Interactive Powerpoint_How to Master effective communication
FILMING SCHEDULE FOR JOSEPHINE FERNANDES PROJECT
1. JOSEPHINE FERNANDES | 5631 | 64770
FILMING SCHEDULE
Filming What I intend to How many times How long will
Equipment: Mise-en-Scene:
Day: shoot: will I shoot it? it take:
Sarah outside in the
Sarah Kane
garden Minimum of 3 times 30 minutes Video Camera Outside Costume
(scenes 1, 2 and 13)
Sarah in the kitchen Sarah Kane
Filming Day 1
and walking upstairs Minimum of 3 times 15 minutes Video Camera Inside Costume
After School Kitchen utensils
(scenes 4, 5 and 11)
Sarah sat reading Sarah Kane
the book Minimum of 3 times 15 minutes Video Camera Inside Costume
(scene 14 and 15) Novel
Until the sequence
Mirror stop motion Video Camera or Green post-it notes
looks sufficient on 30 minutes Pink rose
(scene 6) Photo Camera
Filming Day 2 camera
After School Cupcake stop Until the sequence
Video Camera or Bakery cupcake
motion looks sufficient on 15 minutes Green post-it note
Photo Camera
(scene 10) camera
Time lapse of the Video Camera
sunset Once 30 minutes and /
(time from light to dark)
(scene 3) Tripod
Mobile phone
Filming Day 3 Video Camera or
messages Minimum of 3 times 30 minutes Mobile Phone
After School Photo Camera
(scenes 7, 8 and 12)
Social networking
Video Camera or
status (scenes 9 and Minimum of 3 times 30 minutes Galaxy Tab/Laptop
Photo Camera
16)