UNITED COLLEGE OF
ENGINEERING
& RESEARCH
NAINI ALLAHABAD
DEPARTMENT OF CIVIL ENGINEERING
DATE-27TH AUGUST 2016
8/26/2016 1
8/26/2016 2
PRESENTATION ON
INDUSTRIAL TRAINING
F R O M - N O R T H C E N T R A L R A I LWAY
PRESENTED BY – ABHIJIT KUMAR
ROLL NO- 1301000001
B.TECH 4TH YEAR
BATC H 2016-2017
:
 Storage Reservoir:
A reservoir (etymology: from French reservoir a “storehouse”)
is an enlarged natural or artificial lake, storage pond or
impoundment created using a dam or lock to store water.
Tank reservoirs store liquids or gases in storage tanks that may be elevated,
at grade level, or buried. Tank reservoirs for water are also called cisterns.
Underground reservoirs store almost exclusively water and petroleum below
ground.
 Water Tank:
In simple words a water tank is a container for storing liquid.
8/26/2016 3
8/26/2016 4
1 Based on the types of material and location:
(i) Chemical contact tank: This type of water tank is made of
polyethylene construction, allows for retention time for
chemical treatment.
(ii) Ground water tank: This type of water tank is made of lined
carbon steel, it may receive water from a water well or from surface
water allowing a large volume of water to be placed in inventory
and used during peak demand cycles.
(iii)Elevated Water Tank: This type of water tank is also known
as a water tower, an elevated water tower will create pressure at the
ground-level outlet of 1 psi per 2.31 feet of elevation, thus a tank
elevated to 70 feet creates about 30 psi of discharge pressure. 30 psi
is sufficient for most domestic and industrial requirements.
8/26/2016 5
(iv) Vertical cylindrical dome top : This type of tanks may hold
from fifty gallons to several million gallons. Horizontal cylindrical
tanks are typically used for transport because their low-profile creates
a low center of gravity helping to maintain equilibrium for the
transport vehicle, trailer or truck.
(v) A Hydro-pneumatic Tank: This type of tank is typically a
horizontal pressurized storage tank. Pressurizing this reservoir of
water creates a surge free delivery of stored water into the
distribution system.
8/26/2016 6
2Based upon the shapes:
i Circular Tanks: They are most economical and used for large
capacity in water supply, sewage treatment etc.
iiRectangular Tanks: They are used for small storage capacity and
their framework is costly.
iii Spherical Tanks: They are used for the economy and aesthetic view
point.
iv Intze Tanks: They are used for large storage capacity. In such tanks,
domes are used in place of level slabs.
8/26/2016 7
A typical Intze tank consists of :
1) Top dome.
2) Top ring beam.
3) Side walls.
4) Bottom ring beam.
5) Conical dome.
6)Bottom spherical dome.
7) Bottom circular ring beam.
8)Staging – Columns & bracings.
9)Foundation.
8/26/2016 8
DESIGN A R.C.C OVERHEAD WATER
TANK LOCATED AT RAILWAY COLONY
ALLAHABAD FOR A TARGET
POPULATION OF 1500
8/26/2016 9
Location: Kalyani
Target Population: 1500
Maximum daily consumption (demand)
=180% of average daily demand = 1.8q
[Ref: Water Supply Engineering by S.K.Garg, Page-19]
8/26/2016 10
Domestic water demand = 200 lit/capita/day
Average daily demand (q) = per demand  Population
= 200  1500
= 3, 00,000 lit/day
Hence, maximum daily demand = 1.8  q litres/day
= 1.8  300000 litres/day
= 540  103 litres/day
= 540 m3/day
8/26/2016 11
Let us assume, diameter of tank (D) = 12m (< 30m)
[as per Clause 7.2.1.1 of IS:2210-1988, page 8]
Hence, radius of tank (R) = 12/2 = 6m.
Now, volume of tank = 540 m3.
Let h be the height of the cylindrical tank.
Capacity of tank =  R2 h
8/26/2016 12
Substituting the values, we get
 62 h = 540
or, h = 540/( 36)
or, h = 4.77
Thus, height of the cylindrical tank = 4.77 m.
Assuming, free board = 0.25 m.
Hence, total height of the tank = (4.77+0.25)
= 5.02 m  5 m
8/26/2016 13
Proposed Foundation – Raft foundation
Bearing Capacity of soil - 90 KN/m2
Grade of Concrete – M30
Grade of steel – Fe500
Staging height – 12m up to bottom of tank
Capacity – 540000 litres
No. of columns – 8
Diameter of columns – 1.5m
8/26/2016 14
D
r
A C B
 
