Installation ProcessInstallation Process
 Ship and install support equipmentShip and install support equipment
 Position equipment in designatedPosition equipment in designated
locationslocations
 Reassemble computer systemReassemble computer system
 Verify system startup and stabilizationVerify system startup and stabilization
 Verify system on-site qualityVerify system on-site quality
 Prepare system operationsPrepare system operations
Site EvaluationSite Evaluation
Considerations for site selection:Considerations for site selection:
 Electrical power qualityElectrical power quality
 Air qualityAir quality
 Cooling water qualityCooling water quality
 Vibration sourcesVibration sources
 Structural strength of computer room floorStructural strength of computer room floor
Computer Room DesignComputer Room Design
Computer room design considers:Computer room design considers:
 Personnel safety and securityPersonnel safety and security
 Air quality and positive air pressureAir quality and positive air pressure
 Future computer equipment plansFuture computer equipment plans
 Seismic vibrationSeismic vibration
 Raised flooring capabilityRaised flooring capability
 Sound reduction and proper lightingSound reduction and proper lighting
capabilitycapability
 Handicapped personnel accessHandicapped personnel access
Computer Room EnvironmentComputer Room Environment
Computer equipment is designed to operateComputer equipment is designed to operate
within specific ranges of air quality,within specific ranges of air quality,
temperatures, and relative humidity levelstemperatures, and relative humidity levels
 Temperature: 60Temperature: 60 °F to 83 °F (16 °C to 28 °C)°F to 83 °F (16 °C to 28 °C)
 Humidity 35% to 65% relative humidityHumidity 35% to 65% relative humidity
 Dewpoint 60Dewpoint 60 °F (16 °C)°F (16 °C)
 Air quality: One fresh air change per hourAir quality: One fresh air change per hour
Support Equipment RoomSupport Equipment Room
EnvironmentEnvironment
Support equipment consists of motorSupport equipment consists of motor
generator units and refrigeration control unitsgenerator units and refrigeration control units
 Temperature: 65Temperature: 65 °F to 95 °F (18 °C to 35 °C)°F to 95 °F (18 °C to 35 °C)
 Humidity 30% to 80% relative humidityHumidity 30% to 80% relative humidity
 A clean, dirt- and dust-free environmentA clean, dirt- and dust-free environment
 Located as close as possible to computerLocated as close as possible to computer
roomroom
Electrical RequirementsElectrical Requirements
 Computer equipment requires a protectiveComputer equipment requires a protective
power safety-ground systempower safety-ground system
 Computer equipment requires a signalComputer equipment requires a signal
reference gridreference grid
 Customer provides and installs all powerCustomer provides and installs all power
wiring, circuit breakers, and circuit breakerwiring, circuit breakers, and circuit breaker
panelspanels
Dielectric-cooling SystemsDielectric-cooling Systems
Dielectric coolant:Dielectric coolant:
 Is inert liquidIs inert liquid
 Has insulating and non-corroding propertiesHas insulating and non-corroding properties
 Has large capacity for absorbing heat fromHas large capacity for absorbing heat from
integrated circuit modules and powerintegrated circuit modules and power
suppliessupplies
Cooling Water SupplyCooling Water Supply
 System requires clean, adequate source ofSystem requires clean, adequate source of
water for cooling purposeswater for cooling purposes
 Closed-loop cooling water supply isClosed-loop cooling water supply is
generally requiredgenerally required
 Open system water supply may not complyOpen system water supply may not comply
with water system requirementswith water system requirements
 Water supply temperature should range fromWater supply temperature should range from
4040 °F to 70 °F°F to 70 °F
Equipment Separation LimitsEquipment Separation Limits
General requirements for arranging computerGeneral requirements for arranging computer
system equipment must consider thesystem equipment must consider the
following:following:
 Personnel safetyPersonnel safety
 Maximum system performanceMaximum system performance
 Satisfactory system installationSatisfactory system installation
 Satisfactory operator and maintenanceSatisfactory operator and maintenance
accessaccess
Floor PreparationFloor Preparation
Computer room floor must:Computer room floor must:
 Be raised floor and be static-dissipativeBe raised floor and be static-dissipative
 Provide signal reference grid for computerProvide signal reference grid for computer
systemsystem
 Provide space for power cables, signalProvide space for power cables, signal
cables, coolant piping, and air flowcables, coolant piping, and air flow
 Provide minimum clearance of 18 inchesProvide minimum clearance of 18 inches
(46 cm)(46 cm)
ReferenceReference
 Cray Research, Inc. (1993). Site PlanningCray Research, Inc. (1993). Site Planning
and preparation. Publication numberand preparation. Publication number
HR-04036HR-04036

More Related Content

What's hot

What's hot (7)

CI_SCS_Intro
CI_SCS_IntroCI_SCS_Intro
CI_SCS_Intro
 
Sound Level Meter by ACMAS Technologies Pvt Ltd.
Sound Level Meter by ACMAS Technologies Pvt Ltd.Sound Level Meter by ACMAS Technologies Pvt Ltd.
Sound Level Meter by ACMAS Technologies Pvt Ltd.
 
