PROJECTS IN  “INGERSOLL RAND ”, AHMD, ROTARY PRODUCTION DEPARTMENT Project 1.Visual Factory, Project 2. Kan Ban, Project 3. Productivity improvement in Rotary
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Based on their annual consumption value
Introduction of Team Members
Production Manager, Rotary
PHASE 1: ROTARY, INVENTORY STORES Project 1: Visual Factory
NPD STORE ,[object Object],Lay out of Racks Present layout Proposed A B C M/C 1 M/C 2
[object Object],MAIN STORE ,[object Object],[object Object],[object Object],Colors chosen: Constraints for Visuals in Stores: Shadow concept was introduced in stores: Red: For Motors Blue: For Coolers Green: For Fan Brown: For Foam Sets Yellow: For items with no location defined
Kan Ban Triggering Board Mother store Stores… Old Format New Format ROTARY KAN BAN BOARD DATES MONTH SUN 1 2 3 4 5 6 JAN JUL MON 7 8 9 10 11 DELAY FEB AUG TUE 12 13 14 15 16 DELAY MAR SEP WED 17 18 19 20 21 DELAY APRIL OCT THUS 22 23 24 25 26 MAY NOV FRI 27 28 29 30 31 NO SCRATCH JUN DEC SAT RACK NO ROTARY KAN BAN DELAY DATES 1-7 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   8-15 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   16-24 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   25-34 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   35-40 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH  
Kan Ban Triggering Board Mother store Stores… OLD NEW Uniform Distribution of cards is evident, with new format
Mother store Stores…
Mother store Stores… CCNC No.xxx Name: abc Loc.:RO xxx
PHASE 2: ROTARY, ASSEMBLY Project 1: Visual Factory
[object Object],[object Object],[object Object],Assembly area…
Assembly area…
Assembly area…
Assembly area… Quadrant 1: Pareto analysis of last 15 Days Quadrant 2: FPY status for the month Quadrant 3: Current FPY issues and corresponding actions Quadrant 4: Issues in Pareto and corresponding actions
Project 2: Productivity improvement for Rotary (MIS) Phase 1: FPY Report analysis
FPY Report analysis… Pareto analysis
FPY Report analysis… Root Cause analysis (Fish Bone Diagram)
Phase 2: MIS Assembly Flow line ( Proposed)
MIS Flow Line…
MIS Flow Line… Cycle Time = 1415 min (Avg.) Precedence diagram of current Procedure
MIS Flow Line…
MIS Flow Line…
WORKING OF ASSEMBLY LINE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MIS Flow Line…
Cost of operating the line ,[object Object],[object Object],[object Object],MIS Flow Line… ,[object Object],[object Object],[object Object],Saving in operations: -  => 6X - 5.4X = 0.6X  1 2 1 2 Salary of skilled Associate = X Salary of apprentice associate = 0.1X
Productivity improvement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MIS Flow Line…
Benefits of Line assembly to Batch assembly MIS Flow Line…
Project 3: Kan Ban extension and analysis Rotary Phase 1: Analysis of existing system
Implementation of Kan Ban   COMPARISON OF INVENTORY LEVEL/VALUE OF AVERAGE STOCK ON HAND BEFORE AND AFTER IMPLEMENTATION OF KAN BAN (EXPECTED) KAN BAN… Kan Ban was implemented for 94 items in Rotary Store May  June Average  After Kan implementation Quantity on hand 13318 11207 12,262 3384 Value (Rs.) 6, 78,046.86/- 6,  33 ,214.26/- 6, 55,631/- 1, 80,937
Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],KAN BAN…
KAN BAN… Kan Ban is recently implemented and has brought down the inventory level The reasons for increase in inventory level found due to pending orders were not cancelled at the time of implementation.
For item we can see huge variation in month of March, where stock level has reached at its lowest value, ‘Zero’. While searching for the cause, we were able to find out that company had quality issue with supplier of this particular category Limits with KB = 94 Limits with KB = 60 This was a case where Kan Ban quantity was decreased after negotiating with supplier. But inventory was found outside the control limits.  Therefore close monitoring is required. KAN BAN…
KAN BAN… Limits with KB Qty = 75 Limits with KB Qty = 50 Error was found Here the average quantity in stock was higher than was necessary so Kan Ban quantity was reduced to50 The item was found to be a part of set, which comes with other items of that particular set only. But system was showing higher quantity i.e. > 8. Therefore, DIT is required.
Kan Ban Quantity = 50 Average consumption = 40 System stock = 13 Physical stock = 169 This variation in Physical stock and system was found due to the duplicate CCNC No. for imported as well as local item. Binning was same for both the items Still the stock recorded is well above the control limit. Therefore DIT is required KAN BAN…
Inference ,[object Object],[object Object],[object Object],KAN BAN…
Suggestions ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],Suggestions
Suggestions ,[object Object]

