SlideShare a Scribd company logo
1 of 7
Lakshminarayanan Page 1 of 6
Lakshminarayanan.R
No 31, Kamalam Apartment
3RD
floor, Ashokan Street,
3RD
cross, Nethaji Nagar 1,
Uppalam, Pondicherry
Mobile: +91 9003548624
E-mail: r.lakshnarayan@gmail.com
Objective
To seek a challenging position in a progressive environment where my experience skills provide
ample opportunity in my growth.
Education
Degree : Bachelor of Engineering (B.E.) in Electrical and Electronics Engineering
Class : First class
Institution : Adhiyamaan College of Engineering, Hosur
Electrical License : “C” Certified by TNEB License No. C 37387
Professional Experience
TOTAL YEARS OF EXPERIENCE: 14 YRS
Present Company : SAROVAR Hotels & Resorts( The promenade ) Pondicherry.
Designation : CHIEF ENGINEER
Experience : Oct 2015 to Till
Job Responsibility (Experience details)
Overall In charge of Operation and Maintenance Department.
Operation and Maintenance of 500 KVA DG
A check (Daily checking)
1. Battery voltage,
2. Distilled water level& specific gravity
3. Belt condition,
4. RPM,
5. Lubrication oil level,
6. Radiator coolant water level,
7. Fuel level.
Lakshminarayanan Page 2 of 6
B check (6 month once)
1. To change the oil 20w40
2. To change the oil filter
3. To change the fuel filter
C check (Yearly once)
1. To change the air filter
2. Both A& B check
D check (if required)
1. Full servicing work
2. Radiator & injector
Operation and Maintenance of Transformer500 KVA
1. To check the oil level (indicator) in conservator tank.
2. To check the silica gel color in breather.
3. To check the oil temperature & winding temperature in temp
gauge
4. To check the oil leak.
Operation and Maintenance 60 KVA UPS
1. To check the input voltage, current, frequency, power factor
2. To check the output voltage line to line and line to neutral in
each phase.
3. To check the output current in each phase.
4. To check the output frequency, power factor
5. To check the battery voltage and charging.
6. To check the battery internal resistance and charging voltage.
Operation and Maintenance of centralized CHILLER PLANT
A/C 340TR
1. To check the chilled water leaving temperature
2. To check the chilled water return temperature
3. To check the full load amps in each phase.
4. To ensure all the condensing water pump (10 HP) and
chilled water pump (7.5 HP) are working properly.
5. To ensure the cooling tower pumps (5 HP) are working
properly.
6. To check the air lock problem in all the pipe lines.
7. To maintain the water level and water purification in
cooling towers.
8. To ensure the cooling tower water must be in PH value
Lakshminarayanan Page 3 of 6
8 To ensure the makeup tank water always full because of to avoid air lock problem.
9 To check all the AHU blower and belt condition, motor working properly.
10 To check the AHU canvass.
11 To check the entire FCU unit is working properly.
Operation and maintenance of LIFT
1. To ensure the floor level landing& voice indication.
2. To check all floor indication.
3. To check the robe condition in the lift room
4. To check the oil level in gear box
5. To ensure the emergency light functioning correct.
Operation and Maintenance of firefighting equipment’s
1. To ensure firefighting equipment’s are placed in right place.
2. To ensure firefighting equipment’s are refilling as per the due date.
3. To ensure firefighting equipment’s are properly working or not.
4. To ensure the fire hose having any leak.
5. Daily checking the fire pumps Jacky and main pump working or not.
Operation and maintenance of ACCESS CONTROL SYSTEMS
1. Access card activation and deletion and card block.
2. Temporary access card issuing.
Operation and maintenance of others
1. Operation and maintenance of BMS( Building management systems)
2. Operation and maintenance of CCTV,Smoke detectors
3. Operation and maintenance of STP
4. Operation and Maintenance of SWIMMINGPOOL
Maintenance of reports
1. Generates periodical MMR reports.
2. Update PPM schedule and maintains PPM records in designated files.
3. Ensure timely renewal of all AMC.
4. To prepare all check list on daily basis and monthly basis.
Lakshminarayanan Page 4 of 6
5. To prepare monthly report of all services and activities carried out in the month along
with consumption data of consumables.
6. Track and maintain records in house and AMC vendors PPM activates
7. Monitoring Spares and Planning Maintenance Schedule.
8. Interacting with other Departments and AMC Vendors.
9. Maintaining all logs and Records.
Previous experience details
Previous Company : National Contracting Co. Ltd. Doha, Qatar
Designation : PROJECT ENGINEER
Experience : 2years (July 2012 to March 2014).
Project details:
GOVERNMENT PROJECT - EHV UNDERGROUND CABLE ERECTION.
Qatar Power transmission System Expansion, Phase – 10, EHV Cables
GTC/372F/2010 – Package C6 &C7.
1. EHV Cable-132 KV & 66KV- 2000 SQ MM underground cable erections, from one
substation to another substation.
2. Supervision of Cable jointing and Termination for 132kV, 66kV, Cables.
3. HVDC Sheath testing of EHV Cable.
4. Link box erection and bonding cable (300sqmm)laying, jointing and termination.
5. Earth cable laying and earth molding.
6. Fiber optical (24 C) cable laying and splicing and testing.
7. Phase sequence checking as per route drawing.
8. Cross bonding verification.
9. Supervision of Cable support works in the Sub- Station
10. Making As- built drawing for the executed project.
11. Underground Cable Fault locating (Sheath & Conductor) and rectification of faults.
12. Preparation of daily, weekly and monthly program and progress reports.
Lakshminarayanan Page 5 of 6
13. Coordination with Quality control / External agency for inspection and clearance of job
agency for inspection and clearance of job and cost estimation of jobs after completion.
Previous company details
Company : Hotel Le Royal Park, Pondicherry
Designation : Maintenance Engineer.
Experience : 1year (Nov 2014 to Oct 2015).
Company : SPI GLOBAL, Pondicherry
Designation : Team lead (FMG-Operatio&Maintenance)
Experience : 1year (Aug 2011 to May 2012).
Company : Hotel Annamalai International Pvt ltd, Pondy (3 star Hotel)
Designation : Assistant Engineer (Maintenance)
Experience : 3+ years (Jan 2008 to June 2011).
Company : Integra Software Services Pvt Ltd – Pondicherry
Designation : Facility Executive (Maintenance)
Experience : 2 years (Jan 2006 to Dec 2007).
Company : CMWSSB
Designation : Operation & Maintenance Engineer
Experience : 1 year (Feb2005 to Dec 2005).
Company : VOLTAS A/C
Designation : Engineer
Experience : 1 year(Jan 2003 to Dec2003).
Lakshminarayanan Page 6 of 6
PROFESSIONAL TRAINING
Company : Tamil Nadu Electricity Board.
Designation : Graduate Engineer Trainee
Experience : 1 year (Jan 2004 to Jan 2005).
.COMPUTER SKILL SET
Platform : MS-DOS, Windows 98, Windows NT
PERSONAL PROFILE
Father's Name: Mr. B.Rettamalai
Date of Birth: 28.03.80
Age: 35 Yrs
Marital Status: Married
Nationality: Indian
Sex: male
Languages Known: English, Tamil & Telegu
Religion Hindu
DECLARATION
I hereby declare that the given above information’s are true and correct to the best of my
knowledge and belief.
Place: Pondicherry Yours Truly
Date : R.Lakshminarayanan.
Lakshminarayanan Page 7 of 6