Ecotech serinus-31-co2-analyser-spec-sheet-20190403
Ecotech serinus-31-co2-analyser-spec-sheet-20190403Ecotech serinus-31-co2-analyser-spec-sheet-20190403
Ecotech serinus-31-co2-analyser-spec-sheet-20190403
 
Offshore Europe Technology Zone Presentation
Offshore Europe Technology Zone Presentation Offshore Europe Technology Zone Presentation
Offshore Europe Technology Zone Presentation
 
Portable Gas Detection From Drager
Portable Gas Detection From DragerPortable Gas Detection From Drager
Portable Gas Detection From Drager
 
Co12 m carbon monoxide gfc analyser datasheet
Co12 m carbon monoxide gfc analyser datasheetCo12 m carbon monoxide gfc analyser datasheet
Co12 m carbon monoxide gfc analyser datasheet
 
Refrigerated water bath equipments
Refrigerated water bath equipmentsRefrigerated water bath equipments
Refrigerated water bath equipments
 

Viewers also liked

Messendger Copy
Messendger CopyMessendger Copy
Messendger Copyguest9f84f
 
Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8
Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8
Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8stone2.0
 
Reaktsiooni Kiiruse Muutmine
Reaktsiooni Kiiruse MuutmineReaktsiooni Kiiruse Muutmine
Reaktsiooni Kiiruse Muutminekatrinsoika
 
Jets and Missing Energy at CDF
Jets and Missing Energy at CDFJets and Missing Energy at CDF
Jets and Missing Energy at CDFJay Wacker
 
Revista Retranca
Revista RetrancaRevista Retranca
Revista RetrancaCalalia3
 
New Gcse Geography
New Gcse GeographyNew Gcse Geography
New Gcse Geographyguest92e153
 
One million reasons to enjoy walking
One million reasons to enjoy walkingOne million reasons to enjoy walking
One million reasons to enjoy walkingASUHealthDesignClass
 
La Crisis En España_trabajo udima
La Crisis En España_trabajo udimaLa Crisis En España_trabajo udima
La Crisis En España_trabajo udimavictor_patrick
 
Powerpoint presentation (1)
Powerpoint presentation (1)Powerpoint presentation (1)
Powerpoint presentation (1)jrh042
 
Wealthbuilder Video
Wealthbuilder VideoWealthbuilder Video
Wealthbuilder Videokmt366
 
Oblivious Transfer
Oblivious TransferOblivious Transfer
Oblivious Transferrobertsicoie
 

Viewers also liked (20)

Messendger Copy
Messendger CopyMessendger Copy
Messendger Copy
 
Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8
Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8
Cn Enterprise 20 A New Age Of Aquarius 1227152882658553 8
 
Reaktsiooni Kiiruse Muutmine
Reaktsiooni Kiiruse MuutmineReaktsiooni Kiiruse Muutmine
Reaktsiooni Kiiruse Muutmine
 
FERGIE
FERGIEFERGIE
FERGIE
 
Game Grad School: DIY_Cassinat
Game Grad School: DIY_CassinatGame Grad School: DIY_Cassinat
Game Grad School: DIY_Cassinat
 
FIC Magazine Ad '07
FIC Magazine Ad '07FIC Magazine Ad '07
FIC Magazine Ad '07
 
Bank Account1
Bank Account1Bank Account1
Bank Account1
 
Seminar
SeminarSeminar
Seminar
 
Jets and Missing Energy at CDF
Jets and Missing Energy at CDFJets and Missing Energy at CDF
Jets and Missing Energy at CDF
 
Ledum Palustre
Ledum PalustreLedum Palustre
Ledum Palustre
 
Sipel Isis
Sipel IsisSipel Isis
Sipel Isis
 
Cq Slide Share Pp
Cq Slide Share PpCq Slide Share Pp
Cq Slide Share Pp
 
Revista Retranca
Revista RetrancaRevista Retranca
Revista Retranca
 
New Gcse Geography
New Gcse GeographyNew Gcse Geography
New Gcse Geography
 
One million reasons to enjoy walking
One million reasons to enjoy walkingOne million reasons to enjoy walking
One million reasons to enjoy walking
 
