SlideShare a Scribd company logo
1 of 3
HELEN L. MANNEA, NCARB, AIA                                                     Dallas/Fort Worth, Texas
                                                                                214-632-1760
                                                                                hlmannea@gmail.com
PROJECT EXPERIENCE
Educational:
          • Hillsboro Community College
              New Technology Building
              Laboratories, Auditorium & Classrooms
          • Hillsboro & Orange County Schools
              School prototypes developed for specific sites in Florida
              K-5; 6-8; and High School facilities
          • DeSoto and Florida County Schools
              New High School facilities
          • Ohio Schools Facilities Commission
              Various Ohio county school district surveys
          • University of Miami, Oxford
              Cafeteria Addition and Renovation Project
Public:
          • Lochwood Branch Dallas County Library
          • New county library facility to be LEED certified
          • Bethel Branch Clermont County Library
              New county library facility
          • United States Post Office Madisonville Branch
              Facility Survey and Renovation Cost Analysis
          • Fairfield City Parks
              Gazebo – Pavilion Prototype
              Recreation courts and fields projects
              Dual use retention pond/recreational tennis & basketball courts
          • City of Oakwood, Planning Committee Member
              City Master Plan Review and Recommendation Committee
Healthcare:
          • Children’s Hospital Medical Center of Dallas
              8-story addition and build-out
              Auto & pedestrian bridge connector
              Morgue project
              NICU, CVICU & CVI step-down mock-ups
          • University of Texas Southwest Medical Center
              Build-out for Spine Clinic, Laser Eye Clinic, and IVF Clinics
          • 7-Rivers Community Hospital
              22-bed patient addition
              National Medical enterprises
          • Riverside Center Medical Office Building
              Design-build spec office building
          • Blue Ash Oncology Lab
              New lab facility and offices
          • Lykes Memorial Hospital Master Plan
              Renovation and additions
              Phasing and asbestos abatement plans
          • Jewish Community Center Nursing Home
              Orthodox senior activity and nursing home and assisted living facility
          • Riverside Community Hospital
              Renovation and Addition
          • Fort Walton Beach Psychiatric Addition
              Humana Hospitals
          • Lykes Memorial Hospital
          Senior Services Center
Recreation:
          •      Jewish Community Center in Dayton
                 New Health & Fitness Club with Indoor Pool and Elevated Running track & bicycle balcony
             • Fairfield City Parks
                 Gazebo Park, tennis court facilities/multi-use retention pond, basketball court/ice skating, xc trail
             • Sturbridge Village Community Center
                 Schematic layouts, space planning and preliminary design for design-build project
Correctional/Institutional:
             • UNICOR Federal Prison Industries
                 Federal Corrections Institute De Soto County, Florida
             • Sarasota State Juvenile Detention Facility
 Assembly/Entertainment/ Hospitality:
             • Cincinnati Ballet Performance Studio
                 Professional dancer training facility & amenities
                 Performance studio and auditorium “black box”
             • Vicksburg Hotel Resort Casino
                 Vicksburg Mississippi Phase I of master plan for Hotel Resort
                 Casino, 613-key 9-story hotel, 4-level parking garage, elevated walkway, swimming pool, & HR
                 bldg.
             • Chilocco Casino Hotel
                 Oklahoma
                 Casino, restaurants, and 3-story hotel
             • Four Winds, Pokagon Hotel, Casino Master Plan – Phase I
New Buffalo, Michigan
                 Phase I Casino with Restaurants, Kids Quest, 4-story parking garage, and remote HR
                 6-story; 162-key suite type hotel fast track phase
             • WinStar Hotel
Thackerville, Oklahoma
                 12-Story Concrete Post-tensioned slab and Concrete Columns 1-story steel joist slab on grade
                 First floor assembly area (restaurant, bar, ball & meeting rooms, and in-house laundry)
                 Adjoining steel structure at property line w 4-hour fire-wall @ Won Door moveable wall.
             • Sheraton Hotel Arlington
Arlington, Texas
                 Architect consultant to resolve code violation “hidden conditions” uncovered during renovation.
                 Researched solution(s) and Coordinated with Owner, Contractor, Code Officials and inspectors.
             • Denver Sheraton Hotel
Denver, Colorado
                 $60 Million– 1225 key Hotel Convention Center Renovation of 8-story & 22 story tower complex
                 133,00 SF meeting, ballroom, exhibition convention center facility.
                 Integral fitness center, pool, restaurant, bar, lounge, reception areas.
                 Incarceration and Correctional Facility
Commercial/Retail:
             • Lake Point Service Center & Office Complex
                 Trammel Crow Design-build project in Orlando
             • Breckenridge IV Office Building
                 TC Design-Build project in Orlando
             • Terrace Collection Retail Center
                 TC Design-build retail center on Busch Boulevard, Tampa
             • Pak ‘N Save Grocery & Warehouse
                 Design-Develop-Construct prototype for new concept grocery/warehouse
Industrial:
             • General Electric Southeast Distribution Center
                 2.5-acre Sabal Park Distribution Center
             • Cincinnati EPA Water treatment Processing Laboratory
                 Roundbottom Road water treatment and test laboratory space planning and equipment layout
             • Franklin Paper Mill coating Facility
                 Existing Facility and Process survey and analysis
Facility production renovation and construction staging plan