More Related Content

What's hot (20)

CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016CV Mohd Haffiz latest 2016
CV Mohd Haffiz latest 2016
 
resume
resumeresume
resume
 
Ac technician
Ac technicianAc technician
Ac technician
 
Praveen
PraveenPraveen
Praveen
 
Resume
ResumeResume
Resume
 
Resume_Product Support_2016
Resume_Product Support_2016Resume_Product Support_2016
Resume_Product Support_2016
 
ASHANUL KABIR
ASHANUL KABIRASHANUL KABIR
ASHANUL KABIR
 
Parco internship report
Parco internship reportParco internship report
Parco internship report
 
HARIS CV
HARIS  CVHARIS  CV
HARIS CV
 
CURRICULUM_VITAE
CURRICULUM_VITAECURRICULUM_VITAE
CURRICULUM_VITAE
 
Letter of Appreciation
Letter of AppreciationLetter of Appreciation
Letter of Appreciation
 
BPCL
BPCLBPCL
BPCL
 
Resume Nawal Singh
Resume Nawal SinghResume Nawal Singh
Resume Nawal Singh
 
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
 
CV2016 NasseerQusyairi
CV2016 NasseerQusyairiCV2016 NasseerQusyairi
CV2016 NasseerQusyairi
 
resume
resumeresume
resume
 
madhavan bio-data
madhavan bio-datamadhavan bio-data
madhavan bio-data
 
Instrument Engineer
Instrument EngineerInstrument Engineer
Instrument Engineer
 
Praful_CV_1
Praful_CV_1Praful_CV_1
Praful_CV_1
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copy
 

