Summer Internship Report
(May-June 2013)
Prepared by:
Kartik Sharma
Undergraduate Mining Engineering Student
IIT_(BHU), Varanasi
Under the guidance of:
Mr. Pankaj Sinhha
Director
IMC-SRG Consulting (P) Limited
135, Jodhpur Park, Kolkata – 700068. India
Acknowledgement
I take this opportunity to express my profound gratitude and deep
regards to Mr. Mihir (Senior Consultant, IMC- SRG) and Mr. R.
Karthikeyan (Principal Consultant, IMC-SRG) for their exemplary
guidance, monitoring and constant encouragement throughout the
course of this internship. The blessing, help and guidance given by
them time to time shall carry me a long way in the journey of life on
which I am about to embark.
I also take this opportunity to express a deep sense of gratitude to
Mr. T. N. Gunaseelan (Managing Director, IMC-SRG) and Mr. Pankaj Kr
Sinha (Director, IMC-SRG) for providing me this excellent opportunity of
Internship. Their cordial support and valuable guidance has helped me
in completing this task through various stages. Their encouragement to
me during weekly presentations has really helped me in my
improvement.
I am obliged to the family of IMC-SRG, namely Mr. D.K.Lamba, Mr.
Madan Pal Singh, Mr. K.K.Chaudhuri, Mr. S.N.Munsi, Mr. S.K.Pal, Mr.
Ajay Singh, Mr. Rohit Dewangan, Mr. Prashant Tiwari, Ms Sharmila
Patra, Ms Arpita Basak, Mr. Amitava Maji, Mr. Arbind Patel, Mr. Mihir
Chandra,Mr. Somnath Gain,Ms Debasmita Mukherjee,Mr. Halder and
many more, for the valuable information provided by them in their
respective fields. I am grateful for their cooperation during the period of
my internship.
Lastly, I thank almighty, my parents, brothers, sisters and friends for
their constant encouragement without which this internship would not be
possible.
Date: 29/06/2013
Place: Kolkata, India Kartik Sharma
Introduction
For summer internship at IMC-SRG Consulting (P) Limited, there were
lot of applicants. Luckily I got this excellent opportunity of working in
such a good consulting firm of Mining in India.
Summer Internship started on 8th
of May, 2013, with a small interview
with Mr. T. N. Gunaseelan (Managing Director, IMC-SRG), Mr. Pankaj
Kumar Sinha (Director, IMC-SRG) and Mr. A. R. Ganapathy (Principal
Consultant, IMC-SRG). It was mainly focussed on myself, my specific
field of interest in Mining Engineering, so that I shall be involved in some
live projects of the company. As I had a working experience of a project
in field of Rock Mechanics (B.Tech. Project), so it was decided that I
shall be working in the same field, namely Geotechnical Engineering.
So I was assigned to carry out Geotechnical analysis of a Mining project
of Gujarat Fluorochemicals Ltd, to be carried out in Morocco. It is a
Fluorite mining project, whose planning is being carried out by the team
of IMC-SRG. Firstly it was planned to extract the fluorite deposit by
methods of Underground mining. So I was asked to propose an
underground roof support system, by going through all the geotechnical
parameters. With a very great guidance of Mr. Tushar sir, an
underground mining expert, I started this job, in which I made and
followed a scheme of doing the geotechnical analysis, which I will
elaborate in next section.
Meanwhile, I learnt some software widely used in Mine planning like
AutoCAD Map 3D, Gemcom Surpac. In AutoCAD Map 3D, I started with
the basics and with a proper direction from Mr. Rohit sir and Mr. Tushar
sir, I designed the pit for some project. In Surpac also, I designed a 3D
solid model of the Pit for GFL project. Mr. Prashant sir helped me learn
the solid ore body modelling in Surpac.
After a while, the planning team of GFL project decided that the method
of mining of the fluorite deposit shall be Open-pit, and after a time period
of around 6-7 years the mining will be done by Underground methods.
Hence my work then also got switched. Instead of going for an
underground support design, now it included analysing the slopes of the
open-pit for stability. Hence with a kind guidance of Mr. Karthikeyan sir, I
started this job, studying various parameters effecting the stability, and
then I was supposed to work on some numerical modelling software (like
FLAC, SLIDE). But due to lack of time it was not completed well. Still last
section of this report includes analysis of slopes in an open-pit mine.I will
do that analysis after joining my institute, as a future scope of work.
Last but not the least, I also learnt a lot while assisting my guides in their
works. Some of them includes making a database of geotechnical
reports of some mines, collecting details of mining equipment for the
GFL project, translation of some Korean reports for an upcoming project.
Section 1:
Geotechnical Analysis (Project: GFL, Morocco)
Gujarat Fluorochemicals Ltd (“GFL”) Noida, India is part of a diversified
group of companies and has been exploring opportunities globally for
investment in mineral properties in general and Fluorspar deposits in
particular. GFL identified Jbel Terrimi Fluorspar deposit in Morocco and
initiated discussion on investment opportunities.
GFL engaged IMC-SRG Consulting (P) Ltd for Geological Study
and Conceptual Mine Planning of Jbel Tirremi Fluorspar Deposit in
Morocco.
As per the discussion with GFL, IMC-SRG started investigation and
exploration of the fluorite deposit in Morocco, by taking data from
previously drilled holes as well as by drilling around 10 new boreholes.
All information related to the deposit like amount of reserve, strike, dip,
geological conditions, hydrology etc. were collected and calculated. A
conceptual mine planning was being carried out by IMC-SRG team
based on the collected data.
As the decision of the team was to carry out underground method of
mining for the deposit, it was a must to carry out the geotechnical
analysis of the deposit and country rock. This task was being taken care
by Mr. David Carter (DMT, Germany office). I was asked to make a
proper stage wise plan for doing geotechnical study.
For doing the geotechnical analysis, site investigation is the first step to
proceed with. Five processes are to be done in this, steps are as
follows:-
1. Desktop Study: Geological setting, existing data, site history, aerial
photographs and terrain assessment.
2. Definition of needs: Justify investigation requirements and
anticipated cost.
3. Preliminary investigation: Depth, thickness and composition of
strata.
4. Detailed site investigation: Quantitative characterisation of critical
or founding strata.
5. Monitoring/Investigation: Instrumentation as required.
Geotechnical Study Key Model
Geological
Relative (100%
total) Key data Comments
Effort Benefit
Geological setting,
Desktop study model <5% ∼20% existing data, site Minor SI costs (site
history, aerial
photographs, and terrain
assessment.
reconnaissance) with
significant planning
benefits.
Definition of needs <5% ∼20% Safety plans and
services checks.
Justify investigation Physical,
requirements and environmental and
anticipated costs. allowable site access.
Preliminary
Investigation Geological and 15% ∼20% Planning/Preliminary
geotechnical Depth, thickness and Investigation of ~20%
investigation composition of soils and of planned detailed
strata. site investigation.
Detailed site
investigation Geotechnical 75% ∼20%
model Quantitative, and Laboratory analysis of
characterisation of 20% of detailed soil
critical or founding strata profile.
Monitoring/Inspection <10% ∼20% Instrumentation as
required. QA testing.
Confirms models
adopted or
requirements to
adjust assumptions.
Increased effort for
observational design
approach.
Table 1. Geotechnical Requirements
Figure 1. Steps in effective use of geotechnical input throughout all
phases of the project.
Part 1: Desktop Study:
This includes the understanding of the geological setting, collection of
existing data, site history, aerial photographs, and terrain assessment.
Data of boreholes is available to us. From this data, we can find
the RQD values. Data related to geology of the area is also available,
containing the types of rock strata present from the surface to given
depths.
This part of study is called Desktop study.
Part 2: Definition of Needs:
This part consist of defining our aim. Our aim is mining the deposit by
forming stopes, and then extracting them. For this purpose, we have to
ensure that the surrounding rock must be stable during stoping. For this
we go for geotechnical study rock mass.
For doing the geotechnical analysis of rock to conclude for its
stability, we must have the following rock properties:
1. The rock joint pattern
2. The nature of the joints and the infilling material
3. The status of water seepage in the rock
4. The compressive & tensile strength of the rocks
5. The amount of explosives to be used in blasting and their
frequency
If we get these rock properties, then we can appoint a Rock Mass
classification scheme, to decide the stability of rock and then we can go
for employing a particular type of support system.
There are many rock mass classification systems, but most widely used
and accepted system was given by Bieniawski, 1989 (modified version
of previous). This is called Rock Mass Rating (RMR) system. It gives a
rating to the rock on a 100 point scale, based on its following properties:
1. Uniaxial compressive strength of rock material.
2. Rock Quality Designation (RQD).
3. Spacing of discontinuities.
4. Condition of discontinuities.
5. Groundwater conditions.
6. Orientation of discontinuities.
The RMR for different stopes is to be calculated separately (by
calculating all factors listed for that part of ore body). Following table
shows the RMR classification calculation scheme based on the above
six parameters:
Fig 2. RMR calculation sheet.
