SlideShare a Scribd company logo
1 of 46
Download to read offline
CIN No. U40105DL2009GOI188682
ड क
ं ोलर ऑफ इं डया ल मटेड
(भारत सरकार का उ यम)
भूतपूव पावर स टम ऑपरेशन कारपोरेशन ल मटेड
GRID CONTROLLER OF INDIA LIMITED
(A Government of India Enterprise)
Erstwhile POWER SYSTEM OPERATION CORPORATION LIMITED
द ण े ीय लोड ड पेच क
े , 29, रेस कोस ास रोड, बगलूर – 560 009
SOUTHERN REGIONAL LOAD DESPATCH CENTRE, 29, RACE COURSE CROSS ROAD, BENGALURU – 560 009
संदभ. द. े.भा. े.क
े /एसओ/2023-24/D-01 िदनांक:17-अग त-2023
Ref No. SRLDC/SO/2023-24/D-01 Date: 17 August 2023
सेवा म / To,
सूची क
े अनुसार / As per list
वषय : द ण े ीय भार ेषण क
े क जुलाई 2023 माह क णाल चालन रपोट ।
Sub: System Operation Report of SRLDC for the month of July 2023
महोदय / Sir,
आपको सू चत कया जाता है क द ण े ीय भार ेषण क
े क जुलाई 2023 माह
क णाल चालन रपोट वेब साइट www.srldc.in पर उपल ध है ।
This is to inform you that System Operation Report of Southern Regional Load
Despatch Centre for the month of July 2023 is available in the website www.srldc.in.
आगे भी हर माह क णाल चालन रपोट इसी वेब साइट पर उपल ध रहेगी ।
The system operation report of every month will be available in the same website
in future also.
ध यवाद स हत / With Regards,
Yours Faithfully
(ट ी नवास / T Srinivas)
मु य महा बंधक / CGM
एसओ-II / SO-II
प्रणाली प्रचालन वििरण
SYSTEM OPERATION REPORT
SOUTHERN REGION 2023-24
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
GRID CONTROLLER OF INDIA LIMITED
JULY 2023 BANGALORE
JULY 2023
Document Management Information
Document Effective Date: 17 August 2023
Classification
Modification History
Sr. No Description Date of Change Version No.
1 System Operation Report – July 2023 17 August 2023 00
Departmental Procedure Document Number
(Based on ISO 9001:2008) SRLDC/SO/D-01/SYSTEM OPERATION REPORT
Prepared By: Checked By Approved by: Issued by:
Ch.Manager (SO-2) DGM (SO-2) CGM (SO-2) MR (SRLDC)
MAX MIN AVG <49.9
49.9-
50.05
>50.05 FVI STD_DEV
01-Jul-23 50.23 49.75 49.99 8.84 72.60 18.55 0.045 0.067
02-Jul-23 50.27 49.62 49.98 12.53 71.55 15.91 0.073 0.084
03-Jul-23 50.20 49.58 49.98 11.26 71.89 16.85 0.072 0.083
04-Jul-23 50.26 49.83 50.02 2.49 71.79 25.72 0.035 0.057
05-Jul-23 50.23 49.77 50.01 4.47 67.50 28.03 0.048 0.068
06-Jul-23 50.23 49.77 50.01 5.21 68.35 26.45 0.047 0.067
07-Jul-23 50.25 49.79 50.01 4.93 72.86 22.21 0.039 0.063
08-Jul-23 50.30 49.78 50.01 5.38 69.90 24.72 0.042 0.064
09-Jul-23 50.20 49.74 50.00 4.27 79.83 15.90 0.033 0.058
10-Jul-23 50.31 49.70 50.01 7.36 62.80 29.84 0.061 0.077
11-Jul-23 50.20 49.73 50.01 4.51 74.68 20.81 0.036 0.059
12-Jul-23 50.21 49.71 50.00 7.51 74.46 18.03 0.046 0.068
13-Jul-23 50.15 49.73 50.01 4.71 70.85 24.44 0.037 0.060
14-Jul-23 50.26 49.83 50.03 1.40 71.74 26.86 0.045 0.062
15-Jul-23 50.18 49.83 50.01 3.44 76.98 19.58 0.032 0.056
16-Jul-23 50.15 49.82 50.00 2.95 83.83 13.22 0.023 0.048
17-Jul-23 50.19 49.73 50.00 3.44 79.87 16.69 0.028 0.053
18-Jul-23 50.20 49.76 50.00 5.48 81.15 13.38 0.029 0.054
19-Jul-23 50.19 49.76 50.01 3.47 79.39 17.14 0.028 0.053
20-Jul-23 50.25 49.83 50.01 2.89 79.98 17.13 0.026 0.051
21-Jul-23 50.16 49.79 49.99 6.12 83.47 10.41 0.029 0.053
22-Jul-23 50.17 49.79 50.01 3.55 77.49 18.96 0.028 0.052
23-Jul-23 50.26 49.77 50.01 3.53 76.24 20.23 0.034 0.058
24-Jul-23 50.22 49.75 50.00 3.01 79.25 17.74 0.031 0.055
25-Jul-23 50.15 49.66 50.00 5.51 79.24 15.26 0.035 0.059
26-Jul-23 50.31 49.82 50.02 1.59 71.55 26.86 0.047 0.064
27-Jul-23 50.20 49.84 50.01 1.83 77.60 20.57 0.025 0.049
28-Jul-23 50.19 49.87 50.01 0.46 83.48 16.05 0.022 0.045
29-Jul-23 50.39 49.76 50.02 2.93 75.63 21.45 0.076 0.085
30-Jul-23 50.42 49.70 50.04 2.64 66.79 30.57 0.104 0.095
31-Jul-23 50.17 49.74 50.01 4.98 71.03 23.99 0.036 0.058
AVERAGE 50.23 49.76 50.01 4.60 74.96 20.44 0.04 0.06
MAX 50.42 30-07-2023 30-07-2023 0.104 0.095
MIN 03-07-2023 49.58 28-07-2023 0.022 0.045
FREQUENCY PROFILE FOR July-2023
49.30
49.50
49.70
49.90
50.10
50.30
50.50 01-Jul-23
03-Jul-23
05-Jul-23
07-Jul-23
09-Jul-23
11-Jul-23
13-Jul-23
15-Jul-23
17-Jul-23
19-Jul-23
21-Jul-23
23-Jul-23
25-Jul-23
27-Jul-23
29-Jul-23
31-Jul-23
Frequency
(Hz)
Days
Frequency Profile for Jul 2023
MAX MIN AVG
ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMIL NADU
(I) GENERATION DETAILS:(MU)
HYDRO 171 106 751 510 366
THERMAL 2736 2774 1581 1962
DIESEL 0 0 0 0 0
GAS 0 165
TOTAL 2907 2880 2332 510 2493
INDEPENDENT P.P * 64 161 212 37 226
WIND 1802 55 1691 23 2828
SOLAR 299 404 605 30 866
CAPTIVE PLANTS * * 0 0 0 0 0
TOTAL DRAWALS INCL HVDC 1262 2989 1358 1708 4494
(II)ACTUAL CONSUMPTION (MU) 6334 6489 6198 2307 10907
(III) MAXIMUM DEMAND(MW) 11584 12610 12359 3999 17774
MAX DEMAND ON DATE 02-07-2023 14-07-2023 15-07-2023 31-07-2023 31-07-2023
MAX DEMAND AT TIME 12:30 07:48 11:00 19:00 16:00
FREQUENCY OF MAX DEMAND 49.89 50.12 50.01 50.06 50.03
MW DATE TIME FREQUENCY
54211 17-Jul-2023 10:25:20 50.03
SR GRID SUMMARY FOR THE MONTH OF July-2023
REGIONAL MAXIMUM DEMAND:
DATE
Act.
Drawal
Net Schd
Act.
Drawal
Net Schd
Act.
Drawal
Net Schd
Act.
Drawal
Net Schd
Act.
Drawal
Net Schd
Act.
Drawal
Net Schd
01-Jul-23 68.60 68.66 91.43 90.12 59.15 57.88 65.78 63.79 169.48 173.21 9.61 9.93
02-Jul-23 57.47 58.34 94.82 94.69 54.86 53.49 61.32 59.31 139.30 146.17 8.34 8.65
03-Jul-23 49.23 51.37 104.09 102.27 77.96 76.14 57.74 56.45 116.95 121.01 8.66 8.83
04-Jul-23 39.63 37.58 118.57 116.70 64.46 63.18 54.18 53.50 102.03 108.57 7.41 8.07
05-Jul-23 34.94 34.89 108.95 109.30 63.61 64.36 47.77 46.01 116.68 120.56 8.52 8.93
06-Jul-23 23.59 25.42 109.05 109.40 48.85 52.42 49.54 48.58 132.70 138.10 8.76 8.68
07-Jul-23 39.44 39.64 101.09 99.55 45.96 46.17 50.55 49.29 156.75 162.40 9.36 9.35
08-Jul-23 44.39 43.22 100.01 98.12 45.06 44.83 52.68 51.43 164.55 167.02 9.63 9.64
09-Jul-23 53.07 53.41 95.44 95.57 43.91 43.29 48.00 46.60 146.26 152.77 8.87 9.46
10-Jul-23 61.97 60.97 106.13 104.60 61.08 58.07 53.12 50.57 175.75 177.08 8.84 9.23
11-Jul-23 48.44 46.65 107.92 107.45 64.73 63.67 57.45 55.57 165.42 170.03 8.94 9.18
12-Jul-23 62.10 59.98 116.00 113.48 69.44 69.82 58.59 56.22 159.88 162.72 9.03 9.18
13-Jul-23 49.98 51.39 131.66 128.90 64.91 63.09 57.56 55.85 149.72 153.11 9.34 9.52
14-Jul-23 34.97 33.59 149.53 149.16 60.44 60.68 56.84 55.22 156.45 158.56 9.36 9.69
15-Jul-23 65.24 64.10 143.96 145.39 62.11 62.30 56.33 54.96 161.56 162.96 9.72 9.82
16-Jul-23 58.84 59.45 124.25 124.09 53.98 54.28 55.06 53.29 152.25 153.41 8.93 9.28
17-Jul-23 47.08 46.81 123.82 122.87 54.70 54.76 56.33 54.75 154.69 157.06 9.30 9.40
18-Jul-23 26.95 30.18 98.24 101.08 45.57 48.25 61.27 60.08 142.17 145.88 9.54 9.96
19-Jul-23 23.66 22.90 75.60 74.84 21.10 23.51 57.04 55.53 149.35 152.33 9.34 9.60
20-Jul-23 20.43 22.14 62.53 64.05 21.90 24.25 57.26 55.54 139.36 145.05 9.30 9.12
21-Jul-23 18.81 18.98 53.65 51.65 40.84 38.87 58.72 57.13 145.03 146.41 9.35 9.35
22-Jul-23 21.72 22.86 67.90 67.34 34.72 36.91 58.34 57.31 145.66 147.80 9.31 9.49
23-Jul-23 20.63 22.86 87.07 88.11 10.39 13.88 52.79 52.51 122.17 133.90 8.48 9.09
24-Jul-23 38.86 35.56 87.57 86.63 7.33 8.16 49.92 49.14 126.62 131.75 8.66 9.13
25-Jul-23 32.72 32.37 68.03 67.73 24.63 24.72 50.19 49.85 129.78 128.69 8.90 8.94
26-Jul-23 27.15 26.95 66.00 65.14 19.22 19.83 47.91 46.30 128.87 132.20 8.99 9.17
27-Jul-23 20.79 23.14 40.90 42.65 14.35 17.37 48.07 46.66 139.87 141.37 9.37 9.65
28-Jul-23 30.44 31.91 67.13 66.09 23.51 24.71 54.42 53.03 151.28 153.47 9.86 10.07
29-Jul-23 33.13 34.44 90.01 88.12 27.66 26.57 57.98 56.95 158.72 159.54 9.95 10.39
30-Jul-23 48.53 48.06 99.37 97.29 27.83 26.99 55.59 54.68 139.46 143.55 9.12 9.94
31-Jul-23 59.49 58.36 98.67 99.07 43.75 41.84 59.69 58.35 154.78 156.67 9.80 10.21
1262.29 1266.18 2989.39 2971.45 1358.01 1364.29 1708.03 1664.45 4493.54 4603.35 282.59 290.95
NET DRAWAL SCHEDULE AND ACTUAL DRAWAL FOR THE MONTH OF July-2023
ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00
Schedules Jul 2023
ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00
ISTS Drawal Profile Jul 2023
ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY
ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R
DEMAND DEMAND DEMAND DEMAND DEMAND DEMAND DEMAND
01-Jul-23 11560 10356 12037 3921 17381 470 53487
02-Jul-23 11584 9962 11135 3502 15217 405 50038
03-Jul-23 11276 11415 12232 3443 16258 419 53581
04-Jul-23 10314 11616 11484 3334 16185 408 51098
05-Jul-23 9740 10853 10787 3413 16159 415 49315
06-Jul-23 9129 11078 10630 3565 16175 417 49179
07-Jul-23 9823 11496 10636 3600 16465 447 50560
08-Jul-23 9758 11144 10913 3548 16969 449 50817
09-Jul-23 10639 11026 9527 3487 14934 430 47939
10-Jul-23 10800 12335 11454 3862 16331 433 53120
11-Jul-23 10138 11571 11718 3856 15810 427 51032
12-Jul-23 10322 11979 12010 3941 16008 463 52236
13-Jul-23 9557 12415 11970 3802 15631 438 51417
14-Jul-23 10075 12610 12038 3815 16221 456 53354
15-Jul-23 9936 12489 12359 3847 16302 475 53196
16-Jul-23 9978 11895 10580 3619 15128 430 50410
17-Jul-23 9939 12134 12053 3906 16762 455 54211
18-Jul-23 9403 10595 11004 3906 17025 462 50170
19-Jul-23 8893 10039 10657 3891 16797 431 49123
20-Jul-23 9013 8984 10512 3961 17070 452 47915
21-Jul-23 8858 8029 10808 3929 17190 452 48235
22-Jul-23 9317 8946 10120 3608 17488 439 48489
23-Jul-23 8984 9952 9074 3167 14980 410 45754
24-Jul-23 9013 10227 9291 3353 16108 407 47620
25-Jul-23 8236 8500 8425 3566 15827 432 43981
26-Jul-23 7902 8468 8903 3613 15901 441 43427
27-Jul-23 8261 6830 8577 3593 16548 463 44102
28-Jul-23 8502 8325 9478 3698 17162 472 45619
29-Jul-23 8891 9626 9568 3795 17455 462 49034
30-Jul-23 9306 10340 8806 3572 15886 455 46758
31-Jul-23 9958 11109 10594 3999 17774 492 52196
AVG 9649 10527 10625 3681 16360 442 49594
MAX 11584 12610 12359 3999 17774 492 54211
MIN 7902 6830 8425 3167 14934 405 43427
17.DEMAND
MAX DEMAND FOR THE MONTH OF July-2023
DATE
0
10000
20000
30000
40000
50000
60000
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
MW
Peak Demand during Jul 2023
ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R
ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R
CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT
01-Jul-23 240.01 209.79 224.90 78.49 376.90 10.37 1140.46
02-Jul-23 239.08 204.96 211.44 71.72 337.16 9.01 1073.37
03-Jul-23 226.65 221.41 222.63 71.97 346.19 9.34 1098.19
04-Jul-23 213.68 229.95 219.08 68.81 339.09 8.10 1078.71
05-Jul-23 207.68 212.26 212.04 66.22 342.84 9.22 1050.26
06-Jul-23 201.31 217.44 203.11 68.84 345.06 9.48 1045.24
07-Jul-23 207.72 218.03 203.66 71.27 358.43 10.09 1069.20
08-Jul-23 209.40 216.93 203.07 70.77 360.60 10.23 1071.00
09-Jul-23 217.09 215.85 188.32 67.28 331.59 9.57 1029.70
10-Jul-23 219.26 235.09 214.99 76.28 343.14 9.50 1098.26
11-Jul-23 216.07 226.79 218.97 78.26 328.44 9.59 1078.12
12-Jul-23 213.58 232.21 221.66 78.50 338.67 9.62 1094.24
13-Jul-23 207.11 244.06 220.54 77.85 336.30 9.95 1095.81
14-Jul-23 212.35 260.07 222.65 76.54 349.53 10.08 1131.22
15-Jul-23 216.26 251.22 222.89 77.79 355.50 10.49 1134.15
16-Jul-23 211.34 239.71 202.94 73.15 337.36 9.65 1074.15
17-Jul-23 211.48 246.05 215.57 79.38 356.96 10.03 1119.47
18-Jul-23 199.81 210.59 206.95 79.97 365.85 10.27 1073.44
19-Jul-23 193.66 189.90 201.62 78.32 368.63 10.07 1042.20
20-Jul-23 191.28 175.24 195.93 87.96 363.52 10.04 1023.97
21-Jul-23 195.04 165.35 202.40 80.58 374.86 10.07 1028.30
22-Jul-23 197.00 184.43 193.61 75.90 373.33 10.08 1034.35
23-Jul-23 191.30 203.42 170.45 67.14 336.84 9.20 978.35
24-Jul-23 190.02 200.71 177.88 70.67 337.91 9.37 986.56
25-Jul-23 178.45 172.82 172.26 72.10 336.04 9.64 941.31
26-Jul-23 170.52 170.06 170.41 71.64 339.21 9.51 931.35
27-Jul-23 171.24 142.93 166.31 71.25 349.45 9.91 911.09
28-Jul-23 184.56 169.05 175.30 73.75 366.83 10.59 980.08
29-Jul-23 194.66 197.35 173.60 75.58 376.26 10.67 1028.12
30-Jul-23 199.25 210.11 166.33 70.72 355.67 9.84 1011.92
31-Jul-23 207.22 215.12 196.79 78.75 378.75 10.52 1087.15
AVG 204.33 209.32 199.95 74.43 351.84 9.81 1049.67
MAX 240.01 260.07 224.90 87.96 378.75 10.67 1140.46
MIN 170.52 142.93 166.31 66.22 328.44 8.10 911.09
TOTAL 6334.08 6488.90 6198.30 2307.45 10906.91 304.10 32539.74
CONSUMPTION FOR THE MONTH OF July-2023
DATE
0
200
400
600
800
1000
1200
0
50
100
150
200
250
300
350
400
01/07/23
02/07/23
03/07/23
04/07/23
05/07/23
06/07/23
07/07/23
08/07/23
09/07/23
10/07/23
11/07/23
12/07/23
13/07/23
14/07/23
15/07/23
16/07/23
17/07/23
18/07/23
19/07/23
20/07/23
21/07/23
22/07/23
23/07/23
24/07/23
25/07/23
26/07/23
27/07/23
28/07/23
29/07/23
30/07/23
31/07/23
MU
Consumption of States and Region during Jul 2023
ANDHRA CONSMPT TELANGANA CONSMPT KARNATAKA CONSMPT
KERALA CONSMPT TAMILNADU CONSMPT S.R CONSMPT
0
200
400
600
800
1000
1200
01/Jul
02/Jul
03/Jul
04/Jul
05/Jul
06/Jul
07/Jul
08/Jul
09/Jul
10/Jul
11/Jul
12/Jul
13/Jul
14/Jul
15/Jul
16/Jul
17/Jul
18/Jul
19/Jul
20/Jul
21/Jul
22/Jul
23/Jul
24/Jul
25/Jul
26/Jul
27/Jul
28/Jul
29/Jul
30/Jul
31/Jul
ENERGY
IN
MUs
-->
DAYS -->
REGIONAL AVAILABILITY DURING THE MONTH OF JULY 2023
ISGS ISGS + STATE_THERMAL ISGS+STATE_THERMAL+STATE_HYDRO CONSUMPTION
1) IMPORTANT EVENTS 01-07-2023
A)CHARGING/COMMISSIONING OF NEW GENERATING UNITS
SL.NO. STATE/ISGS STATION NAME TYPE CAPACITY (MW)
1 ISGS Tuticorin Wind 40.50