Behavior change intervention
Behavior change interventionBehavior change intervention
Behavior change intervention
 
La Crisis En España_trabajo udima
La Crisis En España_trabajo udimaLa Crisis En España_trabajo udima
La Crisis En España_trabajo udima
 
Powerpoint presentation (1)
Powerpoint presentation (1)Powerpoint presentation (1)
Powerpoint presentation (1)
 
Wealthbuilder Video
Wealthbuilder VideoWealthbuilder Video
Wealthbuilder Video
 
Oblivious Transfer
Oblivious TransferOblivious Transfer
Oblivious Transfer
 

Similar to Unit 9 system install_pwr_point

IT Computer Room Health Check
IT Computer Room Health CheckIT Computer Room Health Check
IT Computer Room Health CheckAlfonso Castillo
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxNeometrix_Engineering_Pvt_Ltd
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Upsite Technologies
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF John Chavez
 
A Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of ElectronicsA Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of ElectronicsKamal Karimanal
 
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...Net Master
 
What's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & MoreWhat's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & MoreUpsite Technologies
 
How to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationHow to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationNercon
 
Csc.Cooling Audit Results.V1.12 Jul 08
Csc.Cooling Audit Results.V1.12 Jul 08Csc.Cooling Audit Results.V1.12 Jul 08
Csc.Cooling Audit Results.V1.12 Jul 08guest3072df
 
MPL Data Centre World 2017 DCIM presentation v1.2
MPL Data Centre World 2017 DCIM presentation v1.2MPL Data Centre World 2017 DCIM presentation v1.2
MPL Data Centre World 2017 DCIM presentation v1.2Venessa Moffat MBA
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSMohammad Azam Khan
 
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...SimScale
 

Similar to Unit 9 system install_pwr_point (20)

IT Computer Room Health Check
IT Computer Room Health CheckIT Computer Room Health Check
IT Computer Room Health Check
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF
 
Metabolic Shaker by ACMAS Technologies Pvt Ltd.
Metabolic Shaker by ACMAS Technologies Pvt Ltd.Metabolic Shaker by ACMAS Technologies Pvt Ltd.
Metabolic Shaker by ACMAS Technologies Pvt Ltd.
 
A Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of ElectronicsA Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of Electronics
 
Walk in-seed-germinator
Walk in-seed-germinatorWalk in-seed-germinator
Walk in-seed-germinator
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
 
Hot air-oven
Hot air-ovenHot air-oven
Hot air-oven
 
Vacuum oven-rectangular
Vacuum oven-rectangularVacuum oven-rectangular
Vacuum oven-rectangular
 
What's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & MoreWhat's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & More
 
How to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationHow to Plan for Line Controls and Integration
How to Plan for Line Controls and Integration
 
Csc.Cooling Audit Results.V1.12 Jul 08
Csc.Cooling Audit Results.V1.12 Jul 08Csc.Cooling Audit Results.V1.12 Jul 08
Csc.Cooling Audit Results.V1.12 Jul 08
 
Vacuum Oven Round by ACMAS Technologies Pvt Ltd.
Vacuum Oven Round by ACMAS Technologies Pvt Ltd.Vacuum Oven Round by ACMAS Technologies Pvt Ltd.
Vacuum Oven Round by ACMAS Technologies Pvt Ltd.
 
MPL Data Centre World 2017 DCIM presentation v1.2
MPL Data Centre World 2017 DCIM presentation v1.2MPL Data Centre World 2017 DCIM presentation v1.2
MPL Data Centre World 2017 DCIM presentation v1.2
 
HVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMSHVAC, Heating Ventilation Air Conditioning BMS
HVAC, Heating Ventilation Air Conditioning BMS
 
Incubator shaker
Incubator shakerIncubator shaker
Incubator shaker
 
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
 
Temperature humidity control cabinets
Temperature humidity control cabinetsTemperature humidity control cabinets
Temperature humidity control cabinets
 

Recently uploaded

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Recently uploaded (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Unit 9 system install_pwr_point

