhammad
 
Khl lawyer introduction
Khl lawyer introductionKhl lawyer introduction
Khl lawyer introduction
 
Portfolio Pics-Office of VP/Provost-MC, Germantown Campus
Portfolio Pics-Office of VP/Provost-MC, Germantown CampusPortfolio Pics-Office of VP/Provost-MC, Germantown Campus
Portfolio Pics-Office of VP/Provost-MC, Germantown Campus
 
Meet The Teacher Night
Meet The Teacher Night Meet The Teacher Night
Meet The Teacher Night
 
Smart Steps - How It Works
Smart Steps - How It WorksSmart Steps - How It Works
Smart Steps - How It Works
 
Chi omega gamma
Chi omega gammaChi omega gamma
Chi omega gamma
 

Similar to Dviz quickglance. 022010.final

International traffic termination session 13b
International traffic termination session 13bInternational traffic termination session 13b
International traffic termination session 13b
Hamza Negadi
 
ICR_August06_Song_Gianh
ICR_August06_Song_GianhICR_August06_Song_Gianh
ICR_August06_Song_Gianh
Anh Nguyen
 

Similar to Dviz quickglance. 022010.final (20)

Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8
 
Investing in wind energy in Vietnam — legal certainty and bankability — makin...
Investing in wind energy in Vietnam — legal certainty and bankability — makin...Investing in wind energy in Vietnam — legal certainty and bankability — makin...
Investing in wind energy in Vietnam — legal certainty and bankability — makin...
 
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM - ONSHORE AND OFFSHORE WIND EN...
Lawyer in Vietnam Dr. Oliver Massmann  VIETNAM - ONSHORE AND OFFSHORE WIND EN...Lawyer in Vietnam Dr. Oliver Massmann  VIETNAM - ONSHORE AND OFFSHORE WIND EN...
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM - ONSHORE AND OFFSHORE WIND EN...
 
VIETNAM – WIND AND SOLAR PROJECTS: HOW TO GET DEALS DONE
VIETNAM – WIND AND SOLAR PROJECTS:  HOW TO GET DEALS DONEVIETNAM – WIND AND SOLAR PROJECTS:  HOW TO GET DEALS DONE
VIETNAM – WIND AND SOLAR PROJECTS: HOW TO GET DEALS DONE
 
Mẫu thiết kế Brochure giới thiệu khu công nghiệp Vinatex Id
Mẫu thiết kế Brochure giới thiệu khu công nghiệp Vinatex IdMẫu thiết kế Brochure giới thiệu khu công nghiệp Vinatex Id
Mẫu thiết kế Brochure giới thiệu khu công nghiệp Vinatex Id
 
International traffic termination session 13b
International traffic termination session 13bInternational traffic termination session 13b
International traffic termination session 13b
 
Committee on CPECNew
Committee on CPECNewCommittee on CPECNew
Committee on CPECNew
 
FDI in Infrastructure
FDI in InfrastructureFDI in Infrastructure
FDI in Infrastructure
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN HOW TO DEVELOP SOLAR PROJECTS IN VIETNAM?
LAWYER IN VIETNAM DR. OLIVER MASSMANN HOW TO DEVELOP SOLAR PROJECTS IN VIETNAM?LAWYER IN VIETNAM DR. OLIVER MASSMANN HOW TO DEVELOP SOLAR PROJECTS IN VIETNAM?
LAWYER IN VIETNAM DR. OLIVER MASSMANN HOW TO DEVELOP SOLAR PROJECTS IN VIETNAM?
 
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
 
INVESTING IN VIETNAM SOLAR POWER MARKET - How to do it right?
INVESTING IN VIETNAM SOLAR POWER MARKET - How to do it right?INVESTING IN VIETNAM SOLAR POWER MARKET - How to do it right?
INVESTING IN VIETNAM SOLAR POWER MARKET - How to do it right?
 