Based on the above methodology, I have made a worksheet for easy
calculation of the RMR value of the rock. Its preview is shown below:
Table 2. RMR Calculator preview (Input: Yellow, Output: Red).
Rock Mass Rating (RMR)
Column1 Calculation Column2 Column3
Value(in given unit) Rating
1. Strength Point Load (MPa) 0 0
UCS (MPa) 0 0
2. RQD (%) 0 0
3. Spacing of
discontinuities (m) 0 5
4. Condition of
Discontinuity
very rough surface, not continuous, no separation,
unweather (30)
slightly rough, separation<1mm,slightly
weathered walls(25)
slightly rough, separation<1mm,highly
weathered walls(20) 0
slicken sided surface, separation 1-
5mm continuous(10)
separation>5mm continuous(0)
5.Ground
water
condition Completely Dry(15)
Damp(10)
Wet(7) 0
Dripping(4)
Flowing(0)
R.M.R. VALUE
(out of 100) Very good rock (81-100)
Good rock (61-80)
Fair rock (41-60) 5
Poor rock (21-40)
Very poor rock (0-20)
It is very easy to use table. In excel worksheet, you have to give the
values for all the factors considered in RMR system, which is based on
the rules for assigning weightage to each parameters. After which the
sheet gives you the value of the RMR of the rock.
The RMR calculator can be found here.
A good user friendly version of RMR calculator is made available by
InfoMine, and it is free to use by anyone. It can be accessed (through
internet connection) here.
After the RMR calculations, you have to consider some adjustment
factors for mining use. The methodology to do so is given in the following
flow chart:
Fig 3. RMR adjustment methodology.
Based on the value of RMR, Bieniawski gave a graphical method of
finding the average stand-up time of the roof in underground excavation.
It is an empirical method for prediction of roof stability, and it is very
useful for mine safety.
Fig 4. Average stand-up time prediction (interpretation from RMR value
and roof span).
Section 2:
Working in AutoCAD Map 3D 2011
AutoCADis a software application for computer-aided design
(CAD) and drafting. The software supports both 2D and 3D formats. The
software is developed and sold by Autodesk, Inc., first released in
December 1982 by Autodesk in the year following the purchase of the
first form of the software by Autodesk founder John Walker. AutoCAD is
Autodesk's flagship product and by March 1986 had become the most
ubiquitous microcomputer design program in the world, utilizing
functions such as "polylines" and "curve fitting". Prior to the introduction
of AutoCAD, most other CAD programs ran on mainframe
computers or minicomputers, with each CAD operator (user) working at
a graphical terminal or workstation.
According to Autodesk company information, the AutoCAD software is
now used in a range of industries, employed by architects, project
managers and engineers, amongst other professions, and as of 1994
there had been 750 training centres established across the world to
educate users about the company's primary products.
AutoCAD is used widely in all different type of industries. Each field has
its own designing purpose, due to which Autodesk has release many
types of AutoCAD versions. In mining and geological modelling purpose,
we use MAP 3D version of AutoCAD. Following image shows how
AutoCAD Map looks like.
Fig 5. AutoCAD window view.
In AutoCAD, followings things I have learnt and practised:
• Designing a pit-model for one of the mining projects. Slices of ore
body at various layers was given. Bench data was given (height,
width, slope angle). Using these things, I made an optimised pit
model in AutoCAD MAP 3D. Following image shows a 3D pit.
Fig 6. Designed pit in AutoCAD Map 3D
Patches with different colours are slice of the ore body at different levels.
Task was to enclose each slice within the pit, for perfect economical
excavation.
• Rubber sheeting:
In cartography, rubber-sheeting refers to the process by which a
layer is distorted to allow it to be seamlessly joined to an adjacent
geographic layer of matching imagery, such as satellite imagery
(most commonly vector cartographic data) which are digital maps.
This is sometimes referred to as image-to-vector conflation. Often
this has to be done when layers created from adjacent map sheets
are joined together. Rubber-sheeting is necessary because the
imagery and the vector data will rarely match up correctly due to
various reasons, such as the angle at which the image was taken,
the curvature of the surface of the earth, minor movements in the
imaging platform (such as a satellite or aircraft), and other errors in
the imagery.
Basically, a map of some lease-hold area was given to me. The
task was to form an accurate image of this file in AutoCAD, in
respect to the given coordinate system. Following image shows
the work:
0DMT IMC
.
..
..
.J ..
.
Fig 7. Rubber sheeted Map image. Red circles encloses various
boreholes present.
Section 3:
Working in Surpac 6.2
Gemcom Surpac is the world’s most popular geology and mine planning
software, supporting open pit and underground operations and
exploration projects in more than 120 countries. The software delivers
efficiency and accuracy through ease-of-use, powerful 3D graphics and
workflow automation that can be aligned to company-specific processes
and data flows.
Surpac addresses all the requirements of geologists, surveyors, and
mining engineers in the resource sector and is flexible enough to be
suitable for every commodity, ore-body and mining method. Its
multilingual capabilities allow global companies to support a common
solution across their operations.
Fig 8. Surpac window. Drawing area at centre, file list at left side, various
tools at the topmost toolbar.
Works that I have learnt in Surpac are as follows:
1. Optimised pit and ramp design
The task which was done in AutoCAD, was also done in Surpac.
But Surpac is an ultimate modelling software in mine design etc.
because it makes an easy to understand 3D solid model called a
.dtm file. Ramp design is not possible in AutoCAD due to the
complex structure of a ramp (manually drawing a ramp in AutoCAD
is a tedious job). In Surpac, it becomes quite easier. Just we need
to provide the ramp data like gradient, ramp width etc. and a
proper position to start a ramp from. After which Surpac itself
designs the ramp accurately.
Following are the bullet point followed in pit design in Surpac:
o using string tools to create a simple pit design
o preparing data for use in basic pit design
o using pit design tools to create ramps, crests, toes, and
berms
o creating switchbacks
o extending a pit design to a DTM surface
Ore body data of GFL, Morocco project was given to me (in form of
Surpac string files of optimised pit cross-sections at various levels).
From this data, I made following 3D pit model, including ramps.
Fig9. Plan view of the designed pit.
Fig 10. Cross-sectional view of the designed pit.
Fig 11. Isometric view of the designed pit (with 10m wide ramp)
2. Importing geological data in Surpac:
During geological exploration drilling, core samples of rocks are
collected. Proper laboratory testing of these samples gives the
grade of ore in them. After getting the ore grade, it is linked with
that particular drill hole from which it is recovered.
Three type of data is must to store for making a proper geological
model of ore body. First is the collar data, which include the x,y,z
coordinated of the borehole collar. It is a must for locating the
holes in plan. Second must thing to know is the survey data of
boreholes. It includes the dip and azimuth of the drill holes (as
these may be vertical or curved). Third important thing is Assay
data. It is just the grade of various compound present in these
sample data.
After we have these three data, we import excel csv format files of
each into Surpac. It gives in output the location and size/shape of
the boreholes. Following figures show the output of Supac after
importing data:
Fig 12. Plan view of boreholes (marked) in Surpac after importing data.
Fig 13. Cross-section of boreholes.
3. Solid Modelling
Solids Modelling allows us to use triangulation to create three-
dimensional models based on DigitalTerrain Models (DTMs) and
String files.
Basically if we have different planes or surfaces and we want to
join them to form a single solid body, Surpac works here very well.
This is termed as solid modelling. I was given with the same
borehole data shown in previous section. Also I was given with the
topography of that area. From this I made various sections of ore-
bogy using the bore holes plotted. Total seven sections were
drawn, which looks like this:
Fig 14. Isometric view of 7 ore-body sections and boreholes.
After this, using the triangulation technique, we can make a solid ore
body model in Surpac. It is as shown below:
Fig 15. Solid model (same view as previous figure’s).
Fig 16. Triangulation of sections (isometric view).
Workflow of Solid Modelling:
Fig 17. Solid Modelling flow-chart
Section 4:
Slope Stability Analysis
Overview
Slope stability analysis forms an integral part of the opencast mining
operations during the life cycle of the project. In Indian mining
conditions, slope design guidelines are yet to be formulatedfor different
types of mining practices and there is a growing need to develop such
guidelines formaintaining safety and productivity. Till date, most of the
design methods are purely based onfield experience, rules of thumb
followed by sound engineering judgment. During the last fourdecades,
the concepts of slope stability analysis have emerged within the domain
of rockengineering to address the problems of design and stability of
excavated slopes.
In India, the number of operating opencast mines is steadily increasing
