1. Dear Sir / Madam
Thanks for showing interest in my candidature for the challenging position.
I express my willingness to take up the assignment.
As desired, please find attached my resume for your perusal and kind consideration.
I have graduate degree in Civil Engineering, MBA, Certified Cost Engineer (CCE) and Project
Management Professional (PMP) Certification with 26 years of work experience (9 years in GCC - 7
years in Qatar) gained on various large scale projects.
Projects executed include High Rise Buildings Residential & Commercial Complexes, Port & Marine
Constructions, Oil & Gas Refinery, Infrastructure works, etc.
I have worked on various positions viz. Assistant Engineer, Civil Engineer, Cost Engineer, Contracts
Engineer, Projects Coordinator, Site in-Charge, Assistant Manager, Manager, Chief Manager
(Projects), Deputy General Manager (Projects) & currently working as Contracts Manager.
Project Management and Contract Management remain my core requirement of all my employments
and assignments included roles for Pre-Contract as well Post-Contract stages and from sides of
Contractor and Client / Developer. I have worked in large organizations as well as start-up
companies and can manage in both situations.
Besides the above skills & experience on Projects management & Control functions, I acquired
professional qualifications in Law, Accounting & Management to supplement my career progress
towards senior managerial roles with increasing responsibilities and challenges.
With skills and work experience briefly described above, I feel confident to contribute for the
organization while working at the senior managerial position as stated above
I need notice period of about 1 month..
Look forward for your positive response soon
With best regards
Kishan Solanki
Abu Dhabi, UAE
Mob. 00971 50 7396163
----------------------
PS: I can provide necessary NOC from my current employer for changing sponsorship in UAE.
-------------------------------------------------------------------------------------------------------------------------------------
Kishankumar Jayantilal Solanki, PO Box 47804, Abu Dhabi, UAE
Indian Passport No. F2532516 valid upto 19 June 2015, Date of Birth – 05 September 1963.
Mobile +971 50 7396163 (UAE) / +91-9723191575 (India) ,
Email: kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
2.
3. Resume of Kishan Solanki
Resume Summary:
I am KISHANKUMAR JAYANTILAL SOLANKI and prefer to be called by short name KISHAN
SOLANKI. Following points summarize key aspects of my skills, experience and personality:
- Certified Project Management Professional (PMP) and Certified Cost Engineer (CCE) with
Graduate degree in Civil Engg, MBA and over 26 years work experience (9 years in GCC).
- Good integrator of multi-disciplinary teams. Held responsible positions in Projects
Management and Contracts Management.
- Worked on projects of Residential & Commercial Complex; Hotel & Residential Towers;
Green-Field Port with Infrastructures; Oil & Gas Refinery; and Industrial infrastructures.
- Believe in continuous professional development; delivering more value than expected; and
learning from mistakes of self and others. Take initiatives to identify potential areas for
concern and work for practical solutions proactively.
- Have valid car driving license from India, Qatar and UAE.