More Related Content

Viewers also liked

IPC+HC_ELDER+MEDICAL
IPC+HC_ELDER+MEDICALIPC+HC_ELDER+MEDICAL
IPC+HC_ELDER+MEDICALTony Fanelli
 
Middleboro Strategic Plan
Middleboro Strategic PlanMiddleboro Strategic Plan
Middleboro Strategic PlanJess Jacobs
 
Why is clogging an issue in aeroponics?
Why is clogging an issue in aeroponics?Why is clogging an issue in aeroponics?
Why is clogging an issue in aeroponics?Upstart University
 
Natural Disasters and the Law: The Aftermath of Superstorm Sandy and Its Imp...
Natural Disasters and the Law:  The Aftermath of Superstorm Sandy and Its Imp...Natural Disasters and the Law:  The Aftermath of Superstorm Sandy and Its Imp...
Natural Disasters and the Law: The Aftermath of Superstorm Sandy and Its Imp...Anthony DellaPelle, Esq., CRE
 
Distrifood Interview - Enorme kans voor supers in vers-bewerkt
Distrifood Interview - Enorme kans voor supers in vers-bewerktDistrifood Interview - Enorme kans voor supers in vers-bewerkt
Distrifood Interview - Enorme kans voor supers in vers-bewerktWouter de Heij
 
Convention of security presidential homage zero listo
Convention of security presidential homage zero listoConvention of security presidential homage zero listo
Convention of security presidential homage zero listoProducciones IDENTIDAD CERO
 
EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...
EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...
EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...Ayuntamiento de Málaga
 
Waarom RFEM de optimale rekensoftware is voor uw ingenieurs
Waarom RFEM de optimale rekensoftware is voor uw ingenieursWaarom RFEM de optimale rekensoftware is voor uw ingenieurs
Waarom RFEM de optimale rekensoftware is voor uw ingenieursJo Gijbels
 
Cinetransformer - Brochure ENG 2016
Cinetransformer - Brochure ENG 2016Cinetransformer - Brochure ENG 2016
Cinetransformer - Brochure ENG 2016Cinetransformer
 
18 Travel Goals Everyone Should Have
18 Travel Goals Everyone Should Have18 Travel Goals Everyone Should Have
18 Travel Goals Everyone Should HaveImOnHolidays
 
1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым
1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым
1.4.1 Интервью с продукт-менеджером компании ДКС Антоном ДьяконовымIgor Golovin
 
Diálogos transdisciplinarios en la si nº 2 identidades
Diálogos transdisciplinarios en la si nº 2 identidadesDiálogos transdisciplinarios en la si nº 2 identidades
Diálogos transdisciplinarios en la si nº 2 identidadesEduardo Rojas
 
God vishnu in kushana kingdom of gandhara
God vishnu in kushana kingdom of gandharaGod vishnu in kushana kingdom of gandhara
God vishnu in kushana kingdom of gandharaAdesh Katariya
 

Viewers also liked (20)

Comunicado deportes
Comunicado deportesComunicado deportes
Comunicado deportes
 
Agenda Arquidiocesana Nª 322
Agenda Arquidiocesana Nª 322Agenda Arquidiocesana Nª 322
Agenda Arquidiocesana Nª 322
 
IPC+HC_ELDER+MEDICAL
IPC+HC_ELDER+MEDICALIPC+HC_ELDER+MEDICAL
IPC+HC_ELDER+MEDICAL
 
Middleboro Strategic Plan
Middleboro Strategic PlanMiddleboro Strategic Plan
Middleboro Strategic Plan
 
Why is clogging an issue in aeroponics?
Why is clogging an issue in aeroponics?Why is clogging an issue in aeroponics?
Why is clogging an issue in aeroponics?
 
