Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Drawings
1.
2. JALAN DATO SAGOR
JALAN
PANGLIMA
BUKIT
GANTANG
WAHAB
JALAN SULTAN ISKANDAR
JALAN SULTAN ISKANDAR
JALAN
PANGLIMA
JALAN
BANDA
R
TIMAH
JALAN SULTAN ISKANDAR
JALAN
PANGLIMA
BUKIT
GANTANG
WAHAB
JALAN
PANGLIMA
BUKIT
GANTANG
WAHAB
JALAN DATO SAGOR
JALAN DATO SAGOR
SHEET NO./ NO. LEMBARAN
DRAWING NO./ NO. LUKISAN
ARC60305/ ARC2323/ ARC1215
MEASURED DRAWINGS
31650 IPOH, PERAK,
24
AS SHOWN
MAJLIS BANDARAYA IPOH
1
DBI. 001
KEY PLAN
LOCATION PLAN
LOCATION PLAN/ PELAN LOKASI
SCALE/ SKALA: 1:1200
SITE PLAN/ PELAN TAPAK
SCALE/ SKALA: 1:500
SITE PLAN
KEY PLAN/ PELAN KUNCI
SCALE/ SKALA: N.T.S.
PADANG IPOH
PADANG IPOH (MBI)
LOT 36685 7.8125 ekar
MASJID NEGERI LOT
4439N
MENARA JAM
(MBI) LOT 4578
TAMAN REKREASI
MAHKAMAH TINGGI 10712
DEWAN BANDARAN IPOH 1914
3. A B C D E
A B C
D E
LEGENDS
LEGENDS
A. IPOH HIGH COURT/ MAHKAMAH TINGGI IPOH IPOH HIGH COURT/ MAHKAMAH TINGGI IPOH
B. ROADWAY/ JALAN RAYA ROADWAY/ JALAN RAYA C. IPOH TOWNHALL/ DEWAN
BANDARAYA IPOH IPOH TOWNHALL/ DEWAN BANDARAYA IPOH D.
ROADWAY/ JALAN RAYA ROADWAY/ JALAN RAYA E. CAR PARK/ TEMPAT LETAK
KERETACAR PARK/ TEMPAT LETAK KERETA
A. BUILDING UNDER CONSTRUCTION/ BANGUNAN DALAM PEMBINAAN BUILDING UNDER CONSTRUCTION/ BANGUNAN DALAM
PEMBINAAN B. ROADWAY/ JALAN RAYA ROADWAY/ JALAN RAYA C.
IPOH TOWNHALL/ DEWAN BANDARAYA IPOH IPOH TOWNHALL/ DEWAN BANDARAYA IPOH D.
ROADWAY/ JALAN RAYA ROADWAY/ JALAN RAYA E. PARK/ TAMANPARK/ TAMAN
PROJECT TITLE/ TAJUK PROJEK
DRAWING TITLE/ TAJUK LUKISAN
ARC60305/ ARC2323/ ARC1215
METHODS OF DOCUMENTATION AND
DEWAN BANDARAN IPOH
31650 IPOH, PERAK,
24
SCALE/ SKALA
1:150
MAJLIS BANDARAYA IPOH
2
DBI. 002
SITE SECTION A
SITE SECTION B
SITE SECTION B
SCALE/ SKALA 1:150
SITE SECTION A
SCALE/ SKALA 1:150
INACCESSIBLE AREA/
INACCESSIBLE AREA/
4. F
1
FFL: +0.00
A B D E G H
LEGENDS
FFL: +0.532 FFL: +1.260
FFL: +1.220
FFL: +1.060FFL: +1.260 FFL: +1.260 FFL: +1.220
FFL: +1.220
FFL: +1.220
FFL: +1.260
FFL: +1.260
FFL: +1.260
FFL: +0.720
FFL: +1.260
FFL: +1.260
FFL: +1.260
FFL: +1.260
C I J K L M N O P
2
3
4
5
6
7
8
FFL: +2.595 FFL: +1.060
FFL: +1.260 FFL: +1.260
FFL: +1.260 FFL: +1.260
CT
TF
CPT
MB
QT
CR
CR
FFL: +1.220
MB MB QT TFCPT
CPT
CPT
QTCT MB
MB
MB
CR
CR
CR
CR
CR
MB MB
MB MB
CT
CT CT
CT CT
MB
CPTCT
CT
E
E
EFFL: -0.200
FFL: +1.260
CR
FFL: +2.595
CPT
FFL: +1.260
MB
INACCESSIBLE AREA/
3
2
1
9
2
3
4