R1 R1
O
Notations:
D = Diameter of the tank = 12m
r = Central rise of the dome
R1= Radius of the dome
= Semi-central angle of the dome
From the geometry of the figure,
 AOC &  BOC are right-angled triangles.
Central rise, r = 1/8 to 1/6 of span
[Ref: Advanced Reinforced Concrete by H.J.Shah, page-406]
8/26/2016 15
We take, r = 1/6 of span
r = 1/6  12 = 2
Thus, central rise of the dome is 2 m.
From  AOC,
OC2 + AC2 = AO2
or, (R1-r)2 + (D/2)2 = R1
2
or, (R1-2)2 + (12/2)2 = R1
2
or, R1
2 – 4R1+4+36=R1
2
or, 4R1 = 40
or, R1 = 40/4 = 10
Thus, radius of the dome is 10m.
8/26/2016 16
Again, cos  = = = = 0.8
or,  = cos-1(0.8)
or,  = 36.87
Thus, semi-central angle of the dome is 36.87
30<< 40. Hence, OK.
[as per IS:2210-1988, page-8]
8/26/2016 17
Again,  = 36.87< 51.8
Hence, tensile stress is not developed.
[Ref: Advanced Reinforced Concrete by H.J Shah,
page 64]
Now, r/D = 2/12 = 1/6 (< 1/5)
[as per IS: 2210-1988, page-10]
So, it is a deep doubly curved shell and membrane
analysis is required.
8/26/2016 18
Load calculation:
We assume, thickness of top dome = 100 mm ( 40 mm)
[as per Clause 7.1.1 of IS:2210-1988, page-8]
Minimum imposed load for accessible roof = 1.5KN/m2
[as per IS-875 Part-2]
Self-weight of the dome = 0.1  25 = 2.5 KN/m2
Finishing = 0.05  24 = 1.2 KN/m2
___________________________________________________
Total load = (1.5+2.5+1.2) = 5.2 KN/m2
8/26/2016 19
Calculation of Meridional stress and Hoop stress:
Meridional force:
Due to UDL =
[Ref: Advanced Reinforced Concrete by H.J Shah, page-64]
Meridional force = 5.2  10 
= 28.89 KN.
Meridional stress for per meter span =
= 0.2889 N/mm2
 0.29 N/mm2 (compressive)
8/26/2016 20
As the minimum grade of concrete is M30, thus for M30
[as per IS-456:2000, Table-21, page-81]
σcc = 8N/mm2
Thus, 0.29 < 8 N/mm2. Hence, OK.
8/26/2016 21
Hoop force:
Due to UDL =
[Ref: Advanced Reinforced Concrete by H.J Shah,
page-64]
Hoop force = 5.2  10 
= 12.71KN.
Hoop stress for per meter span =
= 0.1271 N/mm2
 0.13 N/mm2 (compressive)
Thus, 0.13 < 8 N/mm2. Hence OK.
Hence, the stresses are within the safe limit.
8/26/2016 22
Since the stresses are very small, we provide nominal
tensile reinforcement of 0.3%
[as per IS: 3370 (Part-2:2009) page-3, Table-3 the
nominal percentage of nominal tensile reinforcement
shall not be less than 0.15% in any case]
= 0.3
or, Ast = 1000  100
or, Ast = 300 mm2
Thus, area of steel reinforcement is 300 mm2.
8/26/2016 23
We provide 6 - 8mm # bars,
[as per clause 12.3.1 of IS: 2210-1988]
Spacing of 8mm # bars = = 167.53 mm
 180 mm c/c
Thus, we provide 6 – 8mm @180mm c/c both ways.
Actual Percentage of steel required (Pt)
= = = 0.30%
8/26/2016 24
Clear cover [as per clause 7.1.1.1 of IS: 2210-1988]:-
(i) 15mm.
(ii) Nominal size
whichever is greater.
Now, for severe exposure, nominal cover = 45 mm
[as per Table 16 of IS: 456-2000]
As, 45 > 15mm, so we provide clear cover = 45mm.
8/26/2016 25
Thickness =100mm
Clear cover =45mm
Grade of concrete =M30
Grade of steel =Fe500
Reinforcement=8 mm # @180 c/c – Meridional Direction
8 mm # @180 c/c – Circumferential Direction
8/26/2016 26
8/26/2016 27
8/26/2016 28
8/26/2016 29
8/26/2016 30
(i) Water Supply Engineering by S.K.Garg
(ii) IS 2210-1988
(iii) Advanced Reinforced Concrete by H.J.Shah
(iv) IS 875 (Part 1 & 2)
(iv) IS-456:2000
(v) IS: 3370:2009 [Part-2]
(vi) Wikipedia
(vii) Softwares – AutoCAD & STAAD.Pro
8/26/2016 31
MEN AT WORK
8/26/2016 32
 SITE : NEAR RAILWAY GROUND @ RAILWAY COLONY ALLAHABAD JUNCTION
R E I N F O RC E M E N T A B OV E R A F T
F O U N DAT I O N
8/26/2016 33
V I B R AT I O N WO R K I N C O N C R E T E
U S I N G I N T E R N A L T Y P E V I B R ATO R
8/26/2016 34
PO URING O F C O NC RE TE USING RA MP
SHO E
8/26/2016 35
THANKS FOR YOUR
PRECIOUS TIME
8/26/2016 36