  • 1. System InstallationSystem Installation Cray Research, Inc.Cray Research, Inc. December 21, 2012December 21, 2012
  • 2. Installation ProcessInstallation Process  Ship and install support equipmentShip and install support equipment  Position equipment in designatedPosition equipment in designated locationslocations  Reassemble computer systemReassemble computer system  Verify system startup and stabilizationVerify system startup and stabilization  Verify system on-site qualityVerify system on-site quality  Prepare system operationsPrepare system operations
  • 3. Site EvaluationSite Evaluation Considerations for site selection:Considerations for site selection:  Electrical power qualityElectrical power quality  Air qualityAir quality  Cooling water qualityCooling water quality  Vibration sourcesVibration sources  Structural strength of computer room floorStructural strength of computer room floor
  • 4. Computer Room DesignComputer Room Design Computer room design considers:Computer room design considers:  Personnel safety and securityPersonnel safety and security  Air quality and positive air pressureAir quality and positive air pressure  Future computer equipment plansFuture computer equipment plans  Seismic vibrationSeismic vibration  Raised flooring capabilityRaised flooring capability  Sound reduction and proper lightingSound reduction and proper lighting capabilitycapability  Handicapped personnel accessHandicapped personnel access
  • 5. Computer Room EnvironmentComputer Room Environment Computer equipment is designed to operateComputer equipment is designed to operate within specific ranges of air quality,within specific ranges of air quality, temperatures, and relative humidity levelstemperatures, and relative humidity levels  Temperature: 60Temperature: 60 °F to 83 °F (16 °C to 28 °C)°F to 83 °F (16 °C to 28 °C)  Humidity 35% to 65% relative humidityHumidity 35% to 65% relative humidity  Dewpoint 60Dewpoint 60 °F (16 °C)°F (16 °C)  Air quality: One fresh air change per hourAir quality: One fresh air change per hour
  • 6. Support Equipment RoomSupport Equipment Room EnvironmentEnvironment Support equipment consists of motorSupport equipment consists of motor generator units and refrigeration control unitsgenerator units and refrigeration control units  Temperature: 65Temperature: 65 °F to 95 °F (18 °C to 35 °C)°F to 95 °F (18 °C to 35 °C)  Humidity 30% to 80% relative humidityHumidity 30% to 80% relative humidity  A clean, dirt- and dust-free environmentA clean, dirt- and dust-free environment  Located as close as possible to computerLocated as close as possible to computer roomroom
  • 7. Electrical RequirementsElectrical Requirements  Computer equipment requires a protectiveComputer equipment requires a protective power safety-ground systempower safety-ground system  Computer equipment requires a signalComputer equipment requires a signal reference gridreference grid  Customer provides and installs all powerCustomer provides and installs all power wiring, circuit breakers, and circuit breakerwiring, circuit breakers, and circuit breaker panelspanels
  • 8. Dielectric-cooling SystemsDielectric-cooling Systems Dielectric coolant:Dielectric coolant:  Is inert liquidIs inert liquid  Has insulating and non-corroding propertiesHas insulating and non-corroding properties  Has large capacity for absorbing heat fromHas large capacity for absorbing heat from integrated circuit modules and powerintegrated circuit modules and power suppliessupplies
  • 9. Cooling Water SupplyCooling Water Supply  System requires clean, adequate source ofSystem requires clean, adequate source of water for cooling purposeswater for cooling purposes  Closed-loop cooling water supply isClosed-loop cooling water supply is generally requiredgenerally required  Open system water supply may not complyOpen system water supply may not comply with water system requirementswith water system requirements  Water supply temperature should range fromWater supply temperature should range from 4040 °F to 70 °F°F to 70 °F
  • 10. Equipment Separation LimitsEquipment Separation Limits General requirements for arranging computerGeneral requirements for arranging computer system equipment must consider thesystem equipment must consider the following:following:  Personnel safetyPersonnel safety  Maximum system performanceMaximum system performance  Satisfactory system installationSatisfactory system installation  Satisfactory operator and maintenanceSatisfactory operator and maintenance accessaccess
  • 11. Floor PreparationFloor Preparation Computer room floor must:Computer room floor must:  Be raised floor and be static-dissipativeBe raised floor and be static-dissipative  Provide signal reference grid for computerProvide signal reference grid for computer systemsystem  Provide space for power cables, signalProvide space for power cables, signal cables, coolant piping, and air flowcables, coolant piping, and air flow  Provide minimum clearance of 18 inchesProvide minimum clearance of 18 inches (46 cm)(46 cm)
  • 12. ReferenceReference  Cray Research, Inc. (1993). Site PlanningCray Research, Inc. (1993). Site Planning and preparation. Publication numberand preparation. Publication number HR-04036HR-04036