CERAMIC TILES / JUBIN TEMBIKAR
MARBLES / JUBIN MARMAR
TIMBER FLOOR / LANTAI KAYU
QUARRY TILES / JUBIN KUARI
CARPET / PERMAIDANI
4
2
EARTH / TANAH
DRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
GROUND FLOOR PLAN/ PELAN ARAS BAWAH
NAME OF SPACE/ NAME RUANG
TYPE OF FINISHING/ JENIS LANTAI
FINISH FLOOR LEVEL/ ARAS LANTAI
SCALE 1:100/ SKALA 1:100
DOOR/ PINTU
WINDOW/ KACA
STAIRCASE/ TANGGA
PROJECT TITLE/ TAJUK PROJEK
ARC60305/ ARC2323/ ARC1215
METHODS OF DOCUMENTATION AND
31650 IPOH, PERAK,
24
DRAWING DETAILS/ BUTIRAN
1:100
MAJLIS BANDARAYA IPOH
3
DBI. 003
GROUND FLOOR PLAN
5. FFL: +7.232
FFL: +7.232
FFL: +7.232
FFL: +7.232
FFL: +7.210
FFL: +7.232 FFL: +7.232
FFL: +7.232 FFL: +7.232
FFL: +7.232 FFL: +7.232
FFL: +7.232
FFL: +7.232FFL: +7.232
CPT
MB
CPT
TF TF
TF
TF TF
TF
TF TF
TF TF
CT
CT
1
2
3
4
5
6
7
8
A B D E F G HC I J K L M N O P
TF
TF
FFL: +7.210
MB
FFL: +7.210
MB FFL: +7.210
MB
FFL: +7.210
MB
FFL: +7.210
MB
LEGENDS
CT
TF
CPT
MB
QT
CR
E
FFL: +2.595
CPT
3
2
1
9
2
3
4
FIRST FLOOR PLAN/ PELAN TINGKAT 1
SCALE 1:100/ SKALA 1:100
INACCESSIBLE AREA/
CERAMIC TILES / JUBIN TEMBIKAR
MARBLES / JUBIN MARMAR
TIMBER FLOOR / LANTAI KAYU
QUARRY TILES / JUBIN KUARI
CARPET / PERMAIDANI
CEMENT RENDER / LANTAI SIMEN
EARTH / TANAH
DRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
NAME OF SPACE/ NAME RUANG
TYPE OF FINISHING/ JENIS LANTAI
FINISH FLOOR LEVEL/ ARAS LANTAI
DOOR/ PINTU
STAIRCASE/ TANGGA
SHEET NO./ NO. LEMBARAN
DRAWING NO./ NO. LUKISAN
ARC60305/ ARC2323/ ARC1215
MEASURED DRAWINGS
31650 IPOH, PERAK,
24
1:100
MAJLIS BANDARAYA IPOH
4
DBI. 004
FIRST FLOOR PLAN
6. FA B D E G H
1
LEGENDS
C I J K L M N O P
2
3
4
5
6
7
8
CR
FFL: +2.595
CPT
FFL: +12.680
CR+16.580
+12.680
+16.580 +17.863
+16.217
+14.880
+16.217
+14.880
+14.880
+16.947
+15.972+15.556
+15.556 +15.972
+16.080
+16.080
+15.159
+16.038
+16.038
FALL
FALL
FALLFALL
FALL
FALL
FALL
FALL
FALL
FALL FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL FALL
FALL
FALL
FALLFALL
FALL
FALL
FALL
FALL
FALL
3
2
1
9
2
3
4
CEMENT RENDER / LANTAI SIMENDRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
ROOF PELAN/ PELAN BUMBUNG
NAME OF SPACE/ NAME RUANG
TYPE OF FINISHING/ JENIS LANTAI
FINISH FLOOR LEVEL/ ARAS LANTAI
SCALE 1:100/ SKALA 1:100
METAL DECK ROOF/
CERAMIC TILES ROOF/
5
TOP OF ROOF/ TINGGI BUMBUNG
SHEET NO./ NO. LEMBARAN
PROJECT TITLE/ TAJUK PROJEK
ARC60305/ ARC2323/ ARC1215