2 STATE Karnataka Wind 64.00
3 STATE Karnataka Solar 138.82
4 STATE Kerala Wind 0.25
5 STATE Kerala Solar 24.01
6 STATE Tamil Nadu Wind 19.50
7 STATE Tamil Nadu Solar 107.99
B)CHARGING/COMMISSIONING OF NEW TRANSMISSION LINES
SL.NO. OWNER kV Length (km) Conductor Type DATE
1 KPTCL 400 122.75 QUAD ACSR MOOSE 5-Jul-23
2 WKTL 765 167.72 HEXA ZEBRA 12-Jul-23
3 WKTL 765 167.72 HEXA ZEBRA 13-Jul-23
C)LILO/Re-Arrangement OF TRANSMISSION LINES
SL.NO. CONSTITUENT kV Length (km) Conductor Type DATE
NIL
D)CHARGING/COMMISSIONING OF NEW ICTs
SL.NO. CONSTITUENT ICT- NUMBER kV RATIO CAPACITY (MVA) DATE
1 PGCIL SR-2 3 400/220 500 13-Jul-23
E) CHARGING/COMMISSIONING OF NEW SUBSTATIONS
SL.NO. CONSTITUENT kV RATIO CAPACITY (MVA) DATE
NIL
F)CHARGING/COMMISSIONING OF REACTORS/STATCOM/FILTER BANK
SL.NO. OWNER Rating CAPACITY (MVAR) Element Name DATE
NIL
FREQUENCY (HZ) DATE FVI DATE
MAXIMUM 50.42 30-Jul-23 0.10 30-Jul-23
MINIMUM 49.58 03-Jul-23 0.02 28-Jul-23
AVERAGE 50.01 0.04
b) FREQUENCY DISTRIBUTION FOR THE MONTH
The frequency ranges as a percentage of time during the month
%TIME FREQUENCY < 49.9 49.90-50.05 >50.05
% 4.60 74.96 20.44
3) POWER SUPPLY POSITION FOR THE MONTH
AP TG KAR KER TN PONDY REGION
UNRESTRICTED PEAK
DEMAND(MW)
11619 12629 12359 3999 17774 492 54211
PEAK DEMAND MET
(MW)
11584 12610 12359 3999 17774 492 54211
UNRESTRICTED ENERGY
REQMT(MU)
6334 6407 6116 2281 10800 301 32239
ENERGY MET (MU) 6334 6489 6198 2307 10907 304 32540
400kV YTPS - Kalburgi - 2
LINE NAME & CKT NO.
766 KV Kurnool-Maheshwaram - 2
STATION NAME
STATION/LINE NAME
LINE NAME / LILO at
765 KV Kurnool-Maheshwaram - 1
400kV KOCHI
STATION NAME
REMARKS
1. 18.9 MW w.e.f 06.07.2023 00:00 Hrs.
2. 21.6 MW w.e.f 29.07.2023 00:00 Hrs
B) DETAILED REPORTS.
1. Detailed State wise breakup of installed capacity (MW)
AGENCY GAS DIESEL
ANDHRA PRADESH 272
__
TELANGANA
__ __
KARNATAKA
__
0
KERALA
__
160
TAMILNADU 516
__
PONDICHERRY 33
__
CENTRAL SECTOR 0
__
PRIVATE 3781.8
__
TOTAL 4602 160
* The Installed Capacity is reconciled with the data received from states
2. SALIENT FEATURES OF SYSTEM CONDITIONS.
Jul-2022 7085 8733 32.5 18345 62847 112385
Jul-2023 7885 8733 32.5 18345 66899 118309
% INCREASE (i) 11.29 0.00 0.00 0.00 6.45 5.27
ENERGY (GROSS)
Unrestricted
Requirement(MU)
Jul-2022 5722 5342
Jul-2023 6334 6116
Energy Availability (MU)
Jul-2022 5722 5371
Jul-2023 6334 6198
Shortage(-)/
Surplus(+)
Jul 2022 (MU) / % 0 / (-0.00) 28 / -(-0.53)
Jul 2023 (MU) / % 0 / (-0.00) 82 / -(-1.34)
DEMAND
Unrestricted
Demand (MW)
Jul-2022 9805 10855
Jul-2023 11619 12359
Availability (MW)
Jul-2022 9763 10855
Jul-2023 11584 12359
Shortage(-)/
Surplus(+)
APTRNSCO KPTCL
Jul 2022 (MW) / % -42 / (-0.43) 0 / (-0.00)
Jul 2023 (MW) / % -35 / (-0.30) 0 / (-0.00)
470
-19 / (-0.15)
2106
2281
12610 3999
TELANGANA
0 / (-0.00)
TNEB
12486
54211
48810
492
2116
48810
REGIONAL
292
10142
301 / -(-0.93)
10 / -(-0.47)
0 / (-0.00)
-18 / (-0.14)
17774
0 / (-0.00)
3999
54211
REGIONAL
KSSB
12468
APTRANSCO KPTCL
82 / -(-1.28)
INSTALLED CAPACITY DERATED
(MW)
APTRANSCO KPTCL
28 / -(-0.52)
5325
TELANGANA
-29 / (-0.18)
KSEB
PONDY
469
0 / (-0.00)
492
12629
17774
16235
5
13
0 / (-0.00)
16206
-1 / (-0.18)
0 / (-0.00)
TNEB PONDY
304
105 / -(-0.36)
10907
38 / -(-0.38)
2307
3 / -(-1.01)
107 / -(-0.99)
27 / -(-1.17)
291
10800
6489
1 / -(-0.38)
6407 301
10104
5298
32540
TOTAL
--- 7885
--- 8733
NUCLEAR
6485
---
28968
RE/OTHERS
HYDRO
1798
2157
THERMAL
---
5810
2442 4043 1
34
2330
--- 33
---
---
7600
---
9.08
---
KSEB
5020
3679
66899
---
2222
135
49461
TELANGANA
6485
---
4845 17
APTRANSCO KPTCL
TELANGANA
13416
12538
7.42
REGIONAL
TNEB
2322
KSEB
2330
TNEB
CENTRAL
SECTOR
PONDY
0.34
5945
47146
IPP
3320
14890
---
1118
18345
49666
3320
3662
3662
118310
32239
REGIONAL
PONDY
7600
7075
28863
3) PERFORMANCE OF CONSTITUENTS
Jul-23
From 01-04-2023
To 31-07-2023
1 MACHKUND (3x23+3x17)x70% = 84.00 44.40 145.25
2 T.B.DAM (8x9)x80% = 57.60 0.97 3.56
3 UPPER SILERU 4x60 = 240.00 0.00 62.48
4 DONKARAYI 1x25 = 25.00 36.44 74.31
5 LOWER SILERU 4x115 = 460.00 1.62 177.70
6 SRISAILAM RBPH 7x110 = 770.00 89.19 173.04
7 NSR RT.CANAL.P.H 3x30 = 90.00 0.02 0.12
8 PENNA AHOBILAM 2x10 = 20.00 0.00 0.00
9
Mini Hydro(Chettipet2x0.5) & Nagarjunasagar
Tailpond
1+2x25 = 51.00 0.00 0.32
TOTAL 1797.600 172.643 636.764
1 VIJAYAWADA 6x210 + 1x500 = 1760.00 917.33 4167.30
2 RAYALASEEMA 5x210+1X600 = 1650.00 773.75 3485.82
3 KRISHNAPATNAM 3x800 = 2400.00 799.05 3908.13
TOTAL 5810.000 2490.123 11561.251
1 VIJJESWARAM STAGE 1 (GAS) 2x33+1x34 = 100.00 0.00 0.00
2 VIJJESWARAM STAGE 2 (GAS) 1x112.5+1x59.5 = 172.00 0.00 0.00
TOTAL 272.000 0.000 0.000
1 SOLAR JURALA 5.43 = 5.43 0.00 0.00
2 Wind 0 = 0.00 0.00 0.00
TOTAL 5.430 0.000 0.000
1 MINI HYDRO 102.598 = 102.60 0.00 30.12
2 HINDUJA POWER CORPORATION LTD 2x520 = 1040.00 419.37 1782.87
1 GVK-I (Godavari Gas)(Jegurupadu) 2x45.8+1x48.9+1x75.5 = 216.82 0.00 0.00
2 GVKStg-II EXTENSION(GAS) 1x145+1x75 = 220.00 0.00 0.00
3 SPECTRUM (GAS) 1x46.8+2x46.1+1x68.88 = 208.31 0.00 0.00
4 LANCO (GAS) 2x115+1x125 = 351.49 0.00 0.00
5 ISOLATED GAS WELL (GAS) (LVS) 27.04 = 27.04 0.00 0.00
6 RELIANCE ENERGY LTD. (GAS) 1x140+1x80 = 220.00 0.00 0.00
7 VEMAGIRI POWER GENERATION LTD.(GAS) 1x233+1x137 = 370.00 0.00 0.00
8 GAUTAMI CCPP 2x145 + 1x174 = 464.00 0.00 0.00
9 KONASEEMA CCPP 145+140+165 = 444.08 0.00 0.00
10 GMR (BARG) 237 = 237.00 0.00 0.00
Total 2758.740 0.000 0.000
1 Solar 2871.59 = 2871.59 520.05 2596.91
3 WIND 4083.57 = 4083.57 1801.74 3924.10
4
BAGASSE+BIOMASS+WASTE BASED
PP+CO-GENERATION (NC)
488.9 = 488.90 50.00 180.98
5 MINI POWER PLANTS 82 = 82.00 14.29 26.29
RE Total 7526.060 2386.081 6728.272
TOTAL IPP 11427.398 2805.451 8541.264
TOTAL ANDHRA PRADESH 19312.428 5468.218 20739.279
Jul-23
From 01-04-2023
To 31-07-2023
ENERGY GENERATED BY GENERATING STATIONS / UNITS IN
SOUTHERN REGION DURING JUL 2023
ANDHRA PRADESH
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
THERMAL
GAS/NAPTHA/DIESEL
WIND/SOLAR
IPP
COAL
HYDRO
HYDRO
GAS/NAPTHA/DIESEL
WIND / SOLAR / OTHERS
TELANGANA
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
1 SRISAILAM LBPH 6x150 = 900.00 22.02 22.37
2 N'SAGAR 1x110+7x100.8 = 815.60 1.56 85.38
3 NSR LT.CANAL.P.H 2x30 = 60.00 53.41 100.15
4 NIZAMSAGAR 2x5 = 10.00 15.80 24.71
5 POCHAMPAD 4x9 = 36.00 0.00 3.13
6 SINGUR 2x7.5 = 15.00 0.54 1.77
7 JURALA 6x39 = 234.00 26.03 26.22
8 LOWER JURALA 6x40 = 240.00 0.00 0.28
9 PULICHINTALA 4x30 = 120.00 0.00 19.62
10 MINI HYDEL 11.16 = 11.16 3.63 4.62
TOTAL 2441.760 122.981 288.249
1 RAMAGUNDAM-B 1x62.5 = 62.50 0.00 50.31
2 KOTHAGUDEM-A 4x60 (Unit-1,2,3,4 Decomissioned) = 0.00 0.00 0.00
3 KOTHAGUDEM-B 2x120 (Unit-5,6 Decomissioned) = 0.00 0.00 0.00
4 KOTHAGUDEM-C 2x120 (Unit-7,8 Decomissioned) = 0.00 0.00 0.00
5 KOTHAGUDEM-D 2x250 = 500.00 27.98 612.03
6 KOTHAGUDEM ST VI 1x500 = 500.00 282.81 1215.56
6 KOTHAGUDEM ST VII 1X800 = 800.00 317.51 1700.81
7 KAKATIYA ST1&ST2 1x500+1x600 = 1100.00 877.88 3167.61
8 Bhadradri Thermal Power Plant 4X270 = 1080.00 710.66 2201.08
TOTAL 4042.500 2216.834 8947.401
1 Solar 1 = 1.00 0.00 0.00
2 Wind 0 = 0.00 0.00 0.00
TOTAL 1.000 0.000 0.000
1 MINI HYDRO(SMALL HYDRO) 39.86 = 39.86 0.01 0.01
1 SINGARENI TPS 2x600 = 1200.00 680.54 2592.98
1 Solar 5880.78 = 5880.78 773.94 3781.52
2
BAGASSE+BIOMASS+WASTE BASED
PP+CO-GENERATION (NC)
67.2+129.6+62.9 = 259.70 44.11 171.91
3 WIND 128.1 = 128.10 54.78 130.73
RE TOTAL 6268.580 872.834 4084.156
TOTAL IPP 7508.440 1553.386 6677.149
TOTAL TELANGANA 13993.700 3893.201 15912.800
Jul-23
From 01-04-2023
To 31-07-2023
1 SHARAVATHY 10x103.5 = 1035.00 197.23 1184.40
2 LINGANAMAKKI.P.H. 2x27.5 = 55.00 3.45 35.77
3 JOG (MGHES) 4x21.6+4x13.2 = 139.20 21.21 145.82
4 NAGJHERI 1x135+5x150 = 885.00 238.21 1108.99
5 SUPA 2x50 = 100.00 15.20 149.02
6 VARAHI 4x115 = 460.00 96.87 241.24
7 BHADRA POWER HOUSE 1x7+2x12.1+1x2+6 = 39.20 0.00 7.54
8 SIVANSAMUDRAM 6x3+4x6 = 42.00 9.01 32.98
9 SHIMSHA 2x8.6 = 17.20 0.00 7.60
10 MUNIRABAD 1x10 + 3x9 = 38.00 0.00 0.00
11 T.B.DAM SHARE (20 %) 8x9(20%) = 14.40 0.11 0.77
12 GHATAPRABHA 2x16 = 32.00 0.00 8.72
13 MANI DAM.P.H. 2x4.5 = 9.00 0.00 1.85
14 MINI HYDRO 1.4+0.35+2.7 = 4.45 0.00 0.00
15 MALLAPUR 2x4.5 = 9.00 0.00 0.00
16 KADRA 3x50 = 150.00 61.70 113.54
17 KODASALLI 3x40 = 120.00 43.12 134.85
18 SHARAVATHI TAIL RACE 4x60 = 240.00 38.77 146.30
19 ALMATTI 1x15+5x55 = 290.00 40.54 60.16
HYDRO
THERMAL
WIND/SOLAR
IPP
HYDRO
THERMAL
WIND / SOLAR / OTHERS
KARNATAKA
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
HYDRO
20 JURALA SHARE 4.43 4.43
TOTAL 3679.450 769.842 3383.994
1 RAICHUR.T.PS. 7x210 +1x250 = 1720.00 514.87 1886.82
2 BELLARY TPS 2x 500+1x700 = 1700.00 542.83 2128.81
3 YERAMARAS TPS 2x800 = 1600.00 538.23 1833.09
TOTAL 5020.00 1595.93 5848.71
1 SOLAR 34 = 34.00 2.46 12.62
2 Wind 0 = 0.00 1.07 2.46
TOTAL 34.00 3.536 15.079
1 MINI HYDEL 903.46 = 903.46 0.00 0.00
1 UPCL(THERMAL) 2x600 = 1200.00 91.94 966.74
2 JINDAL (COAL & COREX) 2x130+4x300 = 1460.00 42.76 587.16
3 MINI THERMAL 3.87 15.27
2660.00 138.57 1569.18
1 TATA ELECTRIC (DIESEL) 5x16.26* = 0.00 0.00 0.00
2 RAYAL SEEMA ALKALIES (DIESEL) 3x12* = 0.00 0.00 0.00
3 I T P L (DIESEL) 9* = 0.00 0.00 0.00
0.00 0.00 0.00
1 WIND MILL 5200.9 = 5200.90
2 CO-GENERATION 1731.16 = 1731.16
3 SOLAR 5719.65 = 5719.65
4 Bio mass 139.03 = 139.03
RE total 12790.74 2781.115 9290.286
TOTAL IPP 16354.20 2919.688 10859.464
TOTAL KARNATAKA 25087.650 5288.996 20107.251
Jul-23
From 01-04-2023
To 31-07-2023
1 KUTTIADI + EXTENTION + ADDL. EXTN. 3x25+ 1x50+2x50 = 225.00 88.71 200.16
2 SHOLAYAR 3x18 = 54.00 23.61 40.26
3 PORINGALKUTHU 4x9 = 36.00 11.43 18.31
4 PORIG. L. BANK 1x16 = 16.00 10.39 72.33
5 PALLIVASAL 3x7.5+3x5 = 37.50 4.93 78.65
6 SENGULAM 4x12 = 48.00 14.05 45.49
7 PANNIAR 2x16 = 32.00 18.69 26.35
8 NERIAMANGALAM + EXTENSION 3x17.5 +25 = 77.50 6.14 49.14
9 SABARIGIRI 2x60 + 4x55 = 340.00 39.34 92.67
10 IDUKKI 3x130+3x130 = 780.00 80.27 153.33
11 IDAMALAYAR 2x37.5 = 75.00 82.57 865.27
12 KALLADA 2x7.5 = 15.00 57.62 452.74
13 PEPPARA 3 = 3.00 14.94 73.47
14 MADUPETTY 2 = 2.00 2.53 8.42
15 MALAMPUZHA 1x2.5 = 2.50 0.00 0.59
16 Lower Periyar 3x60 = 180.00 0.02 1.65
17 KAKKAD 2x25 = 50.00 2.71 3.19
18 CHEMBUKADAVU 1x2.7+1x3.75 = 6.45 0.00 0.00
19 URUMI 3x1.25+3x0.8 = 6.15 1.24 2.31
20 Upper Kallar 2x1 = 2.00 0.63 3.85
21 MALANKARA 3 x 3.5 = 10.50 2.07 11.17
22 Lower meenmutty 2x1.5 + 1x0.5 = 3.50 0.60 1.29
23 Kuttiady tail race 3 x 1.25 = 3.75 0.86 2.03
24 Poozhithode 3 x 1.60 = 4.80 2.89 3.81
25 Ranni-Perunadu 2 x 2 = 4.00 0.83 3.11
26 Peechi 3x2.5 = 7.50 0.00 0.03
27 Vilangad 1 x 1.25+22.60 = 31.85 4.27 5.16
THERMAL
GAS/NAPTHA/DIESEL
WIND / SOLAR / OTHERS
2781.12 9290.29
KERALA
THERMAL
WIND/SOLAR
IPP
HYDRO
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
HYDRO
28 Chimmini 2.5 = 2.50 0.00 0.00
29 Adiyanpara 3.5 = 3.50 2.05 2.27
30 Vellathuval 3.6 = 3.60 0.93 1.63
31 Barapole 15 = 15.00 7.31 7.34
32 Perunthenaruvi 6 = 6.00 1.86 2.19
33 Kakkayam SHEP 10.5 = 10.50 1.14 2.56
34 Anakampoil 8 = 8.00 6.09 8.87
35 Arippara 4.5 = 4.50 2.86 4.10
36 Chathangottunada SHEP 6 = 6.00 2.86 3.50
37 Pallivasal Extension Scheme (PES) 37.5 37.50 15.88 34.29
38 Peruvannamuzhi 6 6.00 1.78 1.78
TOTAL 2157.10 514.106 2283.306
1 BRAHMAPURAM DGPP (DIESEL)* 3x21.32 = 63.96 0.00 0.00
2 KOZHIKODE DPP (DIESEL)* 6x16 = 96.00 0.00 0.00
TOTAL 159.96 0.000 0.000
1 WIND MILL 2.03 = 2.03 0.16 0.56
2 Solar 10.50 = 10.50 0.63 3.64
TOTAL 12.525 0.788 4.205
1 MANIYAR(CPP) 3x4 = 12.00 3.29 8.60
2 KUTHUNGAL(CPP) 3x7 = 21.00 1.82 12.61
3 ULLUNKAL(IPP) 2x3.5 = 7.00 1.70 6.44
4 IRUTTUKANAM(IPP) 1x3 = 3.00 3.88 7.44
5 KARIKKAYAM(IPP) 3 x 3.5 = 10.50 4.42 14.86
6 MEENVALLOM(IPP) 1 x 3 = 11.00 1.62 2.48
7 Pathankayam(IPP) 2x3.5+1x1 = 8.00 5.39 7.27
72.500 22.113 59.711
1 RGCCPP,KAYAMKULAM (KSEB) - NTPC 2x116.6(GT)+1x126.38(ST) = 359.58 0.00 0.00
2 BSES (NAPTHA) 3x40.5(GT)+1x35.5(ST) = 157.00 0.00 0.00
3 KASARGODE (DIESEL) 3x7.31(De Commissided) = 0.00 0.00 0.00
4 MPS STEEL CASTINGS(Co-gen)(IPP) 1x10 = 10.00 0.00 0.00
526.580 0.000 0.000
1 Wind 69.25 = 69.25 22.88 58.03
2 Solar 776.77 = 776.77 29.67 148.24
3 PCBL Thermal CPP 10 = 10.00 6.14 28.17
RE TOTAL 856.020 58.687 234.436
TOTAL IPP 1455.100 80.800 294.147
TOTAL KERALA 3784.685 595.693 2581.658
Jul-23
From 01-04-2023
To 31-07-2023
1 PYKARA 3x6.65+1x11+2x14 = 58.95 0.63 1.01
2 PYKARA MICRO 1x2 = 2.00 0.18 0.90
3 PYKARA ULTIMATE (PUSHEP) 3x50 = 150.00 26.98 87.99
4 MOYAR 3x12 = 36.00 6.90 26.87
5 MARAVAKANDI 1x0.75 = 0.75 0.06 0.20
6 KUNDAH-I 3x20 = 60.00 15.34 92.66
7 KUNDAH-II 5x35 = 175.00 45.93 238.37
8 KUNDAH-III 3x60 = 180.00 28.46 145.34
9 KUNDAH-IV 2x50 = 100.00 24.97 39.57
10 KUNDAH-V 2x20 = 40.00 3.55 31.90
11 SURULIYAR 1x35 = 35.00 0.00 0.00
12 KADAMPARAI 4x100 = 400.00 0.00 44.47
13 ALIYAR 1x60 = 60.00 9.69 31.11
14 POONACHI 1x2 = 2.00 0.32 0.39
15 METTUR DAM 4x12.5 = 50.00 14.02 52.74
GAS/NAPTHA/DIESEL
WIND
IPP
HYDRO
GAS/NAPTHA/DIESEL
WIND/OTHERS
TAMILNADU
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
HYDRO
16 METTUR TUNNEL 4x50 = 200.00 52.77 89.22
17 LOWER METTUR BARRIAGE - 1 TO 4 8x15 = 120.00 55.28 94.50
18 BHAVANISAGAR MICRO 4x2 = 8.00 5.28 15.37
19 PERIYAR 4x35 = 140.00 25.82 42.45
20 VAIGAI 2x3 = 6.00 0.00 0.23