as compared tounderground mines. It is due to low gestation period,
higher productivity, and quick rate ofinvestment. On the contrary,
opencast mining attracts environmental concerns such as
solidwastemanagement, land degradation and socio-economical
problems. In addition to that a largenumber of opencast mines, whether
large or small, are now days reaching to deeper miningdepths. As a
result analysis of stability of operating slopes and ultimate pit slope
design arebecoming a major concern. Slope failures cause loss of
production, extra stripping cost forrecovery and handling of failed
material, dewatering the pits and sometimes lead to
mineabandonment/premature closure.
Maintaining pit slope angles that are as steep as possible is of vital
importance to the reduction ofstripping (mining of waste rock), which will
in turn have direct consequences on the economy ofthe mining
operation. Design of the final pit limit is thus governed not only by the
ore gradedistribution and the production costs, but also by the overall
rock mass strength and stability. Thepotential for failure must be
assessed for given mining layouts and incorporated into the design ofthe
ultimate pit.
Against this backdrop, there is a strong need for good practices in slope
design and managementso that suitable corrective actions can be taken
in a timely manner to minimize the slope failures.
Objectives
The prime objectives of the project are addressed towards:
a) Understanding the different types and modes of slope failures; and
b) Designing of stable slopes for opencast mines using numerical
models.
Factors Affecting Slope Stability
Slope failures of different types are affected by the following factors:
1. Slope Geometry
The basic geometrical slope design parameters are height, overall slope
angle and area of failuresurface. With increase in height the slope
stability decreases. The overall angle increases thepossible extent of the
development of the any failure to the rear of the crests increases and
itshould be considered so that the ground deformation at the mine
peripheral area can be avoided.
Generally overall slope angle of 45° is considered to be safe by
Directorate General of MinesSafety (DGMS). The curvature of the slope
has profound effect on the instability and thereforeconvex section slopes
should be avoided in the slope design. Steeper and higher the height
ofslope less is the stability. Diagram showing bench, ramp, overall slope
and their respectiveangles is given in Fig. 2.1.
Fig 18. Diagram showing bench, ramp, overall slope and their respective
angles.
2. Geological Structure
The main geological structure which affect the stability of the slopes in
the open pit mines are:
1. Amount and direction of dip
2. Intra-formational shear zones
3. Joints and discontinuities
a) Reduce shear strength
b) Change permeability
c) Act as sub surface drain and plains of failure
4. Faults
a) Weathering and alternation along the faults
b) Act as ground water conduits
c) Provides a probable plane of failure
Fig 19. Different types of joints and faults.
Instability may occur if the strata dip into the excavations. Faulting
provides a lateral or rearrelease plane of low strength and such strata
plan are highly disturbed. Localized steepening ofstrata is critical for the
stability of the slopes. If a clay band comes in between the two
rockbands, stability is hampered. Joints and bedding planes also provide
surfaces of weakness.
Stability of the slope is dependent on the shear strength available along
such surface, on theirorientations in relation to the slope and water
pressure action on the surface. These shear strengththat can be
mobilized along joint surface depending on the functional properties of
the surfaceand the effective stress which are transmitted normal to the
surface. Joints can create a situationwhere a combination of joint sets
provides a cross over surface.
5. Lithology
The rock materials forming a pit slope determines the rock mass
strength modified bydiscontinuities, faulting, folding, old workings and
weathering. Low rock mass strength ischaracterized by circular; ravelling
and rock fall instability like the formation of slope in massivesandstone
restrict stability. Pit slopes having alluvium or weathered rocks at the
surface have lowshearing strength and the strength gets further reduced
if water seepage takes place throughthem. These types of slopes must
be flatter.
6. Ground Water
It causes the following:
a) Alters the cohesion and frictional parameters and
b) Reduce the normal effective stress
Ground water causes increased up thrust and driving water forces and
has adverse effect on thestability of the slopes. Physical and chemical
effect of pure water pressure in joints fillingmaterial can thus alter the
cohesion and friction of the discontinuity surface. Physical effects
ofproviding uplift on the joint surface, reduces the frictional resistances.
This will reduce theshearing resistance along the potential failure plane
by reducing the effective normal stressacting on it. Physical and the
chemical effect of the water pressure in the pores of the rock causea
decrease in the compressive strength particularly where confining stress
has been reduced.
7. Mining Method and Equipment
Generally there are four methods of advance in open cast mines. They
are:
(a) Strike cut- advancing down the dip
(b) Strike cut- advancing up the dip
(c) Dip cut- along the strike
(d) Open pit working
The use of dip cuts with advance on the strike reduces the length and
time that a face is exposedduring excavation. Dip cuts with advance
oblique to strike may often be used to reduce the stratadip in to the
excavation. Dip cut generally offer the most stable method of working
but sufferfrom restricted production potential. Open pit method are used
in steeply dipping seams, due tothe increased slope height are more
prone to large slab/buckling modes of failure. Miningequipment which
piles on the benches of the open pit mine gives rise to the increase in
surchargewhich in turn increases the force which tends to pull the slope
face downward and thus instabilityoccurs. Cases of circular failure in
spoil dumps are more pronounced.
8. Dynamic Forces
Due to effect of blasting and vibration, shear stresses are momentarily
increased and as resultdynamic acceleration of material and thus
increases the stability problem in the slope face. Itcauses the ground
motion and fracturing of rocks.
Blasting is a primary factor governing the maximum achievable bench
face angles. The effects ofcareless or poorly designed blasting can be
very significant for bench stability, as noted by Sage(1976) and Bauer
and Calder (1971). Besides blast damage and back break which both
reducethe bench face angle, vibrations from blasting could potentially
cause failure of the rock mass. Forsmall scale slopes, various types of
smooth blasting have been proposed to reduce these effectsand the
experiences are quite good (e.g. Hoek and Bray, 1981). For large scale
slopes, however,blasting becomes less of problem since back break and
blast damage of benches have negligibleeffects on the stable overall
slope angle. Furthermore, the high frequency of the blast
accelerationwaves prohibit them from displacing large rock masses
uniformly, as pointed out by Bauer andCalder (1971). Blasting-induced
failures are thus a marginal problem for large scale slopes.
Seismic events, i.e., low frequency vibrations, could be more dangerous
for large scale slopes andseveral seismic-induced failures of natural
slopes have been observed in mountainous areas.
Together with all these causes external loading can also plays an
important role when they arepresent as in case of surcharge due to
dumps on the crest of the benches. In high altitude areas,freezing of
water on slope faces can results in the build-up of ground water
pressure behind the face which again adds up to instability of the slope.
9. Cohesion
It is the characteristic property of a rock or soil that measures how well it
resists being deformedor broken by forces such as gravity. In soils/rocks
true cohesion is caused by electrostatic forcesin stiff over consolidated
clays, cementing by Fe2O3, CaCO3, NaCl, etc. and root cohesion.
However the apparent cohesion is caused by negative capillary pressure
and pore pressureresponse during untrained loading. Slopes having
rocks/soils with less cohesion tend to be lessstable. The factors that
strengthen cohesive force are as follows:
a) Friction
b) Stickiness of particles can hold the soil grains together. However,
being too wet or toodry can reduce cohesive strength.
c) Cementation of grains by calcite or silica deposition can solidify earth
materials intostrong rocks.
d) Man-made reinforcements can prevent some movement of material.
The factors that weaken cohesive strength are as follows:
a) High water content can weaken cohesion because abundant water
both lubricates (Overcoming friction) and adds weight to a mass.
b) Alternating expansion by wetting and contraction by drying of water
reduces strength ofcohesion, just like alternating expansion by freezing
and contraction by thawing. Thisrepeated expansion is perpendicular to
the surface and contraction vertically by gravityovercomes cohesion
resulting with the rock and sediment moving slowly downhill.
c) Undercutting in slopes
d) Vibrations from earthquakes, sonic booms, blasting that create
vibrations whichovercome cohesion and cause mass movement.
10. Angle of Internal Friction
Angle of internal friction is the angle, measured between the normal
force (N) and resultantforce (R), that is attained when failure just occurs
in response to a shearing stress (S). Its tangent(S/N) is the coefficient of