Professional Education:
1. Graduate Degree in Civil Engg (BE Civil) 1984 from Saurashtra University, Gujarat, India
2. Graduate Degree in General Laws (LLB) 2000 from Gujarat University, Gujarat, India
3. Diplomas in Management – Marketing (DMM) 1993, Finance (DFM) 1995 and Human
Resources (DHRM) 1995 – from Indira Gandhi National Open University, India
4. Final Pass in Professional Course of Institute of Cost & Works Accountants of India, 1995
5. Final Pass in Professional course with International Accounting System of ACCA, UK, 2003
6. Master of Business Administration (MBA), Indira Gandhi National Open University, India,2009
7. Project Management Professional (PMP), Project Management Institute, USA, 2010
8. Certified Cost Engineer (CCE), AACEI, USA, 2010
Employment Summary: Total Experience 26 years
- In GCC (Total 9 years)
2010 onwards: Contracts Manager with M/s TAFSEER contracting & gen. Maint. Co. LLC, UAE
2008 to 2010: Contracts Manager with M/s Al Habtoor STFA Soil Group LLC, UAE
2008: Dy. General Manager (Projects) with M/s Shapoorji Pallonji Mideast LLC,UAE
2006 to Feb 2008: Chief Manager (Projects) with M/s Simplex Infrastructure Limited, QATAR
2003 to 2006: Office Engineer, Project Control Engineer & Contracts Engineer with M/s RAMCO Trading &
Contracting wll, at QATAR
2001 to 2002: Asst Manager - Group Internal Audit with M/s Mannai Corporation (QSC),QATAR
- In India (Total 17 years)
1998 to 2001 - Manager with M/s Adani Port Ltd (APL), Gujarat State
1996 to 1998 - Cost Accountant in Practice – Self employed, Gujarat State
1995 to 1996 - Cost Engineer with M/s Toyo Engineering Corporation at MRPL Project, Mangalore
1985 to1995 - Assistant Engineer with M/s Gujarat Industrial Development Corporation (GIDC)– a Govt. of
Gujarat Undertaking for development of Industrial Estates within the state of Gujarat
1984 to 1985 - Assistant Engineer with Govt. of Gujarat – Water Resources department
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 1 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
4. Major Projects Handled
Country Project Client Consultant Project Year My Role
Value
(in
Million
US $)
UAE Various Building Works Various Various 514 2010 Contracts
– High Rise & Mixed Manager
use villa complex
UAE Various Enabling Works Various Various 160 2008-10 Contracts
– Piling, Shoring, Manager
Excavation, Dewatering,
etc
UAE Various -Tower Various Various 480 2008 Deputy
Buildings upto 50 floors General
& Residential Complex Manager
(Projects)
Qatar Various - Hotel & Various Various 126 2006-08 Chief Manager
Residential Towers; (Projects)
Infrastructure works
Qatar Hotel (B+G+20) Tower Private Arab 41 2005-06 Project
(Residential changed to Engineering Coordinator
Hotel) Bureau cum Contracts
Engineer
Qatar Retail Complex Asmakh GHD 36 2004-05 Project
(36,000 m2, B+G+2) Real Estate Controls
Engineer
Qatar Various – For Oil & Gas Various Various 260 2001-02 Asst Manager
related projects – Group
Internal Audit
India Green Field Port – First Adani In-House by 148 1998-20 Manager -
in private Sector Ports in Group of Adani Port 01 Similar to
India – Components Companies Ltd combination of
included 75 km Road & Project
Railway; Jetty 80000
Controls
DWT; Open & Covered
Storage areas; Manager &
Chemical Storage Contracts
Terminals; massive Manager
earth filling – 1 million
m3; Housing Complex,
etc
India Mangalore Refinery MRPL Toyo 1120 1995-96 Cost Engineer
Engineering
India Various Industrial GIDC GIDC 250 1985-95 Asst. Engineer
Infrastructures
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 2 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
5. Summary of Transferable Skills Developed:
In pursuance of the Career objective, developed skills while working at various positions for total 26 years
(9 years in GCC & 17 years in India):
1. Multiple Professional & General Management skills: Started study with Civil Engineering (BE Civil),
then gradually learned for Cost & Management Accountancy (AICWAI); Management – Marketing
(DMM), Finance (DFM), Human Resources (DHRM); General Law (LLB) and Financial Accounting
(FCCA). With these skills, I can effectively provide General Management in role of Profit Centre Head
for Projects and/or Business Operations covering functional requirements and coordination with
specialists..
2. Contracts Management – This is my core requirement in present job and remained core element of
my previous employments. This included roles in both stages viz. Pre-Contracts & Post Contracts –
Preparation & Review of Budgets, Pre-Start Estimates, Cost to Complete (CTC), Cost & Revenue
forecasting, Variations, Claims, Time Extensions, Arbitrations, Finalization Sub Contractors / Vendors,
Contract Finalization with Client, Consultants & Sub Contractors/Vendors. Advanced skills in FIDIC
based contracts.