21 PAPANASAM 4x8 = 32.00 7.71 8.73
22 SERVALAR 1x20 = 20.00 2.13 2.13
23 SARKARAPATHY 1x30 = 30.00 0.00 3.76
24 SHOLAYAR 2x35+25 = 95.00 1.02 1.02
25 KODAYAR 1x60+1x40 = 100.00 0.00 6.87
26 LOWER BHAVANISAGAR 2X4 = 8.00 0.00 3.13
27 SATHANUR DAM PH 1x7.5 = 7.50 0.00 4.99
28 KUNDAH-VI (Parson Valley) 1x30 = 30.00 1.76 1.76
29 MICRO TOTAL 0.70+1.95+2.5+4+1.3+5.25 = 15.70 1.36 1.65
30 BHAVANI KATTALAI BARRAGE - I & II 4x15 = 60.00 39.88 66.20
TOTAL 2221.900 370.032 1135.557
1 ENNORE.T.P.S* 2x60+3x110 = 0.00 0.00 0.00
2 TUTUCORIN.T.P.S 5x210 = 1050.00 457.11 2175.26
3 METTUR.T.P.S 4x210 + 1x600 = 1440.00 504.92 2943.65
4 NORTH CHENNAI T.P.S 3x210 + 2x600 = 1830.00 786.11 3373.43
5 SEPC PPL 525 = 525.00 267.14 805.57
TOTAL 4845.000 2015.283 9297.904
ENNORE.T.P.S* shutdown of Units permenently from 31.03.17
1 BASIN BRIDGE (NAPTHA) 4x30 = 120.00 0.00 0.00
2 KOVIL KALAPPAL (GAS) 1x70+1x37.88 = 107.88 12.73 47.27
3 VALUTHUR (GAS) STG1 1x60+1x35 = 95.00 59.75 230.80
4 VALUTHUR (GAS) STG2 1 x 60 + 1 x 32 = 92.00 49.22 182.00
5 KUTTALAM (GAS) 1x64+1x37 = 101.00 55.79 216.35
TOTAL 515.880 177.486 676.423
1 TNEB WIND MILL 17.465 = 17.47 0.00 0.00
2 Solar 0 = 0.00 0.00 0.00
TOTAL 17.465 0.000 0.000
1 NEYVELI-I (TN) - NLC 6x50+3x100* = 0.00 0.00 0.00
2 ST - CMS 250 = 250.00 149.40 592.01
250.000 149.396 592.014
1 GMR POWER (DIESEL) 4x49*# = 0.00 0.00 0.00
2 SAMALPATTY (DIESEL) 7x15.1*# = 0.00 0.00 0.00
3 MADURAI POWER CL (DIESEL) 106*# = 0.00 0.00 0.00
4 P P NALLUR (NAPTHA) 330.5 = 330.50 0.00 0.00
5 ABAN POWER (GAS)(LANCO) 74.41+38.81 = 113.20 0.00 129.94
6 ARKEY ENERGY(PENNA)(GAS)(PIONEER) 1x38 + 2x6.8 + 1x20 = 52.80 0.00 0.00
496.500 0.000 129.936
1 WIND MILL 8759.80 = 8759.80 2828.34 6336.13
2 SOLAR 6301.11 = 6301.11 865.90 3443.00
3 CO-GENERATION 711.00 = 711.00 1294.88
4 BIO-MASS & CPP 265.60 = 265.60 0.00
5 Captive Power Projects (CPPs) 895.00 = 895.00 0.000 0.00
RE TOTAL 16037.505 3920.166 11074.017
TOTAL IPP 17679.005 4069.562 11795.967
TOTAL TAMIL NADU 25279.250 6632.363 22905.851
THERMAL
COAL/LIGNITE
GAS/NAPTHA/DIESEL
WIND / SOLAR
IPP
LIGNITE/THERMAL
GAS/NAPTHA/DIESEL
WIND / SOLAR / OTHERS
225.930
PONDICHERRY
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
* NLC ST1 -U1 to U9 Decommissioned.
*# TANTRANSCO/TN SLDC vide communication dated 05.06.2023 had informed that the PPA with the Madurai PPCL(106MW), Samalpatty PCL(106
MW), GMR(196 MW), Penna and Aban-166 MW) have expired and the same may be removed from the Installed Capacity of TN.
Jul-23
From 01-04-2023
To 31-07-2023
1 KARAIKAL POWER PLANT (GAS) 22.9 + 9.6 = 32.50 0.00 0.00
TOTAL 32.50 0.00 0.00
TOTAL PONDICHERRY 32.500 0.000 0.000
1 LANCO KONDAPPILLI POWER LTD. ST2&ST3 233 + 133+2*(233 + 133) = 1098.00 0.00 0.00
2 SIMHAPURI ENERGY PVT LTD 4 x 150 = 600.00 198.04 720.23
3 MEENAKSHI ENERGY PVT LTD 2 x 150+1X350 = 650.00 0.00 0.00
4 COASTAL ENERGY 2x600 = 1200.00 200.10 1628.26
5 SEIL(TPCIL) 2x660 = 1320.00 827.70 3365.88
6 IL&FS 2x600 = 1200.00 316.09 2065.86
7 SEILP2(SGPL) 2x660 = 1320.00 788.72 3178.24
TOTAL 7388.000 2330.649 10958.465
TOTAL IPP UNDER OPEN ACCESS 7388.000 2330.649 10958.465
Jul-23
From 01-04-2023
To 31-07-2023
1 RAMAGUNDAM T.P.S (ISGS) - NTPC 3x200+4x500 = 2600 1408.33 5618.21
2 TALCHER STAGE II (ISGS) - NTPC 4x500 = 2000 1072.65 4869.47
3 SIMHADRI STAGE - I - NTPC 2x500 = 1000 482.32 1783.00
4 SIMHADRI STAGE - II - NTPC 2x500 = 1000 242.84 1517.37
5 VALLUR TPS - NTPC 3x500 = 1500 841.73 3184.51
6 NTPL 2X500 = 1000 338.86 1777.11
7 NTPC KUDGI 3x800 = 2400 744.24 3882.92
TOTAL 11500.000 5130.976 22632.602
8 NEYVELI-II (ISGS) - NLC 7x210 = 1470 383.27 1779.79
9 NEYVELI TPS-I (Expansion) (ISGS) - NLC 2x210 = 420 264.57 939.04
10 NEYVELI TPS-II (Expansion) (ISGS) - NLC 2 x 250 = 500 239.46 811.95
11 New Neyveli Thermal Power Project 2x500 = 1000 597.89 2464.77
TOTAL 3390.000 1485.188 5995.540
10 M.A.P.S KALPAKAM (ISGS) - NPC 2x220 = 440.00 0.00 480.88
11 KAIGA A.P.S (ISGS) - NPC 4x220 = 880.00 627.62 2437.21
12 KUDANKULAM A.P.S (ISGS) - NPC 2x1000 = 2000.00 943.54 3584.34
TOTAL 3320.000 1571.163 6502.435
13 RAMANGUNDAM 10.000 = 10.00 0.39 3.43
14 N P Kunta 1400.000 = 1400.00 195.31 999.52
15 PAVAGADA 2050.000 = 2050.00 298.99 1525.09
16 NTPC Ramagundam FSPP 100.000 = 100.00 12.64 68.55
17 NTPC Simhadri FSPP 25.000 = 25.00 1.46 12.57
18 TUTICORIN 380.000 = 380.00 71.74 276.61
TOTAL 3965.000 580.522 2885.781
19 TUTICORIN 1011.700 = 1090.10 490.76 1108.93
20 PUGALUR 300.000 = 300.00 138.56 304.89
21 HIRIYUR 300.300 = 300.30 156.10 352.59
TOTAL 1690.400 785.423 1766.415
TOTAL CENTRAL SECTOR 23865.400 9553.272 39782.774
GRAND TOTAL 118743.613 33762.393 132988.078
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
GAS/NAPTHA/DIESEL
IPP UNDER OPEN ACCESS
GAS/NAPTHA/DIESEL
CENTRAL SECTOR
SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)
ENERGY GENERATION
Note: Generation data received from RPC. REMC ISTS Wind and Solar based on REMC data
THERMAL
COAL
LIGNITE
NUCLEAR
SOLAR
WIND
ENERGY EXCHANGES
Seller/Buyer ANDHRAPRADESH ASSAM BALCO_WR BIHAR DELHI GOA-WR GOA-SR GUJARAT HARYANA JHARKHAND KARNATAKA KERALA
MAHARASHT
RA
NAGALAND ODISHA
PUDUCHERR
Y
RAJASTHAN TAMILNADU TELANGANA
UTTARPRADE
SH
UTTARPRADE
SH
Grand Total
NORTH(ABCREPL_BHDL2) 21.65 21.65
NORTH(AvSusRJPPL_BKN) 31.65 27.69 59.34
NORTH(DSNTPC_FTG2) 47.53 47.53
NORTH(KSPPNL_BHDL2) 81.01 81.01
NORTH(NOKHRANT_BHDL2) 57.41 57.41
NORTH(NSNTPC_FTG1) 62.68 62.68
NORTH(RSRPL_BKN) 0.14 2.82 2.95
NORTH(RSUPL_FTG2) 33.67 25.75 59.42
NORTH(TPSL_BKN) 22.62 22.62
SOUTH(ANP_AdaniAPSeven) 44.66 44.66
SOUTH(ANP_AthenaBhiwadi) 8.20 8.20
SOUTH(ANP_AthenaHisar) 8.20 8.20
SOUTH(ANP_AthenaKarnal) 8.21 8.21
SOUTH(ANP_AYANA) 42.75 42.75
SOUTH(ANP_AZURE) 7.09 7.09
SOUTH(ANP_IGS1) 8.47 8.47
SOUTH(ANP_IGS2) 8.57 8.57
SOUTH(ANP_NTPC) 26.88 26.88
SOUTH(Anp_SprngAgnitra) 43.53 43.53
SOUTH(ANP_TATARENEWABLE) 14.70 14.70
SOUTH(HIRIYUR_OSTROKANNADA) 0.15 104.43 0.99 0.72 0.50 0.08 0.60 0.21 3.45 3.00 3.26 5.67 123.06
SOUTH(NTPCRGDMFSP) 7.66 0.62 8.28
SOUTH(NTPCSIMHFSP) 4.87 4.87
SOUTH(NTPCSIMHFSP_STG1) 0.59 0.59
SOUTH(PGLR_SREPL) 162.20 162.20
SOUTH(PVG_AdaniKANine) 32.81 32.81
SOUTH(PVG_ADYAH) 49.57 49.57
SOUTH(PVG_AMPLUS_PAVAGADA) 8.11 8.11
SOUTH(PVG_AMPLUS_TUMKUR) 8.10 8.10
SOUTH(PVG_AVAADASOLAR) 22.41 22.41
SOUTH(PVG_AvaadaSolarise) 22.80 22.80
SOUTH(PVG_AzurePowerEarth) 16.89 16.89
SOUTH(PVG_FORTUMFINSURYA) 14.75 14.75
SOUTH(PVG_FortumSolar) 40.27 40.27
SOUTH(PVG_KREDL) 6.64 6.64
SOUTH(PVG_PARAMPUJYA) 23.91 23.91
SOUTH(PVG_ReNew_TN2) 8.08 8.08
SOUTH(PVG_TATARENEWABLE) 63.13 63.13
SOUTH(PVG_YARROW) 8.06 8.06
SOUTH(Tuticorin_BETAMWIND) 24.32 40.69 40.70 105.71
SOUTH(Tuticorin_GIREL) 23.79 23.79 23.79 47.54 118.92
SOUTH(Tuticorin_GRTJIPL) 29.81 29.81
SOUTH(Tuticorin_JSWRETwo) 62.94 62.94
SOUTH(Tuticorin_Mytrah) 22.70 22.70 22.70 45.40 113.51
SOUTH(Tuticorin_NTPCETPRM) 43.90 43.90
SOUTH(Tuticorin_Orange) 47.70 47.70 95.39
WEST(APRAAVA_KHKRDA_JAM_W) 13.15 13.15
WEST(AWEK1L) 19.87 19.87
WEST(GANDHAR_SOLAR) 2.10 2.10
WEST(KAWAS_SOLAR) 6.07 6.07
WEST(MASAYA_BWSPRA_KNDW_S) 14.42 14.42
WEST(SHERISHA_RAIPUR_S) 3.54 3.54
WEST(SITAC_CHUGGER_BHJ2_W) 33.05 33.05
Grand Total 221.27 22.70 0.15 252.75 24.78 7.66 0.86 0.50 47.70 46.58 296.88 42.49 0.21 9.53 43.70 67.85 62.94 68.58 371.39 5.67 328.65 1922.83
ISTS_Wind and Solar_ LTA Schedule Details for the month of July-2023
Seller/Buyer ANDHRAPRADESH BANGLADESH GOA-SR GOA-WR GUJARAT KARNATAKA KERALA TAMILNADU TELANGANA Grand Total
ANDHRAPRADESH(APTRANSCO) 0.00 0.00
ANDHRAPRADESH(NVVN_SOLAR_AP) 1.72 1.72
CHATTISGARH(MARWATPP) 0.00 0.00
DVC(KODERMA) 161.12 161.12
DVC(MEJB) 112.98 58.07 171.06
DVC(RTPS) 32.48 32.48
EAST(APNRL) 73.46 73.46
EAST(JITPL) 0.00 0.00
EAST(MPL) 197.35 197.35
GOA(GOA-SR) 0.11 0.11
GOA(GOAWR) 1.00 1.00
RAJASTHAN(RAJ_SOLAR) 6.79 6.79
SOUTH(COASTGEN) 185.60 185.60
SOUTH(ILFS) 291.13 291.13
SOUTH(SEIL) 154.93 579.94 734.87
SOUTH(SEILP2) 334.80 72.06 406.86
TELANGANA(TSTRANSCO) 0.00 0.00
WEST(BALCO) 53.14 102.70 155.84
WEST(DBPL) 201.95 201.95
WEST(DHARIWAL_ISTS) 63.93 63.93
WEST(GMRWARORA) 92.31 92.31
WEST(JHABUA_IPP) 86.50 86.50
WEST(JPL-2) 183.02 226.55 409.57
WEST(JPNIGRIE_JNSTPP) 36.75 36.75
WEST(KSK_MAHANADI) 335.71 335.71
WEST(MBMP) 0.00 0.00
WEST(NSPCL) 9.42 9.42
Grand Total 154.93 334.80 1.00 0.11 72.06 280.89 610.56 1619.50 581.67 3655.51
LTA and MTOA Schedule Details for the month of July-2023
Seller/Buyer AMNSIL_WR
ANDHRAPRADE
SH
ASSAM BALCO_WR BIHAR
DADRA&NAG
ARHAVELI
DELHI GOA-WR GUJARAT HARYANA JHARKHAND KARNATAKA KERALA
MAHARASHT
RA
ODISHA PUNJAB RAJASTHAN TAMILNADU TELANGANA
UTTARAKHA
ND
UTTARPRADE
SH
WESTBENGAL Grand Total
ANDHRAPRADESH(APCPDCL) 337.82 54.93 89.28 482.03
ANDHRAPRADESH(ITCWIND) 0.60 0.64 0.91 7.98 2.31 0.69 13.13
ANDHRAPRADESH(NALCOAP) 22.68 22.68
ANDHRAPRADESH(TADASWIND) 7.06 0.42 1.81 2.65 3.81 15.74
DELHI(BYPL) 0.77 0.77
EAST(APNRL) 0.33 1.64 1.97
EAST(DIKCHU) 6.11 8.75 14.86
EAST(GMRKEL) 56.52 56.52
EAST(Teesta_III) 3.06 54.50 88.65 50.20 196.40
Gujarat(APLStage-3(U-9)) 12.06 17.98 30.05
Gujarat(UNOSUGEN) 0.45 0.45
HIMACHALPRADESH(HP-GOVT) 1.86 1.86
HIMACHALPRADESH(MALANA) 0.67 1.40 2.07
KARNATAKA(CORSUGKRPET) 0.08 0.08
KARNATAKA(EDCLHARANGI) 1.25 1.25
KARNATAKA(GODAVARIBIOREF) 4.49 0.25 4.74
KARNATAKA(ICPLBAGALKOT) 4.20 1.08 5.28
KARNATAKA(JSWEL) 0.32 16.50 16.82
KARNATAKA(NSLSUGAR) 4.54 0.49 0.09 5.12
KARNATAKA(PCKL) 51.65 14.88 0.45 0.78 1.95 16.92 641.50 1.60 176.70 906.42
KARNATAKA(TADASWIND_KAR) 7.13 0.26 1.30 2.61 2.58 13.88
KARNATAKA(UDUPI_SR) 0.25 0.27 0.26 0.32 1.10
KERALA(KSEB) 43.76 131.76 175.52
MAHARASHTRA(LMELMSEB) 0.20 1.67 0.04 1.90
NORTH(ADHPL) 0.64 2.68 4.89 8.21
NORTH(KWHEP) 1.01 1.26 2.26
NORTH(SCLTPS) 2.64 2.64
NORTH(SINGOLI) 0.60 3.55 4.15
ODISHA(DCBLRajgangpur) 0.51 0.51
ODISHA(GMRKEL(STU)) 0.18 0.31 15.50 16.00
ODISHA(KCMW(od)) 0.03 0.03
ODISHA(NBVLOTCL) 19.15 19.15
RAJASTHAN(APL_RAJ) 0.08 0.08
RAJASTHAN(SREE-RJ) 0.13 0.13
SOUTH(SEIL) 52.87 0.56 4.15 57.57
SOUTH(SEILP2) 0.50 260.40 1.04 19.27 1.83 10.35 293.39
SOUTH(SIMHAPURI) 2.46 0.24 2.54 2.35 4.58 0.73 115.02 1.61 0.35 1.84 0.88 0.15 1.87 37.69 0.45 172.75
TAMILNADU(BIRLACARBONTN) 5.43 5.43
TAMILNADU(OPGPGPLU2TN) 52.08 52.08
TAMILNADU(TANGEDCO) 58.67 203.15 21.68 283.50
TAMILNADU(TULSYAN_NEC_LTD) 0.07 0.18 0.12 0.36
TELANGANA(NAVABHARAT) 25.40 25.40
TELANGANA(TSSPDCL) 60.00 60.00
UTTARPRADESH(LAPL-UP) 0.36 2.88 3.34 0.08 6.66
UTTARPRADESH(PPGCL) 0.35 0.35
WEST(ACBIL) 1.02 12.59 3.93 17.53
WEST(APL_RaipurTPP) 6.61 52.39 59.00
WEST(DBPL) 11.46 24.53 35.99
WEST(JHABUA_IPP) 3.09 3.09
WEST(JPL) 0.53 34.05 11.80 46.38
WEST(JPL-2) 2.64 44.32 53.22 100.18
WEST(JPNIGRIE_JNSTPP) 7.34 6.00 13.34
WEST(MAHANENERGEN) 37.04 101.23 138.27
WEST(MCCPL) 1.51 1.63 3.14
WEST(RKM_POWER) 0.45 9.00 1.32 1.97 12.74
Grand Total 60.84 260.85 2.46 16.20 3.59 14.19 111.37 4.58 56.13 550.38 1.61 24.51 69.54 6.91 42.89 1091.34 1.60 408.67 346.54 2.31 333.69 0.77 3410.95
STOA Bilateral Transactions Schedule Details for the month of July-2023
4) RESERVOIR PARTICULARS
MDDL (M) FRL (M) 1st day Last day 1st day Last day
NILAGIRIS 0.00 0.00 0.00 0.00 135.00 529.00 582.71 149.80
IDUKKI 694.94 732.43 702.95 710.83 313.00 695.00 459.98 78.71
JALAPUT 818.39 838.40 822.87 824.54 89.00 115.00 205.48 78.87
N.SAGAR 149.30 179.90 158.40 156.97 94.00 48.00 72.17 49.87
SRISAILAM 243.84 270.70 246.43 258.47 25.00 258.00 192.21 1.55
SUPA 495.00 564.00 525.86 544.75 664.00 1632.00 868.48 240.07
LINGANAMAKKI 522.73 554.50 530.46 544.81 334.00 2048.00 1621.28 189.47
KAKKI 908.3 981.45 936.04 958.07 98.00 322.00 280.38 57.03
5) a) BRIEF DESCRIPTION OF GRID INCIDENCES:-
Outage
Duration
Date Time (Hrs) Date Time (Hrs) Time
1
1. 230kV NCTPS Unit-1,2&3
2. 230kV NCTPS ETPS line
3. 230kV NCTPS Kilpauk line
Tamil Nadu 02-07-2023 13:07 02-07-2023 14:04 57mins 504 0 GD-1
2
1. 220kV/110kV Ambewadi Transformer-1,2&3
2. 220kV Nagjheri Ambewadi Line-1&2
3. 220kV Ambewadi Narendra Line-1&2
4. 220kV Ambewadi Ponda Line-1&2
Karnataka 27-07-2023 09:41 27-07-2023 10:09 28mins 0 98 GD-1
3
1. 220kV BG Kothur Manuguru
2. 220kV BG Kothur Chintur
3. 220kV BG Kothur KTPS Stage-V
4. 220kV BG Kothur KTPS Stage-III
Telangana 27-07-2023 16:10 27-07-2023 21:27 5hrs 17mins 0 0 GD-1
b) BRIEF DESCRIPTION OF GRID DISTRUBANCES :-
Outage Duration
Date Time (Hrs) Date Time (Hrs) Time
1 1. 400kV Guddigudem Hinduja Line-1 Andhra Pradesh 03-07-2023 17:37 03-07-2023 18:33 54 mins 0 0 GI-2
2
1. 220kV Jurala Raichur_KA Line-2
2. 220kV Bus coupler at 220kV Jurala PH
Telangana 06-07-2023 00:34 06-07-2023 01:27 53 mins 0 0 GI-1
3
1. 400kV Kalpakka Gajuwaka Line-1&2
2. 400kV Kalpakka Simhari Line-2
3. 400kV kalpakka Vemagiri Line-1
4. 400kV/220kV Kalpakka ICT-3
Andhra Pradesh 11-07-2023 19:54 11-07-2023 23:00 3hrs 6mins 0 0 GI-2
4 1. 400kV/230kV ICT-5 at Alamathy Tamil Nadu 27-07-2023 07:12 27-07-2023 09:46 2hr 34mins 0 0 GI-2
Sl. No. CONSTITUENTS
Installed as on
31-03-2022
(MVAr)
Additional
requirement
during 2022-23
(MVAr)
Actual Addition
upto 31-03-
2023 (MVAr)
Balance to be
installed
(MVAr)
1 APTRANSCO 5533.700 544.800 31.600 513.200
2 TSTRANSCO 6979.910 2463.520 32.626 2430.894
3 KPTCL 8762.503 162.964 342.768 0.000
4 KSEB 1027.000 0.000 0.000 0.000
5 TNEB 4243.610 48.000 48.000 0.000
6 PONDY 32.400 0.000 0.000 0.000