sliding friction. It is a measure of the ability of a unit of rock or soil
towithstand a shear stress. This is affected by particle roundness and
particle size. Lowerroundness or larger median particle size results in
larger friction angle. It is also affected byquartz content. The sands with
less quartz contained greater amounts of potassium-
feldspar,plagioclase, calcite, and/or dolomite and these minerals
generally have higher sliding frictionalresistance compared to that of
quartz.
Types of Slope Failure
1. Plane Failure
Simple plane failure is the easiest form of rock slope failure to analyse. It
occurs when adiscontinuity striking approximately parallel to the slope
face and dipping at a lower angleintersects the slope face, enabling the
material above the discontinuity to slide. Variations on thissimple failure
mode can occur when the sliding plane is a combination of joint sets
which form astraight path.
This means that the solution is never anything more than the analysis of
equilibrium of a singleblock resting on a plane and acted upon by a
number of external forces (water pressure, earthquake, etc.)
deterministic and probabilistic solution in which parameters are
considered as beingprecisely known may be readily obtained by hand
calculation if effect of moment is neglected.
Fig 20. Plane failure.
2. Wedge Failure
The three dimensional wedge failures occur when two discontinuities
intersects in such a way that the wedge of material, formed above the
discontinuities, can slide out in a direction parallel to the line of
intersection of the two discontinuities. It is particularly common in the
individual bench scale but can also provide the failure mechanism for a
large slope where structures are very continuous and extensive.
Fig 21. Wedge failure.
When two discontinuities strike obliquely across the slope face and their
line of intersection ‘daylights’ in the slope, the wedge of the rock resting
over these discontinuities will slide down along the line of intersection
provided the inclination of these line is significantly greater than the
angle of friction and the shearing component of the plane of the
discontinuities is less than the total downward force. The total downward
force is the downward component of the weight of the wedge and the
external forces (surcharges) acting over the wedge.
3. Circular Failure
The pioneering work, in the beginning of the century, in Sweden
confirmed that the surface of the failure in spoil dumps or soil slopes
resembles the shape of a circular arc. This failure can occurs in soil
slopes, the circular method occurs when the joint sets are not very well
defined.
When the material of the spoil dump slopes are weak such as soil,
heavily jointed or broken rock mass, the failure is defined by a single
discontinuity surface but will tend to follow a circular path.
The conditions under which circular failure occurs are follows:
1. When the individual particles of soil or rock mass, comprising the
slopes are small as compared to the slope.
2. When the particles are not locked as a result of their shape and tend
to behave as soil.
Fig 22. Three-dimensional failure geometry of a rotational shear failure.
Types of circular failure
Circular failure is classified in three types depending on the area that is
affected by the failure surface. They are:-
(a) Slope failure: In this type of failure, the arc of the rupture surface
meets the slope above the toe of the slope. This happens when the
slope angle is very high and the soil close to the toe possess the high
strength.
(b) Toe failure: In this type of failure, the arc of the rupture surface meets
the slope at the toe.
(c) Base failure: In this type of failure, the arc of the failure passes below
the toe and in to base of the slope. This happens when the slope angle
is low and the soil below the base is softer and more plastic than the soil
above the base.
4. Two Block Failure
Two block failures are much less common mode of rock slope failure
than single block failures such as the planes and the 3D wedge and,
consequently, are only briefly considered here.
Several methods of solution exist and each may be appropriate at some
level of investigation.
5. Toppling Failure
Toppling or overturning has been recognized by several investigators as
being a mechanism of rock slope failure and has been postulated as the
cause of several failures ranging from small to large ones.
Fig 23. Toppling failure
It occurs in slopes having near vertical joint sets very often the stability
depends on the stability of one or two key blocks. Once they are
disturbed the system may collapse or this failure has been postulated as
the cause of several failures ranging from small to large size. This type
of failure involves rotation of blocks of rocks about some fixed base. This
type of failure generally occurred when the hill slopes are very steep.
Factors to be considered in Assessment of Stability
1. Ground Investigation
Before any further examination of an existing slope, or the ground on
which a slope is to be built,essential borehole information must be
obtained. This information will give details of the strata,moisture content
and the standing water level and shear planes. Piezometer tubes are
installedinto the ground to measure changes in water level over a period
of time. Ground investigationsalso include:-
• In-situ and laboratory tests
• Aerial photographs
• Study of geological maps and memoirs to indicate probable soil
conditions
• Visiting and observing the slope.
2. Most Critical Failure Surface
In homogeneous soils relatively unaffected by faults or bedding, deep
seated shear failuresurfaces tend to form in a circular, rotational manner.
The aim is to find the most critical surfaceusing "trial circles".
The method is as follows:
• A series of slip circles of different radii is to be considered but with
same centre ofrotation. Factor of Safety (FOS) for each of these
circles is plotted against radius, and theminimum FOS is found.
• This should be repeated for several circles, each investigated from
an array of centers.The simplest way to do this is to form a
rectangular grid from the centers.
• Each centre will have a minimum FOS and the overall lowest FOS
from all the centreshows that FOS for the whole slope. This
assumes that enough circles, with a largespread of radii, and a
large grid of centers have been investigated.
• An overall failure surface is found.
Below figures shows variety of slope failure circles analysed at varying
radii from a singlecentre and variation of factor of safety with critical
circle radius respectively.
Fig 24. Variety of slope failure circles analysed at varying radii from a
single centre
Fig 25. Variation of factor of safety with critical circle radius
3. Tension Cracks
A tension crack at the head of a slide suggests strongly that instability is
imminent. Tensioncracks are sometimes used in slope stability
calculations, and sometimes they are considered tobe full of water. If this
is the case, then hydrostatic forces develop as shown in Fig.
Fig 26. Effect of tension crack at the head of a slide
Tension cracks are not usually important in stability analysis, but can
become so in some specialcases. Therefore assume that the cracks
don't occur, but take account of them in analysing aslope which has
already cracked.
4. Submerged Slopes
When an external water load is applied to a slope, the pressure it exerts
tends to have astabilizing effect on the slope. The vertical and horizontal
forces due to the water must be takeninto account in analysis of the
slope. Thus, allowing for the external water forces by usingsubmerged
densities in the slope, and by ignoring water externally.
5. Factor of Safety (FOS)
The FOS is chosen as a ratio of the available shear strength to that
required to keep the slopestable.
Table 3. Guidelines for equilibrium of a slope
For highly unlikely loading conditions, factors of safety can be as low as
1.2-1.25, even for dams. E.g. situations based on seismic effects, or
where there is rapid drawdown of the water level in a reservoir.
6. Progressive Failure
This is the term describing the condition when different parts of a failure
surface reach failure atdifferent times. This often occurs if a potential
failure surface passes through a foundationmaterial which is fissured or
has joints or pre-existing failure surfaces. Where these fissuresoccur
there will be large strain values, so the peak shear strength is reached
before other places.
7. Pre-Existing Failure Surfaces
If the foundation on which a slope sits contains pre-existing failure
surfaces, there is a largepossibility that progressive failure will take place
if another failure surface were to cut throughthem. The way to deal with
this situation is to assume that sufficient movement has previouslytaken
place for the ultimate state to develop in the soil and then using the
ultimate stateparameters. If failure has not taken place, then a decision
has to be made on which parameters tobe used.
The numerical modelling portion of slope stability analysis was not
carried out due to time constraints. Hence I will try to do that analysis
after joining my institute, as a future scope of work.
References
1. Classifications of Rock Masses for engineering: The RMR
system and Future Trends, by Z. T. Bieniawski, Pennsylvania
State University, USA.
2. Geotechnical considerations in underground mines,
Guideline, Moshab approved, December 1997, Document
No: ZME723QT.
3. Handbook of Geotechnical Investigationand Design Tables, by
Burt G. LookConsulting Geotechnical Engineer.
4. Pit Design Tutorial, Surpac 6.3by Gemcom.
5. Design of stable slope for opencast mines, B.Tech. Project
Thesis, B. B. Prakash, NIT Rourkela.