3. Claims, Litigations & Alternative Dispute Resolutions (ADR): The formal degree in Law along with
hands-on cases of raising the dispute upto litigation in legal courts all through process of ADR.
4. Commercial Management of Projects covering Quantity Surveying – Take off Quantities from
Drawings, Site Measurements, Billings for Client & Sub Contractors/Vendors;
5. Site Execution of Large Projects: Directly involved in Execution of various Projects of High Rise
Buildings, Commercial Complexes, Residential Buildings, Industrial Buildings, Port Construction (First
Private Sector Port in India), Oil & Gas Refinery, Development Industrial Estates & Infrastructural
Works – Roads, Railways, Water Supply, Drainage.
6. Technical Services for Projects: Review of Design Drawings, Shop Drawings Management,
Technical Submission for Materials, Methods Statements, Quality Control Manual, Safety Manuals,
Finalization of Site Mobilization Plans, Determination of Requirements for Manpower, Formworks and
Plants & Equipments, Strategic Planning & work Schedules
7. Financial & Internal Control related matters involving Cash Flow, Internal Audit, Review of Internal
Control Procedures, Cost & Management Audits, Financial Audits, Finalizing Insurance requirements,
Pricing, Profitability Analysis, Developing System for Cost Management & Financial Accounting
Systems
8. Appraisal of Project Proposals & Cost Estimates for various project works & developments
9. Risk Analysis: Identify risk factors covering various aspects, evaluate impact on profitability and
initiate, recommend & review measures for mitigation impact of high risk factors.
10. Computer Skills in MS Office Applications (Word, Excel & Power Point), AutoCAD, Primavera, MS
Project and other general applications
11. Presentations & Writing Articles: Made presentations and wrote articles for Professional bodies of
Engineers & others.
12. Training & Teaching – Provide training & motivation to various staff & Workers to enable them to work
efficiently & effectively. This help me for Team buildings and develop junior staff for higher skills
EMPLOYMENT DETAILS: Total 26 years
Current Employment: From February 2010 onwards:
Presently, I am working with M/s TAFSEER Contracting & Gen Maint. Co. LLC as Contracts Manager.
TAFSEER is a Royal /PAL group Company established as major General works contractor operating in
Abu Dhabi, UAE.
Responsible for Pre-contract (Tendering) as well as Post-Contract - commercial and contractual matters of
Projects in Abu Dhabi, UAE which are mainly FIDIC based contracts – Correspondence with Client /
Consultants, Claims, Variations, Valuations, Subcontracts Management and Internal Control.
Provide directions for Project Managers for improving performance at projects in terms of profitability,
contractual obligations, and achieving work progress in time.
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 3 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
6. Previous Employments:
From November 2008 to February 2010
Contracts Manager with M/s Al Habtoor STFA Soil Group LLC (HSSG). HSSG is a Joint venture of Al
Habtoor Group of UAE & STFA of Turkey, established as major Piling & enabling works contractor
operating in Middle East.
Responsible for commercial and contractual matters of Projects in UAE which are mainly FIDIC based
contracts – Correspondence with Client / Consultants, Claims, Variations, Valuations, Subcontracts
Management and Internal Control.
Provided directions for Project Managers for improving performance at projects in terms of profitability,
contractual obligations, and achieving work progress in time.
From March 2008 to November 2008
Dy. General Manager (Projects) with M/s Shapoorji Pallonji Mideast LLC, a leading Indian
Civil Construction Contracting Company working in UAE.