7 SOUTHERN REGION 26579.123 3219.284 454.994 2944.094
* As per details received from SRPC vide letter dt. 14/06/2023
ENERGY (MU's)
STORAGE
Outage
Complete Outage of 220kV/11kV BG Kothur LIS SS of TSTRANSCO: As per the reports submitted, the triggering incident was
tripping of all 220kV connected lines at 220kV/11kV BG Kothur LIS SS on CTD operation due to DC supply failure. This resulted in
complete outage of 220kV/11kV BG Kothur LIS SS.
Tripping of 400kV Bus-1 of 400kV Hinduja Generating station: As per the reports submitted, the triggering incident was B-N fault
in 400kV Guddigudem Hinduja line-1. At Hinduja end, the main breaker failed to open causing LBB to operate and all the main
breakers connected to 400kV Bus-1 tripped.
Event
(As reported)
C) CAPACITOR DETAILS
ELEMENT NAME
Revival
PROGRESSIVEINFLOW (MU's)
Complete Outage of 230kV NCTPS Stage-1 Generating Station of TANGEDCO: As per the reports submitted, the triggering
incident was tripping of 230kV NCTPS ETPS line and 230kV NCTPS Kilapuk line on faults at 13:07hrs and 13:09hrs respectively.
Tripping of these lines led to tripping of NCTPS Unit-1,2 & 3 on over-frequency protection. This led to a complete outage of the
230kV NCTPS Stage-1 Generating Station.
Complete Outage of 220kV/110kV Ambewadi SS of KPTCL: Duirng antecedent conditions, all 220kV elements were connected to
220kV Bus-1 at 220kV/110kV Ambewadi SS. As per the reports submitted, the triggering incident was B-N fault in 220kV Nagjheri
Ambewadi line-2 and the line tripped. Because of this, 220kV Ambewadi Nagjheri line-1 got overloaded and caused the B-phase
bus jumper connected to the line to fail. This resulted in a B-phase bus fault causing BBP to operate and all the elements connected
to the 220kV Bus tripped. This led to a complete outage of 220kV/110kV Ambewadi SS.
PROGRESSIVE
ENERGY USAGE (MU's)
Owner /
Agency
Tripping of 220kV Bus-2 of 220kV Upper Jurala PH of TSGENCO: During antecedent conditions, there was no generation at
220kV Upper Jurala PH. As per the reports submitted, the triggering incident was R-N fault in 220kV Jurala Raichur_KA Line-2. At
the same time, the Bus Coupler tripped on over current protection. Tripping of only connected line and bus coupler resulted in de-
energization of 220kV Bus-2 at 220kV Upper Jurala PH.
NAME OF RESERVOIR
ELEMENT NAME
Outage
Owner / Agency
Revival
LEVEL (M)
S.NO.
Note:
Generation loss
(MW)
Tripping of 400kV Bus-3 and Bus-4 of 400kV/220kV Kalpakka SS of APTRANSCO: As per the reports submitted, the triggering
incident was R-phase CT failure in Bus coupler-2 bay of 400kV/220kv Kalpakka SS. Immediately, 400kV Bus-3 and Bus-4 BBP
operated and all the elements connected to the Bus-3 and Bus-4 tripped.
Tripping of 400kV Bus-1 of 400kV/230kV/110kV Alamathy SS of TANTRANSCO: 400kV/230kV/110kV Alamathy SS is operating
with one and half breaker scheme at 400kV level. As per the reports submitted, the triggering incident was bus-side B-phase CT
failure in 400kV/230kV ICT-5 at 400kV/230kV/110kV Alamathy SS. Immediately, 400kV Bus-1 BBP operated and the main breakers
connected to the 400kV Bus-1 tripped. This resulted in de-energisation of 400kV Bus-1 of 400kV/230kV/110kV Alamathy SS.
S.NO.
Event
(As reported)
Load loss (MW)
Category
as per CEA
Grid
Standards
Generation loss
(MW)
Category as
per CEA
Grid
Standards
Load loss (MW)
0
20
40
60
80
100
120
140
MU
Date
Day-wise Solar Generation from 01/07/2023 to 31/07/2023 in MU
SR AP Kar TN TS
-200
1800
3800
5800
7800
9800
11800
13800
15800
00:00
00:27
00:54
01:21
01:48
02:15
02:42
03:09
03:36
04:03
04:30
04:57
05:24
05:51
06:18
06:45
07:12
07:39
08:06
08:33
09:00
09:27
09:54
10:21
10:48
11:15
11:42
12:09
12:36
13:03
13:30
13:57
14:24
14:51
15:18
15:45
16:12
16:39
17:06
17:33
18:00
18:27
18:54
19:21
19:48
20:15
20:42
21:09
21:36
22:03
22:30
22:57
23:24
23:51
MW
Time
SR Solar Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 117.62 MU on 01-07-2023 / Minimum: 55.48 MU on 26-07-2023
-100
400
900
1400
1900
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
AP Solar Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 13.81 MU on 01-07-2023 / Minimum: 3.35 MU on 26-07-2023
0
500
1000
1500
2000
2500
3000
3500
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
Karnataka Solar Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 25.56 MU on 14-07-2023 / Minimum: 10.45 MU on 25-07-2023
-100
900
1900
2900
3900
4900
00:00
00:27
00:54
01:21
01:48
02:15
02:42
03:09
03:36
04:03
04:30
04:57
05:24
05:51
06:18
06:45
07:12
07:39
08:06
08:33
09:00
09:27
09:54
10:21
10:48
11:15
11:42
12:09
12:36
13:03
13:30
13:57
14:24
14:51
15:18
15:45
16:12
16:39
17:06
17:33
18:00
18:27
18:54
19:21
19:48
20:15
20:42
21:09
21:36
22:03
22:30
22:57
23:24
23:51
MW
Time
TN Solar Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 35.2 MU on 30-07-2023 / Minimum: 19.2 MU on 03-07-2023
0
500
1000
1500
2000
2500
3000
3500
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
Telangana Solar Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 22.82 MU on 01-07-2023 / Minimum: 4.28 MU on 20-07-2023
0
50
100
150
200
250
300
350
MU
Date
Day-wise Wind Generation from 01/07/2023 to 31/07/2023 in MU
SR AP Kar TN
0
2000
4000
6000
8000
10000
12000
14000
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
SR Wind Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 298.39 MU on 21-07-2023 / Minimum: 147.5 MU on 10-07-2023
0
500
1000
1500
2000
2500
3000
3500
4000
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
AP Wind Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 77.14 MU on 21-07-2023 / Minimum: 33.66 MU on 10-07-2023
0
500
1000
1500
2000
2500
3000
3500
4000
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
Karnataka Wind Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 76.09 MU on 19-07-2023 / Minimum: 37.61 MU on 10-07-2023
0
1000
2000
3000
4000
5000
6000
00:00
00:26
00:52
01:18
01:44
02:10
02:36
03:02
03:28
03:54
04:20
04:46
05:12
05:38
06:04
06:30
06:56
07:22
07:48
08:14
08:40
09:06
09:32
09:58
10:24
10:50
11:16
11:42
12:08
12:34
13:00
13:26
13:52
14:18
14:44
15:10
15:36
16:02
16:28
16:54
17:20
17:46
18:12
18:38
19:04
19:30
19:56
20:22
20:48
21:14
21:40
22:06
22:32
22:58
23:24
23:50
MW
Time
TN Wind Generation on Maximum and Minimum Generation days
Max MU day Min MU day
Maximum: 117.11 MU on 04-07-2023 / Minimum: 56.6 MU on 11-07-2023
0
10000
20000
30000
40000
50000
60000
00:00:00
00:30:00
01:00:00
01:30:00
02:00:00
02:30:00
03:00:00
03:30:00
04:00:00
04:30:00
05:00:00
05:30:00
06:00:00
06:30:00
07:00:00
07:30:00
08:00:00
08:30:00
09:00:00
09:30:00
10:00:00
10:30:00
11:00:00
11:30:00
12:00:00
12:30:00
13:00:00
13:30:00
14:00:00
14:30:00
15:00:00
15:30:00
16:00:00
16:30:00
17:00:00
17:30:00
18:00:00
18:30:00
19:00:00
19:30:00
20:00:00
20:30:00
21:00:00
21:30:00
22:00:00
22:30:00
23:00:00
23:30:00
MW
Time
DEMAND HYD THL Drawl WIND SOLAR
REGIONAL GENERATION AND DEMAND FOR MAXIMUM DEMAND DAY 01-07-2023
MAX DMD 53481 MIN DMD 41952
0
2000
4000
6000
8000
10000
12000
14000
00:00:00
00:32:00
01:04:00
01:36:00
02:08:00
02:40:00
03:12:00
03:44:00
04:16:00
04:48:00
05:20:00
05:52:00
06:24:00
06:56:00
07:28:00
08:00:00
08:32:00
09:04:00
09:36:00
10:08:00
10:40:00
11:12:00
11:44:00
12:16:00
12:48:00
13:20:00
13:52:00
14:24:00
14:56:00
15:28:00
16:00:00
16:32:00
17:04:00
17:36:00
18:08:00
18:40:00
19:12:00
19:44:00
20:16:00
20:48:00
21:20:00
21:52:00
22:24:00
22:56:00
23:28:00
MW
Time
DEMAND HYD THL Drawl WIND SOLAR
MAX DMD 11601 MIN DMD 8194
AP DEMAND ON MAXIMUM DEMAND DAY 01-07-2023
0
2000
4000
6000
8000
10000
12000
14000
00:00:00
00:32:00
01:04:00
01:36:00
02:08:00
02:40:00
03:12:00
03:44:00
04:16:00
04:48:00
05:20:00
05:52:00
06:24:00
06:56:00
07:28:00
08:00:00
08:32:00
09:04:00
09:36:00
10:08:00
10:40:00
11:12:00
11:44:00
12:16:00
12:48:00
13:20:00
13:52:00
14:24:00
14:56:00
15:28:00
16:00:00
16:32:00
17:04:00
17:36:00
18:08:00
18:40:00
19:12:00
19:44:00
20:16:00
20:48:00
21:20:00
21:52:00
22:24:00
22:56:00
23:28:00
MW
Time
DEMAND HYD THL Drawl WIND SOLAR
MAX DMD 12087 MIN DMD 7581
KARNATAKA ON MAXIMUM DEMAND DAY 01-07-2023
0
500
1000
1500
2000
2500
3000
3500
4000
4500
00:00:00
00:33:00
01:06:00
01:39:00
02:12:00
02:45:00
03:18:00
03:51:00
04:24:00
04:57:00
05:30:00
06:03:00
06:36:00
07:09:00
07:42:00
08:15:00
08:48:00
09:21:00
09:54:00
10:27:00
11:00:00
11:33:00
12:06:00
12:39:00
13:12:00
13:45:00
14:18:00
14:51:00
15:24:00
15:57:00
16:30:00
17:03:00
17:36:00
18:09:00
18:42:00
19:15:00
19:48:00
20:21:00
20:54:00
21:27:00
22:00:00
22:33:00
23:06:00
23:39:00
MW
Time
HYD THL Drawl DEMAND
KERALA ON MAXIMUM DEMAND DAY 01-07-2023
MAX DMD 3949 MIN DMD 2710
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
00:00:00
00:33:00
01:06:00
01:39:00
02:12:00
02:45:00
03:18:00
03:51:00
04:24:00
04:57:00
05:30:00
06:03:00
06:36:00
07:09:00
07:42:00
08:15:00
08:48:00
09:21:00
09:54:00
10:27:00
11:00:00
11:33:00
12:06:00
12:39:00
13:12:00
13:45:00
14:18:00
14:51:00
15:24:00
15:57:00
16:30:00
17:03:00
17:36:00
18:09:00
18:42:00
19:15:00
19:48:00
20:21:00
20:54:00
21:27:00
22:00:00
22:33:00
23:06:00
23:39:00
MW
TIME
TAMIL NADU ON MAXIMUM DEMAND DAY 01-07-2023
DEMAND Drawl HYD THL WIND SOLAR
MAX DMD 17408 MIN DMD 14318
-2000
0
2000
4000
6000
8000
10000
12000
00:00:00
00:32:00
01:04:00
01:36:00
02:08:00
02:40:00
03:12:00
03:44:00
04:16:00
04:48:00
05:20:00
05:52:00
06:24:00
06:56:00
07:28:00
08:00:00
08:32:00
09:04:00
09:36:00
10:08:00
10:40:00
11:12:00
11:44:00
12:16:00
12:48:00
13:20:00
13:52:00
14:24:00
14:56:00
15:28:00
16:00:00
16:32:00
17:04:00
17:36:00
18:08:00
18:40:00
19:12:00
19:44:00
20:16:00
20:48:00
21:20:00
21:52:00
22:24:00
22:56:00
23:28:00
MW
Time
TELANGANA ON MAXIMUM DEMAND DAY 01-07-2023
DEMAND THL Drawl HYD SOLAR
MAX DMD 10243 MIN DMD 7102
0
2000
4000
6000
8000
10000
12000
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
0:00
0:32
1:04
1:36
2:08
2:40
3:12
3:44
4:16
4:48
5:20
5:52
6:24
6:56
7:28
8:00
8:32
9:04
9:36
10:08
10:40
11:12
11:44
12:16
12:48
13:20
13:52
14:24
14:56
15:28
16:00
16:32
17:04
17:36
18:08
18:40
19:12
19:44
20:16
20:48
21:20
21:52
22:24
22:56
23:28
MW
MW
Time
REGIONAL GENERATION AND DEMAND FOR MINIMUM DEMAND DAY 27-07-2023
DEMAND HYD THL Drawl WIND SOLAR
MAX DMD 44102 MIN DMD 30194
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
-500
0
500
1000
1500
2000
2500
3000
3500
00:00
00:31
01:02
01:33
02:04
02:35
03:06
03:37
04:08
04:39
05:10
05:41
06:12
06:43
07:14
07:45
08:16
08:47
09:18
09:49
10:20
10:51
11:22
11:53
12:24
12:55
13:26
13:57
14:28
14:59
15:30
16:01
16:32
17:03
17:34
18:05
18:36
19:07
19:38
20:09
20:40
21:11
21:42
22:13
22:44
23:15
23:46
MW
Time
AP DEMAND ON MINIMUM DEMAND DAY 27-07-2023
HYD SOLAR WIND THL Drawl DEMAND
MAX DMD 8299 MIN DMD 6221
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
-1000
-500
0
500
1000
1500
2000
2500
3000
3500
0:00
0:33
1:06
1:39
2:12
2:45
3:18
3:51
4:24
4:57
5:30
6:03
6:36
7:09
7:42
8:15
8:48
9:21
9:54
10:27
11:00
11:33
12:06
12:39
13:12
13:45
14:18
14:51
15:24
15:57
16:30
17:03
17:36
18:09
18:42
19:15
19:48
20:21
20:54
21:27
22:00
22:33
23:06
23:39
MW
Time
KARNATAKA ON MINIMUM DEMAND DAY 27-07-2023
HYD THL Drawl WIND SOLAR DEMAND
MAX DMD 8749 MIN DMD 4776
0
1000
2000
3000
4000
5000
6000
7000
8000
00:00:00
00:28:00
00:56:00
01:24:00
01:52:00
02:20:00
02:48:00
03:16:00
03:44:00
04:12:00
04:40:00
05:08:00
05:36:00
06:04:00
06:32:00
07:00:00
07:28:00
07:56:00
08:24:00
08:52:00
09:20:00
09:48:00
10:16:00
10:44:00
11:12:00
11:40:00
12:08:00
12:36:00
13:04:00
13:32:00
14:00:00
14:28:00
14:56:00
15:24:00
15:52:00
16:20:00
16:48:00
17:16:00
17:44:00
18:12:00
18:40:00
19:08:00
19:36:00
20:04:00
20:32:00
21:00:00
21:28:00
21:56:00
22:24:00
22:52:00
23:20:00
23:48:00
MW
Time
KERALA ON MINIMUM DEMAND DAY 27-07-2023
DEMAND Drawl THL HYD
MAX DMD 3621 MIN DMD 2323
-1000
0
1000
2000
3000
4000
5000
6000
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
00:00
00:29
00:58
01:27
01:56
02:25
02:54
03:23
03:52
04:21
04:50
05:19
05:48
06:17
06:46
07:15
07:44
08:13
08:42
09:11
09:40
10:09
10:38
11:07
11:36
12:05
12:34
13:03
13:32
14:01
14:30
14:59
15:28
15:57
16:26
16:55
17:24
17:53
18:22
18:51
19:20
19:49
20:18
20:47
21:16
21:45
22:14
22:43
23:12
23:41
MW
Time
TAMIL NADU ON MINIMUM DEMAND DAY 27-07-2023
DEMAND HYD THL Drawl WIND SOLAR
MAX DMD 16977 MIN DMD 12465
0
100
200
300
400
500
600
700
800
900
0
1000
2000
3000
4000
5000
6000
7000
8000
00:00
00:40
01:20
02:00
02:40
03:20
04:00
04:40
05:20
06:00
06:40
07:20
08:00
08:40
09:20
10:00
10:40
11:20
12:00
12:40
13:20
14:00
14:40
15:20
16:00
16:40
17:20
18:00
18:40
19:20
20:00
20:40
21:20
22:00
22:40
23:20
MW
Time
TELANGANA ON MINIMUM DEMAND DAY 27-07-2023
DEMAND THL Drawl HYD SOLAR
MAX DMD 6989 MIN DMD 3835
ग्रिड क
ं ट्र ोलर ऑफ इंग्रडया ग्रलग्रिट्ेड
(भारत सरकार का उद्यि)
भूतपूर्व पार्र ग्रसस्टि ऑपरेशन कारपोरेशन ग्रलग्रिट्ेड
GRID CONTROLLER OF INDIA LIMITED
(A Govt. of India Enterprise)
Erstwhile POWER SYSTEM OPERATION CORPORATION LIMITED
दक्षिण िेत्रीय लोड क्षडस्पेच क
े न्द्र / SOUTHERN REGIONAL LOAD DESPATCH CENTRE
29, रेस कोसस क्रास रोड, बेंगलूर – 560 009 / 29, RACE COURSE CROSS ROAD, BANGALORE – 560 009.
E Mail – srldcos@grid-india.in, Website – www.srldc.in