More Related Content

Similar to Intern report - IMC

Similar to Intern report - IMC (20)

Geologist cv
Geologist cvGeologist cv
Geologist cv
 
Cv Pradipta
Cv PradiptaCv Pradipta
Cv Pradipta
 
Sourav Cv
Sourav CvSourav Cv
Sourav Cv
 
Resume Dhirendra Pratap Singh
Resume Dhirendra Pratap SinghResume Dhirendra Pratap Singh
Resume Dhirendra Pratap Singh
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist
 
A Project Report.pdf
A Project Report.pdfA Project Report.pdf
A Project Report.pdf
 
SRG-Consultancy Services
SRG-Consultancy ServicesSRG-Consultancy Services
SRG-Consultancy Services
 
resume
resumeresume
resume
 
Muhammad Nafees Abbasi
Muhammad Nafees AbbasiMuhammad Nafees Abbasi
Muhammad Nafees Abbasi
 
Project proposal
Project proposalProject proposal
Project proposal
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Aamir Hameed C.V
Aamir Hameed C.VAamir Hameed C.V
Aamir Hameed C.V
 
SUMMER TRAINING PROJECT REPORT
SUMMER TRAINING PROJECT REPORTSUMMER TRAINING PROJECT REPORT
SUMMER TRAINING PROJECT REPORT
 
report.docx
report.docxreport.docx
report.docx
 
Company profile pt. reka bumi consulting
Company profile pt. reka bumi consultingCompany profile pt. reka bumi consulting
Company profile pt. reka bumi consulting
 
Shakil Hassain_Resume_tslcanada
Shakil Hassain_Resume_tslcanadaShakil Hassain_Resume_tslcanada
Shakil Hassain_Resume_tslcanada
 
Durgesh Gawde-cv
Durgesh Gawde-cvDurgesh Gawde-cv
Durgesh Gawde-cv
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)
 