La constituyente economica
La constituyente economicaLa constituyente economica
La constituyente economica
 
Natural Disasters and the Law: The Aftermath of Superstorm Sandy and Its Imp...
Natural Disasters and the Law:  The Aftermath of Superstorm Sandy and Its Imp...Natural Disasters and the Law:  The Aftermath of Superstorm Sandy and Its Imp...
Natural Disasters and the Law: The Aftermath of Superstorm Sandy and Its Imp...
 
Thoughts
ThoughtsThoughts
Thoughts
 
Distrifood Interview - Enorme kans voor supers in vers-bewerkt
Distrifood Interview - Enorme kans voor supers in vers-bewerktDistrifood Interview - Enorme kans voor supers in vers-bewerkt
Distrifood Interview - Enorme kans voor supers in vers-bewerkt
 
Convention of security presidential homage zero listo
Convention of security presidential homage zero listoConvention of security presidential homage zero listo
Convention of security presidential homage zero listo
 
3 Simple Steps To Master Your Local Marketing
3 Simple Steps To Master Your Local Marketing 3 Simple Steps To Master Your Local Marketing
3 Simple Steps To Master Your Local Marketing
 
Convenioanti t-rex-p-p-2016 - recargado
Convenioanti t-rex-p-p-2016 - recargadoConvenioanti t-rex-p-p-2016 - recargado
Convenioanti t-rex-p-p-2016 - recargado
 
EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...
EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...
EL AYUNTAMIENTO SE SUMA AL PARO INTERNACIONAL DE MUJERES Y A LOS 5 MINUTOS SI...
 
Hola Somos Bialar ! Expertos en Marketing Estratégico Agropecuario.
Hola Somos Bialar !  Expertos en Marketing Estratégico Agropecuario.Hola Somos Bialar !  Expertos en Marketing Estratégico Agropecuario.
Hola Somos Bialar ! Expertos en Marketing Estratégico Agropecuario.
 
Waarom RFEM de optimale rekensoftware is voor uw ingenieurs
Waarom RFEM de optimale rekensoftware is voor uw ingenieursWaarom RFEM de optimale rekensoftware is voor uw ingenieurs
Waarom RFEM de optimale rekensoftware is voor uw ingenieurs
 
Cinetransformer - Brochure ENG 2016
Cinetransformer - Brochure ENG 2016Cinetransformer - Brochure ENG 2016
Cinetransformer - Brochure ENG 2016
 
18 Travel Goals Everyone Should Have
18 Travel Goals Everyone Should Have18 Travel Goals Everyone Should Have
18 Travel Goals Everyone Should Have
 
1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым
1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым
1.4.1 Интервью с продукт-менеджером компании ДКС Антоном Дьяконовым
 
Diálogos transdisciplinarios en la si nº 2 identidades
Diálogos transdisciplinarios en la si nº 2 identidadesDiálogos transdisciplinarios en la si nº 2 identidades
Diálogos transdisciplinarios en la si nº 2 identidades
 
God vishnu in kushana kingdom of gandhara
God vishnu in kushana kingdom of gandharaGod vishnu in kushana kingdom of gandhara
God vishnu in kushana kingdom of gandhara
 

Similar to Helen Mannea Project Experience

Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentationTomKummer
 
LP Introduction
LP IntroductionLP Introduction
LP Introductionrennis
 
Phoenix Contractors, Inc. Presentation
Phoenix Contractors, Inc. PresentationPhoenix Contractors, Inc. Presentation
Phoenix Contractors, Inc. PresentationMark Hiser
 
Lp Presentation
Lp PresentationLp Presentation
Lp Presentationspourvakil
 
Introduction to LP Consulting Engineers
Introduction to LP Consulting EngineersIntroduction to LP Consulting Engineers
Introduction to LP Consulting Engineersjdedora
 
Comox Valley Community Presentation - December 8, 2015
Comox Valley Community Presentation - December 8, 2015Comox Valley Community Presentation - December 8, 2015
Comox Valley Community Presentation - December 8, 2015Island Health
 
Campbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationCampbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationIsland Health
 
Draft space plan_del_wg
Draft space plan_del_wgDraft space plan_del_wg
Draft space plan_del_wgnorthvanrec
 
Willard-Sherwood Health and Community Center Community Open House 01-29-2022
Willard-Sherwood Health and Community Center Community Open House 01-29-2022Willard-Sherwood Health and Community Center Community Open House 01-29-2022
Willard-Sherwood Health and Community Center Community Open House 01-29-2022Fairfax County
 
Willard Sherwood Virtual Community Open House #1 - 01-26-2022
Willard Sherwood Virtual Community Open House #1 -  01-26-2022Willard Sherwood Virtual Community Open House #1 -  01-26-2022
Willard Sherwood Virtual Community Open House #1 - 01-26-2022Fairfax County
 