Similar to lax resume (20)

Parthipan Resume
Parthipan  ResumeParthipan  Resume
Parthipan Resume
 
CV_Sachin Lone
CV_Sachin LoneCV_Sachin Lone
CV_Sachin Lone
 
B more vitae
B more vitaeB more vitae
B more vitae
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
C.V
C.VC.V
C.V
 
Resume of sazzad hossain
Resume of sazzad hossainResume of sazzad hossain
Resume of sazzad hossain
 
R.Patil
R.PatilR.Patil
R.Patil
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Koneru_Raj_kumar_2
Koneru_Raj_kumar_2
 
Shehjad_Ahmed_Resume
Shehjad_Ahmed_ResumeShehjad_Ahmed_Resume
Shehjad_Ahmed_Resume
 
hampa Resume
hampa Resumehampa Resume
hampa Resume
 
Zafar
ZafarZafar
Zafar
 
Zafar
ZafarZafar
Zafar
 
Dipesh pawar CV
Dipesh pawar CVDipesh pawar CV
Dipesh pawar CV
 
Milind_Padwal
Milind_PadwalMilind_Padwal
Milind_Padwal
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
M. T. R. Azad
M. T. R. AzadM. T. R. Azad
M. T. R. Azad
 
Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Resume_Ajay_24-9-15
Resume_Ajay_24-9-15
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 