Intern report - IMC

  • 1. Summer Internship Report (May-June 2013) Prepared by: Kartik Sharma Undergraduate Mining Engineering Student IIT_(BHU), Varanasi Under the guidance of: Mr. Pankaj Sinhha Director IMC-SRG Consulting (P) Limited 135, Jodhpur Park, Kolkata – 700068. India
  • 2. Acknowledgement I take this opportunity to express my profound gratitude and deep regards to Mr. Mihir (Senior Consultant, IMC- SRG) and Mr. R. Karthikeyan (Principal Consultant, IMC-SRG) for their exemplary guidance, monitoring and constant encouragement throughout the course of this internship. The blessing, help and guidance given by them time to time shall carry me a long way in the journey of life on which I am about to embark. I also take this opportunity to express a deep sense of gratitude to Mr. T. N. Gunaseelan (Managing Director, IMC-SRG) and Mr. Pankaj Kr Sinha (Director, IMC-SRG) for providing me this excellent opportunity of Internship. Their cordial support and valuable guidance has helped me in completing this task through various stages. Their encouragement to me during weekly presentations has really helped me in my improvement. I am obliged to the family of IMC-SRG, namely Mr. D.K.Lamba, Mr. Madan Pal Singh, Mr. K.K.Chaudhuri, Mr. S.N.Munsi, Mr. S.K.Pal, Mr. Ajay Singh, Mr. Rohit Dewangan, Mr. Prashant Tiwari, Ms Sharmila Patra, Ms Arpita Basak, Mr. Amitava Maji, Mr. Arbind Patel, Mr. Mihir Chandra,Mr. Somnath Gain,Ms Debasmita Mukherjee,Mr. Halder and many more, for the valuable information provided by them in their respective fields. I am grateful for their cooperation during the period of my internship. Lastly, I thank almighty, my parents, brothers, sisters and friends for their constant encouragement without which this internship would not be possible. Date: 29/06/2013 Place: Kolkata, India Kartik Sharma
  • 3. Introduction For summer internship at IMC-SRG Consulting (P) Limited, there were lot of applicants. Luckily I got this excellent opportunity of working in such a good consulting firm of Mining in India. Summer Internship started on 8th of May, 2013, with a small interview with Mr. T. N. Gunaseelan (Managing Director, IMC-SRG), Mr. Pankaj Kumar Sinha (Director, IMC-SRG) and Mr. A. R. Ganapathy (Principal Consultant, IMC-SRG). It was mainly focussed on myself, my specific field of interest in Mining Engineering, so that I shall be involved in some live projects of the company. As I had a working experience of a project in field of Rock Mechanics (B.Tech. Project), so it was decided that I shall be working in the same field, namely Geotechnical Engineering. So I was assigned to carry out Geotechnical analysis of a Mining project of Gujarat Fluorochemicals Ltd, to be carried out in Morocco. It is a Fluorite mining project, whose planning is being carried out by the team of IMC-SRG. Firstly it was planned to extract the fluorite deposit by methods of Underground mining. So I was asked to propose an underground roof support system, by going through all the geotechnical parameters. With a very great guidance of Mr. Tushar sir, an underground mining expert, I started this job, in which I made and followed a scheme of doing the geotechnical analysis, which I will elaborate in next section. Meanwhile, I learnt some software widely used in Mine planning like AutoCAD Map 3D, Gemcom Surpac. In AutoCAD Map 3D, I started with the basics and with a proper direction from Mr. Rohit sir and Mr. Tushar sir, I designed the pit for some project. In Surpac also, I designed a 3D solid model of the Pit for GFL project. Mr. Prashant sir helped me learn the solid ore body modelling in Surpac. After a while, the planning team of GFL project decided that the method of mining of the fluorite deposit shall be Open-pit, and after a time period of around 6-7 years the mining will be done by Underground methods. Hence my work then also got switched. Instead of going for an underground support design, now it included analysing the slopes of the open-pit for stability. Hence with a kind guidance of Mr. Karthikeyan sir, I
  • 4. started this job, studying various parameters effecting the stability, and then I was supposed to work on some numerical modelling software (like FLAC, SLIDE). But due to lack of time it was not completed well. Still last section of this report includes analysis of slopes in an open-pit mine.I will do that analysis after joining my institute, as a future scope of work. Last but not the least, I also learnt a lot while assisting my guides in their works. Some of them includes making a database of geotechnical reports of some mines, collecting details of mining equipment for the GFL project, translation of some Korean reports for an upcoming project.
  • 5. Section 1: Geotechnical Analysis (Project: GFL, Morocco) Gujarat Fluorochemicals Ltd (“GFL”) Noida, India is part of a diversified group of companies and has been exploring opportunities globally for investment in mineral properties in general and Fluorspar deposits in particular. GFL identified Jbel Terrimi Fluorspar deposit in Morocco and initiated discussion on investment opportunities. GFL engaged IMC-SRG Consulting (P) Ltd for Geological Study and Conceptual Mine Planning of Jbel Tirremi Fluorspar Deposit in Morocco. As per the discussion with GFL, IMC-SRG started investigation and exploration of the fluorite deposit in Morocco, by taking data from previously drilled holes as well as by drilling around 10 new boreholes. All information related to the deposit like amount of reserve, strike, dip, geological conditions, hydrology etc. were collected and calculated. A conceptual mine planning was being carried out by IMC-SRG team based on the collected data. As the decision of the team was to carry out underground method of mining for the deposit, it was a must to carry out the geotechnical analysis of the deposit and country rock. This task was being taken care by Mr. David Carter (DMT, Germany office). I was asked to make a proper stage wise plan for doing geotechnical study. For doing the geotechnical analysis, site investigation is the first step to proceed with. Five processes are to be done in this, steps are as follows:- 1. Desktop Study: Geological setting, existing data, site history, aerial photographs and terrain assessment. 2. Definition of needs: Justify investigation requirements and anticipated cost. 3. Preliminary investigation: Depth, thickness and composition of strata. 4. Detailed site investigation: Quantitative characterisation of critical or founding strata. 5. Monitoring/Investigation: Instrumentation as required.
  • 6. Geotechnical Study Key Model Geological Relative (100% total) Key data Comments Effort Benefit Geological setting, Desktop study model <5% ∼20% existing data, site Minor SI costs (site history, aerial photographs, and terrain assessment. reconnaissance) with significant planning benefits. Definition of needs <5% ∼20% Safety plans and services checks. Justify investigation Physical, requirements and environmental and anticipated costs. allowable site access. Preliminary Investigation Geological and 15% ∼20% Planning/Preliminary geotechnical Depth, thickness and Investigation of ~20% investigation composition of soils and of planned detailed strata. site investigation. Detailed site investigation Geotechnical 75% ∼20% model Quantitative, and Laboratory analysis of characterisation of 20% of detailed soil critical or founding strata profile. Monitoring/Inspection <10% ∼20% Instrumentation as required. QA testing. Confirms models adopted or requirements to adjust assumptions. Increased effort for observational design approach. Table 1. Geotechnical Requirements
  • 7. Figure 1. Steps in effective use of geotechnical input throughout all phases of the project. Part 1: Desktop Study: This includes the understanding of the geological setting, collection of existing data, site history, aerial photographs, and terrain assessment. Data of boreholes is available to us. From this data, we can find the RQD values. Data related to geology of the area is also available, containing the types of rock strata present from the surface to given depths. This part of study is called Desktop study.
  • 8. Part 2: Definition of Needs: This part consist of defining our aim. Our aim is mining the deposit by forming stopes, and then extracting them. For this purpose, we have to ensure that the surrounding rock must be stable during stoping. For this we go for geotechnical study rock mass. For doing the geotechnical analysis of rock to conclude for its stability, we must have the following rock properties: 1. The rock joint pattern 2. The nature of the joints and the infilling material 3. The status of water seepage in the rock 4. The compressive & tensile strength of the rocks 5. The amount of explosives to be used in blasting and their frequency If we get these rock properties, then we can appoint a Rock Mass classification scheme, to decide the stability of rock and then we can go for employing a particular type of support system. There are many rock mass classification systems, but most widely used and accepted system was given by Bieniawski, 1989 (modified version of previous). This is called Rock Mass Rating (RMR) system. It gives a rating to the rock on a 100 point scale, based on its following properties: 1. Uniaxial compressive strength of rock material. 2. Rock Quality Designation (RQD). 3. Spacing of discontinuities. 4. Condition of discontinuities. 5. Groundwater conditions. 6. Orientation of discontinuities. The RMR for different stopes is to be calculated separately (by calculating all factors listed for that part of ore body). Following table shows the RMR classification calculation scheme based on the above six parameters:
  • 9. Fig 2. RMR calculation sheet. Based on the above methodology, I have made a worksheet for easy calculation of the RMR value of the rock. Its preview is shown below: Table 2. RMR Calculator preview (Input: Yellow, Output: Red). Rock Mass Rating (RMR) Column1 Calculation Column2 Column3 Value(in given unit) Rating 1. Strength Point Load (MPa) 0 0 UCS (MPa) 0 0 2. RQD (%) 0 0 3. Spacing of discontinuities (m) 0 5
  • 10. 4. Condition of Discontinuity very rough surface, not continuous, no separation, unweather (30) slightly rough, separation<1mm,slightly weathered walls(25) slightly rough, separation<1mm,highly weathered walls(20) 0 slicken sided surface, separation 1- 5mm continuous(10) separation>5mm continuous(0) 5.Ground water condition Completely Dry(15) Damp(10) Wet(7) 0 Dripping(4) Flowing(0) R.M.R. VALUE (out of 100) Very good rock (81-100) Good rock (61-80) Fair rock (41-60) 5 Poor rock (21-40) Very poor rock (0-20) It is very easy to use table. In excel worksheet, you have to give the values for all the factors considered in RMR system, which is based on the rules for assigning weightage to each parameters. After which the sheet gives you the value of the RMR of the rock. The RMR calculator can be found here. A good user friendly version of RMR calculator is made available by InfoMine, and it is free to use by anyone. It can be accessed (through internet connection) here.
  • 11. After the RMR calculations, you have to consider some adjustment factors for mining use. The methodology to do so is given in the following flow chart: Fig 3. RMR adjustment methodology. Based on the value of RMR, Bieniawski gave a graphical method of finding the average stand-up time of the roof in underground excavation. It is an empirical method for prediction of roof stability, and it is very useful for mine safety.
  • 12. Fig 4. Average stand-up time prediction (interpretation from RMR value and roof span).
  • 13. Section 2: Working in AutoCAD Map 3D 2011 AutoCADis a software application for computer-aided design (CAD) and drafting. The software supports both 2D and 3D formats. The software is developed and sold by Autodesk, Inc., first released in December 1982 by Autodesk in the year following the purchase of the first form of the software by Autodesk founder John Walker. AutoCAD is Autodesk's flagship product and by March 1986 had become the most ubiquitous microcomputer design program in the world, utilizing functions such as "polylines" and "curve fitting". Prior to the introduction of AutoCAD, most other CAD programs ran on mainframe computers or minicomputers, with each CAD operator (user) working at a graphical terminal or workstation. According to Autodesk company information, the AutoCAD software is now used in a range of industries, employed by architects, project managers and engineers, amongst other professions, and as of 1994 there had been 750 training centres established across the world to educate users about the company's primary products. AutoCAD is used widely in all different type of industries. Each field has its own designing purpose, due to which Autodesk has release many types of AutoCAD versions. In mining and geological modelling purpose, we use MAP 3D version of AutoCAD. Following image shows how AutoCAD Map looks like.