More Related Content

What's hot

IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various PositionsIRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various PositionsIRJET Journal
 
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS IJMER
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
 
Design of post tensioned straddle beam for bridge support
Design of post tensioned straddle beam for bridge support  Design of post tensioned straddle beam for bridge support
Design of post tensioned straddle beam for bridge support Amin Zuraiqi
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
 
IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...IRJET Journal
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...Rajesh Prasad
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...IAEME Publication
 
Parametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingParametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingIRJET Journal
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
Analysis of Energy Absorption Tubes (Crush Can)
Analysis of Energy Absorption Tubes (Crush Can)Analysis of Energy Absorption Tubes (Crush Can)
Analysis of Energy Absorption Tubes (Crush Can)IRJET Journal
 
G+3 APARTMENT BUILDING PROJECT REPORT
G+3 APARTMENT BUILDING  PROJECT  REPORTG+3 APARTMENT BUILDING  PROJECT  REPORT
G+3 APARTMENT BUILDING PROJECT REPORTFresher Thinking
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Rajesh Prasad
 
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...IRJET Journal
 
Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...IJSRD
 
Seismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesSeismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesManish Mall
 
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGESTUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGEAELC
 
Truss bridge final presentation
Truss bridge final presentationTruss bridge final presentation
Truss bridge final presentationkaiumbhai
 

What's hot (20)

IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various PositionsIRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
 
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
Design of post tensioned straddle beam for bridge support
Design of post tensioned straddle beam for bridge support  Design of post tensioned straddle beam for bridge support
Design of post tensioned straddle beam for bridge support
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...
IRJET- Dynamic Analysis of Tall Tubular Steel Structures for Different Geomet...
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
 
THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTI...
THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTI...THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTI...
THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTI...
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
 
Parametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingParametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic Loading
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Analysis of Energy Absorption Tubes (Crush Can)
Analysis of Energy Absorption Tubes (Crush Can)Analysis of Energy Absorption Tubes (Crush Can)
Analysis of Energy Absorption Tubes (Crush Can)
 