More Related Content

Similar to SRLDC Monthly Grid Report_Jul2023.pdf

Fondo Federal Solidario Abril 2009 - Mayo 2015
Fondo Federal Solidario Abril 2009 - Mayo 2015Fondo Federal Solidario Abril 2009 - Mayo 2015
Fondo Federal Solidario Abril 2009 - Mayo 2015Eduardo Nelson German
 
Erlang table
Erlang tableErlang table
Erlang tablejesmin256
 
Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2NelsonBort
 
1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mb1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mbPaul Dahlke
 
Consolidated report.pdf
Consolidated report.pdfConsolidated report.pdf
Consolidated report.pdfSubbuA31
 

Similar to SRLDC Monthly Grid Report_Jul2023.pdf (20)

Homework
Homework Homework
Homework
 
Fondo Federal Solidario Abril 2009 - Mayo 2015
Fondo Federal Solidario Abril 2009 - Mayo 2015Fondo Federal Solidario Abril 2009 - Mayo 2015
Fondo Federal Solidario Abril 2009 - Mayo 2015
 
Go Ahead for F&O Report 04 July 2013 Mansukh Investment and Trading Solution
Go Ahead for F&O Report 04 July 2013 Mansukh Investment and Trading SolutionGo Ahead for F&O Report 04 July 2013 Mansukh Investment and Trading Solution
Go Ahead for F&O Report 04 July 2013 Mansukh Investment and Trading Solution
 
Erlang table
Erlang tableErlang table
Erlang table
 
Erlang table
Erlang tableErlang table
Erlang table
 
Erlang table
Erlang tableErlang table
Erlang table
 
002 apicasing
002 apicasing002 apicasing
002 apicasing
 
Erlang table
Erlang tableErlang table
Erlang table
 
F&O Report 29 July 2013 Mansukh Investment and Trading Solution
F&O Report 29 July 2013 Mansukh Investment and Trading SolutionF&O Report 29 July 2013 Mansukh Investment and Trading Solution
F&O Report 29 July 2013 Mansukh Investment and Trading Solution
 
CorrelationMIDWPV
CorrelationMIDWPVCorrelationMIDWPV
CorrelationMIDWPV
 
F&O Report 09 July 2013 Mansukh Investment and Trading Solution
F&O Report 09 July 2013 Mansukh Investment and Trading SolutionF&O Report 09 July 2013 Mansukh Investment and Trading Solution
F&O Report 09 July 2013 Mansukh Investment and Trading Solution
 
Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2
 
600 c 1
600 c 1600 c 1
600 c 1
 
1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mb1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mb
 
Future levels 03.07.13
Future levels 03.07.13Future levels 03.07.13
Future levels 03.07.13
 
Go Ahead for F&O Report 17 May 2013 Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 May 2013 Mansukh Investment and Trading SolutionGo Ahead for F&O Report 17 May 2013 Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 May 2013 Mansukh Investment and Trading Solution
 
Tabel x2
Tabel x2Tabel x2
Tabel x2
 
F&O Report 22 August 2013 Mansukh Investment and Trading Solution
F&O Report 22 August 2013 Mansukh Investment and Trading SolutionF&O Report 22 August 2013 Mansukh Investment and Trading Solution
F&O Report 22 August 2013 Mansukh Investment and Trading Solution
 
Consolidated report.pdf
Consolidated report.pdfConsolidated report.pdf
Consolidated report.pdf
 
Steam tables
Steam tablesSteam tables
Steam tables
 

More from karikalcholanmayavan1

More from karikalcholanmayavan1 (7)

understanding standards for understanding.pptx
understanding standards for understanding.pptxunderstanding standards for understanding.pptx
understanding standards for understanding.pptx
 
India energy Power Sector Review 2024.pptx
India energy Power Sector Review 2024.pptxIndia energy Power Sector Review 2024.pptx
India energy Power Sector Review 2024.pptx
 
Distribution In India for better understanding.pptx
Distribution In India for better understanding.pptxDistribution In India for better understanding.pptx
Distribution In India for better understanding.pptx
 
Risk intro-1.pptx
Risk intro-1.pptxRisk intro-1.pptx
Risk intro-1.pptx
 
six-paradoxes_brochure.pdf
six-paradoxes_brochure.pdfsix-paradoxes_brochure.pdf
six-paradoxes_brochure.pdf
 
ETAC letter.pdf
ETAC letter.pdfETAC letter.pdf
ETAC letter.pdf
 
SRLDC Monthly Grid Report.pdf
SRLDC Monthly Grid Report.pdfSRLDC Monthly Grid Report.pdf
SRLDC Monthly Grid Report.pdf
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 