MEASURED DRAWINGS
31650 IPOH, PERAK,
24
DRAWING DETAILS/ BUTIRAN
1:100
MAJLIS BANDARAYA IPOH
5
DBI. 005
ROOF PLAN
7. CFL: +6.730 CFL: +5.694
from ffl from ffl
CFL: +5.694
from ffl
CFL: +5.694
from ffl
CFL: +5.694
from ffl
CFL: +5.694
from ffl
CFL: +5.694
from ffl
CFL: +5.694
from ffl
CFL: +10.107
from ffl CFL: +8.744
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.270
from ffl
CFL: +5.650
from ffl
CFL: +5.650
from ffl
CFL: +5.650
from ffl
1
2
3
4
5
6
7
8
A B D E F G HC I J K L M N O P
LEGENDS
CFL: +5.810
from ffl
JBC
GC
CC
GCGC
JBC
JBC
JBC
JBC
JBC
JBC
CC
CC
CC
CC
CC
CC
GC
CC
GC GC
GC
GC
GC
GC GC
CC
CC
THIS DRAWING IS A COPYRIGHT:
ALL DRAWINGS ARE PROPERTIES OF TAYLORS SABD AND CANNOT BE USED WITHOUT THEIR WRITTEN PERMISSION
3
2
1
9
2
3
4
4
2
GROUND FLOOR REFLECTED CEILING PLAN
SCALE 1:100/ SKALA 1:100
INACCESSIBLE AREA/DRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
NAME OF SPACE/ NAME RUANG
DRAWING NO./ NO. LUKISAN
ARC60305/ ARC2323/ ARC1215
31650 IPOH, PERAK,
MALAYSIA.
24
1:100
MAJLIS BANDARAYA IPOH
6
DBI. 006
GROUND FLOOR REFLECTED
CEILING PLAN
8. LEGENDS
CFL: +5.810
from ffl
CFL: +5.810
from ffl
CFL: +5.810
from ffl
CFL: +5.810
from ffl
CFL: +5.810
from ffl
CFL: +5.810
from ffl
CFL: +10.107
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.448
from ffl
CFL: +5.585
from ffl
1
2
3
4
5
6
7
8
A B D E F G HC I J K L M N O P
CFL: +5.810
from ffl
CFL: +5.448
from ffl
CFL: +5.585
from ffl
CFL: +5.585
from ffl
CFL: +8.744
from ffl
CFL: +5.810
from ffl
JBC
GC
CC
GC
GC
GC
GC
GCGC
GC GC
GCGC
GC
JBC
GC GC
GC
GC
GC
GC
GC
GC
GC
GC
GC
CC
THIS DRAWING IS A COPYRIGHT:
ALL DRAWINGS ARE PROPERTIES OF TAYLORS SABD AND CANNOT BE USED WITHOUT THEIR WRITTEN PERMISSION
INACCESSIBLE AREA/DRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
FIRST FLOOR REFLECTED CEILING PLAN
NAME OF SPACE/ NAME RUANG
SCALE 1:100/ SKALA 1:100
3
2
1
9
2
3
4
4
2
DRAWING NO./ NO. LUKISAN
ARC60305/ ARC2323/ ARC1215
31650 IPOH, PERAK,
MALAYSIA.
24
1:100
MAJLIS BANDARAYA IPOH
7
DBI. 007
FIRST FLOOR REFLECTED
CEILING PLAN
10. A B D E F G HC I J K L M N O P
+12.680
+7.232
+1.260
+0.00
+18.462
LEGENDS
4. RIGHT ELEVATION
SCALE 1:100/ SKALA 1:100
4. RIGHT ELEVATION (STREET VIEW)
DRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
DOOR/ PINTU
STAIRCASE/ TANGGA
1
5
5
5
DRAWING NO./ NO. LUKISAN
ARC60305/ ARC2323/ ARC1215
31650 IPOH, PERAK,
MALAYSIA.