G+3 APARTMENT BUILDING PROJECT REPORT
G+3 APARTMENT BUILDING  PROJECT  REPORTG+3 APARTMENT BUILDING  PROJECT  REPORT
G+3 APARTMENT BUILDING PROJECT REPORT
 
Vd tinhtoan cautreo
Vd tinhtoan cautreoVd tinhtoan cautreo
Vd tinhtoan cautreo
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
 
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
 
Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...Design & Analysis of High rise Building With & Without Floating Column Using ...
Design & Analysis of High rise Building With & Without Floating Column Using ...
 
Seismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesSeismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devices
 
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGESTUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
 
Truss bridge final presentation
Truss bridge final presentationTruss bridge final presentation
Truss bridge final presentation
 

Similar to Design and Analysis of an Overhead Water Tank for Railway Colony

143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanksbernard347
 
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET Journal
 
Numerical Analysis of Liquid Storage Tank Subjected to Dynamic Loading
Numerical Analysis of Liquid Storage Tank Subjected to Dynamic LoadingNumerical Analysis of Liquid Storage Tank Subjected to Dynamic Loading
Numerical Analysis of Liquid Storage Tank Subjected to Dynamic LoadingIRJET Journal
 
IRJET- Planning and Design of Container Terminal
IRJET-  	  Planning and Design of Container TerminalIRJET-  	  Planning and Design of Container Terminal
IRJET- Planning and Design of Container TerminalIRJET Journal
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorIRJET Journal
 
First Order Analysis of Elevated Water Tanks During Seismic Activity using St...
First Order Analysis of Elevated Water Tanks During Seismic Activity using St...First Order Analysis of Elevated Water Tanks During Seismic Activity using St...
First Order Analysis of Elevated Water Tanks During Seismic Activity using St...IRJET Journal
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Design and Analysis of Acrylic Paneled Rectangular Towing Tank
Design and Analysis of Acrylic Paneled Rectangular Towing TankDesign and Analysis of Acrylic Paneled Rectangular Towing Tank
Design and Analysis of Acrylic Paneled Rectangular Towing TankIJMERJOURNAL
 
Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...
Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...
Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...Ayman Siddique
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tankAamir Patni
 
Design of Floating Bridge Cross Over
Design of Floating Bridge Cross OverDesign of Floating Bridge Cross Over
Design of Floating Bridge Cross OverIRJET Journal
 
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle WallsA Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle WallsIRJET Journal
 
ANALYTICAL STUDY OF STEEL ARCH BRIDGE
ANALYTICAL STUDY OF STEEL ARCH BRIDGEANALYTICAL STUDY OF STEEL ARCH BRIDGE
ANALYTICAL STUDY OF STEEL ARCH BRIDGEIRJET Journal
 
Stress analysis of storage tank piping - Jeba Anand
Stress analysis of storage tank  piping - Jeba AnandStress analysis of storage tank  piping - Jeba Anand
Stress analysis of storage tank piping - Jeba AnandJeba Anand Nadar
 
Parametric study of rcc staging (support structure) for overhead water tanks ...
Parametric study of rcc staging (support structure) for overhead water tanks ...Parametric study of rcc staging (support structure) for overhead water tanks ...
Parametric study of rcc staging (support structure) for overhead water tanks ...Issar Kapadia
 
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power PlantStudy on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power PlantIRJET Journal
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET Journal
 

Similar to Design and Analysis of an Overhead Water Tank for Railway Colony (20)

water tank
water tankwater tank
water tank
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
 
Intze tank design
Intze tank designIntze tank design
Intze tank design
 
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
 
Numerical Analysis of Liquid Storage Tank Subjected to Dynamic Loading
Numerical Analysis of Liquid Storage Tank Subjected to Dynamic LoadingNumerical Analysis of Liquid Storage Tank Subjected to Dynamic Loading
Numerical Analysis of Liquid Storage Tank Subjected to Dynamic Loading
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
IRJET- Planning and Design of Container Terminal
IRJET-  	  Planning and Design of Container TerminalIRJET-  	  Planning and Design of Container Terminal
IRJET- Planning and Design of Container Terminal
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure Accumulator
 