SRLDC Monthly Grid Report_Jul2023.pdf

  • 1. CIN No. U40105DL2009GOI188682 ड क ं ोलर ऑफ इं डया ल मटेड (भारत सरकार का उ यम) भूतपूव पावर स टम ऑपरेशन कारपोरेशन ल मटेड GRID CONTROLLER OF INDIA LIMITED (A Government of India Enterprise) Erstwhile POWER SYSTEM OPERATION CORPORATION LIMITED द ण े ीय लोड ड पेच क े , 29, रेस कोस ास रोड, बगलूर – 560 009 SOUTHERN REGIONAL LOAD DESPATCH CENTRE, 29, RACE COURSE CROSS ROAD, BENGALURU – 560 009 संदभ. द. े.भा. े.क े /एसओ/2023-24/D-01 िदनांक:17-अग त-2023 Ref No. SRLDC/SO/2023-24/D-01 Date: 17 August 2023 सेवा म / To, सूची क े अनुसार / As per list वषय : द ण े ीय भार ेषण क े क जुलाई 2023 माह क णाल चालन रपोट । Sub: System Operation Report of SRLDC for the month of July 2023 महोदय / Sir, आपको सू चत कया जाता है क द ण े ीय भार ेषण क े क जुलाई 2023 माह क णाल चालन रपोट वेब साइट www.srldc.in पर उपल ध है । This is to inform you that System Operation Report of Southern Regional Load Despatch Centre for the month of July 2023 is available in the website www.srldc.in. आगे भी हर माह क णाल चालन रपोट इसी वेब साइट पर उपल ध रहेगी । The system operation report of every month will be available in the same website in future also. ध यवाद स हत / With Regards, Yours Faithfully (ट ी नवास / T Srinivas) मु य महा बंधक / CGM एसओ-II / SO-II
  • 2. प्रणाली प्रचालन वििरण SYSTEM OPERATION REPORT SOUTHERN REGION 2023-24 SOUTHERN REGIONAL LOAD DESPATCH CENTRE GRID CONTROLLER OF INDIA LIMITED JULY 2023 BANGALORE JULY 2023
  • 3. Document Management Information Document Effective Date: 17 August 2023 Classification Modification History Sr. No Description Date of Change Version No. 1 System Operation Report – July 2023 17 August 2023 00 Departmental Procedure Document Number (Based on ISO 9001:2008) SRLDC/SO/D-01/SYSTEM OPERATION REPORT Prepared By: Checked By Approved by: Issued by: Ch.Manager (SO-2) DGM (SO-2) CGM (SO-2) MR (SRLDC)
  • 4. MAX MIN AVG <49.9 49.9- 50.05 >50.05 FVI STD_DEV 01-Jul-23 50.23 49.75 49.99 8.84 72.60 18.55 0.045 0.067 02-Jul-23 50.27 49.62 49.98 12.53 71.55 15.91 0.073 0.084 03-Jul-23 50.20 49.58 49.98 11.26 71.89 16.85 0.072 0.083 04-Jul-23 50.26 49.83 50.02 2.49 71.79 25.72 0.035 0.057 05-Jul-23 50.23 49.77 50.01 4.47 67.50 28.03 0.048 0.068 06-Jul-23 50.23 49.77 50.01 5.21 68.35 26.45 0.047 0.067 07-Jul-23 50.25 49.79 50.01 4.93 72.86 22.21 0.039 0.063 08-Jul-23 50.30 49.78 50.01 5.38 69.90 24.72 0.042 0.064 09-Jul-23 50.20 49.74 50.00 4.27 79.83 15.90 0.033 0.058 10-Jul-23 50.31 49.70 50.01 7.36 62.80 29.84 0.061 0.077 11-Jul-23 50.20 49.73 50.01 4.51 74.68 20.81 0.036 0.059 12-Jul-23 50.21 49.71 50.00 7.51 74.46 18.03 0.046 0.068 13-Jul-23 50.15 49.73 50.01 4.71 70.85 24.44 0.037 0.060 14-Jul-23 50.26 49.83 50.03 1.40 71.74 26.86 0.045 0.062 15-Jul-23 50.18 49.83 50.01 3.44 76.98 19.58 0.032 0.056 16-Jul-23 50.15 49.82 50.00 2.95 83.83 13.22 0.023 0.048 17-Jul-23 50.19 49.73 50.00 3.44 79.87 16.69 0.028 0.053 18-Jul-23 50.20 49.76 50.00 5.48 81.15 13.38 0.029 0.054 19-Jul-23 50.19 49.76 50.01 3.47 79.39 17.14 0.028 0.053 20-Jul-23 50.25 49.83 50.01 2.89 79.98 17.13 0.026 0.051 21-Jul-23 50.16 49.79 49.99 6.12 83.47 10.41 0.029 0.053 22-Jul-23 50.17 49.79 50.01 3.55 77.49 18.96 0.028 0.052 23-Jul-23 50.26 49.77 50.01 3.53 76.24 20.23 0.034 0.058 24-Jul-23 50.22 49.75 50.00 3.01 79.25 17.74 0.031 0.055 25-Jul-23 50.15 49.66 50.00 5.51 79.24 15.26 0.035 0.059 26-Jul-23 50.31 49.82 50.02 1.59 71.55 26.86 0.047 0.064 27-Jul-23 50.20 49.84 50.01 1.83 77.60 20.57 0.025 0.049 28-Jul-23 50.19 49.87 50.01 0.46 83.48 16.05 0.022 0.045 29-Jul-23 50.39 49.76 50.02 2.93 75.63 21.45 0.076 0.085 30-Jul-23 50.42 49.70 50.04 2.64 66.79 30.57 0.104 0.095 31-Jul-23 50.17 49.74 50.01 4.98 71.03 23.99 0.036 0.058 AVERAGE 50.23 49.76 50.01 4.60 74.96 20.44 0.04 0.06 MAX 50.42 30-07-2023 30-07-2023 0.104 0.095 MIN 03-07-2023 49.58 28-07-2023 0.022 0.045 FREQUENCY PROFILE FOR July-2023
  • 6. ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMIL NADU (I) GENERATION DETAILS:(MU) HYDRO 171 106 751 510 366 THERMAL 2736 2774 1581 1962 DIESEL 0 0 0 0 0 GAS 0 165 TOTAL 2907 2880 2332 510 2493 INDEPENDENT P.P * 64 161 212 37 226 WIND 1802 55 1691 23 2828 SOLAR 299 404 605 30 866 CAPTIVE PLANTS * * 0 0 0 0 0 TOTAL DRAWALS INCL HVDC 1262 2989 1358 1708 4494 (II)ACTUAL CONSUMPTION (MU) 6334 6489 6198 2307 10907 (III) MAXIMUM DEMAND(MW) 11584 12610 12359 3999 17774 MAX DEMAND ON DATE 02-07-2023 14-07-2023 15-07-2023 31-07-2023 31-07-2023 MAX DEMAND AT TIME 12:30 07:48 11:00 19:00 16:00 FREQUENCY OF MAX DEMAND 49.89 50.12 50.01 50.06 50.03 MW DATE TIME FREQUENCY 54211 17-Jul-2023 10:25:20 50.03 SR GRID SUMMARY FOR THE MONTH OF July-2023 REGIONAL MAXIMUM DEMAND:
  • 7. DATE Act. Drawal Net Schd Act. Drawal Net Schd Act. Drawal Net Schd Act. Drawal Net Schd Act. Drawal Net Schd Act. Drawal Net Schd 01-Jul-23 68.60 68.66 91.43 90.12 59.15 57.88 65.78 63.79 169.48 173.21 9.61 9.93 02-Jul-23 57.47 58.34 94.82 94.69 54.86 53.49 61.32 59.31 139.30 146.17 8.34 8.65 03-Jul-23 49.23 51.37 104.09 102.27 77.96 76.14 57.74 56.45 116.95 121.01 8.66 8.83 04-Jul-23 39.63 37.58 118.57 116.70 64.46 63.18 54.18 53.50 102.03 108.57 7.41 8.07 05-Jul-23 34.94 34.89 108.95 109.30 63.61 64.36 47.77 46.01 116.68 120.56 8.52 8.93 06-Jul-23 23.59 25.42 109.05 109.40 48.85 52.42 49.54 48.58 132.70 138.10 8.76 8.68 07-Jul-23 39.44 39.64 101.09 99.55 45.96 46.17 50.55 49.29 156.75 162.40 9.36 9.35 08-Jul-23 44.39 43.22 100.01 98.12 45.06 44.83 52.68 51.43 164.55 167.02 9.63 9.64 09-Jul-23 53.07 53.41 95.44 95.57 43.91 43.29 48.00 46.60 146.26 152.77 8.87 9.46 10-Jul-23 61.97 60.97 106.13 104.60 61.08 58.07 53.12 50.57 175.75 177.08 8.84 9.23 11-Jul-23 48.44 46.65 107.92 107.45 64.73 63.67 57.45 55.57 165.42 170.03 8.94 9.18 12-Jul-23 62.10 59.98 116.00 113.48 69.44 69.82 58.59 56.22 159.88 162.72 9.03 9.18 13-Jul-23 49.98 51.39 131.66 128.90 64.91 63.09 57.56 55.85 149.72 153.11 9.34 9.52 14-Jul-23 34.97 33.59 149.53 149.16 60.44 60.68 56.84 55.22 156.45 158.56 9.36 9.69 15-Jul-23 65.24 64.10 143.96 145.39 62.11 62.30 56.33 54.96 161.56 162.96 9.72 9.82 16-Jul-23 58.84 59.45 124.25 124.09 53.98 54.28 55.06 53.29 152.25 153.41 8.93 9.28 17-Jul-23 47.08 46.81 123.82 122.87 54.70 54.76 56.33 54.75 154.69 157.06 9.30 9.40 18-Jul-23 26.95 30.18 98.24 101.08 45.57 48.25 61.27 60.08 142.17 145.88 9.54 9.96 19-Jul-23 23.66 22.90 75.60 74.84 21.10 23.51 57.04 55.53 149.35 152.33 9.34 9.60 20-Jul-23 20.43 22.14 62.53 64.05 21.90 24.25 57.26 55.54 139.36 145.05 9.30 9.12 21-Jul-23 18.81 18.98 53.65 51.65 40.84 38.87 58.72 57.13 145.03 146.41 9.35 9.35 22-Jul-23 21.72 22.86 67.90 67.34 34.72 36.91 58.34 57.31 145.66 147.80 9.31 9.49 23-Jul-23 20.63 22.86 87.07 88.11 10.39 13.88 52.79 52.51 122.17 133.90 8.48 9.09 24-Jul-23 38.86 35.56 87.57 86.63 7.33 8.16 49.92 49.14 126.62 131.75 8.66 9.13 25-Jul-23 32.72 32.37 68.03 67.73 24.63 24.72 50.19 49.85 129.78 128.69 8.90 8.94 26-Jul-23 27.15 26.95 66.00 65.14 19.22 19.83 47.91 46.30 128.87 132.20 8.99 9.17 27-Jul-23 20.79 23.14 40.90 42.65 14.35 17.37 48.07 46.66 139.87 141.37 9.37 9.65 28-Jul-23 30.44 31.91 67.13 66.09 23.51 24.71 54.42 53.03 151.28 153.47 9.86 10.07 29-Jul-23 33.13 34.44 90.01 88.12 27.66 26.57 57.98 56.95 158.72 159.54 9.95 10.39 30-Jul-23 48.53 48.06 99.37 97.29 27.83 26.99 55.59 54.68 139.46 143.55 9.12 9.94 31-Jul-23 59.49 58.36 98.67 99.07 43.75 41.84 59.69 58.35 154.78 156.67 9.80 10.21 1262.29 1266.18 2989.39 2971.45 1358.01 1364.29 1708.03 1664.45 4493.54 4603.35 282.59 290.95 NET DRAWAL SCHEDULE AND ACTUAL DRAWAL FOR THE MONTH OF July-2023 ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 Schedules Jul 2023 ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 ISTS Drawal Profile Jul 2023 ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY
  • 8. ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R DEMAND DEMAND DEMAND DEMAND DEMAND DEMAND DEMAND 01-Jul-23 11560 10356 12037 3921 17381 470 53487 02-Jul-23 11584 9962 11135 3502 15217 405 50038 03-Jul-23 11276 11415 12232 3443 16258 419 53581 04-Jul-23 10314 11616 11484 3334 16185 408 51098 05-Jul-23 9740 10853 10787 3413 16159 415 49315 06-Jul-23 9129 11078 10630 3565 16175 417 49179 07-Jul-23 9823 11496 10636 3600 16465 447 50560 08-Jul-23 9758 11144 10913 3548 16969 449 50817 09-Jul-23 10639 11026 9527 3487 14934 430 47939 10-Jul-23 10800 12335 11454 3862 16331 433 53120 11-Jul-23 10138 11571 11718 3856 15810 427 51032 12-Jul-23 10322 11979 12010 3941 16008 463 52236 13-Jul-23 9557 12415 11970 3802 15631 438 51417 14-Jul-23 10075 12610 12038 3815 16221 456 53354 15-Jul-23 9936 12489 12359 3847 16302 475 53196 16-Jul-23 9978 11895 10580 3619 15128 430 50410 17-Jul-23 9939 12134 12053 3906 16762 455 54211 18-Jul-23 9403 10595 11004 3906 17025 462 50170 19-Jul-23 8893 10039 10657 3891 16797 431 49123 20-Jul-23 9013 8984 10512 3961 17070 452 47915 21-Jul-23 8858 8029 10808 3929 17190 452 48235 22-Jul-23 9317 8946 10120 3608 17488 439 48489 23-Jul-23 8984 9952 9074 3167 14980 410 45754 24-Jul-23 9013 10227 9291 3353 16108 407 47620 25-Jul-23 8236 8500 8425 3566 15827 432 43981 26-Jul-23 7902 8468 8903 3613 15901 441 43427 27-Jul-23 8261 6830 8577 3593 16548 463 44102 28-Jul-23 8502 8325 9478 3698 17162 472 45619 29-Jul-23 8891 9626 9568 3795 17455 462 49034 30-Jul-23 9306 10340 8806 3572 15886 455 46758 31-Jul-23 9958 11109 10594 3999 17774 492 52196 AVG 9649 10527 10625 3681 16360 442 49594 MAX 11584 12610 12359 3999 17774 492 54211 MIN 7902 6830 8425 3167 14934 405 43427 17.DEMAND MAX DEMAND FOR THE MONTH OF July-2023 DATE 0 10000 20000 30000 40000 50000 60000 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000 MW Peak Demand during Jul 2023 ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R
  • 9. ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT 01-Jul-23 240.01 209.79 224.90 78.49 376.90 10.37 1140.46 02-Jul-23 239.08 204.96 211.44 71.72 337.16 9.01 1073.37 03-Jul-23 226.65 221.41 222.63 71.97 346.19 9.34 1098.19 04-Jul-23 213.68 229.95 219.08 68.81 339.09 8.10 1078.71 05-Jul-23 207.68 212.26 212.04 66.22 342.84 9.22 1050.26 06-Jul-23 201.31 217.44 203.11 68.84 345.06 9.48 1045.24 07-Jul-23 207.72 218.03 203.66 71.27 358.43 10.09 1069.20 08-Jul-23 209.40 216.93 203.07 70.77 360.60 10.23 1071.00 09-Jul-23 217.09 215.85 188.32 67.28 331.59 9.57 1029.70 10-Jul-23 219.26 235.09 214.99 76.28 343.14 9.50 1098.26 11-Jul-23 216.07 226.79 218.97 78.26 328.44 9.59 1078.12 12-Jul-23 213.58 232.21 221.66 78.50 338.67 9.62 1094.24 13-Jul-23 207.11 244.06 220.54 77.85 336.30 9.95 1095.81 14-Jul-23 212.35 260.07 222.65 76.54 349.53 10.08 1131.22 15-Jul-23 216.26 251.22 222.89 77.79 355.50 10.49 1134.15 16-Jul-23 211.34 239.71 202.94 73.15 337.36 9.65 1074.15 17-Jul-23 211.48 246.05 215.57 79.38 356.96 10.03 1119.47 18-Jul-23 199.81 210.59 206.95 79.97 365.85 10.27 1073.44 19-Jul-23 193.66 189.90 201.62 78.32 368.63 10.07 1042.20 20-Jul-23 191.28 175.24 195.93 87.96 363.52 10.04 1023.97 21-Jul-23 195.04 165.35 202.40 80.58 374.86 10.07 1028.30 22-Jul-23 197.00 184.43 193.61 75.90 373.33 10.08 1034.35 23-Jul-23 191.30 203.42 170.45 67.14 336.84 9.20 978.35 24-Jul-23 190.02 200.71 177.88 70.67 337.91 9.37 986.56 25-Jul-23 178.45 172.82 172.26 72.10 336.04 9.64 941.31 26-Jul-23 170.52 170.06 170.41 71.64 339.21 9.51 931.35 27-Jul-23 171.24 142.93 166.31 71.25 349.45 9.91 911.09 28-Jul-23 184.56 169.05 175.30 73.75 366.83 10.59 980.08 29-Jul-23 194.66 197.35 173.60 75.58 376.26 10.67 1028.12 30-Jul-23 199.25 210.11 166.33 70.72 355.67 9.84 1011.92 31-Jul-23 207.22 215.12 196.79 78.75 378.75 10.52 1087.15 AVG 204.33 209.32 199.95 74.43 351.84 9.81 1049.67 MAX 240.01 260.07 224.90 87.96 378.75 10.67 1140.46 MIN 170.52 142.93 166.31 66.22 328.44 8.10 911.09 TOTAL 6334.08 6488.90 6198.30 2307.45 10906.91 304.10 32539.74 CONSUMPTION FOR THE MONTH OF July-2023 DATE 0 200 400 600 800 1000 1200 0 50 100 150 200 250 300 350 400 01/07/23 02/07/23 03/07/23 04/07/23 05/07/23 06/07/23 07/07/23 08/07/23 09/07/23 10/07/23 11/07/23 12/07/23 13/07/23 14/07/23 15/07/23 16/07/23 17/07/23 18/07/23 19/07/23 20/07/23 21/07/23 22/07/23 23/07/23 24/07/23 25/07/23 26/07/23 27/07/23 28/07/23 29/07/23 30/07/23 31/07/23 MU Consumption of States and Region during Jul 2023 ANDHRA CONSMPT TELANGANA CONSMPT KARNATAKA CONSMPT KERALA CONSMPT TAMILNADU CONSMPT S.R CONSMPT
  • 11. 1) IMPORTANT EVENTS 01-07-2023 A)CHARGING/COMMISSIONING OF NEW GENERATING UNITS SL.NO. STATE/ISGS STATION NAME TYPE CAPACITY (MW) 1 ISGS Tuticorin Wind 40.50 2 STATE Karnataka Wind 64.00 3 STATE Karnataka Solar 138.82 4 STATE Kerala Wind 0.25 5 STATE Kerala Solar 24.01 6 STATE Tamil Nadu Wind 19.50 7 STATE Tamil Nadu Solar 107.99 B)CHARGING/COMMISSIONING OF NEW TRANSMISSION LINES SL.NO. OWNER kV Length (km) Conductor Type DATE 1 KPTCL 400 122.75 QUAD ACSR MOOSE 5-Jul-23 2 WKTL 765 167.72 HEXA ZEBRA 12-Jul-23 3 WKTL 765 167.72 HEXA ZEBRA 13-Jul-23 C)LILO/Re-Arrangement OF TRANSMISSION LINES SL.NO. CONSTITUENT kV Length (km) Conductor Type DATE NIL D)CHARGING/COMMISSIONING OF NEW ICTs SL.NO. CONSTITUENT ICT- NUMBER kV RATIO CAPACITY (MVA) DATE 1 PGCIL SR-2 3 400/220 500 13-Jul-23 E) CHARGING/COMMISSIONING OF NEW SUBSTATIONS SL.NO. CONSTITUENT kV RATIO CAPACITY (MVA) DATE NIL F)CHARGING/COMMISSIONING OF REACTORS/STATCOM/FILTER BANK SL.NO. OWNER Rating CAPACITY (MVAR) Element Name DATE NIL FREQUENCY (HZ) DATE FVI DATE MAXIMUM 50.42 30-Jul-23 0.10 30-Jul-23 MINIMUM 49.58 03-Jul-23 0.02 28-Jul-23 AVERAGE 50.01 0.04 b) FREQUENCY DISTRIBUTION FOR THE MONTH The frequency ranges as a percentage of time during the month %TIME FREQUENCY < 49.9 49.90-50.05 >50.05 % 4.60 74.96 20.44 3) POWER SUPPLY POSITION FOR THE MONTH AP TG KAR KER TN PONDY REGION UNRESTRICTED PEAK DEMAND(MW) 11619 12629 12359 3999 17774 492 54211 PEAK DEMAND MET (MW) 11584 12610 12359 3999 17774 492 54211 UNRESTRICTED ENERGY REQMT(MU) 6334 6407 6116 2281 10800 301 32239 ENERGY MET (MU) 6334 6489 6198 2307 10907 304 32540 400kV YTPS - Kalburgi - 2 LINE NAME & CKT NO. 766 KV Kurnool-Maheshwaram - 2 STATION NAME STATION/LINE NAME LINE NAME / LILO at 765 KV Kurnool-Maheshwaram - 1 400kV KOCHI STATION NAME REMARKS 1. 18.9 MW w.e.f 06.07.2023 00:00 Hrs. 2. 21.6 MW w.e.f 29.07.2023 00:00 Hrs