Reporting to Sr. Regional General Manager for UAE Region. 4 Project Directors and 4 Project in-charges
reporting to me on dotted line. Job responsibilities included following assignments:
Contracts Management & Control of portfolio 8 projects in various stages:
5B+G+39 Resi. & Commercial Tower C2 at Jumeirah Lake Towers,
2B+7P+42 Commercial PARK Towers, Plot PB - 02 ,DIFC Dubai,
B+G+5 Floors TAJ GRANDEUR RESIDENCES AT Plot C-06 AT THE PALM, JUMEIRAH
B+G+M+7 Floors TAJ Exotica Beach Resort, SPA & Villas at Plot C-07 AT THE PALM, JUMEIRAH
B+G+8 + Health Club Floors UTMOST RESIDENTIAL DEVELOPMENT at Al Barsha
2B+G+8 CENTRO HOTEL -AL BARSHA
G+8 Storied Residential Buildings 15 nos package 5 & 6 at Tijara Town on Dubai-Al Ain Road
Between Two Bridges (B2B) Hotel & Resort, & 18 Villas at Umm Al Nar, Abu Dhabi
Review and update Budgets (Pre-start Estimates), and Cost to Complete (CTC) for balance
project activities and report to the Management for any deviations and impact on overall
profitability and suggest measures for controlling Cost & Schedules.
Review Internal Control Systems for Projects execution, Billings, Procurements, Plant &
Equipments, and Personnel, Subcontracting, Tendering and planning functions.
Providing support to Construction Execution Team for troubleshooting areas on Work Planning,
Materials Procurements, Technical Submissions for Materials & Shop Drawings, Productivity
improvements e.g. Formwork & Equipment requirements finalized for Tijara Town Project,
Participate for ERP Implementation
Management of Subcontractors & Vendors & Review of Work Orders for major items.
Monitoring Project work progress – daily, weekly & Monthly Reviews
From October 2006 to Feb 2008:
Chief Manager (Projects) with M/s Simplex Infrastructure Limited, a leading Grade-AA Indian
Civil Construction Contracting Company working in QATAR.
I was reporting to the General Manager and 4 Project Managers reporting to me directly.
Job responsibilities included were:
Mainly working for Post Contract –Projects Execution, & Contracts Management ensuring assigned
Projects are completed in time, within the Budget and improve Margins
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 4 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
7. − Directly responsible for Projects Execution of projects:
Hilton Hotel (B+G+26) in West Bay DOHA, QATAR, Five Star Hotel
4 nos Residential Towers (G+5P+22) at Porto Arabia, The Pearl Qatar
Infrastructural Projects– Structural works for Pump Houses & Power plant at Qatar.
− Providing directions to Project Managers and Construction Teams for Projects Management and
execution at site, Finance Management, Work Planning, Materials Procurements, Technical
Submissions for Materials & Shop Drawings, Productivity improvements
− Review Resources requirements and deployment of Manpower, Formwork, Plant & Equipments,
Financing, Insurances; and overall work execution methodologies
− Finalization of major Subcontractors & Vendors
− Review and Certification of Billings for Client & Subcontractors
− Co-ordination with Consultant, Client & Subcontractors required for the Projects.
− Monitoring and Control of Projects work progress – daily, weekly & Monthly Reviews
Prepared legal brief for raising dispute with one leading contractor (where Simplex was sub-
contractor) for litigation in courts at Doha, Qatar. The matter was finally settled out-of-court basis.
Also provide support For Pre-Contract Process: Review and provide feedback to. Tendering dept for
Requirements for Manpower, Formwork, Plant & Equipments
Construction strategy & overall work schedule considered for Project execution
Major risk areas apparent from Tender documents and suggesting precautions
From June 2003 to October 2006:
Office Engineer, Project Control Engineer & Contracts Engineer with M/s RAMCO Trading
& Contracting wll - a leading Grade-A Civil Construction Contracting Company in QATAR. I was
reporting to the General Manager.
Job responsibilities included were:
Worked for Projects Execution, & Contracts Management ensuring assigned Projects are completed in
time, within the Budget and improve Margins
− Directly responsible for Contract Management and support for Execution of projects:
Commercial Complex (Asmakh Mall) in Al Sadd DOHA, QATAR, Built-up area 36,000 m2
Al Rayyan Tower (B+G+19) at West Bay, Qatar – Initially designed as Residential use and
during execution changed to Hotel use
− Leading Commercial and Construction teams at site, Finance Management, Work Planning,
Materials Procurements, Technical Submissions for Materials & Shop Drawings, Productivity
improvements, Resources requirements and deployment of Manpower, Formwork, Plant &
Equipments, Financing, Insurances; Finalization of major Subcontractors & Vendors
− Preparation of Valuations and Billings for Client & Subcontractors
− Co-ordination with Consultant, Client & Subcontractors required for the Projects.