lax resume

  • 1. Lakshminarayanan Page 1 of 6 Lakshminarayanan.R No 31, Kamalam Apartment 3RD floor, Ashokan Street, 3RD cross, Nethaji Nagar 1, Uppalam, Pondicherry Mobile: +91 9003548624 E-mail: r.lakshnarayan@gmail.com Objective To seek a challenging position in a progressive environment where my experience skills provide ample opportunity in my growth. Education Degree : Bachelor of Engineering (B.E.) in Electrical and Electronics Engineering Class : First class Institution : Adhiyamaan College of Engineering, Hosur Electrical License : “C” Certified by TNEB License No. C 37387 Professional Experience TOTAL YEARS OF EXPERIENCE: 14 YRS Present Company : SAROVAR Hotels & Resorts( The promenade ) Pondicherry. Designation : CHIEF ENGINEER Experience : Oct 2015 to Till Job Responsibility (Experience details) Overall In charge of Operation and Maintenance Department. Operation and Maintenance of 500 KVA DG A check (Daily checking) 1. Battery voltage, 2. Distilled water level& specific gravity 3. Belt condition, 4. RPM, 5. Lubrication oil level, 6. Radiator coolant water level, 7. Fuel level.
  • 2. Lakshminarayanan Page 2 of 6 B check (6 month once) 1. To change the oil 20w40 2. To change the oil filter 3. To change the fuel filter C check (Yearly once) 1. To change the air filter 2. Both A& B check D check (if required) 1. Full servicing work 2. Radiator & injector Operation and Maintenance of Transformer500 KVA 1. To check the oil level (indicator) in conservator tank. 2. To check the silica gel color in breather. 3. To check the oil temperature & winding temperature in temp gauge 4. To check the oil leak. Operation and Maintenance 60 KVA UPS 1. To check the input voltage, current, frequency, power factor 2. To check the output voltage line to line and line to neutral in each phase. 3. To check the output current in each phase. 4. To check the output frequency, power factor 5. To check the battery voltage and charging. 6. To check the battery internal resistance and charging voltage. Operation and Maintenance of centralized CHILLER PLANT A/C 340TR 1. To check the chilled water leaving temperature 2. To check the chilled water return temperature 3. To check the full load amps in each phase. 4. To ensure all the condensing water pump (10 HP) and chilled water pump (7.5 HP) are working properly. 5. To ensure the cooling tower pumps (5 HP) are working properly. 6. To check the air lock problem in all the pipe lines. 7. To maintain the water level and water purification in cooling towers. 8. To ensure the cooling tower water must be in PH value
  • 3. Lakshminarayanan Page 3 of 6 8 To ensure the makeup tank water always full because of to avoid air lock problem. 9 To check all the AHU blower and belt condition, motor working properly. 10 To check the AHU canvass. 11 To check the entire FCU unit is working properly. Operation and maintenance of LIFT 1. To ensure the floor level landing& voice indication. 2. To check all floor indication. 3. To check the robe condition in the lift room 4. To check the oil level in gear box 5. To ensure the emergency light functioning correct. Operation and Maintenance of firefighting equipment’s 1. To ensure firefighting equipment’s are placed in right place. 2. To ensure firefighting equipment’s are refilling as per the due date. 3. To ensure firefighting equipment’s are properly working or not. 4. To ensure the fire hose having any leak. 5. Daily checking the fire pumps Jacky and main pump working or not. Operation and maintenance of ACCESS CONTROL SYSTEMS 1. Access card activation and deletion and card block. 2. Temporary access card issuing. Operation and maintenance of others 1. Operation and maintenance of BMS( Building management systems) 2. Operation and maintenance of CCTV,Smoke detectors 3. Operation and maintenance of STP 4. Operation and Maintenance of SWIMMINGPOOL Maintenance of reports 1. Generates periodical MMR reports. 2. Update PPM schedule and maintains PPM records in designated files. 3. Ensure timely renewal of all AMC. 4. To prepare all check list on daily basis and monthly basis.
  • 4. Lakshminarayanan Page 4 of 6 5. To prepare monthly report of all services and activities carried out in the month along with consumption data of consumables. 6. Track and maintain records in house and AMC vendors PPM activates 7. Monitoring Spares and Planning Maintenance Schedule. 8. Interacting with other Departments and AMC Vendors. 9. Maintaining all logs and Records. Previous experience details Previous Company : National Contracting Co. Ltd. Doha, Qatar Designation : PROJECT ENGINEER Experience : 2years (July 2012 to March 2014). Project details: GOVERNMENT PROJECT - EHV UNDERGROUND CABLE ERECTION. Qatar Power transmission System Expansion, Phase – 10, EHV Cables GTC/372F/2010 – Package C6 &C7. 1. EHV Cable-132 KV & 66KV- 2000 SQ MM underground cable erections, from one substation to another substation. 2. Supervision of Cable jointing and Termination for 132kV, 66kV, Cables. 3. HVDC Sheath testing of EHV Cable. 4. Link box erection and bonding cable (300sqmm)laying, jointing and termination. 5. Earth cable laying and earth molding. 6. Fiber optical (24 C) cable laying and splicing and testing. 7. Phase sequence checking as per route drawing. 8. Cross bonding verification. 9. Supervision of Cable support works in the Sub- Station 10. Making As- built drawing for the executed project. 11. Underground Cable Fault locating (Sheath & Conductor) and rectification of faults. 12. Preparation of daily, weekly and monthly program and progress reports.
  • 5. Lakshminarayanan Page 5 of 6 13. Coordination with Quality control / External agency for inspection and clearance of job agency for inspection and clearance of job and cost estimation of jobs after completion. Previous company details Company : Hotel Le Royal Park, Pondicherry Designation : Maintenance Engineer. Experience : 1year (Nov 2014 to Oct 2015). Company : SPI GLOBAL, Pondicherry Designation : Team lead (FMG-Operatio&Maintenance) Experience : 1year (Aug 2011 to May 2012). Company : Hotel Annamalai International Pvt ltd, Pondy (3 star Hotel) Designation : Assistant Engineer (Maintenance) Experience : 3+ years (Jan 2008 to June 2011). Company : Integra Software Services Pvt Ltd – Pondicherry Designation : Facility Executive (Maintenance) Experience : 2 years (Jan 2006 to Dec 2007). Company : CMWSSB Designation : Operation & Maintenance Engineer Experience : 1 year (Feb2005 to Dec 2005). Company : VOLTAS A/C Designation : Engineer Experience : 1 year(Jan 2003 to Dec2003).
  • 6. Lakshminarayanan Page 6 of 6 PROFESSIONAL TRAINING Company : Tamil Nadu Electricity Board. Designation : Graduate Engineer Trainee Experience : 1 year (Jan 2004 to Jan 2005). .COMPUTER SKILL SET Platform : MS-DOS, Windows 98, Windows NT PERSONAL PROFILE Father's Name: Mr. B.Rettamalai Date of Birth: 28.03.80 Age: 35 Yrs Marital Status: Married Nationality: Indian Sex: male Languages Known: English, Tamil & Telegu Religion Hindu DECLARATION I hereby declare that the given above information’s are true and correct to the best of my knowledge and belief. Place: Pondicherry Yours Truly Date : R.Lakshminarayanan.