  • 12. B) DETAILED REPORTS. 1. Detailed State wise breakup of installed capacity (MW) AGENCY GAS DIESEL ANDHRA PRADESH 272 __ TELANGANA __ __ KARNATAKA __ 0 KERALA __ 160 TAMILNADU 516 __ PONDICHERRY 33 __ CENTRAL SECTOR 0 __ PRIVATE 3781.8 __ TOTAL 4602 160 * The Installed Capacity is reconciled with the data received from states 2. SALIENT FEATURES OF SYSTEM CONDITIONS. Jul-2022 7085 8733 32.5 18345 62847 112385 Jul-2023 7885 8733 32.5 18345 66899 118309 % INCREASE (i) 11.29 0.00 0.00 0.00 6.45 5.27 ENERGY (GROSS) Unrestricted Requirement(MU) Jul-2022 5722 5342 Jul-2023 6334 6116 Energy Availability (MU) Jul-2022 5722 5371 Jul-2023 6334 6198 Shortage(-)/ Surplus(+) Jul 2022 (MU) / % 0 / (-0.00) 28 / -(-0.53) Jul 2023 (MU) / % 0 / (-0.00) 82 / -(-1.34) DEMAND Unrestricted Demand (MW) Jul-2022 9805 10855 Jul-2023 11619 12359 Availability (MW) Jul-2022 9763 10855 Jul-2023 11584 12359 Shortage(-)/ Surplus(+) APTRNSCO KPTCL Jul 2022 (MW) / % -42 / (-0.43) 0 / (-0.00) Jul 2023 (MW) / % -35 / (-0.30) 0 / (-0.00) 470 -19 / (-0.15) 2106 2281 12610 3999 TELANGANA 0 / (-0.00) TNEB 12486 54211 48810 492 2116 48810 REGIONAL 292 10142 301 / -(-0.93) 10 / -(-0.47) 0 / (-0.00) -18 / (-0.14) 17774 0 / (-0.00) 3999 54211 REGIONAL KSSB 12468 APTRANSCO KPTCL 82 / -(-1.28) INSTALLED CAPACITY DERATED (MW) APTRANSCO KPTCL 28 / -(-0.52) 5325 TELANGANA -29 / (-0.18) KSEB PONDY 469 0 / (-0.00) 492 12629 17774 16235 5 13 0 / (-0.00) 16206 -1 / (-0.18) 0 / (-0.00) TNEB PONDY 304 105 / -(-0.36) 10907 38 / -(-0.38) 2307 3 / -(-1.01) 107 / -(-0.99) 27 / -(-1.17) 291 10800 6489 1 / -(-0.38) 6407 301 10104 5298 32540 TOTAL --- 7885 --- 8733 NUCLEAR 6485 --- 28968 RE/OTHERS HYDRO 1798 2157 THERMAL --- 5810 2442 4043 1 34 2330 --- 33 --- --- 7600 --- 9.08 --- KSEB 5020 3679 66899 --- 2222 135 49461 TELANGANA 6485 --- 4845 17 APTRANSCO KPTCL TELANGANA 13416 12538 7.42 REGIONAL TNEB 2322 KSEB 2330 TNEB CENTRAL SECTOR PONDY 0.34 5945 47146 IPP 3320 14890 --- 1118 18345 49666 3320 3662 3662 118310 32239 REGIONAL PONDY 7600 7075 28863
  • 13. 3) PERFORMANCE OF CONSTITUENTS Jul-23 From 01-04-2023 To 31-07-2023 1 MACHKUND (3x23+3x17)x70% = 84.00 44.40 145.25 2 T.B.DAM (8x9)x80% = 57.60 0.97 3.56 3 UPPER SILERU 4x60 = 240.00 0.00 62.48 4 DONKARAYI 1x25 = 25.00 36.44 74.31 5 LOWER SILERU 4x115 = 460.00 1.62 177.70 6 SRISAILAM RBPH 7x110 = 770.00 89.19 173.04 7 NSR RT.CANAL.P.H 3x30 = 90.00 0.02 0.12 8 PENNA AHOBILAM 2x10 = 20.00 0.00 0.00 9 Mini Hydro(Chettipet2x0.5) & Nagarjunasagar Tailpond 1+2x25 = 51.00 0.00 0.32 TOTAL 1797.600 172.643 636.764 1 VIJAYAWADA 6x210 + 1x500 = 1760.00 917.33 4167.30 2 RAYALASEEMA 5x210+1X600 = 1650.00 773.75 3485.82 3 KRISHNAPATNAM 3x800 = 2400.00 799.05 3908.13 TOTAL 5810.000 2490.123 11561.251 1 VIJJESWARAM STAGE 1 (GAS) 2x33+1x34 = 100.00 0.00 0.00 2 VIJJESWARAM STAGE 2 (GAS) 1x112.5+1x59.5 = 172.00 0.00 0.00 TOTAL 272.000 0.000 0.000 1 SOLAR JURALA 5.43 = 5.43 0.00 0.00 2 Wind 0 = 0.00 0.00 0.00 TOTAL 5.430 0.000 0.000 1 MINI HYDRO 102.598 = 102.60 0.00 30.12 2 HINDUJA POWER CORPORATION LTD 2x520 = 1040.00 419.37 1782.87 1 GVK-I (Godavari Gas)(Jegurupadu) 2x45.8+1x48.9+1x75.5 = 216.82 0.00 0.00 2 GVKStg-II EXTENSION(GAS) 1x145+1x75 = 220.00 0.00 0.00 3 SPECTRUM (GAS) 1x46.8+2x46.1+1x68.88 = 208.31 0.00 0.00 4 LANCO (GAS) 2x115+1x125 = 351.49 0.00 0.00 5 ISOLATED GAS WELL (GAS) (LVS) 27.04 = 27.04 0.00 0.00 6 RELIANCE ENERGY LTD. (GAS) 1x140+1x80 = 220.00 0.00 0.00 7 VEMAGIRI POWER GENERATION LTD.(GAS) 1x233+1x137 = 370.00 0.00 0.00 8 GAUTAMI CCPP 2x145 + 1x174 = 464.00 0.00 0.00 9 KONASEEMA CCPP 145+140+165 = 444.08 0.00 0.00 10 GMR (BARG) 237 = 237.00 0.00 0.00 Total 2758.740 0.000 0.000 1 Solar 2871.59 = 2871.59 520.05 2596.91 3 WIND 4083.57 = 4083.57 1801.74 3924.10 4 BAGASSE+BIOMASS+WASTE BASED PP+CO-GENERATION (NC) 488.9 = 488.90 50.00 180.98 5 MINI POWER PLANTS 82 = 82.00 14.29 26.29 RE Total 7526.060 2386.081 6728.272 TOTAL IPP 11427.398 2805.451 8541.264 TOTAL ANDHRA PRADESH 19312.428 5468.218 20739.279 Jul-23 From 01-04-2023 To 31-07-2023 ENERGY GENERATED BY GENERATING STATIONS / UNITS IN SOUTHERN REGION DURING JUL 2023 ANDHRA PRADESH SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION THERMAL GAS/NAPTHA/DIESEL WIND/SOLAR IPP COAL HYDRO HYDRO GAS/NAPTHA/DIESEL WIND / SOLAR / OTHERS TELANGANA SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION
  • 14. 1 SRISAILAM LBPH 6x150 = 900.00 22.02 22.37 2 N'SAGAR 1x110+7x100.8 = 815.60 1.56 85.38 3 NSR LT.CANAL.P.H 2x30 = 60.00 53.41 100.15 4 NIZAMSAGAR 2x5 = 10.00 15.80 24.71 5 POCHAMPAD 4x9 = 36.00 0.00 3.13 6 SINGUR 2x7.5 = 15.00 0.54 1.77 7 JURALA 6x39 = 234.00 26.03 26.22 8 LOWER JURALA 6x40 = 240.00 0.00 0.28 9 PULICHINTALA 4x30 = 120.00 0.00 19.62 10 MINI HYDEL 11.16 = 11.16 3.63 4.62 TOTAL 2441.760 122.981 288.249 1 RAMAGUNDAM-B 1x62.5 = 62.50 0.00 50.31 2 KOTHAGUDEM-A 4x60 (Unit-1,2,3,4 Decomissioned) = 0.00 0.00 0.00 3 KOTHAGUDEM-B 2x120 (Unit-5,6 Decomissioned) = 0.00 0.00 0.00 4 KOTHAGUDEM-C 2x120 (Unit-7,8 Decomissioned) = 0.00 0.00 0.00 5 KOTHAGUDEM-D 2x250 = 500.00 27.98 612.03 6 KOTHAGUDEM ST VI 1x500 = 500.00 282.81 1215.56 6 KOTHAGUDEM ST VII 1X800 = 800.00 317.51 1700.81 7 KAKATIYA ST1&ST2 1x500+1x600 = 1100.00 877.88 3167.61 8 Bhadradri Thermal Power Plant 4X270 = 1080.00 710.66 2201.08 TOTAL 4042.500 2216.834 8947.401 1 Solar 1 = 1.00 0.00 0.00 2 Wind 0 = 0.00 0.00 0.00 TOTAL 1.000 0.000 0.000 1 MINI HYDRO(SMALL HYDRO) 39.86 = 39.86 0.01 0.01 1 SINGARENI TPS 2x600 = 1200.00 680.54 2592.98 1 Solar 5880.78 = 5880.78 773.94 3781.52 2 BAGASSE+BIOMASS+WASTE BASED PP+CO-GENERATION (NC) 67.2+129.6+62.9 = 259.70 44.11 171.91 3 WIND 128.1 = 128.10 54.78 130.73 RE TOTAL 6268.580 872.834 4084.156 TOTAL IPP 7508.440 1553.386 6677.149 TOTAL TELANGANA 13993.700 3893.201 15912.800 Jul-23 From 01-04-2023 To 31-07-2023 1 SHARAVATHY 10x103.5 = 1035.00 197.23 1184.40 2 LINGANAMAKKI.P.H. 2x27.5 = 55.00 3.45 35.77 3 JOG (MGHES) 4x21.6+4x13.2 = 139.20 21.21 145.82 4 NAGJHERI 1x135+5x150 = 885.00 238.21 1108.99 5 SUPA 2x50 = 100.00 15.20 149.02 6 VARAHI 4x115 = 460.00 96.87 241.24 7 BHADRA POWER HOUSE 1x7+2x12.1+1x2+6 = 39.20 0.00 7.54 8 SIVANSAMUDRAM 6x3+4x6 = 42.00 9.01 32.98 9 SHIMSHA 2x8.6 = 17.20 0.00 7.60 10 MUNIRABAD 1x10 + 3x9 = 38.00 0.00 0.00 11 T.B.DAM SHARE (20 %) 8x9(20%) = 14.40 0.11 0.77 12 GHATAPRABHA 2x16 = 32.00 0.00 8.72 13 MANI DAM.P.H. 2x4.5 = 9.00 0.00 1.85 14 MINI HYDRO 1.4+0.35+2.7 = 4.45 0.00 0.00 15 MALLAPUR 2x4.5 = 9.00 0.00 0.00 16 KADRA 3x50 = 150.00 61.70 113.54 17 KODASALLI 3x40 = 120.00 43.12 134.85 18 SHARAVATHI TAIL RACE 4x60 = 240.00 38.77 146.30 19 ALMATTI 1x15+5x55 = 290.00 40.54 60.16 HYDRO THERMAL WIND/SOLAR IPP HYDRO THERMAL WIND / SOLAR / OTHERS KARNATAKA SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION HYDRO
  • 15. 20 JURALA SHARE 4.43 4.43 TOTAL 3679.450 769.842 3383.994 1 RAICHUR.T.PS. 7x210 +1x250 = 1720.00 514.87 1886.82 2 BELLARY TPS 2x 500+1x700 = 1700.00 542.83 2128.81 3 YERAMARAS TPS 2x800 = 1600.00 538.23 1833.09 TOTAL 5020.00 1595.93 5848.71 1 SOLAR 34 = 34.00 2.46 12.62 2 Wind 0 = 0.00 1.07 2.46 TOTAL 34.00 3.536 15.079 1 MINI HYDEL 903.46 = 903.46 0.00 0.00 1 UPCL(THERMAL) 2x600 = 1200.00 91.94 966.74 2 JINDAL (COAL & COREX) 2x130+4x300 = 1460.00 42.76 587.16 3 MINI THERMAL 3.87 15.27 2660.00 138.57 1569.18 1 TATA ELECTRIC (DIESEL) 5x16.26* = 0.00 0.00 0.00 2 RAYAL SEEMA ALKALIES (DIESEL) 3x12* = 0.00 0.00 0.00 3 I T P L (DIESEL) 9* = 0.00 0.00 0.00 0.00 0.00 0.00 1 WIND MILL 5200.9 = 5200.90 2 CO-GENERATION 1731.16 = 1731.16 3 SOLAR 5719.65 = 5719.65 4 Bio mass 139.03 = 139.03 RE total 12790.74 2781.115 9290.286 TOTAL IPP 16354.20 2919.688 10859.464 TOTAL KARNATAKA 25087.650 5288.996 20107.251 Jul-23 From 01-04-2023 To 31-07-2023 1 KUTTIADI + EXTENTION + ADDL. EXTN. 3x25+ 1x50+2x50 = 225.00 88.71 200.16 2 SHOLAYAR 3x18 = 54.00 23.61 40.26 3 PORINGALKUTHU 4x9 = 36.00 11.43 18.31 4 PORIG. L. BANK 1x16 = 16.00 10.39 72.33 5 PALLIVASAL 3x7.5+3x5 = 37.50 4.93 78.65 6 SENGULAM 4x12 = 48.00 14.05 45.49 7 PANNIAR 2x16 = 32.00 18.69 26.35 8 NERIAMANGALAM + EXTENSION 3x17.5 +25 = 77.50 6.14 49.14 9 SABARIGIRI 2x60 + 4x55 = 340.00 39.34 92.67 10 IDUKKI 3x130+3x130 = 780.00 80.27 153.33 11 IDAMALAYAR 2x37.5 = 75.00 82.57 865.27 12 KALLADA 2x7.5 = 15.00 57.62 452.74 13 PEPPARA 3 = 3.00 14.94 73.47 14 MADUPETTY 2 = 2.00 2.53 8.42 15 MALAMPUZHA 1x2.5 = 2.50 0.00 0.59 16 Lower Periyar 3x60 = 180.00 0.02 1.65 17 KAKKAD 2x25 = 50.00 2.71 3.19 18 CHEMBUKADAVU 1x2.7+1x3.75 = 6.45 0.00 0.00 19 URUMI 3x1.25+3x0.8 = 6.15 1.24 2.31 20 Upper Kallar 2x1 = 2.00 0.63 3.85 21 MALANKARA 3 x 3.5 = 10.50 2.07 11.17 22 Lower meenmutty 2x1.5 + 1x0.5 = 3.50 0.60 1.29 23 Kuttiady tail race 3 x 1.25 = 3.75 0.86 2.03 24 Poozhithode 3 x 1.60 = 4.80 2.89 3.81 25 Ranni-Perunadu 2 x 2 = 4.00 0.83 3.11 26 Peechi 3x2.5 = 7.50 0.00 0.03 27 Vilangad 1 x 1.25+22.60 = 31.85 4.27 5.16 THERMAL GAS/NAPTHA/DIESEL WIND / SOLAR / OTHERS 2781.12 9290.29 KERALA THERMAL WIND/SOLAR IPP HYDRO SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION HYDRO
  • 16. 28 Chimmini 2.5 = 2.50 0.00 0.00 29 Adiyanpara 3.5 = 3.50 2.05 2.27 30 Vellathuval 3.6 = 3.60 0.93 1.63 31 Barapole 15 = 15.00 7.31 7.34 32 Perunthenaruvi 6 = 6.00 1.86 2.19 33 Kakkayam SHEP 10.5 = 10.50 1.14 2.56 34 Anakampoil 8 = 8.00 6.09 8.87 35 Arippara 4.5 = 4.50 2.86 4.10 36 Chathangottunada SHEP 6 = 6.00 2.86 3.50 37 Pallivasal Extension Scheme (PES) 37.5 37.50 15.88 34.29 38 Peruvannamuzhi 6 6.00 1.78 1.78 TOTAL 2157.10 514.106 2283.306 1 BRAHMAPURAM DGPP (DIESEL)* 3x21.32 = 63.96 0.00 0.00 2 KOZHIKODE DPP (DIESEL)* 6x16 = 96.00 0.00 0.00 TOTAL 159.96 0.000 0.000 1 WIND MILL 2.03 = 2.03 0.16 0.56 2 Solar 10.50 = 10.50 0.63 3.64 TOTAL 12.525 0.788 4.205 1 MANIYAR(CPP) 3x4 = 12.00 3.29 8.60 2 KUTHUNGAL(CPP) 3x7 = 21.00 1.82 12.61 3 ULLUNKAL(IPP) 2x3.5 = 7.00 1.70 6.44 4 IRUTTUKANAM(IPP) 1x3 = 3.00 3.88 7.44 5 KARIKKAYAM(IPP) 3 x 3.5 = 10.50 4.42 14.86 6 MEENVALLOM(IPP) 1 x 3 = 11.00 1.62 2.48 7 Pathankayam(IPP) 2x3.5+1x1 = 8.00 5.39 7.27 72.500 22.113 59.711 1 RGCCPP,KAYAMKULAM (KSEB) - NTPC 2x116.6(GT)+1x126.38(ST) = 359.58 0.00 0.00 2 BSES (NAPTHA) 3x40.5(GT)+1x35.5(ST) = 157.00 0.00 0.00 3 KASARGODE (DIESEL) 3x7.31(De Commissided) = 0.00 0.00 0.00 4 MPS STEEL CASTINGS(Co-gen)(IPP) 1x10 = 10.00 0.00 0.00 526.580 0.000 0.000 1 Wind 69.25 = 69.25 22.88 58.03 2 Solar 776.77 = 776.77 29.67 148.24 3 PCBL Thermal CPP 10 = 10.00 6.14 28.17 RE TOTAL 856.020 58.687 234.436 TOTAL IPP 1455.100 80.800 294.147 TOTAL KERALA 3784.685 595.693 2581.658 Jul-23 From 01-04-2023 To 31-07-2023 1 PYKARA 3x6.65+1x11+2x14 = 58.95 0.63 1.01 2 PYKARA MICRO 1x2 = 2.00 0.18 0.90 3 PYKARA ULTIMATE (PUSHEP) 3x50 = 150.00 26.98 87.99 4 MOYAR 3x12 = 36.00 6.90 26.87 5 MARAVAKANDI 1x0.75 = 0.75 0.06 0.20 6 KUNDAH-I 3x20 = 60.00 15.34 92.66 7 KUNDAH-II 5x35 = 175.00 45.93 238.37 8 KUNDAH-III 3x60 = 180.00 28.46 145.34 9 KUNDAH-IV 2x50 = 100.00 24.97 39.57 10 KUNDAH-V 2x20 = 40.00 3.55 31.90 11 SURULIYAR 1x35 = 35.00 0.00 0.00 12 KADAMPARAI 4x100 = 400.00 0.00 44.47 13 ALIYAR 1x60 = 60.00 9.69 31.11 14 POONACHI 1x2 = 2.00 0.32 0.39 15 METTUR DAM 4x12.5 = 50.00 14.02 52.74 GAS/NAPTHA/DIESEL WIND IPP HYDRO GAS/NAPTHA/DIESEL WIND/OTHERS TAMILNADU SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION HYDRO
  • 17. 16 METTUR TUNNEL 4x50 = 200.00 52.77 89.22 17 LOWER METTUR BARRIAGE - 1 TO 4 8x15 = 120.00 55.28 94.50 18 BHAVANISAGAR MICRO 4x2 = 8.00 5.28 15.37 19 PERIYAR 4x35 = 140.00 25.82 42.45 20 VAIGAI 2x3 = 6.00 0.00 0.23 21 PAPANASAM 4x8 = 32.00 7.71 8.73 22 SERVALAR 1x20 = 20.00 2.13 2.13 23 SARKARAPATHY 1x30 = 30.00 0.00 3.76 24 SHOLAYAR 2x35+25 = 95.00 1.02 1.02 25 KODAYAR 1x60+1x40 = 100.00 0.00 6.87 26 LOWER BHAVANISAGAR 2X4 = 8.00 0.00 3.13 27 SATHANUR DAM PH 1x7.5 = 7.50 0.00 4.99 28 KUNDAH-VI (Parson Valley) 1x30 = 30.00 1.76 1.76 29 MICRO TOTAL 0.70+1.95+2.5+4+1.3+5.25 = 15.70 1.36 1.65 30 BHAVANI KATTALAI BARRAGE - I & II 4x15 = 60.00 39.88 66.20 TOTAL 2221.900 370.032 1135.557 1 ENNORE.T.P.S* 2x60+3x110 = 0.00 0.00 0.00 2 TUTUCORIN.T.P.S 5x210 = 1050.00 457.11 2175.26 3 METTUR.T.P.S 4x210 + 1x600 = 1440.00 504.92 2943.65 4 NORTH CHENNAI T.P.S 3x210 + 2x600 = 1830.00 786.11 3373.43 5 SEPC PPL 525 = 525.00 267.14 805.57 TOTAL 4845.000 2015.283 9297.904 ENNORE.T.P.S* shutdown of Units permenently from 31.03.17 1 BASIN BRIDGE (NAPTHA) 4x30 = 120.00 0.00 0.00 2 KOVIL KALAPPAL (GAS) 1x70+1x37.88 = 107.88 12.73 47.27 3 VALUTHUR (GAS) STG1 1x60+1x35 = 95.00 59.75 230.80 4 VALUTHUR (GAS) STG2 1 x 60 + 1 x 32 = 92.00 49.22 182.00 5 KUTTALAM (GAS) 1x64+1x37 = 101.00 55.79 216.35 TOTAL 515.880 177.486 676.423 1 TNEB WIND MILL 17.465 = 17.47 0.00 0.00 2 Solar 0 = 0.00 0.00 0.00 TOTAL 17.465 0.000 0.000 1 NEYVELI-I (TN) - NLC 6x50+3x100* = 0.00 0.00 0.00 2 ST - CMS 250 = 250.00 149.40 592.01 250.000 149.396 592.014 1 GMR POWER (DIESEL) 4x49*# = 0.00 0.00 0.00 2 SAMALPATTY (DIESEL) 7x15.1*# = 0.00 0.00 0.00 3 MADURAI POWER CL (DIESEL) 106*# = 0.00 0.00 0.00 4 P P NALLUR (NAPTHA) 330.5 = 330.50 0.00 0.00 5 ABAN POWER (GAS)(LANCO) 74.41+38.81 = 113.20 0.00 129.94 6 ARKEY ENERGY(PENNA)(GAS)(PIONEER) 1x38 + 2x6.8 + 1x20 = 52.80 0.00 0.00 496.500 0.000 129.936 1 WIND MILL 8759.80 = 8759.80 2828.34 6336.13 2 SOLAR 6301.11 = 6301.11 865.90 3443.00 3 CO-GENERATION 711.00 = 711.00 1294.88 4 BIO-MASS & CPP 265.60 = 265.60 0.00 5 Captive Power Projects (CPPs) 895.00 = 895.00 0.000 0.00 RE TOTAL 16037.505 3920.166 11074.017 TOTAL IPP 17679.005 4069.562 11795.967 TOTAL TAMIL NADU 25279.250 6632.363 22905.851 THERMAL COAL/LIGNITE GAS/NAPTHA/DIESEL WIND / SOLAR IPP LIGNITE/THERMAL GAS/NAPTHA/DIESEL WIND / SOLAR / OTHERS 225.930 PONDICHERRY SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION * NLC ST1 -U1 to U9 Decommissioned. *# TANTRANSCO/TN SLDC vide communication dated 05.06.2023 had informed that the PPA with the Madurai PPCL(106MW), Samalpatty PCL(106 MW), GMR(196 MW), Penna and Aban-166 MW) have expired and the same may be removed from the Installed Capacity of TN.