24
1:100
MAJLIS BANDARAYA IPOH
8
DBI. 008
1.FRONT ELEVATION
2.BACK ELEVATION
11. +12.680
ABDFGH CIKLMNOP EJ
+7.232
+1.260
+0.00
+18.462
LEGENDS
1
5
5
5
3. LEFT ELEVATION
SCALE 1:100/ SKALA 1:100
3. LEFT ELEVATION (STREET VIEW)
SCALE 1:100/ SKALA 1:100
2
DRAWING NAME/ NAMA LUKISAN
DRAWING SHEET NO./ NO. LEMBARAN
DOOR/ PINTU
WINDOW/ KACA
PROJECT TITLE/ TAJUK PROJEK
DRAWING TITLE/ TAJUK LUKISAN
ARC60305/ ARC2323/ ARC1215
METHODS OF DOCUMENTATION AND
31650 IPOH, PERAK,
24
1:100
MAJLIS BANDARAYA IPOH
9
DBI. 009
3.LEFT ELEVATION
15. LEGENDS
TOWN HALL CONSTRUCTION DETAILS
SCALE 1:100/ SKALA 1:100
RockWool
( Insulation )
SCALE/SKALA: n.t.s.
SCALE/SKALA: n.t.s.
SCALE/SKALA: n.t.s.
1
2
3
4
5
6
7
DRAWING NO./ NO. LUKISAN
ARC60305/ ARC2323/ ARC1215
31650 IPOH, PERAK,
MALAYSIA.
24
1:100
MAJLIS BANDARAYA IPOH
14
DBI. 014
CONSTRUCTION DETAILS
16. SINGLE PANEL DOOR
EYEBROW ARCH DOUBLE PANEL DOOR
EYEBROW ARCH DOUBLE PANEL DOOR
SINGLE PANEL GLASS DOOR
SINGLE PANEL DOOR
DOUBLE PANEL DOOR
DOUBLE PANEL DOOR
SINGLE PANEL DOOR
SINGLE PANEL DOOR
D7 D8 D9
D4 D5
D6a
D1 D2 D3
DRAWING TITLE/ TAJUK LUKISAN
ARC60305/ ARC2323/ ARC1215
DEWAN BANDARAN IPOH
31650 IPOH, PERAK,
MALAYSIA.
24
AS SHOWN
MAJLIS BANDARAYA IPOH
15
DBI. 015
DOOR SCHEDULE D1
DOOR SCHEDULE D2
DOOR SCHEDULE D3
DOOR SCHEDULE D4
DOOR SCHEDULE D5
DOOR SCHEDULE D6
DOOR SCHEDULE D7
DOOR SCHEDULE D8
DOOR SCHEDULE D9
D6b
17. CIRCLE ARCH DOUBLE PANEL DOOR
SINGLE PANEL DOOR
EYEBROW ARCH SINGLE PANEL DOOR
DOUBLE PANEL DOOR
SINGLE PANEL DOOR
DOUBLE PANEL DOOR
EYEBROW ARCH DOUBLE PANEL DOOR
EYEBROW ARCH DOUBLE PANEL DOOR
EYEBROW ARCH DOUBLE PANEL DOOR
D16 D17 D18
D13 D14 D15
D10 D11 D12
DRAWING TITLE/ TAJUK LUKISAN
ARC60305/ ARC2323/ ARC1215
DEWAN BANDARAN IPOH
31650 IPOH, PERAK,
MALAYSIA.
24
1:100
MAJLIS BANDARAYA IPOH
16
DBI. 016
DOOR SCHEDULE D10
DOOR SCHEDULE D11
DOOR SCHEDULE D12
DOOR SCHEDULE D13
DOOR SCHEDULE D14
DOOR SCHEDULE D15
DOOR SCHEDULE D16
DOOR SCHEDULE D17
DOOR SCHEDULE D18
18.
19.
20.
21.
22.
23.
24. CONCRETE STAIRCASE & TIMBER BALUSTERSS1
TIMBER STAIRCASES2
PROJECT TITLE/ TAJUK PROJEK
ARC60305/ ARC2323/ ARC1215
METHODS OF DOCUMENTATION AND
31650 IPOH, PERAK,
24
DRAWING DETAILS/ BUTIRAN
AS SHOWN
MAJLIS BANDARAYA IPOH
23
DBI. 023
STAIRCASE DETAIL S1
STAIRCASE DETAIL S2
25. ALUMINIUM STAIRCASES3
CONCRETE STAIRCASE AND BALUSTERSS4
PROJECT TITLE/ TAJUK PROJEK
ARC60305/ ARC2323/ ARC1215
METHODS OF DOCUMENTATION AND
31650 IPOH, PERAK,
24
DRAWING DETAILS/ BUTIRAN
AS SHOWN
MAJLIS BANDARAYA IPOH
24
DBI. 024
STAIRCASE DETAIL S3
STAIRCASE DETAIL S4