First Order Analysis of Elevated Water Tanks During Seismic Activity using St...
First Order Analysis of Elevated Water Tanks During Seismic Activity using St...First Order Analysis of Elevated Water Tanks During Seismic Activity using St...
First Order Analysis of Elevated Water Tanks During Seismic Activity using St...
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Design and Analysis of Acrylic Paneled Rectangular Towing Tank
Design and Analysis of Acrylic Paneled Rectangular Towing TankDesign and Analysis of Acrylic Paneled Rectangular Towing Tank
Design and Analysis of Acrylic Paneled Rectangular Towing Tank
 
Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...
Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...
Penstock Design for a Hydro-electric Pumped Storage Station Report_Ayman_Sidd...
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Design of Floating Bridge Cross Over
Design of Floating Bridge Cross OverDesign of Floating Bridge Cross Over
Design of Floating Bridge Cross Over
 
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle WallsA Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
 
ANALYTICAL STUDY OF STEEL ARCH BRIDGE
ANALYTICAL STUDY OF STEEL ARCH BRIDGEANALYTICAL STUDY OF STEEL ARCH BRIDGE
ANALYTICAL STUDY OF STEEL ARCH BRIDGE
 
Stress analysis of storage tank piping - Jeba Anand
Stress analysis of storage tank  piping - Jeba AnandStress analysis of storage tank  piping - Jeba Anand
Stress analysis of storage tank piping - Jeba Anand
 
Parametric study of rcc staging (support structure) for overhead water tanks ...
Parametric study of rcc staging (support structure) for overhead water tanks ...Parametric study of rcc staging (support structure) for overhead water tanks ...
Parametric study of rcc staging (support structure) for overhead water tanks ...
 
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power PlantStudy on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
Study on Induced Draft Cooling Tower Performance Analysis in Captive Power Plant
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
 

