SlideShare a Scribd company logo
1 of 2
OBJECTIVE
To work with a team of professionals in an organization, who offers dynamic environment and
provides opportunity to not only learn but also demonstrate skills acquired over the course of my
professional career. Proven work ethic, good communications skills and high level of responsibility.
EDUCATION
2010-2014 B.E – Bachelors of Engineering (Electrical/ Electronics)
2007-2010 DAE – Diploma of Associate Engineer (Electronics)
2006-2007 SSC – Secondary School Certificate (science)
EXPERIENCE
Organization: Techno Wash (Pvt.) Chakwal, Pakistan.
Post: Electrical/Electronics Engineer
Duration: Nov-2015 to Date
About Company: TECHNO WASH is a newly emerged Company and plays as an innovation leader
in installing of Automatic Car Wash systems in Pakistan. The system introduced by the Company is
Called, Auto Car Wash Tunnel System.
Summary of Duties & Responsibilities:
• Plant installation at sites.
• Designing and developing new control systems.
• Testing, maintenance and modifying existing system.
• Managing operations.
• Working on new projects with design engineers, operation engineers and purchasers.
• Project management within cost and time constrained environments.
• Purchasing control panel and instrumentation equipment.
• Control Room analysis and maintenance.
1st
Project : Auto Car wash
System Installation in
Abbottabad
• Plant installation mechanicaly and electricaly at
Abbottabad site.
• As an Electrical Engineer I have deployed the whole
electrical wiring of the system including sensors, motors,
pumps, valves, and limit switches to the control room
according to the design.
• Worked with a highly qualified team of TECHNO WASH
in installation of control system and equipment of
Automation to operate the plant through Siemen’s PLC
S7-200 and S7-300 and interfacing of HMI.
2nd
Project: Auto Car Wash
System Installation in Talagang
• Designing, planning and equipment arrangement
• Monitoring and Assessment of the project.
• Electrical line design of the plant from control
room.
• Procurement /purchase of necessary
Components/instruments.
• Control panel installation/operation.
• Instrumentation & Measurement.
3rd
Project: Auto Car Wash
System Installation in
• Designing, planning, monitoring & assessment of
complete project.
Computer Skills:
• Configuration
of Microsoft
Windows (XP,
Win7 & Win8,
Sever2000)
• Trouble Shooting
Computer
Hardware &
Software
• Basics of C++
Programming
• Basics of
MATLAB
• Basics of
AutoCAD
• Word processing
(MS Word)
• Spread Sheet
(MS Excel)
• Microsoft
Power Point
• Microsoft
outlook and
Internet
Languages:
English.
Urdu.
Pashtu.
Panjabi
Extra Activities:
• Technology Blog
follower
• Sports
• Travelling

More Related Content

What's hot (19)

Electronics Engineer
Electronics EngineerElectronics Engineer
Electronics Engineer
 
Ahmed Badr CV
Ahmed Badr CVAhmed Badr CV
Ahmed Badr CV
 
Resume- updated junaid 8
Resume- updated junaid 8Resume- updated junaid 8
Resume- updated junaid 8
 
Bahaa Alatari-CV -
Bahaa Alatari-CV -Bahaa Alatari-CV -
Bahaa Alatari-CV -
 
Baldev CV
Baldev CVBaldev CV
Baldev CV
 
ahmed amer
ahmed amerahmed amer
ahmed amer
 
Resume_FullTime_Controls
Resume_FullTime_ControlsResume_FullTime_Controls
Resume_FullTime_Controls
 
0.RESUME
0.RESUME0.RESUME
0.RESUME
 
Mahmood Sharif CV
Mahmood Sharif CVMahmood Sharif CV
Mahmood Sharif CV
 
CV-Farhan Mushtaq
CV-Farhan MushtaqCV-Farhan Mushtaq
CV-Farhan Mushtaq
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
resume paramatt
resume paramattresume paramatt
resume paramatt
 
Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018
 
Bhagyesh's IR TECH
Bhagyesh's IR TECHBhagyesh's IR TECH
Bhagyesh's IR TECH
 
LeeTatumsResume
LeeTatumsResumeLeeTatumsResume
LeeTatumsResume
 
Jitsu Patel- Resume
Jitsu Patel- ResumeJitsu Patel- Resume
Jitsu Patel- Resume
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 
Mankali Srinivas
Mankali SrinivasMankali Srinivas
Mankali Srinivas
 
nithin_resume 2 (2)
nithin_resume 2 (2)nithin_resume 2 (2)
nithin_resume 2 (2)
 

