A NEW KERALA FROM THE MISSION OF 
JOSE THOMAS MEKKAT 
KERALA METRO PROJECT
This project will be a turning point to the state of kerala 
because it will develop kerala to the maximum possible 
situation ,even with the limited resources of our state. Now 
according to us kerala is almost 25 years back as far as 
comparing the development of other states in India. We are 
not comparing kerala with any of the developing countries 
but only with the different states of India, even when 
kerala is leading in literacy. 
Almost all the train compartments in the state of kerala is 
more than 20 years old . There are more than 70 passenger 
trains and several other intercity trains which are very old.
This project intends to run double decker AC metro trains 
with a gap of 5 minutes from Nagercovil to mangalore via 
kottayam and alleppy and from nagercovil to coimbatore 
also . But how this dream is possible , can only be 
explained effectively by debates and discussions. 
This project is possible if we are able to make the railway 
tracks empty from morning 6 am to evening7 pm, which 
can be possible if the below mentioned things are 
practical
1. There should not be many trains passing through the state of 
kerala to other states 
This is practical in kerala because we have very few trains passing 
through kerala to other states. For example, a train to New delhi 
from kerala will be crossing nearly 10 states to reach New delhi. 
This clearly shows that our tracks are empty most of the time 
when compared to other states. 
2. All the old 75 year old passenger and intercity trains should be 
cancelled from 6am to 7 pm 
This is possible because we are going to use Ac double decker metro 
trains within a gap of 5 minutes from 6am to 7 pm, so the old 
trains can be used in the night for new night routes if needed or 
returned back to the railways.
3. All the lines in kerala should be double track 
This is also practical because ,almost all the lines in kerala are 
running on double track. Only the lines between thiruvalla and 
vaikom road has to be doubled , which wil also be completed 
within a span of two years. 
4. All the lines in kerala should be electrified 
This is also possible because all the electrification works for our 
railways will be over within a span of two years and for us the 
other works for starting this project will also take two years time. 
So this delay of two years for doubling and electrification is not a 
delay as far as this project is concerned.
5. Height of the platforms should be increased. 
This is also possible because half of the platforms in the state have already 
ncreased the height according to the metro standard height and the 
balance height of the platforms can also be increased within a span of 
two years, if our project is declared open. 
6. Width of the tracks 
This is also possible because double decker metro trains can be made 
according to the existing width of the track, which is almost the same of 
the width of the metro trains, starting in cochin.
7. All long running trains should leave tvm from 7 pm 
This is also possible because the timings of most of the long running trains starting from tvm in the day 
time, are fixed almost 15 to 20 years back . But after that, the quality of the tracks , breaking system, 
traffic system and the speed is also increased , but the timings are not changed. A good example is 
that our jayanthi janatha express is haulted for more than 6 hours in various stations , before 
reaching mumbai because of before time.So the timings can be changed easily. 
More than 50% of the long running trains already start after 7 pm even now. 
Moreover it is good for the long running passengers to leave after 7 o clock because they can use the day 
time effectively for other works and enter the train after taking dinner and have a good sleep. And not 
only that traveling throughout the day is very hot and tiring for the passenger. 
These long running trains are not good for the domestic travellers inside kerala because the general 
compartment will be over crowded always specially now by the bengalies and north indian workers. 
Not only that, the charges are very heavy in the reservation compartments for domestic travelers and 
the new reservation system does not permit them to enter into all the reservation compartments and 
more over the AC compartment is also costly now. So if u travel 500 kms or 10 kms, it is the same 
charge. So the rich is depending on their own conveyance which also increases traffic in the state, 
because normally one big car will be used by a single person which makes our road congestic.
8. All incoming trains should enter trivandrum central before 6 am 
This is almost possible because normally many trains are reaching tvm 
before 6am and slight alterations can also make this practical. Now there 
are lot of trains till ernakulam only, so the timing will not be much problem 
to change according to this project. 
So what we say is that, the long running trains are not having a favorable 
atmosphere for domestic traveling, so its always better to make the long 
running trains to start in the night which will also make our kerala metro 
project practical.
9 . Permission from the central govt to start this project 
It purely depends on the mentality of the government in power.They are not 
used to think in this way normally , so our effective debates will surely 
force them to implement these things, or at least submit this project to 
the central government.
10. Only double decker trains can be used for this project. 
This is also possible because it is available in switzerland with an 
affordable price. Normally we need double decker metro trains for this 
project because there will be a rush of local as well as long passengers. 
So if it is a double decker train, the long distance travelers can travel on 
top and the small distance travellers can use the down space for 
traveling. Special facility for long passengers are needed on top 
because this metro is not just traveling 24 kms like our cochin metro 
but this kerala metro train runs nearly 700 kms in one strech , that is 
from nagercovil to mangalore and from nagercovil to coimbatore

More Related Content

Similar to #1 JOSE THOMAS MEKKAT

Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 
Bangladesh Railway (Problems & Prospects)
Bangladesh Railway (Problems & Prospects)Bangladesh Railway (Problems & Prospects)
Bangladesh Railway (Problems & Prospects)
Istiak Ahmed
 

Similar to #1 JOSE THOMAS MEKKAT (20)

Jose thomas mekkat
Jose thomas mekkatJose thomas mekkat
Jose thomas mekkat
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Bullet train feasibility
Bullet train feasibilityBullet train feasibility
Bullet train feasibility
 
Sky bus
Sky busSky bus
Sky bus
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Bangalore - Metro is not the solution
Bangalore - Metro is not the solutionBangalore - Metro is not the solution
Bangalore - Metro is not the solution
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Bullet train study
Bullet train studyBullet train study
Bullet train study
 
Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in India
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Sky Bus
Sky Bus Sky Bus
Sky Bus
 
Piyush
PiyushPiyush
Piyush
 
sky bus
sky bussky bus
sky bus
 
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway CorriodorBULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
 
Bangladesh Railway (Problems & Prospects)
Bangladesh Railway (Problems & Prospects)Bangladesh Railway (Problems & Prospects)
Bangladesh Railway (Problems & Prospects)
 
Bangladesh Railway final
Bangladesh Railway finalBangladesh Railway final
Bangladesh Railway final
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
 
Presentation on bullet train
Presentation on bullet trainPresentation on bullet train
Presentation on bullet train
 
Railway
RailwayRailway
Railway
 

Recently uploaded

No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
Sheetaleventcompany
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Kayode Fayemi
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
raffaeleoman
 

Recently uploaded (20)

Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 

#1 JOSE THOMAS MEKKAT

  • 1. A NEW KERALA FROM THE MISSION OF JOSE THOMAS MEKKAT KERALA METRO PROJECT
  • 2. This project will be a turning point to the state of kerala because it will develop kerala to the maximum possible situation ,even with the limited resources of our state. Now according to us kerala is almost 25 years back as far as comparing the development of other states in India. We are not comparing kerala with any of the developing countries but only with the different states of India, even when kerala is leading in literacy. Almost all the train compartments in the state of kerala is more than 20 years old . There are more than 70 passenger trains and several other intercity trains which are very old.
  • 3. This project intends to run double decker AC metro trains with a gap of 5 minutes from Nagercovil to mangalore via kottayam and alleppy and from nagercovil to coimbatore also . But how this dream is possible , can only be explained effectively by debates and discussions. This project is possible if we are able to make the railway tracks empty from morning 6 am to evening7 pm, which can be possible if the below mentioned things are practical
  • 4. 1. There should not be many trains passing through the state of kerala to other states This is practical in kerala because we have very few trains passing through kerala to other states. For example, a train to New delhi from kerala will be crossing nearly 10 states to reach New delhi. This clearly shows that our tracks are empty most of the time when compared to other states. 2. All the old 75 year old passenger and intercity trains should be cancelled from 6am to 7 pm This is possible because we are going to use Ac double decker metro trains within a gap of 5 minutes from 6am to 7 pm, so the old trains can be used in the night for new night routes if needed or returned back to the railways.
  • 5. 3. All the lines in kerala should be double track This is also practical because ,almost all the lines in kerala are running on double track. Only the lines between thiruvalla and vaikom road has to be doubled , which wil also be completed within a span of two years. 4. All the lines in kerala should be electrified This is also possible because all the electrification works for our railways will be over within a span of two years and for us the other works for starting this project will also take two years time. So this delay of two years for doubling and electrification is not a delay as far as this project is concerned.
  • 6. 5. Height of the platforms should be increased. This is also possible because half of the platforms in the state have already ncreased the height according to the metro standard height and the balance height of the platforms can also be increased within a span of two years, if our project is declared open. 6. Width of the tracks This is also possible because double decker metro trains can be made according to the existing width of the track, which is almost the same of the width of the metro trains, starting in cochin.
  • 7. 7. All long running trains should leave tvm from 7 pm This is also possible because the timings of most of the long running trains starting from tvm in the day time, are fixed almost 15 to 20 years back . But after that, the quality of the tracks , breaking system, traffic system and the speed is also increased , but the timings are not changed. A good example is that our jayanthi janatha express is haulted for more than 6 hours in various stations , before reaching mumbai because of before time.So the timings can be changed easily. More than 50% of the long running trains already start after 7 pm even now. Moreover it is good for the long running passengers to leave after 7 o clock because they can use the day time effectively for other works and enter the train after taking dinner and have a good sleep. And not only that traveling throughout the day is very hot and tiring for the passenger. These long running trains are not good for the domestic travellers inside kerala because the general compartment will be over crowded always specially now by the bengalies and north indian workers. Not only that, the charges are very heavy in the reservation compartments for domestic travelers and the new reservation system does not permit them to enter into all the reservation compartments and more over the AC compartment is also costly now. So if u travel 500 kms or 10 kms, it is the same charge. So the rich is depending on their own conveyance which also increases traffic in the state, because normally one big car will be used by a single person which makes our road congestic.
  • 8. 8. All incoming trains should enter trivandrum central before 6 am This is almost possible because normally many trains are reaching tvm before 6am and slight alterations can also make this practical. Now there are lot of trains till ernakulam only, so the timing will not be much problem to change according to this project. So what we say is that, the long running trains are not having a favorable atmosphere for domestic traveling, so its always better to make the long running trains to start in the night which will also make our kerala metro project practical.
  • 9. 9 . Permission from the central govt to start this project It purely depends on the mentality of the government in power.They are not used to think in this way normally , so our effective debates will surely force them to implement these things, or at least submit this project to the central government.
  • 10. 10. Only double decker trains can be used for this project. This is also possible because it is available in switzerland with an affordable price. Normally we need double decker metro trains for this project because there will be a rush of local as well as long passengers. So if it is a double decker train, the long distance travelers can travel on top and the small distance travellers can use the down space for traveling. Special facility for long passengers are needed on top because this metro is not just traveling 24 kms like our cochin metro but this kerala metro train runs nearly 700 kms in one strech , that is from nagercovil to mangalore and from nagercovil to coimbatore