Lafourche Parish
Comprehensive ResiliencyPlan
  Existing Transportation




                               Kimley-Horn
                               and Associates, Inc.
 Waggonner & Ball Architects
Infrastructure




Lafourche Parish Comprehensive Resiliency Plan
Road
Improvements




 Lafourche Parish Comprehensive Resiliency Plan
Road
Improvements




 Lafourche Parish Comprehensive Resiliency Plan
Road
Improvements




 Lafourche Parish Comprehensive Resiliency Plan
2010 Roadway
   Congestion




 Lafourche Parish Comprehensive Resiliency Plan
2035 Expected
     Roadway
   Congestion




 Lafourche Parish Comprehensive Resiliency Plan
LA-1
LA 1 is a key national example of critical, at-risk Infrastructure.




                                                                Lafourche Parish Comprehensive Resiliency Plan
LA 1 Project calls for 19 miles of Elevated
Highway from the Levee southward to Port
                 Fourchon .




                                  Lafourche Parish Comprehensive Resiliency Plan
Port Fourchon service bases rely on LA 1 as their sole highway access
for supplies.




                                                   Lafourche Parish Comprehensive Resiliency Plan
U.S.D.H.S.
performed an
Assessment of
Consequences
of Disruptions
to LA 1 in 2011.
$7.8 billion of
loss GDP is at
rsk




                   Lafourche Parish Comprehensive Resiliency Plan
USDHS Assessment Findings:
• Estimates up to $7.8 Billion in Loss GDP with a 90
  day outage of LA 1
  Estimates reduction in 160 millions of barrels of
  oil and 320 billions of cubic feet of natural gas
  over 10 yr. with an outage of LA 1 which
  coincides with OCS damage from a major
  hurricane.
• Estimates 25% capability of substitution port
  facilities fulfilling national need
                                    Lafourche Parish Comprehensive Resiliency Plan
The elevation of LA-1 will become increasingly inundated
                 even if the present day relative
      sea level rise (RSLR) remains constant in the future.
          Estimated Effects of RSLR on Frequency and Duration of Inundation for Leeville, LA
       using observations 1987-1990 and then projecting this 4-year time period forward using
                                   present rate of sea level rise

Using “5%” LA-1 elevation of
0.78m NAVD88 (1993)
                                                         Occurrences of
                                                           Inundation   Duration of Inundation Elevation Rise
                                                         (over 4-years)     (over 4- years)      Above 1990 MSL
                                 RSLR rate                              (hours (percent of total
4-yr Time Period                  mm/yr)                   (# of tides)          time))             (meters)


   1987- 1990                        9.24                          0                             0 (0%)                                  -
    2027-2030                        9.24                        124                           960(6%)                              0.3
   2047- 2050                        9.24                       1127                        19163(55%)                              0.6
   2097- 2100                        9.24                       1334                        33699(96%)                              1.0

 Note: NAVD88 elevations for bench marks and for LIDAR elevations for road surface are only estimates and have significant uncertainty

                                                                                                      Lafourche Parish Comprehensive Resiliency Plan
NWS SLOSH storm surge model
Future, weak tropical storms at Port Fourchon
will inundate the existing LA 1 to the point of closure.




                                     Galliano
                                                              Water level reference to
                                                              datum - NAVD88




                                                Grand Isle




                     Port Fourchon




                                                             Lafourche Parish Comprehensive Resiliency Plan
Of 19 miles of needed bridge,1/2 is built.




  LA 1 Toll Road Update January
                                                                              15
  2010                                  Lafourche Parish Comprehensive Resiliency Plan
$165 million Leeville Bridge designed to
withstand 100 yr. storm opened in 2009




                                  Lafourche Parish Comprehensive Resiliency Plan
The elevated highway (background)
will replace the existing at-grade highway.