From June 2001 to November 2002:
Assistant Manager - Group Internal Audit with M/s Mannai Corporation (Q.S.C.) in DOHA,
QATAR. Mannai Group is leading group of companies, engaged in Trading and construction
activities and employing about 3500 employees.
This was my first assignment overseas. Following assignments undertaken:
• Review of Internal Control Systems for Business Operations of Construction Units in
Group.
• Internal Technical audit of project activities ranging from initial Proposals to
Commissioning
• Internal audit of various business units and activities of Joint Venture businesses.
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 5 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
8. Reviewed the overall contracts management and project execution process prevailing in the
Construction Group and provided constructive suggestions for Management consideration.
Employment within India: (17 years)
From April - 1998 to June 2001
Manager with M/s Adani Port Ltd (APL) a subsidiary of M/s Adani Exports Ltd, No. 1 Super Star Trading
House in India. APL is Developer and sole terminal operator of Private Port at Navinal Island, Mundra,
India. The Port development Project was First in Private Sector in India.
The Port Project involved Dredging, Jetty Construction, Petroleum storage terminal of capacity 2.65 lac KL,
Delivery Terminals, Storage godowns, Open storages, 24” Pipelines from Jetty to terminals, Railway line,
Bulk Conveyor System, Container Terminal, Housing township, Electrification, Instrumentation, Roads,
drainage, Water and other Utilities,.
I was mainly responsible for commercial & Contracts management, coordination, monitoring and review of
various activities Project Management and Controls during stages of Pre Contracts and Post Contracts;
and periodical review of activities relating to Quality, Safety, Security and Environmental Protection.
When I joined the Project, it was in board room stage and just taken up with Govt clearances. During my
tenure, the Port was fully operational in a record time of about 4 years and within the budgeted cost.
April 1996 to April 1998:
Cost Accountant in Practice,
Worked as Project Consultant for M/s Adani Port Ltd & established system for Management Control of their
Port Project – mainly for Billing, Budget & cost Control. Also, I conducted statutory Cost Audit of large units
of Textile & Cement production. Provided suggestions on how production cost can be optimized.
August 1995 to March 1996:
Cost Engineer with M/s Toyo Engineering Corporation, Japan at Mangalore Refinery Project – a
Greenfield Refinery Project of capacity 3 MMTPA costing US $ 1 Bn. For which M/s Toyo were the Overall
Project management Consultant.
Worked as part of Project Cost Control Group and responsible for Contracts Management,
November 1985 to August 1995:
Assistant Engineer with M/s Gujarat Industrial Development Corporation – a Govt. of Gujarat Undertaking
for development of Industrial Estates within the state of Gujarat.
This position demanded role of Contracts Management and Execution of Projects at various locations
within the state of Gujarat, India.
The assignments handled:
There were about 160 industrial estates of varying sizes and at various developmental stages spread
across Gujarat State.
Site in-charge for execution of Infrastructure and Developmental works of Industrial estates viz.
Networks of Roads, Water, Power, Underground Drainage, Factory Sheds, and Housing quarters
Review of Design, Estimation, Tender Documents of various work packages
Contracts Management - Contractors & vendors finalization, Certification of payments.
Monitoring and Review of periodical progress reports, cash flows & Budgets
Review and approval of plans for development works & industrial activities in industrial plots
Review and Appraisal of Project Proposals and Cost Estimates of developmental works and Profitability
analysis for the same
Review of Policies relating to valuation of buildings, inventories, cost sharing, Recoveries, planning of
estates & services
Provided regular updates and potential risk areas that may affect the Development works with
suggesting remedial measures to mitigate adverse impact on profitability.