  • 14. Fig 5. AutoCAD window view. In AutoCAD, followings things I have learnt and practised: • Designing a pit-model for one of the mining projects. Slices of ore body at various layers was given. Bench data was given (height, width, slope angle). Using these things, I made an optimised pit model in AutoCAD MAP 3D. Following image shows a 3D pit. Fig 6. Designed pit in AutoCAD Map 3D
  • 15. Patches with different colours are slice of the ore body at different levels. Task was to enclose each slice within the pit, for perfect economical excavation. • Rubber sheeting: In cartography, rubber-sheeting refers to the process by which a layer is distorted to allow it to be seamlessly joined to an adjacent geographic layer of matching imagery, such as satellite imagery (most commonly vector cartographic data) which are digital maps. This is sometimes referred to as image-to-vector conflation. Often this has to be done when layers created from adjacent map sheets are joined together. Rubber-sheeting is necessary because the imagery and the vector data will rarely match up correctly due to various reasons, such as the angle at which the image was taken, the curvature of the surface of the earth, minor movements in the imaging platform (such as a satellite or aircraft), and other errors in the imagery. Basically, a map of some lease-hold area was given to me. The task was to form an accurate image of this file in AutoCAD, in respect to the given coordinate system. Following image shows the work:
  • 16. 0DMT IMC . .. .. .J .. . Fig 7. Rubber sheeted Map image. Red circles encloses various boreholes present.
  • 17. Section 3: Working in Surpac 6.2 Gemcom Surpac is the world’s most popular geology and mine planning software, supporting open pit and underground operations and exploration projects in more than 120 countries. The software delivers efficiency and accuracy through ease-of-use, powerful 3D graphics and workflow automation that can be aligned to company-specific processes and data flows. Surpac addresses all the requirements of geologists, surveyors, and mining engineers in the resource sector and is flexible enough to be suitable for every commodity, ore-body and mining method. Its multilingual capabilities allow global companies to support a common solution across their operations.
  • 18. Fig 8. Surpac window. Drawing area at centre, file list at left side, various tools at the topmost toolbar. Works that I have learnt in Surpac are as follows: 1. Optimised pit and ramp design The task which was done in AutoCAD, was also done in Surpac. But Surpac is an ultimate modelling software in mine design etc. because it makes an easy to understand 3D solid model called a .dtm file. Ramp design is not possible in AutoCAD due to the complex structure of a ramp (manually drawing a ramp in AutoCAD is a tedious job). In Surpac, it becomes quite easier. Just we need to provide the ramp data like gradient, ramp width etc. and a proper position to start a ramp from. After which Surpac itself designs the ramp accurately. Following are the bullet point followed in pit design in Surpac: o using string tools to create a simple pit design o preparing data for use in basic pit design o using pit design tools to create ramps, crests, toes, and berms o creating switchbacks o extending a pit design to a DTM surface
  • 19. Ore body data of GFL, Morocco project was given to me (in form of Surpac string files of optimised pit cross-sections at various levels). From this data, I made following 3D pit model, including ramps. Fig9. Plan view of the designed pit.
  • 20. Fig 10. Cross-sectional view of the designed pit. Fig 11. Isometric view of the designed pit (with 10m wide ramp) 2. Importing geological data in Surpac: During geological exploration drilling, core samples of rocks are collected. Proper laboratory testing of these samples gives the grade of ore in them. After getting the ore grade, it is linked with that particular drill hole from which it is recovered. Three type of data is must to store for making a proper geological model of ore body. First is the collar data, which include the x,y,z coordinated of the borehole collar. It is a must for locating the holes in plan. Second must thing to know is the survey data of boreholes. It includes the dip and azimuth of the drill holes (as these may be vertical or curved). Third important thing is Assay data. It is just the grade of various compound present in these sample data. After we have these three data, we import excel csv format files of each into Surpac. It gives in output the location and size/shape of the boreholes. Following figures show the output of Supac after importing data:
  • 21. Fig 12. Plan view of boreholes (marked) in Surpac after importing data. Fig 13. Cross-section of boreholes.
  • 22. 3. Solid Modelling Solids Modelling allows us to use triangulation to create three- dimensional models based on DigitalTerrain Models (DTMs) and String files. Basically if we have different planes or surfaces and we want to join them to form a single solid body, Surpac works here very well. This is termed as solid modelling. I was given with the same borehole data shown in previous section. Also I was given with the topography of that area. From this I made various sections of ore- bogy using the bore holes plotted. Total seven sections were drawn, which looks like this: Fig 14. Isometric view of 7 ore-body sections and boreholes.
  • 23. After this, using the triangulation technique, we can make a solid ore body model in Surpac. It is as shown below: Fig 15. Solid model (same view as previous figure’s). Fig 16. Triangulation of sections (isometric view).
  • 24. Workflow of Solid Modelling: Fig 17. Solid Modelling flow-chart
  • 25. Section 4: Slope Stability Analysis Overview Slope stability analysis forms an integral part of the opencast mining operations during the life cycle of the project. In Indian mining conditions, slope design guidelines are yet to be formulatedfor different types of mining practices and there is a growing need to develop such guidelines formaintaining safety and productivity. Till date, most of the design methods are purely based onfield experience, rules of thumb followed by sound engineering judgment. During the last fourdecades, the concepts of slope stability analysis have emerged within the domain of rockengineering to address the problems of design and stability of excavated slopes. In India, the number of operating opencast mines is steadily increasing as compared tounderground mines. It is due to low gestation period, higher productivity, and quick rate ofinvestment. On the contrary, opencast mining attracts environmental concerns such as solidwastemanagement, land degradation and socio-economical problems. In addition to that a largenumber of opencast mines, whether large or small, are now days reaching to deeper miningdepths. As a result analysis of stability of operating slopes and ultimate pit slope design arebecoming a major concern. Slope failures cause loss of production, extra stripping cost forrecovery and handling of failed material, dewatering the pits and sometimes lead to mineabandonment/premature closure. Maintaining pit slope angles that are as steep as possible is of vital importance to the reduction ofstripping (mining of waste rock), which will in turn have direct consequences on the economy ofthe mining operation. Design of the final pit limit is thus governed not only by the ore gradedistribution and the production costs, but also by the overall rock mass strength and stability. Thepotential for failure must be assessed for given mining layouts and incorporated into the design ofthe ultimate pit. Against this backdrop, there is a strong need for good practices in slope design and managementso that suitable corrective actions can be taken in a timely manner to minimize the slope failures.
  • 26. Objectives The prime objectives of the project are addressed towards: a) Understanding the different types and modes of slope failures; and b) Designing of stable slopes for opencast mines using numerical models. Factors Affecting Slope Stability Slope failures of different types are affected by the following factors: 1. Slope Geometry The basic geometrical slope design parameters are height, overall slope angle and area of failuresurface. With increase in height the slope stability decreases. The overall angle increases thepossible extent of the development of the any failure to the rear of the crests increases and itshould be considered so that the ground deformation at the mine peripheral area can be avoided. Generally overall slope angle of 45° is considered to be safe by Directorate General of MinesSafety (DGMS). The curvature of the slope has profound effect on the instability and thereforeconvex section slopes should be avoided in the slope design. Steeper and higher the height ofslope less is the stability. Diagram showing bench, ramp, overall slope and their respectiveangles is given in Fig. 2.1. Fig 18. Diagram showing bench, ramp, overall slope and their respective angles.
  • 27. 2. Geological Structure The main geological structure which affect the stability of the slopes in the open pit mines are: 1. Amount and direction of dip 2. Intra-formational shear zones 3. Joints and discontinuities a) Reduce shear strength b) Change permeability c) Act as sub surface drain and plains of failure 4. Faults a) Weathering and alternation along the faults b) Act as ground water conduits c) Provides a probable plane of failure Fig 19. Different types of joints and faults. Instability may occur if the strata dip into the excavations. Faulting provides a lateral or rearrelease plane of low strength and such strata plan are highly disturbed. Localized steepening ofstrata is critical for the stability of the slopes. If a clay band comes in between the two rockbands, stability is hampered. Joints and bedding planes also provide surfaces of weakness. Stability of the slope is dependent on the shear strength available along such surface, on theirorientations in relation to the slope and water pressure action on the surface. These shear strengththat can be
  • 28. mobilized along joint surface depending on the functional properties of the surfaceand the effective stress which are transmitted normal to the surface. Joints can create a situationwhere a combination of joint sets provides a cross over surface. 5. Lithology The rock materials forming a pit slope determines the rock mass strength modified bydiscontinuities, faulting, folding, old workings and weathering. Low rock mass strength ischaracterized by circular; ravelling and rock fall instability like the formation of slope in massivesandstone restrict stability. Pit slopes having alluvium or weathered rocks at the surface have lowshearing strength and the strength gets further reduced if water seepage takes place throughthem. These types of slopes must be flatter. 6. Ground Water It causes the following: a) Alters the cohesion and frictional parameters and b) Reduce the normal effective stress Ground water causes increased up thrust and driving water forces and has adverse effect on thestability of the slopes. Physical and chemical effect of pure water pressure in joints fillingmaterial can thus alter the cohesion and friction of the discontinuity surface. Physical effects ofproviding uplift on the joint surface, reduces the frictional resistances. This will reduce theshearing resistance along the potential failure plane by reducing the effective normal stressacting on it. Physical and the chemical effect of the water pressure in the pores of the rock causea decrease in the compressive strength particularly where confining stress has been reduced. 7. Mining Method and Equipment Generally there are four methods of advance in open cast mines. They are: (a) Strike cut- advancing down the dip (b) Strike cut- advancing up the dip (c) Dip cut- along the strike (d) Open pit working The use of dip cuts with advance on the strike reduces the length and time that a face is exposedduring excavation. Dip cuts with advance oblique to strike may often be used to reduce the stratadip in to the excavation. Dip cut generally offer the most stable method of working but sufferfrom restricted production potential. Open pit method are used in steeply dipping seams, due tothe increased slope height are more