More Related Content

Similar to Ingersoll rand, hiten, mba operations

Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015exerciselean
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Uop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--newUop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--newindi7257
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.pptMehulDatta1
 
UOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.comUOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.comthomashard90
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_indi7257
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...ramuaa129
 
Demand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingDemand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingbisal6
 
Sansera Project Report
Sansera Project ReportSansera Project Report
Sansera Project Reportsohilsha
 
CIM report - final
CIM report - finalCIM report - final
CIM report - finalPraveen S R
 
Kanban board in cutting department1
Kanban board in cutting department1Kanban board in cutting department1
Kanban board in cutting department1AbhilekhThakur2
 
Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply ChainSushovan Bej
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsTanuj Kujur
 

Similar to Ingersoll rand, hiten, mba operations (20)

Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
 
A kanban scrum mashup to deliver fp projects
A kanban scrum mashup to deliver fp projectsA kanban scrum mashup to deliver fp projects
A kanban scrum mashup to deliver fp projects
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
 
zone 3 ppt.pptx
zone 3 ppt.pptxzone 3 ppt.pptx
zone 3 ppt.pptx
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Uop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--newUop ops-571-final-exam-guide- april-2018--new
Uop ops-571-final-exam-guide- april-2018--new
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt
 
UOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.comUOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.com
 
Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_Uop ops-571-final-exam-guide- new--2018_
Uop ops-571-final-exam-guide- new--2018_
 
Lean Assessment 03-09-11
Lean Assessment 03-09-11Lean Assessment 03-09-11
Lean Assessment 03-09-11
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
Demand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingDemand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturing
 
Sansera Project Report
Sansera Project ReportSansera Project Report
Sansera Project Report
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
Kanban board in cutting department1
Kanban board in cutting department1Kanban board in cutting department1
Kanban board in cutting department1
 
Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply Chain
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 