October 1984 to November 1985:
Assistant Engineer with Govt. of Gujarat – Water Resources department
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 6 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
9. Responsible for Site Survey, investigation and Design of for Minor Irrigation schemes in Kutch District and
prepared cost estimates for viable schemes.
Some Example of Projects directly worked with
Asmakh Mall in Al Sadd Area, DOHA, QATAR Residential Towers in Pearl Qatar, QATAR
Built-up Area: 360,000 sq.ft Client: The Land / Al Arrab Contracting
Client: Mr. Ibrahim Asmakh Consultant: The Land Developments
Consultant: GHD Global
Rayyan Tower (B+G+19) in Asmakh Tower (B+G+26) in West Hilton Hotel (B+G+26) in West
West Bay, DOHA, QATAR bay, DOHA, QATAR Bay DOHA, QATAR
Client: Mr. Ali Bin Syed Al Client: Mr. Ibrahim Asmakh Client:Sh. Khalid Bin Hamad Al
Khayarin Consultant: GHD Global Thani (New Doha Hotels Co)
Consultant: Arab Engineering Consultant: MZ & Partners
Bureau
First private Port in India at Mundra-Kutch, Gujarat State, India developed by M/s Adani Port Ltd – All
Weather port capable of handling 80,000 DWT vessels – work packages consisted of Roads, Land
Reclamation, Jetty (with draft of about 20 mtrs) Cargo Conveyor systems, Dry Cargo Storages Open &
covered, Pipe lines from Jetty to Storage, Chemical Storage & Distribution terminals, Railway line and
general Marine works. The Port was fully operational since year 2000.
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 7 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
11. 5B+G+39 Resi. & Commercial Tower C2-Jumeirah Lake 2B+7P+42 Commercial PARK Towers,Plot PB - 02
Towers, Dubai ,DIFC Dubai
Client: Star Giga Establishment Client: Damac Properties
Consultant: Design & Architecture Bureau (DAR) Consultant: Engineering Consultants Group
Project Cost AED 174 Mn Project Cost : AED 570 Mn
Project by SP – ASCON JV Project by SP
2B+G+8 CENTRO HOTEL -AL BARSHA B+G+8 + Health Club Floors UTMOST RESIDENTIAL
Client: MR.Youssuf Mohd.Ali Al Nowais. DEVELOPMENT at Al Barsha
Consultants: Nassar Engineering Services(NES) & Ian Client: THE UTMOST PROPERTIES
Banham & Associates (IBA) Consultants: SCHUSTER PECHTOLD
Project Cost: AED 119 Mn Project Cost: AED 67 Mn
Project by SP
B+G+5 Floors TAJ GRANDEUR RESIDENCES AT Plot B+G+M+7 Floors Taj Exotica Beach Resort, SPA & Villas
C-06 AT THE PALM, JUMERIAH at Plot C-07 AT THE PALM, JUMERIAH
Client: ETA Star Properties Development LLC Client: ETA Star Properties Development LLC
Consultants: ARCHGROUP & Ian Banham & Associates Consultants: ARCHGROUP & Ian Banham & Associates
(IBA) (IBA)
Project Cost: AED 325 Mn Project Cost: AED 441 Mn
Project by SP – ASCON JV Project by SP – ASCON JV
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 9 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com
12. G+8 Storied Residential Buildings 15 nos package 5 & 6 Between Two Bridges (B2B) Hotel & Resort, & 18 Villas
at Tijara Town on Dubai-Al Ain Road at Umm Al Nar, Abu Dhabi
Client: Dubai Properties Client: Al Fahim
Consultant: Al Hasmi & PMDC Consultants: Al Burj Engineering Consultants & Jain
Project Cost: AED 852 Mn Consultants International Inc.
Project by: SP Project Cost: AED 748 Mn
Project by : SP
----------------------------------------------------------------------------------------------------------------------------------------------
KISHAN SOLANKI page 10 of 9
PO BOX 47804, Abu Dhabi, UAE
MOB. 00971 50 7396163 (UAE) kishan_solanki@rediffmail.com, kishan_solanki@yahoo.com