Recently uploaded

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

Design and Analysis of an Overhead Water Tank for Railway Colony

  • 1. UNITED COLLEGE OF ENGINEERING & RESEARCH NAINI ALLAHABAD DEPARTMENT OF CIVIL ENGINEERING DATE-27TH AUGUST 2016 8/26/2016 1
  • 2. 8/26/2016 2 PRESENTATION ON INDUSTRIAL TRAINING F R O M - N O R T H C E N T R A L R A I LWAY PRESENTED BY – ABHIJIT KUMAR ROLL NO- 1301000001 B.TECH 4TH YEAR BATC H 2016-2017
  • 3. :  Storage Reservoir: A reservoir (etymology: from French reservoir a “storehouse”) is an enlarged natural or artificial lake, storage pond or impoundment created using a dam or lock to store water. Tank reservoirs store liquids or gases in storage tanks that may be elevated, at grade level, or buried. Tank reservoirs for water are also called cisterns. Underground reservoirs store almost exclusively water and petroleum below ground.  Water Tank: In simple words a water tank is a container for storing liquid. 8/26/2016 3
  • 5. 1 Based on the types of material and location: (i) Chemical contact tank: This type of water tank is made of polyethylene construction, allows for retention time for chemical treatment. (ii) Ground water tank: This type of water tank is made of lined carbon steel, it may receive water from a water well or from surface water allowing a large volume of water to be placed in inventory and used during peak demand cycles. (iii)Elevated Water Tank: This type of water tank is also known as a water tower, an elevated water tower will create pressure at the ground-level outlet of 1 psi per 2.31 feet of elevation, thus a tank elevated to 70 feet creates about 30 psi of discharge pressure. 30 psi is sufficient for most domestic and industrial requirements. 8/26/2016 5
  • 6. (iv) Vertical cylindrical dome top : This type of tanks may hold from fifty gallons to several million gallons. Horizontal cylindrical tanks are typically used for transport because their low-profile creates a low center of gravity helping to maintain equilibrium for the transport vehicle, trailer or truck. (v) A Hydro-pneumatic Tank: This type of tank is typically a horizontal pressurized storage tank. Pressurizing this reservoir of water creates a surge free delivery of stored water into the distribution system. 8/26/2016 6
  • 7. 2Based upon the shapes: i Circular Tanks: They are most economical and used for large capacity in water supply, sewage treatment etc. iiRectangular Tanks: They are used for small storage capacity and their framework is costly. iii Spherical Tanks: They are used for the economy and aesthetic view point. iv Intze Tanks: They are used for large storage capacity. In such tanks, domes are used in place of level slabs. 8/26/2016 7
  • 8. A typical Intze tank consists of : 1) Top dome. 2) Top ring beam. 3) Side walls. 4) Bottom ring beam. 5) Conical dome. 6)Bottom spherical dome. 7) Bottom circular ring beam. 8)Staging – Columns & bracings. 9)Foundation. 8/26/2016 8
  • 9. DESIGN A R.C.C OVERHEAD WATER TANK LOCATED AT RAILWAY COLONY ALLAHABAD FOR A TARGET POPULATION OF 1500 8/26/2016 9
  • 10. Location: Kalyani Target Population: 1500 Maximum daily consumption (demand) =180% of average daily demand = 1.8q [Ref: Water Supply Engineering by S.K.Garg, Page-19] 8/26/2016 10
  • 11. Domestic water demand = 200 lit/capita/day Average daily demand (q) = per demand  Population = 200  1500 = 3, 00,000 lit/day Hence, maximum daily demand = 1.8  q litres/day = 1.8  300000 litres/day = 540  103 litres/day = 540 m3/day 8/26/2016 11
  • 12. Let us assume, diameter of tank (D) = 12m (< 30m) [as per Clause 7.2.1.1 of IS:2210-1988, page 8] Hence, radius of tank (R) = 12/2 = 6m. Now, volume of tank = 540 m3. Let h be the height of the cylindrical tank. Capacity of tank =  R2 h 8/26/2016 12
  • 13. Substituting the values, we get  62 h = 540 or, h = 540/( 36) or, h = 4.77 Thus, height of the cylindrical tank = 4.77 m. Assuming, free board = 0.25 m. Hence, total height of the tank = (4.77+0.25) = 5.02 m  5 m 8/26/2016 13