Similar to Jamil_cv new (20)

Vijai CV
Vijai CVVijai CV
Vijai CV
 
Mohamed Elwardany's resume
Mohamed Elwardany's resumeMohamed Elwardany's resume
Mohamed Elwardany's resume
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
my_updated_CV_14_3_16
my_updated_CV_14_3_16my_updated_CV_14_3_16
my_updated_CV_14_3_16
 
Facility management in Electircal in shopping mall and high rise buildings
Facility management in Electircal in shopping mall and high rise buildingsFacility management in Electircal in shopping mall and high rise buildings
Facility management in Electircal in shopping mall and high rise buildings
 
dhanaraj
dhanarajdhanaraj
dhanaraj
 
Resume_Rachit Khandelwal
Resume_Rachit KhandelwalResume_Rachit Khandelwal
Resume_Rachit Khandelwal
 
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEERS.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
 
CV_HVAC_ENGINEER
CV_HVAC_ENGINEERCV_HVAC_ENGINEER
CV_HVAC_ENGINEER
 
arghadip
arghadiparghadip
arghadip
 
new
newnew
new
 
Resume_Shakti Patra
Resume_Shakti PatraResume_Shakti Patra
Resume_Shakti Patra
 
RAMESH BABU-CVe
RAMESH BABU-CVeRAMESH BABU-CVe
RAMESH BABU-CVe
 
Upender CV
Upender CVUpender CV
Upender CV
 
Upender CV
Upender CVUpender CV
Upender CV
 
RAMNAIK RESUME- PRD+DESIGN
RAMNAIK RESUME- PRD+DESIGNRAMNAIK RESUME- PRD+DESIGN
RAMNAIK RESUME- PRD+DESIGN
 
Yogesh K
Yogesh KYogesh K
Yogesh K
 
Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
 
Resume
ResumeResume
Resume
 
Meenu Resume
Meenu ResumeMeenu Resume
Meenu Resume
 

Jamil_cv new

  • 1.
  • 2. OBJECTIVE To work with a team of professionals in an organization, who offers dynamic environment and provides opportunity to not only learn but also demonstrate skills acquired over the course of my professional career. Proven work ethic, good communications skills and high level of responsibility. EDUCATION 2010-2014 B.E – Bachelors of Engineering (Electrical/ Electronics) 2007-2010 DAE – Diploma of Associate Engineer (Electronics) 2006-2007 SSC – Secondary School Certificate (science) EXPERIENCE Organization: Techno Wash (Pvt.) Chakwal, Pakistan. Post: Electrical/Electronics Engineer Duration: Nov-2015 to Date About Company: TECHNO WASH is a newly emerged Company and plays as an innovation leader in installing of Automatic Car Wash systems in Pakistan. The system introduced by the Company is Called, Auto Car Wash Tunnel System. Summary of Duties & Responsibilities: • Plant installation at sites. • Designing and developing new control systems. • Testing, maintenance and modifying existing system. • Managing operations. • Working on new projects with design engineers, operation engineers and purchasers. • Project management within cost and time constrained environments. • Purchasing control panel and instrumentation equipment. • Control Room analysis and maintenance. 1st Project : Auto Car wash System Installation in Abbottabad • Plant installation mechanicaly and electricaly at Abbottabad site. • As an Electrical Engineer I have deployed the whole electrical wiring of the system including sensors, motors, pumps, valves, and limit switches to the control room according to the design. • Worked with a highly qualified team of TECHNO WASH in installation of control system and equipment of Automation to operate the plant through Siemen’s PLC S7-200 and S7-300 and interfacing of HMI. 2nd Project: Auto Car Wash System Installation in Talagang • Designing, planning and equipment arrangement • Monitoring and Assessment of the project. • Electrical line design of the plant from control room. • Procurement /purchase of necessary Components/instruments. • Control panel installation/operation. • Instrumentation & Measurement. 3rd Project: Auto Car Wash System Installation in • Designing, planning, monitoring & assessment of complete project. Computer Skills: • Configuration of Microsoft Windows (XP, Win7 & Win8, Sever2000) • Trouble Shooting Computer Hardware & Software • Basics of C++ Programming • Basics of MATLAB • Basics of AutoCAD • Word processing (MS Word) • Spread Sheet (MS Excel) • Microsoft Power Point • Microsoft outlook and Internet Languages: English. Urdu. Pashtu. Panjabi Extra Activities: • Technology Blog follower • Sports • Travelling