The 5 Billion Dollar Mile in Frisco Texas (#5BMile)
The 5 Billion Dollar Mile in Frisco Texas (#5BMile)The 5 Billion Dollar Mile in Frisco Texas (#5BMile)
The 5 Billion Dollar Mile in Frisco Texas (#5BMile)Dave Quinn, CEcD
 
Willard-Sherwood Health and Community Center Community Open House 01-26-2022
Willard-Sherwood Health and Community Center Community Open House 01-26-2022Willard-Sherwood Health and Community Center Community Open House 01-26-2022
Willard-Sherwood Health and Community Center Community Open House 01-26-2022Fairfax County
 
Benya 2011
Benya 2011Benya 2011
Benya 2011JBenya
 
Van Winkle Portfolio 2012 07
Van Winkle  Portfolio 2012 07Van Winkle  Portfolio 2012 07
Van Winkle Portfolio 2012 07kmvanwinkle
 
Campbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentationCampbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentationIsland Health
 
1510 James Kringpdf
1510 James Kringpdf1510 James Kringpdf
1510 James Kringpdfbrian3226
 
Arboretum community meeting 01.22.19 final
Arboretum community meeting   01.22.19   finalArboretum community meeting   01.22.19   final
Arboretum community meeting 01.22.19 finalRamaChilamkurthy
 
Polytec Presentation
Polytec PresentationPolytec Presentation
Polytec Presentationdambram
 

Similar to Helen Mannea Project Experience (20)

Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentation
 
LP Introduction
LP IntroductionLP Introduction
LP Introduction
 
Phoenix Contractors, Inc. Presentation
Phoenix Contractors, Inc. PresentationPhoenix Contractors, Inc. Presentation
Phoenix Contractors, Inc. Presentation
 
Lp Presentation
Lp PresentationLp Presentation
Lp Presentation
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
George Sorich CV
George Sorich CVGeorge Sorich CV
George Sorich CV
 
Introduction to LP Consulting Engineers
Introduction to LP Consulting EngineersIntroduction to LP Consulting Engineers
Introduction to LP Consulting Engineers
 
Comox Valley Community Presentation - December 8, 2015
Comox Valley Community Presentation - December 8, 2015Comox Valley Community Presentation - December 8, 2015
Comox Valley Community Presentation - December 8, 2015
 
Campbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationCampbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce Presentation
 
Draft space plan_del_wg
Draft space plan_del_wgDraft space plan_del_wg
Draft space plan_del_wg
 
Willard-Sherwood Health and Community Center Community Open House 01-29-2022
Willard-Sherwood Health and Community Center Community Open House 01-29-2022Willard-Sherwood Health and Community Center Community Open House 01-29-2022
Willard-Sherwood Health and Community Center Community Open House 01-29-2022
 
Willard Sherwood Virtual Community Open House #1 - 01-26-2022
Willard Sherwood Virtual Community Open House #1 -  01-26-2022Willard Sherwood Virtual Community Open House #1 -  01-26-2022
Willard Sherwood Virtual Community Open House #1 - 01-26-2022
 
The 5 Billion Dollar Mile in Frisco Texas (#5BMile)
The 5 Billion Dollar Mile in Frisco Texas (#5BMile)The 5 Billion Dollar Mile in Frisco Texas (#5BMile)
The 5 Billion Dollar Mile in Frisco Texas (#5BMile)
 
Willard-Sherwood Health and Community Center Community Open House 01-26-2022
Willard-Sherwood Health and Community Center Community Open House 01-26-2022Willard-Sherwood Health and Community Center Community Open House 01-26-2022
Willard-Sherwood Health and Community Center Community Open House 01-26-2022
 
Benya 2011
Benya 2011Benya 2011
Benya 2011
 
Van Winkle Portfolio 2012 07
Van Winkle  Portfolio 2012 07Van Winkle  Portfolio 2012 07
Van Winkle Portfolio 2012 07
 
Campbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentationCampbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentation
 
1510 James Kringpdf
1510 James Kringpdf1510 James Kringpdf
1510 James Kringpdf
 
Arboretum community meeting 01.22.19 final
Arboretum community meeting   01.22.19   finalArboretum community meeting   01.22.19   final
Arboretum community meeting 01.22.19 final
 
Polytec Presentation
Polytec PresentationPolytec Presentation
Polytec Presentation
 