  • 18. Jul-23 From 01-04-2023 To 31-07-2023 1 KARAIKAL POWER PLANT (GAS) 22.9 + 9.6 = 32.50 0.00 0.00 TOTAL 32.50 0.00 0.00 TOTAL PONDICHERRY 32.500 0.000 0.000 1 LANCO KONDAPPILLI POWER LTD. ST2&ST3 233 + 133+2*(233 + 133) = 1098.00 0.00 0.00 2 SIMHAPURI ENERGY PVT LTD 4 x 150 = 600.00 198.04 720.23 3 MEENAKSHI ENERGY PVT LTD 2 x 150+1X350 = 650.00 0.00 0.00 4 COASTAL ENERGY 2x600 = 1200.00 200.10 1628.26 5 SEIL(TPCIL) 2x660 = 1320.00 827.70 3365.88 6 IL&FS 2x600 = 1200.00 316.09 2065.86 7 SEILP2(SGPL) 2x660 = 1320.00 788.72 3178.24 TOTAL 7388.000 2330.649 10958.465 TOTAL IPP UNDER OPEN ACCESS 7388.000 2330.649 10958.465 Jul-23 From 01-04-2023 To 31-07-2023 1 RAMAGUNDAM T.P.S (ISGS) - NTPC 3x200+4x500 = 2600 1408.33 5618.21 2 TALCHER STAGE II (ISGS) - NTPC 4x500 = 2000 1072.65 4869.47 3 SIMHADRI STAGE - I - NTPC 2x500 = 1000 482.32 1783.00 4 SIMHADRI STAGE - II - NTPC 2x500 = 1000 242.84 1517.37 5 VALLUR TPS - NTPC 3x500 = 1500 841.73 3184.51 6 NTPL 2X500 = 1000 338.86 1777.11 7 NTPC KUDGI 3x800 = 2400 744.24 3882.92 TOTAL 11500.000 5130.976 22632.602 8 NEYVELI-II (ISGS) - NLC 7x210 = 1470 383.27 1779.79 9 NEYVELI TPS-I (Expansion) (ISGS) - NLC 2x210 = 420 264.57 939.04 10 NEYVELI TPS-II (Expansion) (ISGS) - NLC 2 x 250 = 500 239.46 811.95 11 New Neyveli Thermal Power Project 2x500 = 1000 597.89 2464.77 TOTAL 3390.000 1485.188 5995.540 10 M.A.P.S KALPAKAM (ISGS) - NPC 2x220 = 440.00 0.00 480.88 11 KAIGA A.P.S (ISGS) - NPC 4x220 = 880.00 627.62 2437.21 12 KUDANKULAM A.P.S (ISGS) - NPC 2x1000 = 2000.00 943.54 3584.34 TOTAL 3320.000 1571.163 6502.435 13 RAMANGUNDAM 10.000 = 10.00 0.39 3.43 14 N P Kunta 1400.000 = 1400.00 195.31 999.52 15 PAVAGADA 2050.000 = 2050.00 298.99 1525.09 16 NTPC Ramagundam FSPP 100.000 = 100.00 12.64 68.55 17 NTPC Simhadri FSPP 25.000 = 25.00 1.46 12.57 18 TUTICORIN 380.000 = 380.00 71.74 276.61 TOTAL 3965.000 580.522 2885.781 19 TUTICORIN 1011.700 = 1090.10 490.76 1108.93 20 PUGALUR 300.000 = 300.00 138.56 304.89 21 HIRIYUR 300.300 = 300.30 156.10 352.59 TOTAL 1690.400 785.423 1766.415 TOTAL CENTRAL SECTOR 23865.400 9553.272 39782.774 GRAND TOTAL 118743.613 33762.393 132988.078 SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) GAS/NAPTHA/DIESEL IPP UNDER OPEN ACCESS GAS/NAPTHA/DIESEL CENTRAL SECTOR SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW) ENERGY GENERATION Note: Generation data received from RPC. REMC ISTS Wind and Solar based on REMC data THERMAL COAL LIGNITE NUCLEAR SOLAR WIND
  • 19. ENERGY EXCHANGES Seller/Buyer ANDHRAPRADESH ASSAM BALCO_WR BIHAR DELHI GOA-WR GOA-SR GUJARAT HARYANA JHARKHAND KARNATAKA KERALA MAHARASHT RA NAGALAND ODISHA PUDUCHERR Y RAJASTHAN TAMILNADU TELANGANA UTTARPRADE SH UTTARPRADE SH Grand Total NORTH(ABCREPL_BHDL2) 21.65 21.65 NORTH(AvSusRJPPL_BKN) 31.65 27.69 59.34 NORTH(DSNTPC_FTG2) 47.53 47.53 NORTH(KSPPNL_BHDL2) 81.01 81.01 NORTH(NOKHRANT_BHDL2) 57.41 57.41 NORTH(NSNTPC_FTG1) 62.68 62.68 NORTH(RSRPL_BKN) 0.14 2.82 2.95 NORTH(RSUPL_FTG2) 33.67 25.75 59.42 NORTH(TPSL_BKN) 22.62 22.62 SOUTH(ANP_AdaniAPSeven) 44.66 44.66 SOUTH(ANP_AthenaBhiwadi) 8.20 8.20 SOUTH(ANP_AthenaHisar) 8.20 8.20 SOUTH(ANP_AthenaKarnal) 8.21 8.21 SOUTH(ANP_AYANA) 42.75 42.75 SOUTH(ANP_AZURE) 7.09 7.09 SOUTH(ANP_IGS1) 8.47 8.47 SOUTH(ANP_IGS2) 8.57 8.57 SOUTH(ANP_NTPC) 26.88 26.88 SOUTH(Anp_SprngAgnitra) 43.53 43.53 SOUTH(ANP_TATARENEWABLE) 14.70 14.70 SOUTH(HIRIYUR_OSTROKANNADA) 0.15 104.43 0.99 0.72 0.50 0.08 0.60 0.21 3.45 3.00 3.26 5.67 123.06 SOUTH(NTPCRGDMFSP) 7.66 0.62 8.28 SOUTH(NTPCSIMHFSP) 4.87 4.87 SOUTH(NTPCSIMHFSP_STG1) 0.59 0.59 SOUTH(PGLR_SREPL) 162.20 162.20 SOUTH(PVG_AdaniKANine) 32.81 32.81 SOUTH(PVG_ADYAH) 49.57 49.57 SOUTH(PVG_AMPLUS_PAVAGADA) 8.11 8.11 SOUTH(PVG_AMPLUS_TUMKUR) 8.10 8.10 SOUTH(PVG_AVAADASOLAR) 22.41 22.41 SOUTH(PVG_AvaadaSolarise) 22.80 22.80 SOUTH(PVG_AzurePowerEarth) 16.89 16.89 SOUTH(PVG_FORTUMFINSURYA) 14.75 14.75 SOUTH(PVG_FortumSolar) 40.27 40.27 SOUTH(PVG_KREDL) 6.64 6.64 SOUTH(PVG_PARAMPUJYA) 23.91 23.91 SOUTH(PVG_ReNew_TN2) 8.08 8.08 SOUTH(PVG_TATARENEWABLE) 63.13 63.13 SOUTH(PVG_YARROW) 8.06 8.06 SOUTH(Tuticorin_BETAMWIND) 24.32 40.69 40.70 105.71 SOUTH(Tuticorin_GIREL) 23.79 23.79 23.79 47.54 118.92 SOUTH(Tuticorin_GRTJIPL) 29.81 29.81 SOUTH(Tuticorin_JSWRETwo) 62.94 62.94 SOUTH(Tuticorin_Mytrah) 22.70 22.70 22.70 45.40 113.51 SOUTH(Tuticorin_NTPCETPRM) 43.90 43.90 SOUTH(Tuticorin_Orange) 47.70 47.70 95.39 WEST(APRAAVA_KHKRDA_JAM_W) 13.15 13.15 WEST(AWEK1L) 19.87 19.87 WEST(GANDHAR_SOLAR) 2.10 2.10 WEST(KAWAS_SOLAR) 6.07 6.07 WEST(MASAYA_BWSPRA_KNDW_S) 14.42 14.42 WEST(SHERISHA_RAIPUR_S) 3.54 3.54 WEST(SITAC_CHUGGER_BHJ2_W) 33.05 33.05 Grand Total 221.27 22.70 0.15 252.75 24.78 7.66 0.86 0.50 47.70 46.58 296.88 42.49 0.21 9.53 43.70 67.85 62.94 68.58 371.39 5.67 328.65 1922.83 ISTS_Wind and Solar_ LTA Schedule Details for the month of July-2023
  • 20. Seller/Buyer ANDHRAPRADESH BANGLADESH GOA-SR GOA-WR GUJARAT KARNATAKA KERALA TAMILNADU TELANGANA Grand Total ANDHRAPRADESH(APTRANSCO) 0.00 0.00 ANDHRAPRADESH(NVVN_SOLAR_AP) 1.72 1.72 CHATTISGARH(MARWATPP) 0.00 0.00 DVC(KODERMA) 161.12 161.12 DVC(MEJB) 112.98 58.07 171.06 DVC(RTPS) 32.48 32.48 EAST(APNRL) 73.46 73.46 EAST(JITPL) 0.00 0.00 EAST(MPL) 197.35 197.35 GOA(GOA-SR) 0.11 0.11 GOA(GOAWR) 1.00 1.00 RAJASTHAN(RAJ_SOLAR) 6.79 6.79 SOUTH(COASTGEN) 185.60 185.60 SOUTH(ILFS) 291.13 291.13 SOUTH(SEIL) 154.93 579.94 734.87 SOUTH(SEILP2) 334.80 72.06 406.86 TELANGANA(TSTRANSCO) 0.00 0.00 WEST(BALCO) 53.14 102.70 155.84 WEST(DBPL) 201.95 201.95 WEST(DHARIWAL_ISTS) 63.93 63.93 WEST(GMRWARORA) 92.31 92.31 WEST(JHABUA_IPP) 86.50 86.50 WEST(JPL-2) 183.02 226.55 409.57 WEST(JPNIGRIE_JNSTPP) 36.75 36.75 WEST(KSK_MAHANADI) 335.71 335.71 WEST(MBMP) 0.00 0.00 WEST(NSPCL) 9.42 9.42 Grand Total 154.93 334.80 1.00 0.11 72.06 280.89 610.56 1619.50 581.67 3655.51 LTA and MTOA Schedule Details for the month of July-2023
  • 21. Seller/Buyer AMNSIL_WR ANDHRAPRADE SH ASSAM BALCO_WR BIHAR DADRA&NAG ARHAVELI DELHI GOA-WR GUJARAT HARYANA JHARKHAND KARNATAKA KERALA MAHARASHT RA ODISHA PUNJAB RAJASTHAN TAMILNADU TELANGANA UTTARAKHA ND UTTARPRADE SH WESTBENGAL Grand Total ANDHRAPRADESH(APCPDCL) 337.82 54.93 89.28 482.03 ANDHRAPRADESH(ITCWIND) 0.60 0.64 0.91 7.98 2.31 0.69 13.13 ANDHRAPRADESH(NALCOAP) 22.68 22.68 ANDHRAPRADESH(TADASWIND) 7.06 0.42 1.81 2.65 3.81 15.74 DELHI(BYPL) 0.77 0.77 EAST(APNRL) 0.33 1.64 1.97 EAST(DIKCHU) 6.11 8.75 14.86 EAST(GMRKEL) 56.52 56.52 EAST(Teesta_III) 3.06 54.50 88.65 50.20 196.40 Gujarat(APLStage-3(U-9)) 12.06 17.98 30.05 Gujarat(UNOSUGEN) 0.45 0.45 HIMACHALPRADESH(HP-GOVT) 1.86 1.86 HIMACHALPRADESH(MALANA) 0.67 1.40 2.07 KARNATAKA(CORSUGKRPET) 0.08 0.08 KARNATAKA(EDCLHARANGI) 1.25 1.25 KARNATAKA(GODAVARIBIOREF) 4.49 0.25 4.74 KARNATAKA(ICPLBAGALKOT) 4.20 1.08 5.28 KARNATAKA(JSWEL) 0.32 16.50 16.82 KARNATAKA(NSLSUGAR) 4.54 0.49 0.09 5.12 KARNATAKA(PCKL) 51.65 14.88 0.45 0.78 1.95 16.92 641.50 1.60 176.70 906.42 KARNATAKA(TADASWIND_KAR) 7.13 0.26 1.30 2.61 2.58 13.88 KARNATAKA(UDUPI_SR) 0.25 0.27 0.26 0.32 1.10 KERALA(KSEB) 43.76 131.76 175.52 MAHARASHTRA(LMELMSEB) 0.20 1.67 0.04 1.90 NORTH(ADHPL) 0.64 2.68 4.89 8.21 NORTH(KWHEP) 1.01 1.26 2.26 NORTH(SCLTPS) 2.64 2.64 NORTH(SINGOLI) 0.60 3.55 4.15 ODISHA(DCBLRajgangpur) 0.51 0.51 ODISHA(GMRKEL(STU)) 0.18 0.31 15.50 16.00 ODISHA(KCMW(od)) 0.03 0.03 ODISHA(NBVLOTCL) 19.15 19.15 RAJASTHAN(APL_RAJ) 0.08 0.08 RAJASTHAN(SREE-RJ) 0.13 0.13 SOUTH(SEIL) 52.87 0.56 4.15 57.57 SOUTH(SEILP2) 0.50 260.40 1.04 19.27 1.83 10.35 293.39 SOUTH(SIMHAPURI) 2.46 0.24 2.54 2.35 4.58 0.73 115.02 1.61 0.35 1.84 0.88 0.15 1.87 37.69 0.45 172.75 TAMILNADU(BIRLACARBONTN) 5.43 5.43 TAMILNADU(OPGPGPLU2TN) 52.08 52.08 TAMILNADU(TANGEDCO) 58.67 203.15 21.68 283.50 TAMILNADU(TULSYAN_NEC_LTD) 0.07 0.18 0.12 0.36 TELANGANA(NAVABHARAT) 25.40 25.40 TELANGANA(TSSPDCL) 60.00 60.00 UTTARPRADESH(LAPL-UP) 0.36 2.88 3.34 0.08 6.66 UTTARPRADESH(PPGCL) 0.35 0.35 WEST(ACBIL) 1.02 12.59 3.93 17.53 WEST(APL_RaipurTPP) 6.61 52.39 59.00 WEST(DBPL) 11.46 24.53 35.99 WEST(JHABUA_IPP) 3.09 3.09 WEST(JPL) 0.53 34.05 11.80 46.38 WEST(JPL-2) 2.64 44.32 53.22 100.18 WEST(JPNIGRIE_JNSTPP) 7.34 6.00 13.34 WEST(MAHANENERGEN) 37.04 101.23 138.27 WEST(MCCPL) 1.51 1.63 3.14 WEST(RKM_POWER) 0.45 9.00 1.32 1.97 12.74 Grand Total 60.84 260.85 2.46 16.20 3.59 14.19 111.37 4.58 56.13 550.38 1.61 24.51 69.54 6.91 42.89 1091.34 1.60 408.67 346.54 2.31 333.69 0.77 3410.95 STOA Bilateral Transactions Schedule Details for the month of July-2023
  • 22. 4) RESERVOIR PARTICULARS MDDL (M) FRL (M) 1st day Last day 1st day Last day NILAGIRIS 0.00 0.00 0.00 0.00 135.00 529.00 582.71 149.80 IDUKKI 694.94 732.43 702.95 710.83 313.00 695.00 459.98 78.71 JALAPUT 818.39 838.40 822.87 824.54 89.00 115.00 205.48 78.87 N.SAGAR 149.30 179.90 158.40 156.97 94.00 48.00 72.17 49.87 SRISAILAM 243.84 270.70 246.43 258.47 25.00 258.00 192.21 1.55 SUPA 495.00 564.00 525.86 544.75 664.00 1632.00 868.48 240.07 LINGANAMAKKI 522.73 554.50 530.46 544.81 334.00 2048.00 1621.28 189.47 KAKKI 908.3 981.45 936.04 958.07 98.00 322.00 280.38 57.03 5) a) BRIEF DESCRIPTION OF GRID INCIDENCES:- Outage Duration Date Time (Hrs) Date Time (Hrs) Time 1 1. 230kV NCTPS Unit-1,2&3 2. 230kV NCTPS ETPS line 3. 230kV NCTPS Kilpauk line Tamil Nadu 02-07-2023 13:07 02-07-2023 14:04 57mins 504 0 GD-1 2 1. 220kV/110kV Ambewadi Transformer-1,2&3 2. 220kV Nagjheri Ambewadi Line-1&2 3. 220kV Ambewadi Narendra Line-1&2 4. 220kV Ambewadi Ponda Line-1&2 Karnataka 27-07-2023 09:41 27-07-2023 10:09 28mins 0 98 GD-1 3 1. 220kV BG Kothur Manuguru 2. 220kV BG Kothur Chintur 3. 220kV BG Kothur KTPS Stage-V 4. 220kV BG Kothur KTPS Stage-III Telangana 27-07-2023 16:10 27-07-2023 21:27 5hrs 17mins 0 0 GD-1 b) BRIEF DESCRIPTION OF GRID DISTRUBANCES :- Outage Duration Date Time (Hrs) Date Time (Hrs) Time 1 1. 400kV Guddigudem Hinduja Line-1 Andhra Pradesh 03-07-2023 17:37 03-07-2023 18:33 54 mins 0 0 GI-2 2 1. 220kV Jurala Raichur_KA Line-2 2. 220kV Bus coupler at 220kV Jurala PH Telangana 06-07-2023 00:34 06-07-2023 01:27 53 mins 0 0 GI-1 3 1. 400kV Kalpakka Gajuwaka Line-1&2 2. 400kV Kalpakka Simhari Line-2 3. 400kV kalpakka Vemagiri Line-1 4. 400kV/220kV Kalpakka ICT-3 Andhra Pradesh 11-07-2023 19:54 11-07-2023 23:00 3hrs 6mins 0 0 GI-2 4 1. 400kV/230kV ICT-5 at Alamathy Tamil Nadu 27-07-2023 07:12 27-07-2023 09:46 2hr 34mins 0 0 GI-2 Sl. No. CONSTITUENTS Installed as on 31-03-2022 (MVAr) Additional requirement during 2022-23 (MVAr) Actual Addition upto 31-03- 2023 (MVAr) Balance to be installed (MVAr) 1 APTRANSCO 5533.700 544.800 31.600 513.200 2 TSTRANSCO 6979.910 2463.520 32.626 2430.894 3 KPTCL 8762.503 162.964 342.768 0.000 4 KSEB 1027.000 0.000 0.000 0.000 5 TNEB 4243.610 48.000 48.000 0.000 6 PONDY 32.400 0.000 0.000 0.000 7 SOUTHERN REGION 26579.123 3219.284 454.994 2944.094 * As per details received from SRPC vide letter dt. 14/06/2023 ENERGY (MU's) STORAGE Outage Complete Outage of 220kV/11kV BG Kothur LIS SS of TSTRANSCO: As per the reports submitted, the triggering incident was tripping of all 220kV connected lines at 220kV/11kV BG Kothur LIS SS on CTD operation due to DC supply failure. This resulted in complete outage of 220kV/11kV BG Kothur LIS SS. Tripping of 400kV Bus-1 of 400kV Hinduja Generating station: As per the reports submitted, the triggering incident was B-N fault in 400kV Guddigudem Hinduja line-1. At Hinduja end, the main breaker failed to open causing LBB to operate and all the main breakers connected to 400kV Bus-1 tripped. Event (As reported) C) CAPACITOR DETAILS ELEMENT NAME Revival PROGRESSIVEINFLOW (MU's) Complete Outage of 230kV NCTPS Stage-1 Generating Station of TANGEDCO: As per the reports submitted, the triggering incident was tripping of 230kV NCTPS ETPS line and 230kV NCTPS Kilapuk line on faults at 13:07hrs and 13:09hrs respectively. Tripping of these lines led to tripping of NCTPS Unit-1,2 & 3 on over-frequency protection. This led to a complete outage of the 230kV NCTPS Stage-1 Generating Station. Complete Outage of 220kV/110kV Ambewadi SS of KPTCL: Duirng antecedent conditions, all 220kV elements were connected to 220kV Bus-1 at 220kV/110kV Ambewadi SS. As per the reports submitted, the triggering incident was B-N fault in 220kV Nagjheri Ambewadi line-2 and the line tripped. Because of this, 220kV Ambewadi Nagjheri line-1 got overloaded and caused the B-phase bus jumper connected to the line to fail. This resulted in a B-phase bus fault causing BBP to operate and all the elements connected to the 220kV Bus tripped. This led to a complete outage of 220kV/110kV Ambewadi SS. PROGRESSIVE ENERGY USAGE (MU's) Owner / Agency Tripping of 220kV Bus-2 of 220kV Upper Jurala PH of TSGENCO: During antecedent conditions, there was no generation at 220kV Upper Jurala PH. As per the reports submitted, the triggering incident was R-N fault in 220kV Jurala Raichur_KA Line-2. At the same time, the Bus Coupler tripped on over current protection. Tripping of only connected line and bus coupler resulted in de- energization of 220kV Bus-2 at 220kV Upper Jurala PH. NAME OF RESERVOIR ELEMENT NAME Outage Owner / Agency Revival LEVEL (M) S.NO. Note: Generation loss (MW) Tripping of 400kV Bus-3 and Bus-4 of 400kV/220kV Kalpakka SS of APTRANSCO: As per the reports submitted, the triggering incident was R-phase CT failure in Bus coupler-2 bay of 400kV/220kv Kalpakka SS. Immediately, 400kV Bus-3 and Bus-4 BBP operated and all the elements connected to the Bus-3 and Bus-4 tripped. Tripping of 400kV Bus-1 of 400kV/230kV/110kV Alamathy SS of TANTRANSCO: 400kV/230kV/110kV Alamathy SS is operating with one and half breaker scheme at 400kV level. As per the reports submitted, the triggering incident was bus-side B-phase CT failure in 400kV/230kV ICT-5 at 400kV/230kV/110kV Alamathy SS. Immediately, 400kV Bus-1 BBP operated and the main breakers connected to the 400kV Bus-1 tripped. This resulted in de-energisation of 400kV Bus-1 of 400kV/230kV/110kV Alamathy SS. S.NO. Event (As reported) Load loss (MW) Category as per CEA Grid Standards Generation loss (MW) Category as per CEA Grid Standards Load loss (MW)
  • 23. 0 20 40 60 80 100 120 140 MU Date Day-wise Solar Generation from 01/07/2023 to 31/07/2023 in MU SR AP Kar TN TS
  • 29. 0 50 100 150 200 250 300 350 MU Date Day-wise Wind Generation from 01/07/2023 to 31/07/2023 in MU SR AP Kar TN
  • 46. ग्रिड क ं ट्र ोलर ऑफ इंग्रडया ग्रलग्रिट्ेड (भारत सरकार का उद्यि) भूतपूर्व पार्र ग्रसस्टि ऑपरेशन कारपोरेशन ग्रलग्रिट्ेड GRID CONTROLLER OF INDIA LIMITED (A Govt. of India Enterprise) Erstwhile POWER SYSTEM OPERATION CORPORATION LIMITED दक्षिण िेत्रीय लोड क्षडस्पेच क े न्द्र / SOUTHERN REGIONAL LOAD DESPATCH CENTRE 29, रेस कोसस क्रास रोड, बेंगलूर – 560 009 / 29, RACE COURSE CROSS ROAD, BANGALORE – 560 009. E Mail – srldcos@grid-india.in, Website – www.srldc.in