                                  Lafourche Parish Comprehensive Resiliency Plan
Lafourche Parish
Comprehensive ResiliencyPlan
  Existing Transportation




                               Kimley-Horn
                               and Associates, Inc.
 Waggonner & Ball Architects

                               Lafourche Parish Comprehensive Resiliency Plan

More Related Content

Viewers also liked

Magazine comparison
Magazine comparisonMagazine comparison
Magazine comparisonTuesdayism
 
How I Appealed To My Target Audience
How I Appealed To My Target AudienceHow I Appealed To My Target Audience
How I Appealed To My Target AudienceTuesdayism
 
Detailed analysis
Detailed analysisDetailed analysis
Detailed analysisTuesdayism
 
Lafourche Parish Economy and Employment
Lafourche Parish Economy and EmploymentLafourche Parish Economy and Employment
Lafourche Parish Economy and Employmentjanepenelopess
 
Materi object yg kosong
Materi object yg kosongMateri object yg kosong
Materi object yg kosongkgsrizky
 
Lafourche Outreach Presentation
Lafourche Outreach PresentationLafourche Outreach Presentation
Lafourche Outreach Presentationjanepenelopess
 
Simple past of regular verbs 5c
Simple  past of regular verbs 5cSimple  past of regular verbs 5c
Simple past of regular verbs 5cpierelumier
 
Ic 2720 h-service_manual
Ic 2720 h-service_manualIc 2720 h-service_manual
Ic 2720 h-service_manualluizpy2wrk
 
Stress and intonation
Stress and intonationStress and intonation
Stress and intonationpacoaustralia
 
Para imprimir
Para imprimirPara imprimir
Para imprimirSandy Vel
 

Viewers also liked (13)

Magazine comparison
Magazine comparisonMagazine comparison
Magazine comparison
 
How I Appealed To My Target Audience
How I Appealed To My Target AudienceHow I Appealed To My Target Audience
How I Appealed To My Target Audience
 
Detailed analysis
Detailed analysisDetailed analysis
Detailed analysis
 
Key findings
Key findingsKey findings
Key findings
 
Lafourche Parish Economy and Employment
Lafourche Parish Economy and EmploymentLafourche Parish Economy and Employment
Lafourche Parish Economy and Employment
 
Materi object yg kosong
Materi object yg kosongMateri object yg kosong
Materi object yg kosong
 
Lafourche Outreach Presentation
Lafourche Outreach PresentationLafourche Outreach Presentation
Lafourche Outreach Presentation
 
Simple past of regular verbs 5c
Simple  past of regular verbs 5cSimple  past of regular verbs 5c
Simple past of regular verbs 5c
 
Kasus 2 mspmi
Kasus 2 mspmiKasus 2 mspmi
Kasus 2 mspmi
 
Negosyo2.
Negosyo2.Negosyo2.
Negosyo2.
 
Ic 2720 h-service_manual
Ic 2720 h-service_manualIc 2720 h-service_manual
Ic 2720 h-service_manual
 
Stress and intonation
Stress and intonationStress and intonation
Stress and intonation
 
Para imprimir
Para imprimirPara imprimir
Para imprimir
 

Similar to Lafourche Parish Existing Transportation

Welland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationWelland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationMichael Reles
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesSMRPC
 
Current Status of CRZ It’s implementation. by-Vasudev P. Mahale
Current Status of CRZ It’s implementation. by-Vasudev P. Mahale Current Status of CRZ It’s implementation. by-Vasudev P. Mahale
Current Status of CRZ It’s implementation. by-Vasudev P. Mahale Ecotist
 
Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...
Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...
Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...michaelcranston
 
Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingAlex Nwoko
 
Nj future redevelopment forum 2014 climate holtzman
Nj future redevelopment forum 2014 climate holtzmanNj future redevelopment forum 2014 climate holtzman
Nj future redevelopment forum 2014 climate holtzmanNew Jersey Future
 
DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...
DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...
DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...Deltares
 

Similar to Lafourche Parish Existing Transportation (9)

Welland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationWelland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information Presentation
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Current Status of CRZ It’s implementation. by-Vasudev P. Mahale
Current Status of CRZ It’s implementation. by-Vasudev P. Mahale Current Status of CRZ It’s implementation. by-Vasudev P. Mahale
Current Status of CRZ It’s implementation. by-Vasudev P. Mahale
 
Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...
Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...
Ensemble rainfall predictions in a countrywide flood forecasting model in Sco...
 
Understanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modellingUnderstanding Who is AT RISK - Flood extent modelling
Understanding Who is AT RISK - Flood extent modelling
 
Advancing wetland restoration with mapping and incentives
Advancing wetland restoration with mapping and incentivesAdvancing wetland restoration with mapping and incentives
Advancing wetland restoration with mapping and incentives
 
Nj future redevelopment forum 2014 climate holtzman
Nj future redevelopment forum 2014 climate holtzmanNj future redevelopment forum 2014 climate holtzman
Nj future redevelopment forum 2014 climate holtzman
 
ORP 2011 Cleanup Caucus Presentation
ORP 2011 Cleanup Caucus PresentationORP 2011 Cleanup Caucus Presentation
ORP 2011 Cleanup Caucus Presentation
 
DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...
DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...
DSD-INT 2018 Adjusting bed slope effects to improve beach dune behavior - Roe...
 

Lafourche Parish Existing Transportation

  • 1. Lafourche Parish Comprehensive ResiliencyPlan Existing Transportation Kimley-Horn and Associates, Inc. Waggonner & Ball Architects
  • 3. Road Improvements Lafourche Parish Comprehensive Resiliency Plan
  • 4. Road Improvements Lafourche Parish Comprehensive Resiliency Plan
  • 5. Road Improvements Lafourche Parish Comprehensive Resiliency Plan
  • 6. 2010 Roadway Congestion Lafourche Parish Comprehensive Resiliency Plan
  • 7. 2035 Expected Roadway Congestion Lafourche Parish Comprehensive Resiliency Plan
  • 8. LA-1 LA 1 is a key national example of critical, at-risk Infrastructure. Lafourche Parish Comprehensive Resiliency Plan
  • 9. LA 1 Project calls for 19 miles of Elevated Highway from the Levee southward to Port Fourchon . Lafourche Parish Comprehensive Resiliency Plan
  • 10. Port Fourchon service bases rely on LA 1 as their sole highway access for supplies. Lafourche Parish Comprehensive Resiliency Plan
  • 11. U.S.D.H.S. performed an Assessment of Consequences of Disruptions to LA 1 in 2011. $7.8 billion of loss GDP is at rsk Lafourche Parish Comprehensive Resiliency Plan
  • 12. USDHS Assessment Findings: • Estimates up to $7.8 Billion in Loss GDP with a 90 day outage of LA 1 Estimates reduction in 160 millions of barrels of oil and 320 billions of cubic feet of natural gas over 10 yr. with an outage of LA 1 which coincides with OCS damage from a major hurricane. • Estimates 25% capability of substitution port facilities fulfilling national need Lafourche Parish Comprehensive Resiliency Plan
  • 13. The elevation of LA-1 will become increasingly inundated even if the present day relative sea level rise (RSLR) remains constant in the future. Estimated Effects of RSLR on Frequency and Duration of Inundation for Leeville, LA using observations 1987-1990 and then projecting this 4-year time period forward using present rate of sea level rise Using “5%” LA-1 elevation of 0.78m NAVD88 (1993) Occurrences of Inundation Duration of Inundation Elevation Rise (over 4-years) (over 4- years) Above 1990 MSL RSLR rate (hours (percent of total 4-yr Time Period mm/yr) (# of tides) time)) (meters) 1987- 1990 9.24 0 0 (0%) - 2027-2030 9.24 124 960(6%) 0.3 2047- 2050 9.24 1127 19163(55%) 0.6 2097- 2100 9.24 1334 33699(96%) 1.0 Note: NAVD88 elevations for bench marks and for LIDAR elevations for road surface are only estimates and have significant uncertainty Lafourche Parish Comprehensive Resiliency Plan
  • 14. NWS SLOSH storm surge model Future, weak tropical storms at Port Fourchon will inundate the existing LA 1 to the point of closure. Galliano Water level reference to datum - NAVD88 Grand Isle Port Fourchon Lafourche Parish Comprehensive Resiliency Plan
  • 15. Of 19 miles of needed bridge,1/2 is built. LA 1 Toll Road Update January 15 2010 Lafourche Parish Comprehensive Resiliency Plan
  • 16. $165 million Leeville Bridge designed to withstand 100 yr. storm opened in 2009 Lafourche Parish Comprehensive Resiliency Plan
  • 17. The elevated highway (background) will replace the existing at-grade highway. Lafourche Parish Comprehensive Resiliency Plan
  • 18. Lafourche Parish Comprehensive ResiliencyPlan Existing Transportation Kimley-Horn and Associates, Inc. Waggonner & Ball Architects Lafourche Parish Comprehensive Resiliency Plan