  • 29. prone to large slab/buckling modes of failure. Miningequipment which piles on the benches of the open pit mine gives rise to the increase in surchargewhich in turn increases the force which tends to pull the slope face downward and thus instabilityoccurs. Cases of circular failure in spoil dumps are more pronounced. 8. Dynamic Forces Due to effect of blasting and vibration, shear stresses are momentarily increased and as resultdynamic acceleration of material and thus increases the stability problem in the slope face. Itcauses the ground motion and fracturing of rocks. Blasting is a primary factor governing the maximum achievable bench face angles. The effects ofcareless or poorly designed blasting can be very significant for bench stability, as noted by Sage(1976) and Bauer and Calder (1971). Besides blast damage and back break which both reducethe bench face angle, vibrations from blasting could potentially cause failure of the rock mass. Forsmall scale slopes, various types of smooth blasting have been proposed to reduce these effectsand the experiences are quite good (e.g. Hoek and Bray, 1981). For large scale slopes, however,blasting becomes less of problem since back break and blast damage of benches have negligibleeffects on the stable overall slope angle. Furthermore, the high frequency of the blast accelerationwaves prohibit them from displacing large rock masses uniformly, as pointed out by Bauer andCalder (1971). Blasting-induced failures are thus a marginal problem for large scale slopes. Seismic events, i.e., low frequency vibrations, could be more dangerous for large scale slopes andseveral seismic-induced failures of natural slopes have been observed in mountainous areas. Together with all these causes external loading can also plays an important role when they arepresent as in case of surcharge due to dumps on the crest of the benches. In high altitude areas,freezing of water on slope faces can results in the build-up of ground water pressure behind the face which again adds up to instability of the slope. 9. Cohesion It is the characteristic property of a rock or soil that measures how well it resists being deformedor broken by forces such as gravity. In soils/rocks true cohesion is caused by electrostatic forcesin stiff over consolidated clays, cementing by Fe2O3, CaCO3, NaCl, etc. and root cohesion. However the apparent cohesion is caused by negative capillary pressure and pore pressureresponse during untrained loading. Slopes having
  • 30. rocks/soils with less cohesion tend to be lessstable. The factors that strengthen cohesive force are as follows: a) Friction b) Stickiness of particles can hold the soil grains together. However, being too wet or toodry can reduce cohesive strength. c) Cementation of grains by calcite or silica deposition can solidify earth materials intostrong rocks. d) Man-made reinforcements can prevent some movement of material. The factors that weaken cohesive strength are as follows: a) High water content can weaken cohesion because abundant water both lubricates (Overcoming friction) and adds weight to a mass. b) Alternating expansion by wetting and contraction by drying of water reduces strength ofcohesion, just like alternating expansion by freezing and contraction by thawing. Thisrepeated expansion is perpendicular to the surface and contraction vertically by gravityovercomes cohesion resulting with the rock and sediment moving slowly downhill. c) Undercutting in slopes d) Vibrations from earthquakes, sonic booms, blasting that create vibrations whichovercome cohesion and cause mass movement. 10. Angle of Internal Friction Angle of internal friction is the angle, measured between the normal force (N) and resultantforce (R), that is attained when failure just occurs in response to a shearing stress (S). Its tangent(S/N) is the coefficient of sliding friction. It is a measure of the ability of a unit of rock or soil towithstand a shear stress. This is affected by particle roundness and particle size. Lowerroundness or larger median particle size results in larger friction angle. It is also affected byquartz content. The sands with less quartz contained greater amounts of potassium- feldspar,plagioclase, calcite, and/or dolomite and these minerals generally have higher sliding frictionalresistance compared to that of quartz. Types of Slope Failure 1. Plane Failure Simple plane failure is the easiest form of rock slope failure to analyse. It occurs when adiscontinuity striking approximately parallel to the slope face and dipping at a lower angleintersects the slope face, enabling the material above the discontinuity to slide. Variations on thissimple failure
  • 31. mode can occur when the sliding plane is a combination of joint sets which form astraight path. This means that the solution is never anything more than the analysis of equilibrium of a singleblock resting on a plane and acted upon by a number of external forces (water pressure, earthquake, etc.) deterministic and probabilistic solution in which parameters are considered as beingprecisely known may be readily obtained by hand calculation if effect of moment is neglected. Fig 20. Plane failure. 2. Wedge Failure The three dimensional wedge failures occur when two discontinuities intersects in such a way that the wedge of material, formed above the discontinuities, can slide out in a direction parallel to the line of intersection of the two discontinuities. It is particularly common in the individual bench scale but can also provide the failure mechanism for a large slope where structures are very continuous and extensive.
  • 32. Fig 21. Wedge failure. When two discontinuities strike obliquely across the slope face and their line of intersection ‘daylights’ in the slope, the wedge of the rock resting over these discontinuities will slide down along the line of intersection provided the inclination of these line is significantly greater than the angle of friction and the shearing component of the plane of the discontinuities is less than the total downward force. The total downward force is the downward component of the weight of the wedge and the external forces (surcharges) acting over the wedge. 3. Circular Failure The pioneering work, in the beginning of the century, in Sweden confirmed that the surface of the failure in spoil dumps or soil slopes resembles the shape of a circular arc. This failure can occurs in soil slopes, the circular method occurs when the joint sets are not very well defined. When the material of the spoil dump slopes are weak such as soil, heavily jointed or broken rock mass, the failure is defined by a single discontinuity surface but will tend to follow a circular path. The conditions under which circular failure occurs are follows: 1. When the individual particles of soil or rock mass, comprising the slopes are small as compared to the slope. 2. When the particles are not locked as a result of their shape and tend to behave as soil.
  • 33. Fig 22. Three-dimensional failure geometry of a rotational shear failure. Types of circular failure Circular failure is classified in three types depending on the area that is affected by the failure surface. They are:- (a) Slope failure: In this type of failure, the arc of the rupture surface meets the slope above the toe of the slope. This happens when the slope angle is very high and the soil close to the toe possess the high strength. (b) Toe failure: In this type of failure, the arc of the rupture surface meets the slope at the toe. (c) Base failure: In this type of failure, the arc of the failure passes below the toe and in to base of the slope. This happens when the slope angle is low and the soil below the base is softer and more plastic than the soil above the base. 4. Two Block Failure Two block failures are much less common mode of rock slope failure than single block failures such as the planes and the 3D wedge and, consequently, are only briefly considered here. Several methods of solution exist and each may be appropriate at some level of investigation. 5. Toppling Failure Toppling or overturning has been recognized by several investigators as being a mechanism of rock slope failure and has been postulated as the cause of several failures ranging from small to large ones.
  • 34. Fig 23. Toppling failure It occurs in slopes having near vertical joint sets very often the stability depends on the stability of one or two key blocks. Once they are disturbed the system may collapse or this failure has been postulated as the cause of several failures ranging from small to large size. This type of failure involves rotation of blocks of rocks about some fixed base. This type of failure generally occurred when the hill slopes are very steep. Factors to be considered in Assessment of Stability 1. Ground Investigation Before any further examination of an existing slope, or the ground on which a slope is to be built,essential borehole information must be obtained. This information will give details of the strata,moisture content and the standing water level and shear planes. Piezometer tubes are installedinto the ground to measure changes in water level over a period of time. Ground investigationsalso include:- • In-situ and laboratory tests • Aerial photographs • Study of geological maps and memoirs to indicate probable soil conditions • Visiting and observing the slope. 2. Most Critical Failure Surface In homogeneous soils relatively unaffected by faults or bedding, deep seated shear failuresurfaces tend to form in a circular, rotational manner. The aim is to find the most critical surfaceusing "trial circles".
  • 35. The method is as follows: • A series of slip circles of different radii is to be considered but with same centre ofrotation. Factor of Safety (FOS) for each of these circles is plotted against radius, and theminimum FOS is found. • This should be repeated for several circles, each investigated from an array of centers.The simplest way to do this is to form a rectangular grid from the centers. • Each centre will have a minimum FOS and the overall lowest FOS from all the centreshows that FOS for the whole slope. This assumes that enough circles, with a largespread of radii, and a large grid of centers have been investigated. • An overall failure surface is found. Below figures shows variety of slope failure circles analysed at varying radii from a singlecentre and variation of factor of safety with critical circle radius respectively. Fig 24. Variety of slope failure circles analysed at varying radii from a single centre
  • 36. Fig 25. Variation of factor of safety with critical circle radius 3. Tension Cracks A tension crack at the head of a slide suggests strongly that instability is imminent. Tensioncracks are sometimes used in slope stability calculations, and sometimes they are considered tobe full of water. If this is the case, then hydrostatic forces develop as shown in Fig.
  • 37. Fig 26. Effect of tension crack at the head of a slide Tension cracks are not usually important in stability analysis, but can become so in some specialcases. Therefore assume that the cracks don't occur, but take account of them in analysing aslope which has already cracked. 4. Submerged Slopes When an external water load is applied to a slope, the pressure it exerts tends to have astabilizing effect on the slope. The vertical and horizontal forces due to the water must be takeninto account in analysis of the slope. Thus, allowing for the external water forces by usingsubmerged densities in the slope, and by ignoring water externally. 5. Factor of Safety (FOS) The FOS is chosen as a ratio of the available shear strength to that required to keep the slopestable. Table 3. Guidelines for equilibrium of a slope
  • 38. For highly unlikely loading conditions, factors of safety can be as low as 1.2-1.25, even for dams. E.g. situations based on seismic effects, or where there is rapid drawdown of the water level in a reservoir. 6. Progressive Failure This is the term describing the condition when different parts of a failure surface reach failure atdifferent times. This often occurs if a potential failure surface passes through a foundationmaterial which is fissured or has joints or pre-existing failure surfaces. Where these fissuresoccur there will be large strain values, so the peak shear strength is reached before other places. 7. Pre-Existing Failure Surfaces If the foundation on which a slope sits contains pre-existing failure surfaces, there is a largepossibility that progressive failure will take place if another failure surface were to cut throughthem. The way to deal with this situation is to assume that sufficient movement has previouslytaken place for the ultimate state to develop in the soil and then using the ultimate stateparameters. If failure has not taken place, then a decision has to be made on which parameters tobe used. The numerical modelling portion of slope stability analysis was not carried out due to time constraints. Hence I will try to do that analysis after joining my institute, as a future scope of work.
  • 39. References 1. Classifications of Rock Masses for engineering: The RMR system and Future Trends, by Z. T. Bieniawski, Pennsylvania State University, USA. 2. Geotechnical considerations in underground mines, Guideline, Moshab approved, December 1997, Document No: ZME723QT. 3. Handbook of Geotechnical Investigationand Design Tables, by Burt G. LookConsulting Geotechnical Engineer. 4. Pit Design Tutorial, Surpac 6.3by Gemcom. 5. Design of stable slope for opencast mines, B.Tech. Project Thesis, B. B. Prakash, NIT Rourkela.