Presiding Officer Training module 2024 lok sabha elections
Video production risk assessment; tescos
1. Video Production Risk Assessment
ProjectTitle:FashionKilla Filmingdate:
Location(one formper location):Serpentine GreenShoppingCentre
Producer:Kyle Wale,KurtHillson,IkramHussain,OscarLannon Date:
Course: Level:
Tick all hazardsthatapply atthis location.
o Access
o Animals/Insects
o Audience /Public
o Cables
o CommunicationFailure
o ConfinedSpaces
o Costume /Make-up
o Derelictbuildings/Dangerousstructures
o Electricity
o Fire / Flammable material
o FirstAid
o FoodHygiene
o Glass
o Heights
o Hostile /Remote environment
o Machinery
o Lighting
o Lone working
o Manual handling
o Mines/ excavations/quarries
o Nightoperation
o Noise
o Radiation(phone towers,transmitters)
o Personwithspecial needs
o Roads
o Setconstruction
o Slipping,tripping,falling
o Smokingonset
o Stunts
o Vehicles
o Weather
o Weapons
o Other:
2. Hazard Evaluation
Hazard: Audience/Public
What could cause harm? Because itisa verypubliclocation,filmingcouldbe anissue.People could
wonderacrossour shootand because ouractors couldbe unaware of themcomingtowardsthem,
theycoulddance or somethingandclashintothe wonderpublic.
What is the likelihoodofthis happening? 5/10
How much harm? Couldbruise the actorand/or the public.
Apply the followingpriorities,howwill this risk be managed (provide detail)?
(1) Eliminate. (2) Reduce or substitute (3) Isolate. (4) Control. (5) Personalprotective equipment
To stop this fromhappening, we couldtryand close of the areainwhichwe are filming bylying our cones andtape around
them or makingsome spare people standingaroundit stopping people fromwalkinginto the shoot.
Hazard: Noise
What could cause harm? Notso much harm topeople inthislocationbutitcouldaffectthe video.
Because itis sopublicand itis indoors,the noise levelisquite high.Sothe noise canputoff our
actors and/orwe will have toeditthe soundout inthe final piece,whichcouldlookabit
unprofessional.
What is the likelihoodofthis happening? 9/10
How much harm? Hardlyany, justlackof concentration.
Apply the followingpriorities,howwill this risk be managed (provide detail)?
(1)Eliminate. (2) Reduce or substitute (3) Isolate. (4) Control. (5) Personalprotective equipment
We couldput in small see-through earphonesto block out the noise whenwe are actuallyfilming.