Helen Mannea Project Experience

  • 1. HELEN L. MANNEA, NCARB, AIA Dallas/Fort Worth, Texas 214-632-1760 hlmannea@gmail.com PROJECT EXPERIENCE Educational: • Hillsboro Community College New Technology Building Laboratories, Auditorium & Classrooms • Hillsboro & Orange County Schools School prototypes developed for specific sites in Florida K-5; 6-8; and High School facilities • DeSoto and Florida County Schools New High School facilities • Ohio Schools Facilities Commission Various Ohio county school district surveys • University of Miami, Oxford Cafeteria Addition and Renovation Project Public: • Lochwood Branch Dallas County Library • New county library facility to be LEED certified • Bethel Branch Clermont County Library New county library facility • United States Post Office Madisonville Branch Facility Survey and Renovation Cost Analysis • Fairfield City Parks Gazebo – Pavilion Prototype Recreation courts and fields projects Dual use retention pond/recreational tennis & basketball courts • City of Oakwood, Planning Committee Member City Master Plan Review and Recommendation Committee Healthcare: • Children’s Hospital Medical Center of Dallas 8-story addition and build-out Auto & pedestrian bridge connector Morgue project NICU, CVICU & CVI step-down mock-ups • University of Texas Southwest Medical Center Build-out for Spine Clinic, Laser Eye Clinic, and IVF Clinics • 7-Rivers Community Hospital 22-bed patient addition National Medical enterprises • Riverside Center Medical Office Building Design-build spec office building • Blue Ash Oncology Lab New lab facility and offices • Lykes Memorial Hospital Master Plan Renovation and additions Phasing and asbestos abatement plans • Jewish Community Center Nursing Home Orthodox senior activity and nursing home and assisted living facility • Riverside Community Hospital Renovation and Addition • Fort Walton Beach Psychiatric Addition Humana Hospitals • Lykes Memorial Hospital Senior Services Center
  • 2. Recreation: • Jewish Community Center in Dayton New Health & Fitness Club with Indoor Pool and Elevated Running track & bicycle balcony • Fairfield City Parks Gazebo Park, tennis court facilities/multi-use retention pond, basketball court/ice skating, xc trail • Sturbridge Village Community Center Schematic layouts, space planning and preliminary design for design-build project Correctional/Institutional: • UNICOR Federal Prison Industries Federal Corrections Institute De Soto County, Florida • Sarasota State Juvenile Detention Facility Assembly/Entertainment/ Hospitality: • Cincinnati Ballet Performance Studio Professional dancer training facility & amenities Performance studio and auditorium “black box” • Vicksburg Hotel Resort Casino Vicksburg Mississippi Phase I of master plan for Hotel Resort Casino, 613-key 9-story hotel, 4-level parking garage, elevated walkway, swimming pool, & HR bldg. • Chilocco Casino Hotel Oklahoma Casino, restaurants, and 3-story hotel • Four Winds, Pokagon Hotel, Casino Master Plan – Phase I New Buffalo, Michigan Phase I Casino with Restaurants, Kids Quest, 4-story parking garage, and remote HR 6-story; 162-key suite type hotel fast track phase • WinStar Hotel Thackerville, Oklahoma 12-Story Concrete Post-tensioned slab and Concrete Columns 1-story steel joist slab on grade First floor assembly area (restaurant, bar, ball & meeting rooms, and in-house laundry) Adjoining steel structure at property line w 4-hour fire-wall @ Won Door moveable wall. • Sheraton Hotel Arlington Arlington, Texas Architect consultant to resolve code violation “hidden conditions” uncovered during renovation. Researched solution(s) and Coordinated with Owner, Contractor, Code Officials and inspectors. • Denver Sheraton Hotel Denver, Colorado $60 Million– 1225 key Hotel Convention Center Renovation of 8-story & 22 story tower complex 133,00 SF meeting, ballroom, exhibition convention center facility. Integral fitness center, pool, restaurant, bar, lounge, reception areas. Incarceration and Correctional Facility Commercial/Retail: • Lake Point Service Center & Office Complex Trammel Crow Design-build project in Orlando • Breckenridge IV Office Building TC Design-Build project in Orlando • Terrace Collection Retail Center TC Design-build retail center on Busch Boulevard, Tampa • Pak ‘N Save Grocery & Warehouse Design-Develop-Construct prototype for new concept grocery/warehouse Industrial: • General Electric Southeast Distribution Center 2.5-acre Sabal Park Distribution Center • Cincinnati EPA Water treatment Processing Laboratory Roundbottom Road water treatment and test laboratory space planning and equipment layout • Franklin Paper Mill coating Facility Existing Facility and Process survey and analysis
  • 3. Facility production renovation and construction staging plan