2. OBJECTIVE
To work with a team of professionals in an organization, who offers dynamic environment and
provides opportunity to not only learn but also demonstrate skills acquired over the course of my
professional career. Proven work ethic, good communications skills and high level of responsibility.
EDUCATION
2010-2014 B.E – Bachelors of Engineering (Electrical/ Electronics)
2007-2010 DAE – Diploma of Associate Engineer (Electronics)
2006-2007 SSC – Secondary School Certificate (science)
EXPERIENCE
Organization: Techno Wash (Pvt.) Chakwal, Pakistan.
Post: Electrical/Electronics Engineer
Duration: Nov-2015 to Date
About Company: TECHNO WASH is a newly emerged Company and plays as an innovation leader
in installing of Automatic Car Wash systems in Pakistan. The system introduced by the Company is
Called, Auto Car Wash Tunnel System.
Summary of Duties & Responsibilities:
• Plant installation at sites.
• Designing and developing new control systems.
• Testing, maintenance and modifying existing system.
• Managing operations.
• Working on new projects with design engineers, operation engineers and purchasers.
• Project management within cost and time constrained environments.
• Purchasing control panel and instrumentation equipment.
• Control Room analysis and maintenance.
1st
Project : Auto Car wash
System Installation in
Abbottabad
• Plant installation mechanicaly and electricaly at
Abbottabad site.
• As an Electrical Engineer I have deployed the whole
electrical wiring of the system including sensors, motors,
pumps, valves, and limit switches to the control room
according to the design.
• Worked with a highly qualified team of TECHNO WASH
in installation of control system and equipment of
Automation to operate the plant through Siemen’s PLC
S7-200 and S7-300 and interfacing of HMI.
2nd
Project: Auto Car Wash
System Installation in Talagang
• Designing, planning and equipment arrangement
• Monitoring and Assessment of the project.
• Electrical line design of the plant from control
room.
• Procurement /purchase of necessary
Components/instruments.
• Control panel installation/operation.
• Instrumentation & Measurement.
3rd
Project: Auto Car Wash
System Installation in
• Designing, planning, monitoring & assessment of
complete project.
Computer Skills:
• Configuration
of Microsoft
Windows (XP,
Win7 & Win8,
Sever2000)
• Trouble Shooting
Computer
Hardware &
Software
• Basics of C++
Programming
• Basics of
MATLAB
• Basics of
AutoCAD
• Word processing
(MS Word)
• Spread Sheet
(MS Excel)
• Microsoft
Power Point
• Microsoft
outlook and
Internet
Languages:
English.
Urdu.
Pashtu.
Panjabi
Extra Activities:
• Technology Blog
follower
• Sports
• Travelling