Ingersoll rand, hiten, mba operations

  • 1. PROJECTS IN “INGERSOLL RAND ”, AHMD, ROTARY PRODUCTION DEPARTMENT Project 1.Visual Factory, Project 2. Kan Ban, Project 3. Productivity improvement in Rotary
  • 2.
  • 5. PHASE 1: ROTARY, INVENTORY STORES Project 1: Visual Factory
  • 6.
  • 7.
  • 8. Kan Ban Triggering Board Mother store Stores… Old Format New Format ROTARY KAN BAN BOARD DATES MONTH SUN 1 2 3 4 5 6 JAN JUL MON 7 8 9 10 11 DELAY FEB AUG TUE 12 13 14 15 16 DELAY MAR SEP WED 17 18 19 20 21 DELAY APRIL OCT THUS 22 23 24 25 26 MAY NOV FRI 27 28 29 30 31 NO SCRATCH JUN DEC SAT RACK NO ROTARY KAN BAN DELAY DATES 1-7 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   8-15 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   16-24 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   25-34 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH   35-40 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16   17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NO SCRATCH  
  • 9. Kan Ban Triggering Board Mother store Stores… OLD NEW Uniform Distribution of cards is evident, with new format
  • 11. Mother store Stores… CCNC No.xxx Name: abc Loc.:RO xxx
  • 12. PHASE 2: ROTARY, ASSEMBLY Project 1: Visual Factory
  • 13.
  • 16. Assembly area… Quadrant 1: Pareto analysis of last 15 Days Quadrant 2: FPY status for the month Quadrant 3: Current FPY issues and corresponding actions Quadrant 4: Issues in Pareto and corresponding actions
  • 17. Project 2: Productivity improvement for Rotary (MIS) Phase 1: FPY Report analysis
  • 18. FPY Report analysis… Pareto analysis
  • 19. FPY Report analysis… Root Cause analysis (Fish Bone Diagram)
  • 20. Phase 2: MIS Assembly Flow line ( Proposed)
  • 22. MIS Flow Line… Cycle Time = 1415 min (Avg.) Precedence diagram of current Procedure
  • 25.
  • 26.
  • 27.
  • 28. Benefits of Line assembly to Batch assembly MIS Flow Line…
  • 29. Project 3: Kan Ban extension and analysis Rotary Phase 1: Analysis of existing system
  • 30. Implementation of Kan Ban   COMPARISON OF INVENTORY LEVEL/VALUE OF AVERAGE STOCK ON HAND BEFORE AND AFTER IMPLEMENTATION OF KAN BAN (EXPECTED) KAN BAN… Kan Ban was implemented for 94 items in Rotary Store May June Average After Kan implementation Quantity on hand 13318 11207 12,262 3384 Value (Rs.) 6, 78,046.86/- 6, 33 ,214.26/- 6, 55,631/- 1, 80,937
  • 31.
  • 32. KAN BAN… Kan Ban is recently implemented and has brought down the inventory level The reasons for increase in inventory level found due to pending orders were not cancelled at the time of implementation.
  • 33. For item we can see huge variation in month of March, where stock level has reached at its lowest value, ‘Zero’. While searching for the cause, we were able to find out that company had quality issue with supplier of this particular category Limits with KB = 94 Limits with KB = 60 This was a case where Kan Ban quantity was decreased after negotiating with supplier. But inventory was found outside the control limits. Therefore close monitoring is required. KAN BAN…
  • 34. KAN BAN… Limits with KB Qty = 75 Limits with KB Qty = 50 Error was found Here the average quantity in stock was higher than was necessary so Kan Ban quantity was reduced to50 The item was found to be a part of set, which comes with other items of that particular set only. But system was showing higher quantity i.e. > 8. Therefore, DIT is required.
  • 35. Kan Ban Quantity = 50 Average consumption = 40 System stock = 13 Physical stock = 169 This variation in Physical stock and system was found due to the duplicate CCNC No. for imported as well as local item. Binning was same for both the items Still the stock recorded is well above the control limit. Therefore DIT is required KAN BAN…
  • 36.
  • 37.
  • 38.
  • 39.

Editor's Notes

  1. Ingersoll Rand’s Business Operating System Module Supplier On-Site Assessment BEFORE MOVING FORWARD WITH THIS MODULE PLEASE CHECK IRBOS WEBSITE TO ENSURE YOU HAVE THE MOST CURRENT REVISION! Notes to Instructor: Qualifications to teach this course: Instructor should have participated in at least two Supplier On-Site Assessments Instructor should have led at least one Supplier On-Site Assessment Instructor should be comfortable fielding questions on the Supplier On-Site Assessment Class Preparation Instructor should make themselves familiar with the area that the class attendees will be coming from as to site examples that would relate to this area Classes should be no larger than 15-20 in size to control the level of engagement Create an agenda so the class understands the timing Class Materials PC and projector for slides Flip Chart and Marker