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Wind Investment Guide
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam -  Wind Investment GuideLawyer in Vietnam Dr. Oliver Massmann - Vietnam -  Wind Investment Guide
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Wind Investment Guide
 
Vietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The GuideVietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The Guide
 
ICR_August06_Song_Gianh
ICR_August06_Song_GianhICR_August06_Song_Gianh
ICR_August06_Song_Gianh
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONEVIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
 
Construction Law: An Indian Perspective
Construction Law: An Indian PerspectiveConstruction Law: An Indian Perspective
Construction Law: An Indian Perspective
 
Invest in Ventspils 2011
Invest in Ventspils 2011Invest in Ventspils 2011
Invest in Ventspils 2011
 

Dviz quickglance. 022010.final

  • 1. DINH VU INDUSTRIAL ZONE AT GLANCE 1 – General Information Location Hai An dist., Hai Phong city Office 5/F Harbour View Office tower, No. 4 Tran Phu Str., Hai Phong City Tel.: 84 31 3 836 269 Fax: 84 31 3 859 130 Email: dviz@vnn.vn Website: www.dinhvu.com Infrastructure Dinh Vu Industrial Zone Joint Stock Company a joint stock company developer between a Foreign partner and Hai Phong People’s Committee; (Investor) Infra Asia ( Hong kong), together with IPEM (International Port Engineering & Management NV) – Belgium Rent A Port – Belgium Dinh Vu Industrial Zone is an integral part of Dinh Vu Peninsula Economic Area Project, consisting of following developments • Industrial Zone: 945 ha • Port zone: 130 ha • Residential/Commercial zone: 65 ha 2 – Location and regional relation Hanoi center 102 km (Capital of Vietnam) Road Direct linked with highway No. 5 road and new expressway of 100m, linking DVIZ with other important national roads such road No.18 going to Quang Ninh, road No. 10 going to Thai Binh and Nam Dinh, as well as, highway No. 1 to the South. 20,000 DWT Dinh Vu General port inside the industrial zone Seaports 10,000 DWT and 20,000 DWT liquid jetties inside the industrial zone to serve petrochemical clients. 3 km from existing Haiphong port, biggest port in the Northern part of 1
  • 2. Vietnam. Close to Lach Huyen Deep sea port of 80,000 DWT, starting construction by 2011. Airport 15 minutes from Cat bi airport 2.5 hours from Noi Bai airport Railway Directly linked with future international railway network Haiphong – Hanoi – Laocai – Kunming in China. This network design is under process. 3 – Infrastructure Phase 1 of 164 ha: completed Construction plan Second phase of 378 ha: Stage 1 of 30 ha is available for lease, other stages are under construction. Remaining area: shall be developed subject to phase 2 and other conditions 20,000 DWT liquid Jetty is under construction and expected to be operational by the end of 2010. Power supply Operational Power station : 126 MVA Central power station: 500 MVA, stage 1 of 250 MVA is operational Water supply 12,500 m3/day (40,000 m3/day upon full development) Telecommunication 2000 lines are designed for the whole area. ADSL, internet service is available. Internal traffic Main road: 68 meter roads; Secondary road: 34, 31 meter; Lot road: 15 meter Fire prevention 270 m3/hour Construction ratio 70% of leased land area; 30% for green and parking area 4 – Tax incentives Tenants in the zone can enjoy tax incentives applied for economic zone: Corporate Income * 10% for 15 years, 25% thereafter Tax 2
  • 3. * 100% exemption for 4 years commencing from first profit making year * 50% reduction for 9 years after exemption period Personal Income 50% reduction to normal rate Tax 5 – Land rental and utility charges US $60 ~ $90/ m2/ leasing term (except for the seafront land), subject to Land rental Investment scope, Land location, land size US$ 60 – US$ 70 : Non petrochemical industry US$ 60 – US$ 90: Petrochemical industry Applied to 31/12/2010. - Apply government rate Power price • Normal hour : US$ 0.0492/Kwh (22 KV transmission line) • Peak hour : US$0.0961/Kwh • Off-peak hour : US$ 0.0273/Kwh (Exchange rate: 1 USD = 19,000 VND) - In addition, tenant shall pay 3% mark up power operation and management fee. Water price 11,428 VND/m3 Maintenance fee US $ 0.055/m2/month Power connection US $ 15,000 (one time payment for land leasing term) fee Water connection US $ 10,000 (one time payment for land leasing term) fee Waste water to be specified in the Utilities contract charge Environments Waste water: tenant has to pretreated waster water to level imposed by requirement DVIZ before discharging into common system. Other standards like noise, dust, etc: follow Vietnamese standards 3
  • 4. 6 – Other information Target investors - Petrochemical industry - Heavy Industry - General light industry required port access Committed clients 33 clients such as Nakashima, Chevron, Proconco, New hope, Sepangar Oshika, Petrovietnam, Vinachem, Petrolimex, Dinh Vu Steel Billet plant,… One Stop Service Free of charge with effectiveness 4