  • 14. Proposed Foundation – Raft foundation Bearing Capacity of soil - 90 KN/m2 Grade of Concrete – M30 Grade of steel – Fe500 Staging height – 12m up to bottom of tank Capacity – 540000 litres No. of columns – 8 Diameter of columns – 1.5m 8/26/2016 14
  • 15. D r A C B   R1 R1 O Notations: D = Diameter of the tank = 12m r = Central rise of the dome R1= Radius of the dome = Semi-central angle of the dome From the geometry of the figure,  AOC &  BOC are right-angled triangles. Central rise, r = 1/8 to 1/6 of span [Ref: Advanced Reinforced Concrete by H.J.Shah, page-406] 8/26/2016 15
  • 16. We take, r = 1/6 of span r = 1/6  12 = 2 Thus, central rise of the dome is 2 m. From  AOC, OC2 + AC2 = AO2 or, (R1-r)2 + (D/2)2 = R1 2 or, (R1-2)2 + (12/2)2 = R1 2 or, R1 2 – 4R1+4+36=R1 2 or, 4R1 = 40 or, R1 = 40/4 = 10 Thus, radius of the dome is 10m. 8/26/2016 16
  • 17. Again, cos  = = = = 0.8 or,  = cos-1(0.8) or,  = 36.87 Thus, semi-central angle of the dome is 36.87 30<< 40. Hence, OK. [as per IS:2210-1988, page-8] 8/26/2016 17
  • 18. Again,  = 36.87< 51.8 Hence, tensile stress is not developed. [Ref: Advanced Reinforced Concrete by H.J Shah, page 64] Now, r/D = 2/12 = 1/6 (< 1/5) [as per IS: 2210-1988, page-10] So, it is a deep doubly curved shell and membrane analysis is required. 8/26/2016 18
  • 19. Load calculation: We assume, thickness of top dome = 100 mm ( 40 mm) [as per Clause 7.1.1 of IS:2210-1988, page-8] Minimum imposed load for accessible roof = 1.5KN/m2 [as per IS-875 Part-2] Self-weight of the dome = 0.1  25 = 2.5 KN/m2 Finishing = 0.05  24 = 1.2 KN/m2 ___________________________________________________ Total load = (1.5+2.5+1.2) = 5.2 KN/m2 8/26/2016 19
  • 20. Calculation of Meridional stress and Hoop stress: Meridional force: Due to UDL = [Ref: Advanced Reinforced Concrete by H.J Shah, page-64] Meridional force = 5.2  10  = 28.89 KN. Meridional stress for per meter span = = 0.2889 N/mm2  0.29 N/mm2 (compressive) 8/26/2016 20
  • 21. As the minimum grade of concrete is M30, thus for M30 [as per IS-456:2000, Table-21, page-81] σcc = 8N/mm2 Thus, 0.29 < 8 N/mm2. Hence, OK. 8/26/2016 21
  • 22. Hoop force: Due to UDL = [Ref: Advanced Reinforced Concrete by H.J Shah, page-64] Hoop force = 5.2  10  = 12.71KN. Hoop stress for per meter span = = 0.1271 N/mm2  0.13 N/mm2 (compressive) Thus, 0.13 < 8 N/mm2. Hence OK. Hence, the stresses are within the safe limit. 8/26/2016 22
  • 23. Since the stresses are very small, we provide nominal tensile reinforcement of 0.3% [as per IS: 3370 (Part-2:2009) page-3, Table-3 the nominal percentage of nominal tensile reinforcement shall not be less than 0.15% in any case] = 0.3 or, Ast = 1000  100 or, Ast = 300 mm2 Thus, area of steel reinforcement is 300 mm2. 8/26/2016 23
  • 24. We provide 6 - 8mm # bars, [as per clause 12.3.1 of IS: 2210-1988] Spacing of 8mm # bars = = 167.53 mm  180 mm c/c Thus, we provide 6 – 8mm @180mm c/c both ways. Actual Percentage of steel required (Pt) = = = 0.30% 8/26/2016 24
  • 25. Clear cover [as per clause 7.1.1.1 of IS: 2210-1988]:- (i) 15mm. (ii) Nominal size whichever is greater. Now, for severe exposure, nominal cover = 45 mm [as per Table 16 of IS: 456-2000] As, 45 > 15mm, so we provide clear cover = 45mm. 8/26/2016 25
  • 26. Thickness =100mm Clear cover =45mm Grade of concrete =M30 Grade of steel =Fe500 Reinforcement=8 mm # @180 c/c – Meridional Direction 8 mm # @180 c/c – Circumferential Direction 8/26/2016 26
  • 31. (i) Water Supply Engineering by S.K.Garg (ii) IS 2210-1988 (iii) Advanced Reinforced Concrete by H.J.Shah (iv) IS 875 (Part 1 & 2) (iv) IS-456:2000 (v) IS: 3370:2009 [Part-2] (vi) Wikipedia (vii) Softwares – AutoCAD & STAAD.Pro 8/26/2016 31
  • 32. MEN AT WORK 8/26/2016 32  SITE : NEAR RAILWAY GROUND @ RAILWAY COLONY ALLAHABAD JUNCTION
  • 33. R E I N F O RC E M E N T A B OV E R A F T F O U N DAT I O N 8/26/2016 33
  • 34. V I B R AT I O N WO R K I N C O N C R E T E U S I N G I N T E R N A L T Y P E V I B R ATO R 8/26/2016 34
  • 35. PO URING O F C O NC RE TE USING RA MP SHO E 8/26/2016 35
  • 36. THANKS FOR YOUR PRECIOUS TIME 8/26/2016 36